Ordinance No. 3,49221028 -7
ORDINANCE NO. 3492
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN
AUTHORIZING CHANGE ORDER NO. 2 TO THE CONTRACT WITH SKRLA,
INC. FOR THE 1982 STREET IMPROVEMENT PROGRAM FOR THE CITY OF
BAYTOWN.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS:
Section 1: That the City Council does hereby authorize
Change Order No.2 to the contract with Skrla, Inc. for the 1982
Street Improvement Program for the City of Baytown. A copy of
said change order is attached hereto marked "Exhibit A ", and made
a part hereof for all intents and purposes.
Section 2: This ordinance shall take effect from and after
the date of its passage.
INTRODUCED, READ, and PASSED by the affirmative vote of the
City Council of the City of Baytown, on this the 28th day of
October, 1982.
T 0. H TTO, Mayor
ATTEST:
EILEEN P. HALL, City Clerk
APPROVED:
NDALL B. STRONG, City torney
21028 -7a
CITY OF BAYTOWN
1982 STREET IMPROVEMENT PROGRAM
CHANGE ORDER NO. 2
October 11, 1982
EMB1T A
SKRLA, Inc.
P. 0. BOX 12301
Houston, Texas
77017
Gentlemen:
We propose
to ADD the
following changes to your present contract:
ITEM
QUANT.
UNIT
DESCRIPTION
COST
NO.
1
292.0
Ton
Hot mix asphaltic concrete, 1.5"
40.00
thick (170 lbs /per s.y.), complete
in place (CIP)
3
568.0
Gal
Asphaltic material, prime coat
1.50
of tack coat (0.17 gals /s.y., CIP
4
3,355
S.Y.
Reconstruct existing base material
2.85
to a depth of 8" including lime &
lime stabilization (30 lbs /s.y.) as
per specifications, CIP
5
850
Ton
Crushed limestone base material
20.00
(4,000 lbs /c.y.), CIP
7
200
S.F.
Concrete driveway 5" thick with
3.00
sand bedding including saw cutting,
removal of existing concrete, haul-
ing, and excavation, CIP
8
500
L.F.
Concrete curb & gutter with 4"
12.00
cement stabilized sand including
saw cutting, removal of existing
concrete, hauling & excavation,CIP
10
300
S.F.
Concrete valley gutter 6" thick
3.15
with 4" cement stabilized sand in-
cluding saw cutting, removal of exist-
ing concrete, hauling & excavation,
CIP
11
880.6
C.Y.
Removal of miscellaneous concrete,CIP
3.50
EMB1T A
21028 --7b
ITEM U� ANT. UNIT DESCRIPTION COST
NO.
12
1971.5
C.Y.
Salvage & reuse existing base
5.00
material & haul to designated
site, CIP
13
869.4
C.Y.
Salvage & reuse existing base
3.00
material in place to the depth
specified on the plans, CIP
14
1,019.1
C.Y.
Excavation of material (subgrade)
5.00
& haul to designated site, CIP
15
4
Each
Adjust waver valve box, CIP
10.00
16
6
Each
Adjust manhole casting, CIP
.100.00
TOTAL
L'11041101�
9,587.50
2,308.20
5,095.50
40.00
600.00
$ 67,352.05
ADD 35 work days to the original 110 days allowed for completion of job.
If this change meets with your approval, please sign this document and re-
turn to the Engineering Department. A signed copy will be returned to you.
Sincerely,
i
Norman Dykes, P.E.
City Engineer /Director of Public Works
APPROVED: By City Council APPROVED:
CITY OF BAYTOWN SKRLA, Inc.
B y: B
Y p
Date: Date: