Ordinance No. 3,45220826 -10 ORDINANCE NO. 3452 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN AUTHORIZING CHANGE ORDER NO. I TO THE CONTRACT WITH SKRLA, INC. FOR THE FOR THE CITY OF BAYTOWN 1982 STREET IMPROVEMENT PROGRAM. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. I to the contract with Skrla, Inc. for the 1982 Street Improvement Program for the City of Baytown. A copy of said change order is attached hereto marked "Exhibit A ", and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect from and after the date of its passage. INTRODUCED, READ, and PASSED by the affirmative vote of the City Council of the City of Baytown, on this the 26th day of August , 1982. oo 'EMMETT 0. TTO, Mayor ATTEST: Z �'6� A —'/4 � EILEEN P. HALL, City Clerk APPROVED: OANDALL•: ,fir ,' "EXHIBIT A" 20526 -10a CITY OF BAYTOWN 1982 STREET IMRPOVEMENT PROGRAM CHANGE ORDER No. 1 AUGUST 20, 1982 SKRLA, Inc. P. 0. Box 12301 Houston, Texas 77017 Gentlemen: We propose to ADD the following changes to your present contract: Item No. quant Unit Description _ Cost Amount 1 100.0 Ton Hot mix asphaltic concrete, $40.00 $ 4,000.00 0 8 W OIL] 10,400.00 440.00 .10 11 724.50 1.5" thick (170 lbs /s.y.), complete in place (CIP) 3 200.0 Gal Asphaltic material, prime 1.50 coat of tack coat (0.17 gals /s.y.), CIP 5 520.0 Ton Crushed limestone base ma- 20.00 terial (4,000 lbs /c.y.), CIP 6 176.0 S.F. Concrete sidewalk 4" thick 2.50 w1l" sand bedding including saw cutting, removal of existing concrete, hauling, & excavation, CIP 9 150.0 L.F. Concrete curb, 6 ", includ -- 4.00 ing drilling holes, dowels, steel, saw cutting, removal of existing concrete, haul- ing, & excavation, CIP 10 230.0 S.F. Concrete valley gutter 6" 3.15 thick with 4" cement sta- bilized sand including saw cutting, removal of exist- ing concrete, hauling, & excavation, CIP 0 8 W OIL] 10,400.00 440.00 .10 11 724.50 20826 -10b Item No. Quant Unit Description Cost Amount 13 460.0 C.Y. Salvage & reuse existing $ 3.00 $ 1,380.00 base mat'l in place to the depth specified on the plans, CIP 14 325.0 G.Y. Excavation of mat'l (sub - 5.00 1,625.00 grade) & haul to desig- nated site, CIP 21 150.0 Ton Cement stabilized sand (1.5 15.00 2,250.00 sack mix), CIP TOTAL $21,719.50 ADD 15 work days to the original 110 days allowed for completion of job. If this change meets with your approval, please sign this document and re- turn to the Engineering Department. A signed copy will be returned to you. Sincerely, Norman Dykes, P.E. City Engineer /Director of Public Works APPF,0VED : APPROVED: City of Baytown SKRLA, Inc. By: Date:. ES /lc 2 By:_ Date: