Loading...
Ordinance No. 2,0877047 ORDINANCE NO. 2087 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING A CHANGE ORDER TO THE CONTRACT WITH R. T. BISHOP CONSTRUCTION COMPANY FOR THE CONSTRUCTION OF EAST HUNNICUTT DRAINAGE IMPROVEMENTS AND PROVIDING FOR THE EFFECTIVE DATE HEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize a change order to the contract with R. T. Bishop Construction Company for the construction of East Hunnicutt drainage improvements. A copy of said change order is attached hereto, marked Exhibit "A," and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect from and after the date of its passage by the affirmative vote of the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of a majority of the City Council of the City of Baytown this 23rd day of September, 1976. TOM GENTRY, Mayor __ATTEST: EILEEN P. HALL, City Clerk APPROVED: U-:0 .0,46 �__ NEEL RIiCHNRDSON, City Attorney ....... .. �C A C; i E X H I B I T "A" 7048 7049 BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTING RNOIN>:4RS 1107 ILUNTWOOD DRIV[ - OAYTOWN.TRXAS 77520 - ►MOMS 1713) 422.8213 September 8, 1976 R. T. Bishop Construction Company Post Office Box 961 Baytown, Texas 77520 Attention: Mr. Doug Lungsford CHANGE ORDER NO. 1 - HUNNICUTT STREET STORM SEWER - JOB NO. 75 -1507 This will confirm.our verbal discussion pertaining to bid item no. 29 of your contract on the referenced job. Since the condition of the wear surface and base on Hunnicutt Street is very poor, it was decided to repair your ditch line only to the extent of backfiiling and installing the specified amount of cement stabilized shell base, deleting the replacement of 1 -1/2 inches of type "F" asphaltic concrete wear surface. It is anticipated that a certain amount of work will be done according to bid item no. 29, so it is being left as is with the understanding that the amount of work done under it will be drastically reduced. This change order, then, will establish a new bid item which involves removal of flexible base pavement and replacement with 8 inches of cement stabilized shell. The agreed upon price for this item is $10.00 per square yard. Work done under this bid item will be listed separately on the estimate sheets as "Work done under Change Order No. 1" and will reflect the amount of work accomplished at $10.00 per unit and the total amount. If you are in agreement with this arrangement, please sign the attached copy and return it to this office. Retain the original for your files. mes Putc Pison, P.E. H /dle Accepted for R. T. Bishop Construction Company By Date