AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS,APPROVING AND ACCEPTING THE CONSTRUCTION OF THE
WEST TEXAS AVENUE GOOSECREEK BRIDGE BY HANNA CONSTRUCTION
COMPANY;FINDING THAT THE CONSTRUCTION IS IN ACCORDANCE
WITH THE TERMS OF THE CONTRACT;ACCEPTING THE ENGINEERS'
CERTIFICATE OF FINAL ACCEPTANCE;AUTHORIZING THE FINAL
PAYMENT TO THE SAID HANNA CONSTRUCTION COMPANY AND
PROVIDING FOR THE EFFECTIVE DATE HEREOF.
WHEREAS,the City of Baytown contracted with Hanna
Construction Company for the construction of the West Texas
Avenue Goose Creek Bridge;and
WHEREAS,all of the said construction,as provided for
in the plans and specifications heretofore prepared by the
Consulting Engineers,and as approved and adopted by the
City Council,has been performed and completed in full
accordance with all of the terms and provisions of the
aforesaid contract;and
WHEREAS,the Consulting Engineers in the manner pro
vided by the terms of the said contract andthe plans and
specifications thereof,have approved and accepted said
construction and have heretofore issued their Certificate of
Final Acceptance,and have certified same to the City Council
and recommended that it accept and receive said work as
constructed and completed by the said Hanna Construction
Company;and
WHEREAS,there remains and owing to the said contractor
thesum of Forty-One Thousand Six Hundred Fifty and No/100
($41,650.00)Dollars,thesum of One Hundred Ninety Thousand
Five Hundred Forty-Three and 50/100 ($190,543.50)Dollars
heretofore advanced to contractor in partial payments under
the provisions of the said contract;NOW THEREFORE,
6880
BE IT ORDAINED BYTHE CITY COUNCIL OF THE CITY OF
BAYTOWN,TEXAS:
Section 1:That the City Council hereby approves and
accepts said construction of the West Texas Avenue Goose
Creek Bridge,and determines that all of said work has been
completed as provided in the plans and specifications
therefore,and in full accordance with all of the terms and
provisions of the aforesaid contract.
Section 2:That the Certificate of Final Acceptance
heretofore issued by the Consulting Engineers and certified
to the City Council is hereby accepted and received.
Section 3:That final payment to the said Hanna Construc
tion Company in the amount of Forty-One Thousand Six Hundred
Fifty and No/100 ($41,650.00)Dollars is hereby authorized
and directed.
Section 4:This ordinance shall take effect from and
after its passage by the City Council of the City of Baytown,
Texas.
INTRODUCED,READ and PASSED by the affirmative vote of
the City Council of the City of Baytown this 22nd day of
July 1976.
TOM GENTRY;Mayor
ATTEST :"
.EILEEN P.HALL,City Clerk
APPROVED:
NEEL RICHARDSON,City Attorney
-2-
■T "in"
6881
il £H £fL A Ji £y.H
July 14,1976
TO:Dan Savage,Assistant City Manager
FROM:Ken Powers,City Engineer
SUBJECT:Final Payment -West Texas AvenueBridge
On June 21,1976Ivan Langford and myself met with Mr.James Hutchison,Vice
President of Busch,Hutchison &Associates,Inc.to inspect the West Texas
AvenueBridge for final approval.Some minor repairs were noted at thattime
and have now been completed.We recommend acceptance of the project and final
payment be authorized.
KP/bm
6882
'guscH,Hutchison &Associates,.Inc.
-bavtown,Texas T7Bao -
/j88*">.
July 7,1976
Honorable Mayor and City Council
City of Baytown
P.0.Box 424
Baytown,Texas 77520
FINAL ESTIMATE -WEST TEXAS AVENUE BRIDGE -JOB NO.74-559
The referenced project has been completed satisfactorily.A final inspection was held with City personnel on June 21,
1976,and the construction was approved bythem.Some final
repairs required were finished on July 7,1976,and the job
was accepted on that date.
The final cost of the job is $232,193.50,representing an
underrun of $4,756,50.This is becauseof the deletion of
one piling perbent which resulted from underground obstructions
and a broken pile being in the way.Therest of the structure
was strengthened to allow forthe missing piling.Also,becauseof the redesigned fill sections near the bridge,some
of the slopepaving was unneccessary which saved a small amount
of money.Subtracting all previous payments from the total cost
leaves a final payment of $41,650.00.We recommend this final
payment be made at this time.
ames P.Hutchison,P.E.
ice President
JPH/dle
6883
BUSCH.HUTCHISON 8c ASSOCIATES,INC.conauLTino
1107 rut utwooo onive —dayiown.tcxas 77920 —phonc (7i3)422-0213
July 7,1976
ESTIMATE .NUMBER:Final
PROJECT:Cityof Baytown -West Texas Avenue Goose-Creok Bridge -Job No.74-559
CONTRACTOR:Hanna Construction Company,P.0.Box 1005,Katy,Texas 77450 ■
AMOUNT OF CONTRACT:$236,950.00 CONSTRUCTION TIME:100 Working Days
No.
1.
2.
3.
'Jew Bridge Construction,
including piles,box beams,
surface slab,approach slabs,
and other incidentals to
furnish a complete structure,
Comnlete in place
Adjustment of driven piling,
as necessary,to build up
length to specified eleva
tion,Complete in place
Slops paving on road fill at
bridge,4"thick,reinforced
CUss 3 concrete,Complete
in olace
Quantity
All
-.0 -
.923
Unit
Lump
Sum
Vert
Fept
S.Y.
Unit Price
218,500.00
30.00
15.00
TOTAL
Total
*
218,500.00
-0 -
13,845.00
$232,345.00 .
ADD for Cement Stabilized Sand 112 C.Y.@ $15.00
LESS Credit for deletion of 1 Pile per bent
TOTAL WORK COMPLETED
'■I :LESSPREVIOUS PAYMENTS '
PAY THIS AMOUNT
Jae P i':J>V*n
J.ames P.Hutchison,P.E.
iiPH/dle
1,680.00
1,831.50
$232,193.50
190,543.50
$41,650.00