Loading...
BAWA Resolution No. 2019-15RESOLUTION NO. 2019-15 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY AUTHORIZING CHANGE ORDER NO. 6 WITH PEPPER LAWSON WATERWORKS, LLC, FOR THE BAWA 6 MGD SURFACE WATER TREATMENT PLANT PROJECT IN THE AMOUNT OF FIVE HUNDRED FIFTY THOUSAND FIVE HUNDRED FIFTY-NINE AND 201100 DOLLARS ($550,559.20); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY: Section 1: That the Board of Directors of the Baytown Area Water Authority does hereby authorize Change Order No. 6 with Pepper Lawson Waterworks, LLC, for the BAWA 6 MGD Surface Water Treatment Plant Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the Board of Directors of the Baytown Area Water Authority hereby authorizes the payment of an amount not to exceed FIVE HUNDRED FIFTY THOUSAND FIVE HUNDRED FIFTY-NINE AND 20+ 100 DOLLARS ($550,559.20) to Pepper Lawson Waterworks, LLC, consistent with the change order authorized in Section 1. Section 3: This resolution shall take effect immediately from and after its passage by the Board of Directors of the Baytown Area Water Authority. INTRODUCED, READ and PASSED by the affirmative vote of the Board of Directors of the Baytown Area Water Authority this the 19th day of June, 2019. XJBRENIIA� BRADLEY SMITH, President APPROVED AS TO FORM: s I NACIO RAMIREZ, SR., G6#ral Counsel RAKaren•.Files.BAWA' Resolution\2019Uune ChangeOrderNo64BAWAEAST.docx CO d k rb Exhibit "A" 3AYTOWN AREA WATER AUTHORITY Change Order No. 6 1GD SURFACE WATER ,rREATMI'M PLANT PO: 1806021 Date: 20-May-19 Per the request from the City and the attached RFP 003, PLW is proposing to Furnish and install the specified Endress+Hauser radar type level transmitters and local readout, in order to match the City of Baytown's Instrumentation. The radar type level transmitters will replace the originally designed ultrasonic level transmitters and transducers per the request. The equipment identifiers will remain t11e same as originally designed. Please see the attached back-up documentation. Additionally, per the request from the City, PLW is proposing to develop install and configure a complete and functional SCADA System per the Contract Documents, as outlined by the EOR/City. Add or Delete Items: Item description Unit uantit . -- ---. -_---- _._ CO 6.1 Radar Type Level Instruments _ LS -1 CO 6.2 SCADA Programming and Coordination LS t --- Total Original Contract Duration 1095 Previous Extensions 0 This Change Ord% 0 Revised Durati Calendar Days 1095 f May 21, 2019 Contractor: PLIN terworks, LLC Date Emilio Lopez P� tti, Executive Vice President Engineering Director Unit Price_ Total -1 4,340.10 $ 4,340.10 546,559.20 1 $ 546,559 S 550,899.30 Date �(i' Consultant: Jones) 'arter, Inc. Dat� City NManager Date 51ZglZo 19