Ordinance No. 2,1627238
ORDINANCE NO. 2162
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, AUTHORIZING A CHANGE ORDER TO THE CONTRACT WITH
UTILITY CONTRACTORS, INC. D /B /A U. C. OF TEXAS, INC.
FOR THE CONSTRUCTION OF BOB SMITH ROAD DRAINAGE IMPROVE -
MENTS AND PROVIDING FOR THE EFFECTIVE DATE HEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize
a change order to the contract with Utility Contractors, Inc.
d /b /a U. C. of Texas, Inc. for the construction of Bob Smith
Road drainage improvements. A copy of said change order is
attached hereto marked Exhibit "A," and made a part hereof
for all intents and purposes.
Section 2: This ordinance shall take effect from and
after the date of its passage by the affirmative vote of the
City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of
a majority of the City Council of the City of Baytown this
13th
day of January , 1977.
TOM GENTRY,-Mayor
ATTEST:
EILEEN P. HALL, City Clerk
APPROVED:
NEELVCHARDSON, City Attorn
7239
E X H I B IT "A"
7240
BUSCH, HUTCH ISON & ASSOCIATES, INC. C. CONSULTING ENGINEERS
1107 FLEETWOOD DRIVE - BAYTOWN. TEXAS 77520 - PHONE (713) 422 -8213
January 4, 1977
City of Baytown
P. 0. Box 424
Baytown, Texas 77520
Attention: Mr. Fritz Lanham, Manager
CHANGE ORDER NUMBER 1 - BOB SMITH ROAD STORM SEWER - JOB NO. 75 -1506
The completion of this project requires the placement of 48" diameter conduit under
the Southern Pacific Railroad at its intersection with Bob Smith Road. Our design
called for reinforced concrete pipe to be installed by tunnelling and jacking, and
the - contract price for this work is $180.00 per linear foot.
The railroad denied our request for permission to do this work citing the use of
concrete pipe as being objectionable. After some negotiation, they have accepted
the use of 8 guage corregated metal pipe, galvanized and asphalt coated. The
cost of this material is somewhat higher than the concrete pipe, and the installed
cost quoted by the contractor is $231.75 per linear foot. This change order will
in effect change Contract Bid Item No. 13 to read: 114811 Diameter, CMP Storm Sewer,
8 guage, galvanized, asbestos bonded, with required bolts, tunnel and jack construction
at railroad, complete in place; Unit Price $231.75.11
This is $51.75 per linear foot higher than the original unit price which results in
an increase of $4,140.00 in the contract.
When the change order is approved, please sign below and return to our office.
HD LAR16�"
Hutchison, P.E.
sident
JPH /dle
Approved: City of Baytown
Date:
Accepted: Utility Contractors, Inc., d /b /a UC of Texas, Inc.
By:
Date: