Ordinance No. 3,66030911 --1 ORDINANCE NO. 3660 AN ORDINANCE AUTHORIZING THE PAYMENT OF SIXTY ONE THOUSAND FOUR HUNDRED TWENTY AND NO /100 ($61,420.00) DOLLARS TO EXXON PIPELINE COMPANY AS THE COST OF ADJUSTING AN UNDERGROUND PIPELINE CROSSED BY THE BAYWAY DRIVE /BAKER ROAD DRAINAGE DITCH; AUTHORIZING THE CITY MANAGER TO EXECUTE THE NECESSARY COMMITMENTS; AND PROVIDING THE EFFECTIVE DATE HEREOF. WHEREAS, the proposed Bayway Drive /Baker Road Drainage Ditch crosses an Exxon Pipeline Company pipeline; and WHEREAS, this pipeline must be adjusted for the protection of these lines and for the protection of the public due to the placement of drainage structures under them; and WHEREAS, the estimated cost of such work is Sixty One Thousand Four Hundred Twenty and No /100 ($61,420.00) Dollars, as shown on the attached Exhibit "A ", which is made a part hereof for all intents and purposes, and the City Council of the City of Baytown desires to authorize payment of such amount; NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown hereby authorizes the payment of Sixty One Thousand Four Hundred Twenty and No /100 ($61,420.00) Dollars to Exxon Pipeline Company for the adjustments as shown on the attached Exhibit "A." Section 2: The City Manager is hereby authorized to execute the attached letter of agreement whereby the City agrees to reimburse this cost to Exxon Pipeline Company. Section 3: This Ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ, and PASSED by the affirmative vote of the City Council of the City of Baytown, this the 11th day of August, 1983. ALLEN CANNON, Mayor 30811 -1a ATTEST: '=enaa,' LYNDA KILGORE, Dep y City Clerk APPROVED: aRANDALL & S NG, C' torney E7jzON PIPELINE COMPANY POST OFFICE BOX 2220 • HOuISTON. TEXAS 77001 WM H HOFFMAN MANAGER, RIGHT CF WAY. CLAIMS & PUBLIC AFFAIRS Mr. Ed Shackelford City of Baytown P. 0. Box 424 Baytown, Texas 77520 Dear Mr. Shackelford: 30811 -lb March 23, 1983 Work Performed for Others Satsuma- Baytown Baker Road "Superditch" Harris County, Texas Attached for your review and handling are five copies of a detailed cost estimate in the amount of $61,420 to raise our 10 -inch pipeline approximately 2.5 feet to allow six 41 x 81 concrete box culverts to be placed beneath our pipelines in conjunction with the City of Baytown's Bayway Drive /Baker Road "Superditch.11 We are unable to consider lowering our lines at this location due to the existence of pipelines belonging to Seagull Pipeline Company which cross our lines at this same location. PIease note that the attached calculation is an estimate only and must not be acted upon in any manner as a contractual commitment. The actual costs can only be determined when the alterations are complete and may well be more or less than the amount estimated. Upon receipt of an executed duplicate of this letter whereby it is agreed that the City of Baytown will reimburse Exxon Pipeline Company 100% of its actual costs to make the adjustments, along with a certified copy of the City Council minutes authorizing execution of this agreement, we will proceed with the work at the earliest possible date. If you have any questions, please contact RJD:tgm Attachments c: Mr. J. M. Betsill ACCEPTED AND AGREED TO THIS day of 1983 CITY OF BAYTOWN By Title me at 656 -3732. Ver truly yo rs �on old PL- 65914 -77) FRONT DATE 3 -7 -83 COMPLETE DESCRIPTI 3081.1 -1c E&ON PIPELINE COMPANY ESTIMATE OF EXPENDITURES CHARGEABLE TO OTHERS (AFE'S CHARGEABLE TO ACCOUNT 19.2) LOCATiON OF WORK TO BE PERFORMED Baytown #1- Houston 10" Products Loc. 522 WORK TO BE PERFORMED 1FE NO. 9.2 Double Stopple and replace with new pipe approx. 110' of ZO" line, raising the elevation approx. 2 -1/2 feet. Reason: To allow for 6 -4'x8' concrete box culverts to be placed beneath the pipeline system in conjunction with the City of Baytown "Superditch." 100% Reimbursable: City of Baytown P. O. Box 424 Baytown, Texas 77520 "TOTE: This Estimate good for 90 days only. • COMPANY LABOR IDESCRI Foreman, 6 days @ $130 /day Gang, 4 men /6 days @ $100 /day ea. Welder w /helper, 6 days @ $384.50 /day Engineering PERSONAL EXPENSES OF COMPANY EMPLOYEES IDESCRIPTION COMPANY VEHICLE AND EQUIPMENT EXPENSE IDESCRIPTION Gang truck, 6 days @ $40 /day Welding truck, 6 days @ $100 /day MATERIALS DESCRIPTION (a) PIPE: 120' pipe 10 ", 0.365" w. t., Gr. B, Smis. 4 - 10 ", 300, 5' Radius lends (b) OTHER- 2 - 10" ANSI G00 stopple fittings (complete) 2 - 10" ANSI 600 blind flange 2 - 2" T -O -R Fittings (complete) Tape coat and primer AMOUNT I TOTAL 780 2,400 2,300 400 240 600 2,675 1,800 3,880 500 500 100 5,880 ,M 9,455 rz A AV I UIT L�LIIYL ti -" � I A L 6»`.J Id 7.1 6 A C K ESTIM' 71 OF EXPENDITURES CHARGEABLE TO HERS — _ CONTRa,_ . LABOR AND EQUIPMENT SCRIPTION ' -- Surveying Vacuum Trucks Contract welder /helper Crawler hoe Sideboom Dozer Testing X--Ray TDW Services CONTRACT HAULING ESCRIPTION 1CC Hauling 30811 -1d AMOUNT TOTAL 1,000 1,200 2,000 3,000 3,000 1,000 1,250 1,000 3,980 2,000 17,430 2,000 MISCELLANEOUS ITEMS 80)_ 3,704 PAYROLL BURDEN AND WELFARE EXPENSE( 63 % OE COMPANY LABOR) — — — ($ — 5 — ,8 — 8 — — — — — — — — — — — - 3,704 RIGHT OF WAY EXPENSE: PROPERTY DAMAGE EXPENSE: MISCELLANEOUS EXPENSE: �YAe /1C CCTIRAATCM FYP;=mn1T1JRrC' ADMINISTRATIVE OVERHEAD: 25% x $39L309 TlITAI CcTi14AATFn GYPFNnIT1JRFS: X5Fr6.'67iDfi11�� Continaency 25% x $49,136 TnTAI FSTIMATFn EXPENDITURES (LESS SALVAGE CREDIT): nrs, 100 %REIMBURSABLE - 39,309 9,827 49,136 12,284 ( 61,420 s 61,420