Ordinance No. 2,0877047
ORDINANCE NO. 2087
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, AUTHORIZING A CHANGE ORDER TO THE CONTRACT WITH
R. T. BISHOP CONSTRUCTION COMPANY FOR THE CONSTRUCTION
OF EAST HUNNICUTT DRAINAGE IMPROVEMENTS AND PROVIDING
FOR THE EFFECTIVE DATE HEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize
a change order to the contract with R. T. Bishop Construction
Company for the construction of East Hunnicutt drainage
improvements. A copy of said change order is attached
hereto, marked Exhibit "A," and made a part hereof for all
intents and purposes.
Section 2: This ordinance shall take effect from and
after the date of its passage by the affirmative vote of the
City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of
a majority of the City Council of the City of Baytown this
23rd day of September, 1976.
TOM GENTRY, Mayor
__ATTEST:
EILEEN P. HALL, City Clerk
APPROVED:
U-:0 .0,46 �__
NEEL RIiCHNRDSON, City Attorney
....... ..
�C A
C; i
E X H I B I T "A"
7048
7049
BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTING RNOIN>:4RS
1107 ILUNTWOOD DRIV[ - OAYTOWN.TRXAS 77520 - ►MOMS 1713) 422.8213
September 8, 1976
R. T. Bishop Construction Company
Post Office Box 961
Baytown, Texas 77520
Attention: Mr. Doug Lungsford
CHANGE ORDER NO. 1 - HUNNICUTT STREET STORM SEWER - JOB NO. 75 -1507
This will confirm.our verbal discussion pertaining to bid item
no. 29 of your contract on the referenced job. Since the condition
of the wear surface and base on Hunnicutt Street is very poor, it
was decided to repair your ditch line only to the extent of
backfiiling and installing the specified amount of cement stabilized
shell base, deleting the replacement of 1 -1/2 inches of type "F"
asphaltic concrete wear surface.
It is anticipated that a certain amount of work will be done according
to bid item no. 29, so it is being left as is with the understanding
that the amount of work done under it will be drastically reduced.
This change order, then, will establish a new bid item which involves
removal of flexible base pavement and replacement with 8 inches of
cement stabilized shell. The agreed upon price for this item is
$10.00 per square yard. Work done under this bid item will be listed
separately on the estimate sheets as "Work done under Change Order
No. 1" and will reflect the amount of work accomplished at $10.00
per unit and the total amount.
If you are in agreement with this arrangement, please sign the
attached copy and return it to this office. Retain the original
for your files.
mes Putc Pison, P.E.
H /dle
Accepted for R. T. Bishop Construction Company
By
Date