Loading...
Ordinance No. 3,63030526 -4 ORDINANCE NO. 3630 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN AUTHORIZING CHANGE ORDER NO. I TO THE CONTRACT WITH JOHN KIDD, FOR THE REHABILITATION OF 400 EAST FAYLE. **** l-## if *kk *** *kkk * * * * *h #+1-iE*kkk**,+ *k*k*kkk***iFif-*#iF-i ***-***. k #*iF #-iFiF**** *** *tF***k**** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. i to the contract with John Kidd, for the rehabilitation of 400 East Fayle in the City of Baytown. A copy of said change order is attached hereto and marked Exhibit "A ", and made a part hereof for all intents and purposes. Section 2: This Ordinance shall take effect from and after the date of its passage. INTRODUCED, READ and PASSED, by the affirmative vote of the City Council of the City of Baytown, on this the 26th day of May, 1983. LEN CANNON, Mayor ATTEST: EfLEEN P. HALL, City Clerk APPROVED: RAND LL B. STRONG, City Cl Conimunity Develol7ment Program iloi} sing IZeliabi.litation Project Change Order Project # 82 -04 -11 Homeowner Millicent Bounds 30526 -4a Date May 20, 1983 Address 400 East Fayle Contractor John Kidd The_Soiiawing;�chaiiges.rto -the- contract for •this_project.are needed: 1. Remove existing water and gas lines, -*Rd- install. all new water and gas lines in old structure. (Dote: this does not include plumbing in rebuilt structure). Old lines were deteriorated and had to be replaced. $850.00 2. Install additional wiring and conduit for electrical. Some of the wiring runs under the structure and has to be installed in conduit. Install boxes for light fixtures. Light fixtures were hanging from ceiling by electrical wires, there are no boxes per city code. $450.00 3. Extend vent hood through attic and roof and install roof jack. Verit hood was vented to attic. $ 70.00 4. Install approximately 40ft of rain gutter with down spout. Gutter needed to divert rain water from house now going in car port/ storage area next to structure. $150.00 Original Contract Price $8,130.00 Cost of Change Order 1,520.00 New Contract Price $ q 6S0 On Approved by: G mmun Development Planner Director of Planning $ Traffic City Manager