Loading...
Ordinance No. 2,513Ira ORDINANCE NO. 2513 810 -1 AN ORDINANCE AUTHORIZING A CHANGE ORDER TO THE CONTRACT WITH R. T. BISHOP CONSTRUCTION COMPANY INC., AND R. T. BISHOP, JOINT VENTURE, FOR THE CONSTRUCTION OF THE COUNTRY CLUB WATER LINE REPLACEMENT PROJECT AND PRO- VIDING FOR THE EFFECTIVE DATE HEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN : Section 1: That the City Council does hereby authorize a change order to the contract with R. T. Bishop Construction Company Inc., and R. T. Bishop, Joint Venture for the con- struction of the Country Club Water Line Replacement Project. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect from and after its passage. INTRODUCED, READ, and PASSED by the affirmative vote of a majority of the City Council of the City of Baytown this 10th day of August , 1978. TT 0. HUTTO, Mayor --ATTEST: - EILEEN P. HALL, City Clerk APPROVED: 6644 0110��Iee� SCOTT BOUNDS, City Attorney .:. ..l' + 1 v �\ _ A 810 -1a E X H I B n. IT "A" City of Baytown Change Order No. 1 Water Line Replacement Job No. 77 -1519 R. T. Bishop Construction Company, Inc. and R. T. Bishop, Joint Venture P. 0. Box 961 Baytown, Texas 77520 Attn: Mr. R. T. Bishop, President Gentlemen: 80810 -1b The City of Baytown has requested that the cast iron water line on Quail Hollow Drive between Burning Tree Drive and Country Club View be replaced with asbestos cement water line. This work consists of items covered in the unit prices of your contract. Please verify the following unit prices bid including the estimated cost for a 6" 900 C.I. Bend. If the following meets with your approval, please sign the change order to accept the added work and return one copy to us. 1. 6" Class 150, asbestos cement water line, open trench construction. 430 L.F. @ 9.48 = $ 4,076.40 2. 6" Class 150, asbestos cement water line, augered construction. 180 L.F. @ 15.93 = $ 2,867.40 3. 6" x 61' Tapping Sleeve & Valve w /Valve Box. 3 Each @705.80 = $ 2,117.40 4. 611 Gate Valve w /Valve Box. 2 Each @172.74 = $ 345.48 S. 6" x 6" x 61' C.I. Tee AB. 3 Each @ 80.27 = $ 240.81 6. 6" - 900 C.I. Bend AB. 1 Each @ 85.00 = $ 85.00 7. Fire Hydrant, 4' Bury. 2 Each @690.00 = $ 1,380.00 TOTAL THIS CHANGE ORDER $11,112.49 Approved: City of Baytown By: Norman Dykes, P.E. City Engineer /Director of Public Works Approved: R. T. Bishop Construction Company, Inc. By: Date: Date: