Ordinance No. 14,053ORDINANCE NO. 14,053 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO.7 WITH CRAIN GROUP, LLC, FOR THE BRUNSON THEATER RENOVATION PROJECT, AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN IN THE AMOUNT OF ONE HUNDRED TWENTY-SIX THOUSAND EIGHT AND 81/100 DOLLARS ($126,008.81); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That subject to funding from the Baytown Municipal Development District, the City Council does hereby authorize Change Order No. 7 with Crain Group, LLC, for the Brunson Theater Renovation Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That subject to funding from the Baytown Municipal Development District, the City Council of the City of Baytown authorizes payment to Crain Group, LLC, in an amount not to exceed ONE HUNDRED TWENTY-SIX THOUSAND EIGHT AND 81/100 DOLLARS ($126,008.81) in accordance with the change order authorized in Section 1 hereinabove. Section 3 : This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 110' day of April, 2019. 01�_ .�( wcc;� BRANDON CAPETILLO, Mayor aST:. LETICIA BRYSCH, Clerk APPROVED AS TO FORM: NACIO RAMIREZ, SR., i Attorney .cobfsO1\Lega1\Karen\Files.City CounciI\0rdinances\2019\Apri1 11.ChangeOrderNo74BrunsonTheater.doc CITY OF BAYTOWN Change Order No. 7 BRUNSON THEATER RENOVATION - 2019 i ivi DATE - 4/5/19 BMTOWN Brief Description of Changes: Additional cost to waterproof and seal the floor and walls as indicated on sketch provided by RPA Architects, including required additional flashing at adjacent buildings. A total of $126,005.07 will be added to the Contract Sum. 136 day are being added due the critical path of the project being placed on hold until a resolution and direction to proceed was established to mitigate and waterproof discovered conditions at the adjacent buildings that were causing water intrusion into the Brunson space. This change order includes a credit of the cost only for Change Order #6 as the time included has expired while waiting on a direction to proceed. if this change order is approved at the 4/11/19 City Council Meeting, the scheduled Substantial Completion date will be 6/14/19. Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 Terrazo Floor Recommendation LS 1 $ 34,875.00 $ 34,875.00 2 Floor and Wall Recommendation LS 1 $ 39,602.80 $ 39,602.80 3 Additional Flashing at Origianl Coping LS 1 $ 10,107.00 $ 10,107.00 4 Flashing @ Lower Existing Wall LS 1 $ 4,327.00 $ 4,327.00 5 Demoliton and Build Back Interior Walls LS 1 $ 25,778.00 $ 25,778.00 6 Dumpsters LS 1 $ 500.00 $ 500.00 7 Final Clean LS 1 $ 5,000.00 $ 5,000.00 8 General Conditions LS 1 $22,848 $ 22,848.00 9 Crain Group OH & P LS 1 $ 14,303.41 $ 14,303.41 10 Credit for Cost Only of Change Order #6 LS 1 $ (31,332.40) $ (31,332,40) Total $ 126,008.81 Contract Price 116,844,25 126,008.81 1,541,853.06 Original Contract Duration 138 Previous Extensions 62 This Change Order 136 lRevisect t),uration - C:alegtar Uays , 1 336 Crain Group RPA Architects Engineering Director Date City Manager Date EXHIBIT A ttAIN caour Change Order Request #7REV2 4.4.19 PROJECT: Brunson Theater 311 West Texas Avenue Baytown, TX 77523 Project No 18-007 DESCRIPTION QTY UNIT RATE ITEM TOTAL DIVISION TOTAL A. Terrazo Floor Recommendation Key Epoxy Terrazo System to match existing pattern 1 Is $34.875.00 $34 875 00 Key Epocoat: Self leveling moisture membrane 1 Is incl Total $34 875 00 B. Floor and Wall Recommendation (Reverse bathtub effect) Install Planiseal VS Primer T. and Novaplan floor sealant 1 Is $39,602.80 $39 602.80 Grind Existing Floor Substrate 1 Is incl CR1 12" vertically up the wall 3" on floor at exterior walls 1 Is incl Pressure wash and seal East & West wall w/ Planiseal WR 1 Is incl Total $39.602 80 C. East Wail Recommendation (NOT INCLUDED) Apply BASF Senergy Stucco 0 Is $0.00 $0.00 Total NOT INCLUDED D. Additional Flashing at Original Coping Fasica extention to cover gaps in existing brick 1 Is $10 107 00 $10.107 00 Total $10 107.00 E. Flashing @ Lower Existing Bank Wall Z trim flashing above shared wall 1 Is $4.327.00 $4 327 00 Total $4.327 00 F. Demolition and build back of finished walls Demo finished sheetrock and studs along exterior 1 Is $25 778 00 $25.778 00 Build back studs and sheetrock 1 Is incl Paint tape and float 1 Is Ind Total $25.778.00 G. Dumpstem Dumpsters needed for added scope 1 ea $500.00 $500.00 Total $500.00 H. Final Clean Additional cleaning of interior space due to disruptive work 1 Is $5 000.00 $5 000.00 required Total $5.000.00 I. General Conditions 1 Is $22.848.00 $22,848 00 Total $22.848 00 Subtotal $143,037.80 Crain Group OH&P 10.001l $14,303.78 Grand Total $157,341.58 CREDIT FOR CHANGE ORDER #6 Grand Total $126,009.18 APPROVED BY DATE QUALIFICATIONS: 1 CDR considers waterproofing floor only in areas depicted in RPA sketch (attached). 2 CDR includes manufacturer warranty's for installed products as described. 3 CDR only considers a credit for the costs included in Change Order #6. as the time included has expired while waiting on a direction to proceed 4 Crain Group requests 136 days to be added to the Contract Time if approved at the 4/11/19 City Council Meeting. If this Change Order is approved an 4/11119, the estimated Substantial Completion date will be 6/14/19. The number of days required to be added is subject to change pending City approval timeframe. EXHIBIT A National Terrazzo Tile & Marble, Inc. kh0N 5728-A Hood St. - Houston. Texas - 77023 937 Reinlie, Austin, Texas 78754 Phone 713.923.8600 - Fax 713.923.1043 Phone 512.476.8400 - Fax 512.476.8408 Date: March 25, 2019 Bid to-- CRAIN GROUP Attention: ZACK BREAZEALE Phone: 713-436-8727 Fax: Project: BRUNSON THEATER - EPDXY TERRAZZO Material Included: O Yes Labor Included: 21 Yes Tax Included: 21 Yes ❑ No Addendum: ❑ Yes ❑ No P No National Terrazzo, Tile and Marble, Inc. is pleased to submit a base bid in the above referenced project for: $34,875.00 Scope of Work: EPDXY TERRAZZO, 3 COLOR AND PATTERN DESIGN TO MATCH EXISITING COLORS TO MATCH AS CLOSE AS POSSIBLE EPOCOAT MOISTURE MEMBRANE FIGURED FULL COVERAGE KEY 580 CRACK MEMBRANE FIGURED FULL COVERAGE TERRAZZO FIGURED TO NTMA GUIDELINES Bid and Qualfcations will be included and referenced in contract. Exclusions: Alternates: PROTECTION FIGURED 1 Terms of Payment Payment to us is not contingent upon payment to the general contractor from the owner If not covered by the specifications on or before the 15th of the month following our request we shall from you for the total value of materials delivered at the job site and work in place, less retainage as stipulated in the prime contract You will withhold no greater percentage retainage from us than the owner holds I 2 Insurance Liability insurance will be evidenced on a certificate (Accord or other standard form) Our insurance will not be primary to the insurance carried by the contractor or any other subcontractor Endorser additional insured(s) and waivers ofsubrogation will not be added to our policies You are to carry complete insurance coverage on all materials and equipment delivered by us at or m the building orjobsite at no ci 3 Hold Harmless/Indemnity Provisions Our liability will be hrruted to the maximum of our insurance coverage and to the extent that we are liable 4 SuretyBonds, Should a surety bond be required by you or a surety bond be required by us the party requesting the bond will pay the premium Our current rates will be given to you upon request 5. Facilities' The jobsite must have adequate heat potable water. hoisting facilities and operator, gangway scaffolding, light storage space and electrical current Connections for terrazzo grinding equipment are 2 on some jobs 220150A13P. All electrical power and electncal connection are to be supplied by you at no cost to us If adequate power is not available. you will supply generators or necessary electrical breakers as r 6 Charges No specific or pro -rated charges for the use of telephone plaster patching general cleaning general office expense stenographer watchmen or temporary structures is included in this proposal No all to pro -rated charges of any sort 7 Demolition/Floor preparation Unless stated in the scope of work or inclusions demolition and/or preparation work are not included in our bid Only normal slab preparation in accordance with N T M A specifica of installation involved is included in our bid. 8 Slab Conditions. Any concrete slab onto which we are to install a -thin-set" or bonded -to -concrete' system shall be structurally sound Coarse steel -trowel finished and free of any fins ridges or voids Slab must (Absolutely NO concrete curing agents are to be used on concrete where terrazzo is to be installed) Slab must be free of all surface contaminants and level (within 114 per 10 ),or with required slopes to drain An necessary to correct conditions will be done as an extra to our contract following issuance ofa change order for a mutually agreeable amount If thislob is epoxy terrazzo, it is the responsibility of the owner, archite contractor, and/or engineer to ensure that the slab (substrate) is not defective due to vapor emissions, hydrostatic pressure, or moisture migration I I I E EXHIBIT A Proposal M.E.K. IS A CERTIFIED MWBE AND HUB CONTRACTOR M.E.K FloorsOffice: (281) 598-6001 P.O. Box 41299 Fax: (281) 598-6005 Houston, Texas 77241 Email: WWW.MEKFloors.net Submitted To: Crain Group Project: Brunson Remediation Attention: John Green / Zack Breazeale Date: 4/4/2019 JOB Address: Proposed By: Bill Wilson City. State: Email: BILL@MEKFloors.com Cell: 832-229-6328 Description I Unit Qty. Unit Sell Extention Bead Blasting to CSP2 and Hand wand wall aster SF 3,500.00 3.34 $ 11,690.0( Plainiseal VS 3 gal A and B EA 3.00 $ 2,355.22 $ 7,065.6( One Coat CR 112" up existing exterior walls 3" on floor 5.00 $ 337.60 $ 1688.0( Primer T 2 gallon Floor Coat 8.00 $ 286.88 $ 2 295.0, Nova Plan 2 + 50 LB Bag - 25 SF Bag 140.00 $ 62.38 $ 8,733.2( Plainitop X to fill Voids At CRl exterior and interior 10.00 $ 49.44 $ 494.4( LMR Fabric 2.00 $ 654.38 $ 1308.7E Power Washing Exterior Wall Above Citizen Bank 1.00 $ 800.64 $ 800.6, Lift For Pressure washing and Applying Plainiseal WR Exterior 1.00 $ 934.08 $ 934.01 Planiseal WR 200 SQ FT Gallon 8.67 $ 529.76 $ 4 593.0: Sales tax not included unless noted above. M.E.K. is a certified HUB & MWBE Business All work warranteed one(1) year from installation. Moisture tests will be billed at $50 for each required to cover manufactures warranty. Epoxy Grout and Backer Boards Not included unless specifically stated above. Additional Bags of Floor Prep Will be charged at $50.00 per bag. Excluded no testing performed by outside Technician. No furniture moving included unless specificallly stated. SUBTOTAL $ 39,602.8( Material TAX Total With Tax 1 $ 39,602.8( Job changes not conforming to last print date on proposal; incurring more materials or labor will require a change order. Prices are based on clean floors, broom swept, and ready to receive flooring. Floor preparation, demo, mopping, vacuuming, waxing, and protection is not included unless specifically stated in proposal. All prices are based on work completed during normal hours unless otherwise noted. It is the responsibility of the Gerneral Contractor to make sure all slabs are cured to meet Floor Covering Standards. Terms Net 30 Accepted By Date ROOFING * SHEETMETAL * WATERPROOFING Since 1961 * Commercial * Industrial * Residential Change Proposal Request Project: Brunson Theater Renovation Request 4 315 West Texas Avenue Baytown, TX 77520 Construction Project #: 173056 Walton Job No: 8-1470-11 Date 4/2/2019 To: Crain Group, LLC 3801 Knapp Road Pearland, TX 77581 Attn: John Green Condition Encountered: Add fascia extender to cover brick face as per the attached detail approximately 405 If Description of Work: Field measure, shop fabricate and install new 24 ga. pre - finished galvalume metal fascia extender with a new 22 ga. galvanized continuous cleat, Remove and dispose of all debris generated by job Labor $8,127.00 Materials $1,980.00 FOR THE SUM OF $10,107.00 Exclusions: Structural stability of the bank side roof, wood blocking, engineering, 10 Additional days will be required for this change NOTE: Standard F. W. Walton Inc. terms and conditions apply. If I can provide you with any additional information, please call me @ 713-674-9777. Sincerely, F.W. Walton Inc. Tony Walton, Vice President Name: Title: Date: EXHIBIT A HPR MODIFIED BITUMEN MEMBRANE FLASH NG PLY CONTINUES UP INSIDE FACE OF PARAPET OVER AND DOWN OUTSIDE P T WOOD NAILER, FIELD VER FY DIMENSION :UNINU MIN 24 GA NKE-FINISHED HEET METAL COPING Wt 6' COVER LATES OF SAME PROFILE ONTIN000S CONCEALED CLEATS 2 GA GALVANIZED SHEET META; 'AME METAL TYPE AS COPING) ASTEN @ 6- O/C FASCIA EXTENDER CONTNUOUS CLEAT ROOFING * SHEETMETAL * WATERPROOFING Since 1961 * Commercial * Industrial * Residential Change Proposal Request Project: Brunson Theater Renovation 315 West Texas Avenue Baytown, TX 77520 Construction Project #: 173056 Walton Job No: 8-1470-11 To: Crain Group, LLC 3801 Knapp Road Pearland, TX 77581 Attn: John Green Request 3 Date 3/27/2019 Revised 4/2/2019 Condition Encountered: Existing wall leak repair approximately 30 If. Description of Work: Field measure, shop fabricate and install new 24 ga. pre - finished galvalume metal EJ cover, counter flashing and cleat to seal up the top of the adjacent wall to eliminate water getting into the cavity, install new peal & stick underlayment prior to installing metal expansion joint, provide new NP-1 sealant to caulk trough of counter flashing, Remove and dispose of all debris generated by job Labor $2,599.00 Materials $1,728.00 FOR THE SUM OF $4,327.00 Exclusions: Structural stability of the bank side roof, wood blocking, engineering, 4 Additional days will be required for this change NOTE: Standard F. W. Walton Inc. terms and conditions apply If I can provide you with any additional information, please call me @ 713-674-9777. Sincerely, F W. Walton Inc. Tony Walton, Vice President Name: Title: Date. EXHIBIT A SXIST'tics,3 � bvuq* t CA -a" Tli.FE., Gout. Wry vet/ PP-19 FCP&V r—m5l}tHC,t C t,.eAl- exjsTlsGL pTlNfa Gltim1S wy— Wi4Ll. (orm-ro SYX) TEM MgWq -FLAWIN 6 Cmzwo) MN�L why. EXHIBIT A afety First 10506 Sagecanyon Drive Houston, TX 77089 281-780-0657 Name / Address Crain Group 3801 Knapp Rd Pearland,Tx 77581 (o)713-436-8727 (F)713-436-8730 CHANGE ORDER Project:Brunson Theater Renovation Estimate Date Estimate # 3/19/2019 385 Item Description Rate Extra Wok This item includes: 25,778.00 1-Remove studs and sheetrock exterior walls that intersect with exterior walls 2-Remove exterior sheetrock and frame at exterior walls. 3-Build back all the wall with studs and drywall. 4-Tape, Float and paint corner to corner back to finished state. Notes: 1-KNJ will not be responsible for any type of work not specified on this estimate 2-Working areas have to be cleaned on a daily basis by "KNJ" and haul all the trash and deposit in the dumpster. (Provided Dumpster EXCLUDED) 3-All these items include material and labor unless otherwise described. 4-This estimate may change after 30 days due to increase in material price. 5-Scissor lift or Boom lift EXCLUDED. Phone # Fax # E-mail Total: $25,778.00 281-780-0657 281-484-3716 KNJ construction a yahoo com