Loading...
Ordinance No. 1,966trtO ORDINANCE NO.1966 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OFBAYTOWN, TEXAS,AUTHORIZING A CHANGE ORDER TO THE CONTRACT WITH KATY ENGINEERING COMPANY FOR THE ENLARGEMENT OF THE EAST DISTRICT SEWAGE TREATMENT PLANT,AND PROVIDINGFOR THE EFFECTIVE DATE HEREOF. BE IT ORDAINED BYTHECITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS: Section 1:That the City Council does hereby authorize a change order to the contract with Katy Engineering Company for the enlargement of the East District Sewage Treatment Plant.A copy of said change order is attached hereto, marked Exhibit "A,"and made a part hereof for all intents and purposes. Section 2:This ordinance shall take effectfrom and after the date of its passage by the affirmative vote of the City Council of the City of Baytown. INTRODUCED,READ and PASSED by the affirmative vote of a majority of the City Council of the City of Baytown this 11th day of March,1976. TOM GENTRY,Mayor \/ ATTEST: EILEEN P.HALL,City Clerk APPROVED: NEEL 5504 EXHIBIT "A" /#*s /«i£505 CHANGE ORDER NO.1 March 5,1976 Mayor and City Council City of Baytown P.O.Box 424 Baytown,Texas 77520 Subject:Addition of Sludge Drying Beds and Chlorination Facil- ities at the East District Sewage Treatment Plant. Contractor:Katy Engineering Co. Contract Dated:October 15,1975 Original Contract Amount:$1,633,330.00 Project:Construction of Enlargement of East District Sewage Treatment Plant,Job No.44B Contract No.1,WPC-Tex- 1048. Gentlemen: Pursuant to your authorization of February 12,1976 we have pre pared this Change Order,for addition of sludge drying beds, chlorination facilities and revisions to the waste sludgepumps at the East District Sewage Treatment Plant.The total cost of these facilities are as listed below,with the attached letters showing the complete breakdown of each item,in accordance with current federal regulations.The sludgedryingbeds shall be constructed within eight weeks after authorization is given to proceed and the chlorination facilities shall be installed as soon as the various items of equipment can be obtained (after submittals have been approved).The attached drawings (Sheets 1 thru 4 of Change Order No.1)show the details of the work to beaccomplished,as outlined below: Description Cost Construction of 8 additional sludge drying beds,as per the attached drawings,(Sheets 1 and 2),and proposal No.5621-3 of Katy Engineering Co.,dated March 3,1976 -$84,917.00 2.Construction of additional chlorination facilities,as per the attached drawing, (Sheet 3),and proposal No.5621-4 ofKaty Engineering Co.dated March 3,1976 -$13,370.00 506 Mayor and City Council -2-March 5,1976 Item No. 3. Description Revisions to waste sludge pumps,as per the attached drawing,(Sheet 4),and pro posed No.5621-1 of Katy Engineering Co., dated March 3,1976 - Cost 850.00 TOTAL COST CHANGE ORDER NO.1 $99,137.00 This represents an increase of (+)6.07%in the original contract amount.This work will require an extension in contract time of 90 calendar days,which will make the revised completion date January 25,1977,in lieu of the original completion date of October 27,1976. RECOMMENDED FOR APPROVAL: LANGFORD ENGINEERING,INC. ACCEPTED: KATY ENGINEERING CO. Robert W.McDaniel,P.E. Vice President APPROVED: CITY OF BAYTOWN Date =_^C/'J By: Fritz Lanham,City Manager Date: Miifa3ri^j ism wjwjuh i—wb.>t aa ;jK'