Ordinance No. 14,026ORDINANCE NO. 14,026 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 4 WITH E.P. BRADY LTD, FOR THE PARTIAL SERVICE AREA DIVERSION TO THE NORTHEAST WASTEWATER TREATMENT PLANT SERVICE AREA ALTERNATIVE PROJECT, IN THE AMOUNT NOT TO EXCEED NINETY-FOUR THOUSAND SIX HUNDRED NINETY-SEVEN AND 501100 DOLLARS ($94,697.50); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 4 with E.P. Brady Ltd, for the Partial Service Area Diversion to the Northeast Wastewater Treatment Plant Service Area Alternative Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes payment in an amount not to exceed NINETY-FOUR THOUSAND SIX HUNDRED NINETY-SEVEN AND 50/100 DOLLARS ($94,697.50) to E.P. Brady Ltd, for the change order authorized in Section 1 hereinabove. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 28th day of February, 2019. BRANDON CAPETILLO, Mayor ATTE LETICIA BRYSCH, City erk APPROVED AS TO FORM: NOR, t/r FA Ki Or.1101 LOB 1611F.110 I I.11�, • COBFSOI\LegaW,aren\Files.CityCounciROrdinances\2019\Febmary28%ChangeOrderNo4forPartialServiceAreaDiversionNEWWTPServiceAreaaltemativeProject.doc Exhibit "A" CITY OF BAYTOWN 904Change Order No. 4 BAYTOWNPartial Service Area Diversion to the Northeast •rte Wastewater Treatment Plant Service Area Alternative 2/12/2019 PO: 1706985 Brief Description of Changes: Extend limits of trenchless co.struction from S I A 12+90 to STA 13+30'1-0 avoid AT&T buried utilities, Adjust scope to rehabilitate lift station wet %veil and com ert to manhole. Increase quantity of asphalt pavement replacement to accommodate limits of trench excavation. Add or Delete Items: Item Description Unit Quantity Unit Price Total 9 Demolish UPS Lift Station LS -1 $ 15,000.00 $ (15,000.00) 38 24 -inch Diameter Gravity Sanitary Sever, Depth < 12 -foot Lr -75 S 286.65 S (21,498.75) 41 24 -inch Diameter Graeity Sanitary Sewer Pipe in 36 -inch Steel Casing, All Depths b� Trenchless Construction at Roadway and Dri%e%va y Crossings Lr 71i S 1,354.15 101,561.25 52 Remove and Dispose of Asphalt Roadway Pavement, AII'Ihicknesses S 555 $ 20.00 $ 11,100.00 56 Asphalt Roadway Pavement Repair and Replac.ement Sl 557 S 40.00 $ 22,200.00 65 4' Diameter Manhole EA -1 S 4,500.00 S (4,500.00) 66 Extra Depth 4' Manhole yr -1 S 165.00 5 (165.00) Rehabilitate Lift Station Wet Well and 68 Convert to Manhole LS 1 5 16,000.00 S 16,000.00 B.3 Asbestos Abatement LS -1 S 15,000.00 $ (15,000.00) total Contract Summary: S 94,697.50 Original Contract Price S 3,319,754.10 Previous 5 522,381.35 This Change Order S 94,697.50 Revised Contract Price S 3,936,832.95 Original Contract Duration 217 Previous Extensions 423 This Change Order 28 Re% ised Duration - Calendar Days 668 CI ULID ?�} WS. 2:13: 2019 Contractor: EP Brad)(, Ltd. Date 2.'12x2019 Consultant- KIT Professionals, Inc. Date Engineering Director Date City Manager Date 0/13/Znv l