Loading...
Ordinance No. 3,49221028 -7 ORDINANCE NO. 3492 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN AUTHORIZING CHANGE ORDER NO. 2 TO THE CONTRACT WITH SKRLA, INC. FOR THE 1982 STREET IMPROVEMENT PROGRAM FOR THE CITY OF BAYTOWN. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No.2 to the contract with Skrla, Inc. for the 1982 Street Improvement Program for the City of Baytown. A copy of said change order is attached hereto marked "Exhibit A ", and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect from and after the date of its passage. INTRODUCED, READ, and PASSED by the affirmative vote of the City Council of the City of Baytown, on this the 28th day of October, 1982. T 0. H TTO, Mayor ATTEST: EILEEN P. HALL, City Clerk APPROVED: NDALL B. STRONG, City torney 21028 -7a CITY OF BAYTOWN 1982 STREET IMPROVEMENT PROGRAM CHANGE ORDER NO. 2 October 11, 1982 EMB1T A SKRLA, Inc. P. 0. BOX 12301 Houston, Texas 77017 Gentlemen: We propose to ADD the following changes to your present contract: ITEM QUANT. UNIT DESCRIPTION COST NO. 1 292.0 Ton Hot mix asphaltic concrete, 1.5" 40.00 thick (170 lbs /per s.y.), complete in place (CIP) 3 568.0 Gal Asphaltic material, prime coat 1.50 of tack coat (0.17 gals /s.y., CIP 4 3,355 S.Y. Reconstruct existing base material 2.85 to a depth of 8" including lime & lime stabilization (30 lbs /s.y.) as per specifications, CIP 5 850 Ton Crushed limestone base material 20.00 (4,000 lbs /c.y.), CIP 7 200 S.F. Concrete driveway 5" thick with 3.00 sand bedding including saw cutting, removal of existing concrete, haul- ing, and excavation, CIP 8 500 L.F. Concrete curb & gutter with 4" 12.00 cement stabilized sand including saw cutting, removal of existing concrete, hauling & excavation,CIP 10 300 S.F. Concrete valley gutter 6" thick 3.15 with 4" cement stabilized sand in- cluding saw cutting, removal of exist- ing concrete, hauling & excavation, CIP 11 880.6 C.Y. Removal of miscellaneous concrete,CIP 3.50 EMB1T A 21028 --7b ITEM U� ANT. UNIT DESCRIPTION COST NO. 12 1971.5 C.Y. Salvage & reuse existing base 5.00 material & haul to designated site, CIP 13 869.4 C.Y. Salvage & reuse existing base 3.00 material in place to the depth specified on the plans, CIP 14 1,019.1 C.Y. Excavation of material (subgrade) 5.00 & haul to designated site, CIP 15 4 Each Adjust waver valve box, CIP 10.00 16 6 Each Adjust manhole casting, CIP .100.00 TOTAL L'11041101� 9,587.50 2,308.20 5,095.50 40.00 600.00 $ 67,352.05 ADD 35 work days to the original 110 days allowed for completion of job. If this change meets with your approval, please sign this document and re- turn to the Engineering Department. A signed copy will be returned to you. Sincerely, i Norman Dykes, P.E. City Engineer /Director of Public Works APPROVED: By City Council APPROVED: CITY OF BAYTOWN SKRLA, Inc. B y: B Y p Date: Date: