Loading...
Ordinance No. 3,69631006 -4 ORDINANCE NO. 3696 AN ORDINANCE OF THE CITY COUNCIL FOR THE CITY OF BAYTOWN AUTHORIZING CHANGE ORDER NO. I TO THE CONTRACT WITH ANGEL BROTHERS ENTERPRISE, INC. FOR THE CITY OF BAYTOWN 1983 STREET IMPROVEMENT PROGRAM. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. I to the contract with Angel Brothers Enterprises, Inc. for the 1983 Street Improvement Program for the City of Baytown. A copy of said change order is attached hereto marked "Exhibit A ", and made a part hereof for all intents and purposes. Section 2: This Ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ, and PASSED by the affirmative vote of the City Council of the City of Baytown, this the 6th day of October, 1983. ALLEN CANNON, Mayor ATTEST: J EILEEN P. HALL, City 4Clerk APPROVED: RANDALL B. STRONG, City Atoeney 31006 -4a CITY OF BAYTOWN 1983 STREET IMPROVEMENT PROGRAM CHANGE ORDER No. 1 OCTOBER 3, 1983 Angel. Brothers Enterprises, Inc. P.O. Box 3926 Baytown, Texas 77520 Gentlemen: We propose to DELETE the following changes to your present contract: Item No. Quant Unit Descri tion Cost Amount 1 330 Ton Hot mix asphaltic $40.00 $ 13,200.00 3 1,415 Ton 4 2,420 Cal conc, 1" level up (100 lbs /s.y.), CIP Hot mix asphaltic conc, 1.75" thick (200 lbs /s.y.) in- cluding blading road shoulders 2' wide for length of street & clean up of mat'l, CIP Asphaltic mat'l, prime coat or tack coat (0.17 gal /s.y.), CIP TOTAL 38.00 53,770.00 1.00 2,420.00 $ 69,390.00 We also propose to ADD the following to the contract: 2 1,015 Ton Hot mix asphaltic 40.00 conc, 1.5" thick (170 lbs /s.y.),CIP 3 500 Ton Hot mix asphaltic 38.00 conc, 1.75" thick (200 lbs /s.y.) in- cluding blading road shoulders 2' wide for length of street & clean up of mat'l, CIP EXHIBIT A 40,600.00 19,000.00 31006 -4b 1983 Street Improvement Program Change Order No. 1 October 3, 1983 Item No. Quant Unit Description Cost Amount 4 2,820 Gal Asphaltic mat'l, $ 1.00 $ 2,820.00 N 49,077.50 18,900.00 3,600.00 2,550.00 31,500.00 4,000.00 prime coat or tack coat (0.17 gal /s.y.), CIP 6 14,650 S.Y. Reconstruct exist- 3.35 ing base mat'l to a depth of 8" in- cluding lime & Lime stabilization (30 lbs /s.y.) as per specs, CIP 7 1,050 Ton Crushed limestone 18.00 base mat'l (4,000 lbs /e.y.), CIP 8 600 S.F. Cone sidewalk 4" 6.00 thick w /1" sand bedding including saw cutting, re- moval of existing cone, hauling & excavation, CIP 9 600 S.F. Cone driveway 5" 4.25 thick w /1'sand bedding including saw cutting, re- moval of existing cone, hauling & excavation, CIP 10 2,100 L.F. Cone curb & gutter 15.00 w /4" cement stabil- ized sand bedding including saw cut- ting, removal of existing cone, hauling, & excava- tion, CIP 11 1,000 S.F. Conc valley gutter 4.00 6" thick w /4" ce- ment stabilized sand including saw cutting, removal of existing cone, hauling, & excava- tion, CIP N 49,077.50 18,900.00 3,600.00 2,550.00 31,500.00 4,000.00 1983 Street Improvement Program 31006 -4c Change Order No. 1 October 3, 1983 Item No. Quant Unit Description Cost Amount 13 700 C.Y. Salvage & reuse $ 7.00 $ 4,900.00 existing base mat'1 in place to the depth specified on the plans, CIP 14 260 C.Y. Salvage & reuse 30.00 7,800.00 existing base mat'1 & haul to desig- nated site, CIP 15 550 C.Y. Excavation of mat'1 7.00 3,850.00 (subgrade) & haul to designated site, CIP 16 2 Each Adjust water valve 75.00 150.00 box, CIP TOTAL $188,747.50 ADD 20 work days to the original 75 days allowed for completion of job. Original Contract -- $379,912.75 Total Addition -- 119,357.50 Net Amount of Contract - $499,270.25 If these changes meet with your approval, please sign this document and return to the Engineering Department. A signed copy will be returned to you. Sincerely, Norman Dykes, P.E. City Engineer /Director of Public Works APPROVED: APPROVED: City of Baytown Angel Brothers Enterprises, Inc. By_ Date ES /Ic 3 By_ Date