Loading...
Ordinance No. 14,010ORDINANCE NO. 14,010 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 TO THE 2018 STREET RECONSTRUCTION PROJECT WITH TRIPLE B SERVICES, LLP, FOR NEW PAVING AND WATER UTILITIES FOR INTERLACHEN STREET AND MUSTANG LANE IN AN AMOUNT NOT TO EXCEED FIVE HUNDRED TWELVE THOUSAND FOUR HUNDRED EIGHTEEN AND 57/100 ($512,418.57); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 to the 2018 Street Reconstruction Project with Triple B Services, LLP, for new paving and water utilities for Interlachen Street and Mustang Lane, in an amount not to exceed FIVE HUNDRED TWELVE THOUSAND FOUR HUNDRED EIGHTEEN AND 57/100 ($512,418.57). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 14`h day of February, 2019. 1 BZiNDON CAPETILLO, Ma or ATTEST: LETICIA BRYSCH, Clerk; x, APPROVED AS TO FORM: NACIO RAMIREZ, S Ci Attorney \\COBFSO 1' Legal\Karen\FileACity Council\Ordinances\2019\February 14\ChangeOrderNo 12AnnualStreetReconstructionContract. doc Exhibit "A" CITY OF BAYT'O N Change Order No.1 2018 5110; L i RECONSTRU(--) TON PROJECT 1/18/2019 Iron 1808483 Rdef Desrriponn of Qattara: New pavinE and walcr fnr lnicriad — and Mustang La, requaled by the City of Daylown. Add or Delcte Items - Item Description Unit Quartifty UnItHce Total 1 hlabMicalion 1 i9 S/3AW-00 $43,50000 2 7• inch Thick CanerctoPayment (CompiewinPlace) 4682 Sy $1111 0 SM4,73MA0 3 Remove and Replace Ex. Curb with 6 -inch Curb Uncluded with 7hwttkn curbs) 2752 LF $3M SWAM 5 Remove mid Replace Fr. HlwWWalkwayn 81.62 Sy I S173M $14,161.07 7 &Irmhlime5tab01mdSutWadc(ComplewinPlace) 5175 Sy $LSD 512,81250 8 Ume (1ype A or 13) (11% by weight) 124 TON $181.110 522261.00 9 RemweAnd ReplsceEx. Curb WcfaWith 5-FeetWide Type CCatch B&Au Indudlag Rcc rowctin8 Inlet Pipes (All nep" Compk4.lar Placa) 2 EACH 5585000 511700.011 14 Remove And Replace Existing Mm. 6 -Inch Concrete Dtiveways Includes Das Weak And 84nch Cement Stabilized Subgra le k Compaction (Cumpkle In Place) 628 SY S125M 57450000 16 Remove And Replacebfdgmes 19 EACH S200A0 S3,BM.00 17 Remove AndRephoeTraRicEgas 4 EACH 530500 $1,220.00 24 Fire Hydrant Assembly, Includes 64nch diameter Iexd, 6 -huh rote valve, Complete In place 1 EACH $3 500A0 $3,=.00 25 IftsbU Short Side Water Service, Complete in place 2 PACH 6400A0 5800.00 26 Insall Lang Side Water Seav(cq Complete in Place 8 EACH SL075A0 S8 600.00 32 6 -inch Cut Plug aid Abandon Exhling Wa sone 2 EACH 571000 51,90.00 38 Temporary Crossover and Driveways (Installation and Removal) 21 EACH $195.00 "A" o0 39 Removal k Disposal of minimum Ern. 7 -Inch thU co naete pavement (Camplele in Place) 4682 Sy 52.00 S9,3W AO Al 9 hKh Diameter PVC C -M Waterlbw With All Fittings Wlrestralntts And Appurtenances, All Depth+, Complete In Place 101 LF 647 s0 f6 41]60 43 6dnrhDiameter PVC C-9WWataEroWith All FR(fng@W/reslminlsAnd All Depdm Complete In Flue u 6 r3+50 $317,7MAppurtenances, 44 64 nit X 6 -Inch Wet Canned And Valva Complete In Plas 3 EACH $3,885.00 $11,6.55.00 45 8 -in& X frinchTopping Skene And Valva Complete In Pies 2 EACH S4,2aW 58,4WM 46 AddluonalTsafOcCanlml 1 is 35,750.00 55,7511.00 1 Od81nal CanuactPrice - -------- T Onvasr Contingency - ----- Pnrvlous GMUngency auawri Aunt {Th:z ConlLigezny aulhurizalion Rcmaminj;cmurgcncy -- �- - 4Ch=gT a Orders - Prcvirua awage Orden _. 7Ma d..g. nnlc:.--. ---- ---- a Iirvinet CuntraC 171ce _ _--_ Contract Duration - Calendar Tune ExUsnslole Rvvb¢dContract mUon•Calendar Days 6617A7857 $2,810,15250 $2,010,152.501 550,110.0.00 $., ST,NIU,152.:U33,322,5TI.V! 1 EnglnoaringMi for Data C31y Manager Date