Loading...
Ordinance No. 1,787ORDINANCE NO.1787 AN ORDINANCE OF THECITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS,DECLARING THAT AN EMERGENCY SITUATION EXISTS;AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AND ATTEST TO A CONTRACT WITH REHAB SPECIALISTS,INC.FOR THE EMERGENCYREPAIR OF APPROXIMATELY 1558 LINEAR FEET OF SANITARY SEWER LINE ON GARTH ROADON A UNIT PRICE BASIS AND THE CONTRACTING OF INDEBTEDNESS BY THE CITY FOR SAID EMERGENCY REPAIR WITH THECOMPENSATION THEREFOR NOT TO EXCEED THIRTY-ONE THOUSAND AND NO/100 ($31,000.00)DOLLARS AND PROVIDING FOR THE EFFECTIVE DATE HEREOF. WHEREAS,approximately 1558 linear feet of sanitary sewer line on Garth Road is in a present state of disrepair due to pipe deterioration and resulting cave-ins;and WHEREAS,said sewer line serves a large area and a great number of people;and WHEREAS,it is necessary to preserve and protect the health,welfare,and safety of the citizens of the City of Baytown;and WHEREAS,considering the above,the City Council of the City of Baytown,deems that an emergency situation exists;NOW THEREFORE, BEIT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS: Section 1:That the City Council of the City of Baytown,Texas,hereby declares that an emergency situation exists. Section 2:That the Mayor andCity Clerk of the City of Baytown are hereby authorized and directed to enter into a contract containing the usual performance and payment bond provisions with REHAB Specialists,Inc.for the emergency repair of approixmately 1558 linear feet of sanitary sewer line on Garth Road on a unit pricebasis as set forth in Exhibit "A,"attached hereto,and made a part hereof for all intents and purposes,with compensation to REHAB Specialists, Inc.for said emergency repair not to exceed Thirty-One Thousand and No/100 ($31,000.00)Dollars. Section 3:That,pursuant to the provisions of Article 2368a,Section 2a,Vernon's Annotated Texas Statutes, the City Manager is hereby granted general authority to approve any change order involving a decrease oran increase in costs of Five Thousand and Mo/100 ($5,000.00)Dollars or less,subject to the proviso that the originalcontract price maynot be increased by morethan twenty-five (25%) per cent without the consent ofthe contractor to such decrease. Section 4:This ordinance shall take effect from and after its passage by the City Council of the City of Baytown. INTRODUCED,READ and PASSED by the affirmative vote of the City Council on this 18th day of April,1975. J.OPY LANDER,Mayor Pro Tem ATTEST: EDNA OLIVER,City Clerk BELINDA BINGHAM,Deputy City Clerk APPROVED: NEEL RICHA'RDSON,City Attorney -2- EXHIBIT "A1 REHAB Specialists,Inc. P.0.Box 9970 Houston,Texas 77015 April 17,1975 Mr.Douglas Lunceford Director of Public Works City of Baytown Baytown,Texas Dear Mr.Lunceford: Pursuant to our conversation of April 17,we are pleased to submit our proposal andcost estimate for your consideration. As outlined in the accompanying proposal,REHAB Specialists,Inc. will assist the city of Baytown in the following slip-lining project: 18W concrete sewer line running alongGarth Rd. from approximately 75 feet south of Inwood Dr., approximately 1,086 feet south and then approx imately 460 feet west to an existing manhole. Enclosed with this letter,you will find the proposal outline for the above project,acost estimate for the above project,and a schedule of chargesfor REHAB Specialists,Inc. If I can answer any questions on the above project,or may beof any assistance to you on any upcoming projects,please do not hesitate to call. Sincerely, Paul E.Baker PEB/rpr enclosures CONSTRUCTION Project:Slipline existing 18"Sewer on Garth Rd. For:City of Baytown Baytown,Texas REHAB Specialists!Inc.propose to furnish the technical expertise, menf and equipment in accordance with the following terms and conditions as directed by the city of Baytown: 1.Develop a job plan andprovide the supervisory personnel to im plement it for the above project. 2.Provide materials,equipment,and personnelfor fusion ofPoly ethylene liner. 3.Provide equipment and personnel to insert Polyethylene liner in existing sewer. 0^ho Provide materials,equipment and personnel to sealpipe ends in manholes. 5.Compensation shall be as per theaccompanying schedule of charges. 6O Terms of Payment: Invoices will be rendered in duplicateonthe first of each month or upon completion of the project,and will be accompanied by one copy of time sheets and itemized charges for materials and equipment. 7.Schedule: Following authorization to proceed,materialscan be ordered im mediately with field work to commence upon delivery of materials. *■APPROVED:CITY OF BAYTOWN APPROVED:REHAB SPECIALISTS,Inc, Signed:Signed:/1;■<'<-i ///7s'<s^C'r Date:Date:U //<"/''/.<T COST ESTIMATE: Project:SLipline existing 18"Sewer on Garth Rd. For:City of Baytown Baytown,Texas f^1.Develop Job Plan:$N/c 2,Material and Fusion ofLiner: A.Phillips Driscopipe 7600 Industrial Pipe Low Pressure (Sliplining Series):$17,247.06[16"1,558 Linear Feet at $11.07 per foot]= B.Equipment:$2,717.00 C.Personnel:$2,384.20 3»Insertion of Liner: A.Equipment:$1,648.00 B.Personnel:$3,481.40 4*Remote Taps: jps A»Material:$150.00 B.Equipment:$840.00 C.Personnel:$436.80 5.Seal Liner in Manhole: A.Material:.$834.35 B.Equipment:$160.OO C.Personnel:$1,014.00 ESTIMATED COST TO THE CITY OF BAYTOWN:$30,912.81 COST MAY BE LESSTHAN BUT WILL NOT EXCEED:$31,000.00 REHAB Specialists,Inc. The classifications listed below are representative of those that may be used on a project.Individual rates are determined by:personal expertise,productionon past projects,responsibility,and length of service. SCHEDULE OP CHARGESj PERSONNEL: Project Coordinator Field Superintendent Foreman Operator Technician Labor (Trainee) EQUIPMENT Pickup Hydraulic Cleaner Winch Truck Grout Equipment HOURLY RATE RANGES! $17.94 -$20.80 $13.65 -$18.85 $9.75 -$14.30 $9.10 -$16.90 $7.15 -$10.40 HOURLY RATEs $5.00 $17.50 $15.00 $6.25