Ordinance No. 3,69631006 -4
ORDINANCE NO. 3696
AN ORDINANCE OF THE CITY COUNCIL FOR THE CITY OF
BAYTOWN AUTHORIZING CHANGE ORDER NO. I TO THE CONTRACT
WITH ANGEL BROTHERS ENTERPRISE, INC. FOR THE CITY OF
BAYTOWN 1983 STREET IMPROVEMENT PROGRAM.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: That the City Council does hereby authorize Change Order No. I
to the contract with Angel Brothers Enterprises, Inc. for the 1983 Street
Improvement Program for the City of Baytown. A copy of said change order is
attached hereto marked "Exhibit A ", and made a part hereof for all intents and
purposes.
Section 2: This Ordinance shall take effect immediately from and after its
passage by the City Council of the City of Baytown.
INTRODUCED, READ, and PASSED by the affirmative vote of the City
Council of the City of Baytown, this the 6th day of October, 1983.
ALLEN CANNON, Mayor
ATTEST:
J
EILEEN P. HALL, City 4Clerk
APPROVED:
RANDALL B. STRONG, City Atoeney
31006 -4a
CITY OF BAYTOWN
1983 STREET IMPROVEMENT PROGRAM
CHANGE ORDER No. 1
OCTOBER 3, 1983
Angel. Brothers Enterprises, Inc.
P.O. Box 3926
Baytown, Texas 77520
Gentlemen:
We propose to DELETE the following changes to your present contract:
Item
No. Quant Unit Descri tion Cost Amount
1 330 Ton Hot mix asphaltic $40.00 $ 13,200.00
3 1,415 Ton
4 2,420 Cal
conc, 1" level up
(100 lbs /s.y.), CIP
Hot mix asphaltic
conc, 1.75" thick
(200 lbs /s.y.) in-
cluding blading
road shoulders 2'
wide for length of
street & clean up
of mat'l, CIP
Asphaltic mat'l,
prime coat or
tack coat (0.17
gal /s.y.), CIP
TOTAL
38.00 53,770.00
1.00 2,420.00
$ 69,390.00
We also propose to ADD the following to the contract:
2 1,015 Ton Hot mix asphaltic 40.00
conc, 1.5" thick
(170 lbs /s.y.),CIP
3 500 Ton Hot mix asphaltic 38.00
conc, 1.75" thick
(200 lbs /s.y.) in-
cluding blading
road shoulders 2'
wide for length of
street & clean up
of mat'l, CIP
EXHIBIT A
40,600.00
19,000.00
31006 -4b
1983 Street Improvement Program
Change Order No. 1
October 3, 1983
Item
No. Quant Unit Description Cost Amount
4 2,820 Gal Asphaltic mat'l, $ 1.00 $ 2,820.00
N
49,077.50
18,900.00
3,600.00
2,550.00
31,500.00
4,000.00
prime coat or
tack coat (0.17
gal /s.y.), CIP
6 14,650
S.Y. Reconstruct exist-
3.35
ing base mat'l to
a depth of 8" in-
cluding lime & Lime
stabilization (30
lbs /s.y.) as per
specs, CIP
7 1,050
Ton Crushed limestone
18.00
base mat'l (4,000
lbs /e.y.), CIP
8 600
S.F. Cone sidewalk 4"
6.00
thick w /1" sand
bedding including
saw cutting, re-
moval of existing
cone, hauling &
excavation, CIP
9 600
S.F. Cone driveway 5"
4.25
thick w /1'sand
bedding including
saw cutting, re-
moval of existing
cone, hauling &
excavation, CIP
10 2,100
L.F. Cone curb & gutter
15.00
w /4" cement stabil-
ized sand bedding
including saw cut-
ting, removal of
existing cone,
hauling, & excava-
tion, CIP
11 1,000
S.F. Conc valley gutter
4.00
6" thick w /4" ce-
ment stabilized
sand including saw
cutting, removal
of existing cone,
hauling, & excava-
tion, CIP
N
49,077.50
18,900.00
3,600.00
2,550.00
31,500.00
4,000.00
1983 Street Improvement Program 31006 -4c
Change Order No. 1
October 3, 1983
Item
No.
Quant Unit Description
Cost
Amount
13
700 C.Y. Salvage & reuse
$ 7.00
$ 4,900.00
existing base mat'1
in place to the
depth specified on
the plans, CIP
14
260 C.Y. Salvage & reuse
30.00
7,800.00
existing base mat'1
& haul to desig-
nated site, CIP
15
550 C.Y. Excavation of mat'1
7.00
3,850.00
(subgrade) & haul to
designated site, CIP
16
2 Each Adjust water valve
75.00
150.00
box, CIP
TOTAL
$188,747.50
ADD
20 work days to the original 75 days allowed for
completion of job.
Original Contract -- $379,912.75
Total Addition -- 119,357.50
Net Amount of Contract - $499,270.25
If these
changes meet with your approval, please
sign this
document and
return to the
Engineering Department. A signed copy
will be
returned to you.
Sincerely,
Norman Dykes, P.E.
City Engineer /Director of
Public
Works
APPROVED: APPROVED:
City of Baytown Angel Brothers Enterprises, Inc.
By_
Date
ES /Ic
3
By_
Date