Loading...
Ordinance No. 2,1627238 ORDINANCE NO. 2162 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING A CHANGE ORDER TO THE CONTRACT WITH UTILITY CONTRACTORS, INC. D /B /A U. C. OF TEXAS, INC. FOR THE CONSTRUCTION OF BOB SMITH ROAD DRAINAGE IMPROVE - MENTS AND PROVIDING FOR THE EFFECTIVE DATE HEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize a change order to the contract with Utility Contractors, Inc. d /b /a U. C. of Texas, Inc. for the construction of Bob Smith Road drainage improvements. A copy of said change order is attached hereto marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect from and after the date of its passage by the affirmative vote of the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of a majority of the City Council of the City of Baytown this 13th day of January , 1977. TOM GENTRY,-Mayor ATTEST: EILEEN P. HALL, City Clerk APPROVED: NEELVCHARDSON, City Attorn 7239 E X H I B IT "A" 7240 BUSCH, HUTCH ISON & ASSOCIATES, INC. C. CONSULTING ENGINEERS 1107 FLEETWOOD DRIVE - BAYTOWN. TEXAS 77520 - PHONE (713) 422 -8213 January 4, 1977 City of Baytown P. 0. Box 424 Baytown, Texas 77520 Attention: Mr. Fritz Lanham, Manager CHANGE ORDER NUMBER 1 - BOB SMITH ROAD STORM SEWER - JOB NO. 75 -1506 The completion of this project requires the placement of 48" diameter conduit under the Southern Pacific Railroad at its intersection with Bob Smith Road. Our design called for reinforced concrete pipe to be installed by tunnelling and jacking, and the - contract price for this work is $180.00 per linear foot. The railroad denied our request for permission to do this work citing the use of concrete pipe as being objectionable. After some negotiation, they have accepted the use of 8 guage corregated metal pipe, galvanized and asphalt coated. The cost of this material is somewhat higher than the concrete pipe, and the installed cost quoted by the contractor is $231.75 per linear foot. This change order will in effect change Contract Bid Item No. 13 to read: 114811 Diameter, CMP Storm Sewer, 8 guage, galvanized, asbestos bonded, with required bolts, tunnel and jack construction at railroad, complete in place; Unit Price $231.75.11 This is $51.75 per linear foot higher than the original unit price which results in an increase of $4,140.00 in the contract. When the change order is approved, please sign below and return to our office. HD LAR16�" Hutchison, P.E. sident JPH /dle Approved: City of Baytown Date: Accepted: Utility Contractors, Inc., d /b /a UC of Texas, Inc. By: Date: