Ordinance No. 1,656ORDINANCE NO.1656 _ r AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS, AUTHORIZING A CHANGE ORDER TO CONTRACT NO.5,UPPER GOOSE CREEK INTERCEPTOR SEWER,JOB NO.44A,CITY OF BAYTOWN,WITH STEPHENS CONTRACTING COMPANY,MAKING AN APPROPRIATION OF AVAILABLE FUNDS TO PAY THE COSTS OF SAID IMPROVEMENT UNDER SAID CHANGE ORDER, AND PROVIDING FOR THEEFFECTIVE DATE HEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS: Section 1:That the City Council does hereby authorize a change order to the contract with Stephens Contracting Company,Contract No.5,Upper Goose Creek Interceptor Sewer,Job No.44A.A copy of said change order is attached hereto, marked Exhibit "A,"and made a part hereof for all intents and purposes. Section 2:The estimated amount of the costs of said improvement to be paid by the City of Baytown,Texas,under the above mentioned change order to Contract No.5,Upper Goose Creek Interceptor Sewer,Job No.44A,withStephens Contracting Company is hereby found and determined tobe thesum of One Hundred Twenty-One Thousand Eight Hundred Ninety and No/100 ($121,890.00)Dollars.There is ap propriated out of the 1970 Sanitary SewerBond and Grant Fund of the City of Baytown, Texas,such sum of One Hundred Twenty-One Thousand Eight Hundred Ninety and No/100 ($121,890.00)Dollars,which sum has been certified by the Director of Finance of said city,evidenced by his signature at the end of this ordinance,tobe an un encumbered balance of an appropriation and available funds for such purpose,or so much thereof as may be necessary to payand discharge the obligations of the City of Baytown,Texasunder said change order. Section 3:Effective Date:That this ordinance shall take effect from and after the date of its passage by an affirmative vote of the City Council of the City of Baytown. INTRODUCED,READ and PASSED by an affirmative vote of the majority of the City Council of the City of Baytown,Texas,on this 12th day of September 1974. OM GENTRY,Mayor EDNA OLIVER,City Clerk APPROVED .«r.LEFEVRET Director of Finance EXHIBIT "A" iJL^angford 1ngineering,inc.consuhing engineers 9321 KATY FWY.•SUITE 11 •HOUSTON,TEXAS 77024 •713/461-3530 Septenber 6,1974 b D Honorable Mnyor and .City Council City of Baytown P.0.Box 4 24 wn,Texas 77520 Ro:Change Order No.2 Upper Cioose Creek Interceptor Sewer,Job vIo.44 A,Contract Mo,5,City of I.aytovm Gentlemen: On February 15,1974,Change Order No.1 was executed providing for a special construction method andaddition?.!work to install a portion of the subject contract behind the Gulf Coast liorrpital. Prior to this construction unstable soil conditions wore also encountered on the r.ranscov.b Tract and the special construction iuetiiod v.ras used in this area. When construction was begun behindGulf Coast Ho$?iial and across 'die East fork of C-ooso Creek,conventional construction r.othods were used.However,after approximately tv/o weeks of construction, during which constant observations were made of the installation, a structural failure occurred between Saturday,June 29 and Monday,July 1,during a period of high tide.Construction ceased and an internal inspection of the pipo was made.Pipe was exam ined and photographed for a distance of approximately 2400 foot upstream from the damaged section including the special construc tion on tho Brans comb Tract.No pipe upstream from the danced section shoved any movement or structural failure.An attempt was made to inspect a 360 foot,section of 36 inch gravity sewer installed in October and November of 19 73 but this could not be inspected internally as silt and mud had filled the pipe. Change Order No.2,as recoranonded,establishes prices and quan tities to complete the construction by the specialconstruction method (established in Change Order No.1)behind Gulf Coast Hospital,and to install 56-inch ductilo ironby the special D L^angford iU^ngineenng,inc. .,,.September 6,1974HonorableMayorandCityCouncil-2- construction method in tho event the 36-inch in place,between Gulf Coast Hospital and Spur 201,that could not be internally inspected has been damaged or moved by unstable soil, The contractor will clean tho 36-inch sever in place and an internal inspection-will be made.Cleaning tho"lino will re quire four to sixweeks.V,'c recommend that the contractor immedi ately place on order the 24-inch ductile iron and the 36-inch ductile iron as delivery tir.e on these itews is approximately 120 ydays.If the 36-inch pipe in place is satisfactory the 36-inch ductile iron pipe order can he cancelled.Considering material delivery time and construction tine,anticipated project comple tion is March,1975. The contractor has requested,and wo would rcconmend,a reduction in retainac;C to 2%on all acceptable workwhich is not contingent on Change Order No.2.iiov/over,so^e finish up and clean wo workjbUJJwillberequiredpriortoarecommendationforreductionin'rc- 1 -^taina^e. Uponyour approval of Change Order Ao.2,v;e will imuediately notify the contractor to bs;-;in pipe cioaninj;operations and to order the necessary materials to complete the project. Yours truly, LANGFORD ENGINEERING,INC.; Ivan "Langford/'Jr.,'P.E. President RV.'S:j lp Attach. cc:Mr.Fritz Lanhan 0m*Mr.Doutf Lunceford^Mr.Jack Morton Mr.Bill Stephens Langford Engineering,Inc.,Baytown CHANGE ORDHR NO.2 September 6,1974 City of Baytown P.0.Box 424 Baytown,Texas 775 20 Subject:Request for Approval of Rates on Labor,and/or Material and/or Equipment used on Extra Work. Contractor:Stephens Contracting Co. Contract Dated:June 7,1973 Original Contract Amount:$481,419.00 Project:Construction of Upper Goose Creek Interceptor Sewer in Baytown,Harris County,Texas,Job No.44A,Con tract No.5. Dear Sir: Due to additional unstable soil conditions encountered on the subject project,we recommend the followingestimated quantitifcs and unit prices to be added to the contract. Approx.Unit .No-Description Quan.Price Extension 1.36"D.I.,Class 4, All Depths 360 L.F.$82.00/L.F.$29,520.00 2.24"D.I.,Class 4 All Depths 533 L.F.51.00/L.F.27,030.00 3.Timber Left inPlace.1621 MFBM 40.00/L.F.64,840.00 4.Brick Bulkhead l 500.00 500.00 TOTAL $121,890.00 Change Order No.2 Job No.44A,Cont.No.S September 5,1974 Page 2 The 36-inch ductile iron and 24-inch ductile iron will be installed on timber bents as per Change Order No.1 and paid at the contracted timber price and a quantity of 31.5 MFBM per bent. Estimated Cost of Work Covered by Above $121,890.00 Previously Approved Extra Work (CO.#1)25,493.00 TOTAL $147,383.00 Revised Contract Amount $628,532.00 RECOMMENDED FORAPPROVAL: LANGFORD ENGINEERING,INC. President APPROVED: CITY OF BAYTOWN,TEXAS AGREED: STEPHENS CONTRACTING CO, By: George Dobbins Date: By:■ Fritz Lanham City Manager Date: RWM:ph