Loading...
Ordinance No. 2,722® ORDINANCE NO. 2722 C7 90913 -1 AN ORDINANCE AUTHORIZING CHANGE ORDER NO. 2 TO THE CONTRACT WITH CHANNEL CONSTRUCTION COMPANY, INC. FOR THE 1979 SANITARY SEWER LINE PROJECT IN THE CITY OF BAYTOWN. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 to the contract with Channel Construction Company, Inc. for the sliplining of sanitary sewer lines in the City of Baytown. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect from and after the date of its passage. INTRODUCED, READ, and PASSED by the affirmative vote of the City Council of the City of Baytown this 13th day of September 1979• ATTEST: - EILEEN P. HALL, City Clerk APPROVED: SCOTT BOUNDS, City Attorney 2 ETT O..HUTTO, Zayor 90913 -1b City of Baytown Change Order No. 2 1979 Sanitary Sewer Sliplining Channel Construction Co., Inc.. P. O. Drawer D Channelview, Texas 77530 Gentlemen: We propose to make the following changes to your present .contract: Add : . 1. 500 ft. Sliplining existing 8" 15.00 7,500.00 sewer with 6" P.E. liner between Alabama - and Utah from Durain Ferry Rd. to Kentucky 20 ea. Service connections 300.00 6,000.00 $13,500.00 2. 700 ft. Sliplining existing 6" 12.00 8,400.00 sewer with 5" P.E. liner between Kentucky and Kansas from Florida - to Mississippi Streets 21 ea. Service connections 300.00 6,200.00 $14,600.00 TOTAL $28,100.00 Norman Dykes, P.E. City Engineer /Director of Public Works Approved: Approved: City of Baytown Channel Construction Co., Inc. By: BY Date: Date: