Loading...
Ordinance No. 3,43020722 -4 ORDINANCE NO. 3430 AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 5 TO THE CONTRACT WITH CHANNEL CONSTRUCTION COMPANY, INC., FOR THE 1981 SANITARY SEWER SLIPLINING - PHASE III; AND PROVIDING FOR THE EFFECTIVE DATE HEREOF. BE IT ORTDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 5 to the contract with Channel Construction Company, Inc., for the 1981 sanitary sewer sliplining - Phase III. A copy of said change order is attached hereto, marked "Exhibit A ", and made a part hereof for all intents and pur- poses. Section 2: This ordinance shall take effect from and after the date of its passage. INTRODUCED, READ, and PASSED by the affirmative vote of the City Council of the City of Baytown this the 22nd day of July , 1982. L- EMMETT 0 . HUTTO , Mayor ATTEST: EILEENyP. HALL, City Clerk APPROVED: ANDALL B STRONT, G ty Attorney 20722 -4a CHANGE ORDER NO. 5 CITY OF BAYTOWN 1981 SANITARY SEWER SLIPLINING - PHASE III JOB NO. 8109 -21 JULY 19, 1982 Channel Construction Co,, Inc. P. 0. Drawer C Channelview, Texas 77530 Gentlemen: The following additions to our contract are proposed for this job: ITEM UNIT NO. QUAN. UNIT DESCRIPTION COST AMOUNT 1 688 L.F. Sliplining 5" polyethylene liner in $10.00 $6,880.00 2 2700 L. F. 4 15 Each 7 Lump Sum 6" existing sanitary sewer lines in _ Whispering Pines subdivision, CIP (MH 3 to MH 4 & MH 4 to end on Savell Drive per your TV log of 7 -6 -82 and Autumn Lane MH to Summer Lane MH per your TV log of 2 -7 -80) Sliplining 6" polyethylene liner in 8" existing sanitary sewer line along west side of Alexander Drive from Peggy Street south to James Street. Service Connections, Whispering Pines Subdivision. Additional work for Alexander Drive to compensate for hazardous conditions due to traffic, line under concrete, and greater depth. $11.00 $29,700.00 $230.00 $3,450.00 $8,100.00 TOTAL: $48,130.00 A tabulation of changes from our original contract follows: Original Contract Amount $125,540.00 Change Order No. 1 4,970.00 Change Order No. 2 15,000.00 Change Order No. 3 1,200.00 Change Order No. 4 4,650.00 Change Order No. 5 (proposed) 48,130.00 REVISED TOTAL CONTRACT AMOUNT $1997 90.00 20722 -4b ($3,200 MH deleted) If this change meets with your approval, please sign below and return this document to the Engineering Department. A signed copy will be returned to you for your records. Approved: City of Baytown By Date ND: sls Yours very truly, Norman Dykes, P.E. City Engineer /Director of Public Works Approved: Channel Construction Co., Inc. By Date