Ordinance No. 3,63030526 -4
ORDINANCE NO. 3630
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
BAYTOWN AUTHORIZING CHANGE ORDER NO. I TO THE
CONTRACT WITH JOHN KIDD, FOR THE REHABILITATION OF
400 EAST FAYLE.
**** l-## if *kk *** *kkk * * * * *h #+1-iE*kkk**,+ *k*k*kkk***iFif-*#iF-i ***-***. k #*iF #-iFiF**** *** *tF***k****
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: That the City Council does hereby authorize Change Order No. i
to the contract with John Kidd, for the rehabilitation of 400 East Fayle in the City
of Baytown. A copy of said change order is attached hereto and marked Exhibit
"A ", and made a part hereof for all intents and purposes.
Section 2: This Ordinance shall take effect from and after the date of its
passage.
INTRODUCED, READ and PASSED, by the affirmative vote of the City
Council of the City of Baytown, on this the 26th day of May, 1983.
LEN CANNON, Mayor
ATTEST:
EfLEEN P. HALL, City Clerk
APPROVED:
RAND LL B. STRONG, City Cl
Conimunity Develol7ment Program
iloi} sing IZeliabi.litation Project
Change Order
Project # 82 -04 -11
Homeowner Millicent Bounds
30526 -4a
Date May 20, 1983
Address 400 East Fayle
Contractor
John Kidd
The_Soiiawing;�chaiiges.rto
-the- contract for •this_project.are needed:
1. Remove
existing water and gas lines, -*Rd- install. all new water
and gas
lines in old structure. (Dote: this does not include
plumbing
in rebuilt structure). Old lines were deteriorated and
had to
be replaced.
$850.00
2. Install
additional wiring and conduit for electrical. Some of the
wiring
runs under the structure and has to be installed in conduit.
Install
boxes for light fixtures. Light fixtures were hanging from
ceiling
by electrical wires, there are no boxes per city code.
$450.00
3. Extend
vent hood through attic and roof and install roof jack.
Verit hood was vented to attic.
$ 70.00
4. Install
approximately 40ft of rain gutter with down spout. Gutter
needed
to divert rain water from house now going in car port/
storage area next to structure.
$150.00
Original Contract Price $8,130.00
Cost of Change Order 1,520.00
New Contract Price $ q 6S0 On
Approved by:
G mmun Development Planner
Director of Planning $ Traffic
City Manager