Ordinance No. 1,8966229 ORDINANCE NO.1896 AN ORDINANCE OFTHE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS,AUTHORIZING A CHANGE ORDER TO THE CONTRACT WITH STAR CONCRETE CONSTRUCTION FOR THE CONSTRUCTION OF DRAINAGE AND EARTH WORK ONTHE WEST TEXAS AVENUE PROJECT, JOB.NO.74-563,AND PROVIDING FOR THE EFFECTIVE DATE HEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1:That the City Councildoes hereby authorize a change order to the contract with Star Concrete Construction for the construction of drainage and earth work on the West Texas Avenue Project,Job No.74-563.A copy of saidchangeorder is attached hereto,marked Exhibit "A,"and made a part hereof for all intents and purposes. Section 2:This ordinance shall take effect from and after the date of its passage by the affirmative vote of the City Council of the City of Baytown. INTRODUCED,READ and PASSED by the affirmative vote of a ma jority of the City Council of the City of Baytown this 23rd day of October,1975. -^/»P >■N. TOM GENTRY,Mayor \/ ATTEST: EILEEN P.HALL,City Clerk APPROVED: NEEL RIQHARDSON,City"Attorney 6230 EXHIBIT "A" BUSCH,HUTCHISON 8c ASSOCIATES,INC.CONSULTINO ENGINEERS UO7 FLEETWOOD DRIVE —BAVtOWN.TEXAS 7732O —PHONE (713)422-8219 October 24,1975 StarConcrete Construction,Inc. P.0.Box3476 Baytown,Texas 77520 Attention:Mr.W.B.Bean CHANGES IN ELEMENTS OF CONSTRUCTION FOR WEST TEXAS AVENUE This will confirm our discussion concerning certainchanges In the construction of West Texas Avenue brought about by the failure of a subsoilstrata. First,the repairof the failed area will be accomplished as follows: Along the toe of the existing fill slope for a parallel distance of about 350feet and for a perpendicular distance of about 25 feet,the subsoil 1s to be removed to a constant elevation of minus two feet (-21).The mucking out operation will be worked simultaneously with a backfill operation so as to maintain a balanced condition.The mucked outmaterial may be cast out beyond the 25 foot distance from the slope toe.The backfill material shall come from the damaged areaof the new embankment.We will mark on the ground the exact extent of this operation.We will also takeoriginal cross sections1ntheareatobemuckedoutsotheamountofexcavationcanbeaccurately determined.This operation,both excavation and backfilling will be paid for at the rate for channel excavation given In the Contract and shall be based on the cubic yards of excavated material. After the mucked out zone 1s backfilled 1t shall be walked 1n and consoli dated as much as possible,hopefully achieving a 90%Standard Proctor Density.On top of this backfill a berm shall be constructed,again using material from the new embankment.The area to be covered by this berm shall be marked by us.The berm shall be brought up to elevation plusseven(+7)In eight Inch (8")lifts,each 11ft being compacted to a 95% Standard Proctor Density.The slope at the outer edgeof the berm may be constructed at a 2:1 slope to the water's edge.To determine the payment for this work we will take crosssections before the mucking/backfilling operation begins and calculate the amount of fill that was 1n place beforethefailureandpayforthatamountoffill.Then after the berm 1s con structed a new set of cross sections will betaken as a base for subsequentfillwork. 6232 Page two -Letter to Star Concrete Construction 10-24-75 When these cross sections are completed the hauling Is to be resumed to bring the roadbed to the line and grade as given 1n the Plans.After this 1s accomplished,a set of final cross sections will be made which will determine the amount of fill tobe paid for 1n this subsequent operation. Two additional changes were discussed Involving the water and sewer line Installation.The water line 1s simply tobe moved to the north side of the bridge.The same lump sum bid applies for thesteel pipe span across the bridge.The revised routing of the underground will be paid for at the linear foot cost 1n the Contract.Any extra fittings will be paid for at those quoted prices.It Is understood that PVC pipe of Class 150(SDR 17)1sto be substituted for the proposed A.C.pipe,but all prices remain the same as quoted for A.C.pipe. A similar substitution of PVC gravity sewer pipe 1s to be made for the proposed V.C.pipe In the sanitary sewer line adjustments bid Item.The work to be done under thisbid Hem 1s changed as reflected on the revised drawings so that 1t Includes approximately 720 feetof 15"PVC gravity sewer pipe.After providing credit for approximately 60 feet of V.C.pipe your proposed add on to the lump sum bidfor Item 31 1s $18,000.00 chanainathatbidItemtoatotalof$42,000.00. Finally,because the order of operations worked out so that the new bridge piling 1s available sooner than anticipated,1t 1s possible to completebidItem31withoutconstructingthetemporarybypasscalledfor1nItem41.Your proposed credit for this bid Hem Is $27,500.00.which Is the full amount less $500.00 1n shipping and handling chargescharged to youbythesupplier.*"J I believe this covers all our proposed changes and the methods of determining fair payment for the work done.If after studying this letter you haveany questions,giveme a call. H V jx> Hutchison,P.E. ke President JPH/sh ■ACCEPTED BY STAR CONCRETE DATE /'/■\j