Ordinance No. 14,010ORDINANCE NO. 14,010
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, AUTHORIZING CHANGE ORDER NO. 1 TO THE 2018 STREET
RECONSTRUCTION PROJECT WITH TRIPLE B SERVICES, LLP, FOR NEW
PAVING AND WATER UTILITIES FOR INTERLACHEN STREET AND
MUSTANG LANE IN AN AMOUNT NOT TO EXCEED FIVE HUNDRED
TWELVE THOUSAND FOUR HUNDRED EIGHTEEN AND 57/100
($512,418.57); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize Change Order No. 1 to the 2018
Street Reconstruction Project with Triple B Services, LLP, for new paving and water utilities for
Interlachen Street and Mustang Lane, in an amount not to exceed FIVE HUNDRED TWELVE
THOUSAND FOUR HUNDRED EIGHTEEN AND 57/100 ($512,418.57). A copy of said change
order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes.
Section 2: This ordinance shall take effect immediately from and after its passage by the
City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City
of Baytown this the 14`h day of February, 2019.
1
BZiNDON CAPETILLO, Ma or
ATTEST:
LETICIA BRYSCH, Clerk;
x,
APPROVED AS TO FORM:
NACIO RAMIREZ, S Ci Attorney
\\COBFSO 1' Legal\Karen\FileACity Council\Ordinances\2019\February 14\ChangeOrderNo 12AnnualStreetReconstructionContract. doc
Exhibit "A"
CITY OF BAYT'O N
Change Order No.1
2018 5110; L i RECONSTRU(--) TON PROJECT
1/18/2019
Iron 1808483
Rdef Desrriponn of Qattara:
New pavinE and walcr fnr lnicriad — and Mustang La, requaled by the City of Daylown.
Add or Delcte Items -
Item
Description
Unit
Quartifty
UnItHce
Total
1
hlabMicalion
1
i9
S/3AW-00
$43,50000
2
7• inch Thick CanerctoPayment (CompiewinPlace)
4682
Sy
$1111 0
SM4,73MA0
3
Remove and Replace Ex. Curb with 6 -inch Curb Uncluded with 7hwttkn
curbs)
2752
LF
$3M
SWAM
5
Remove mid Replace Fr. HlwWWalkwayn
81.62
Sy
I S173M
$14,161.07
7
&Irmhlime5tab01mdSutWadc(ComplewinPlace)
5175
Sy
$LSD
512,81250
8
Ume (1ype A or 13) (11% by weight)
124
TON
$181.110
522261.00
9
RemweAnd ReplsceEx. Curb WcfaWith 5-FeetWide Type CCatch B&Au
Indudlag Rcc rowctin8 Inlet Pipes (All nep" Compk4.lar Placa)
2
EACH
5585000
511700.011
14
Remove And Replace Existing Mm. 6 -Inch Concrete Dtiveways Includes Das
Weak And 84nch Cement Stabilized Subgra le k Compaction (Cumpkle In
Place)
628
SY
S125M
57450000
16
Remove And Replacebfdgmes
19
EACH
S200A0
S3,BM.00
17
Remove AndRephoeTraRicEgas
4
EACH
530500
$1,220.00
24
Fire Hydrant Assembly, Includes 64nch diameter Iexd, 6 -huh rote valve,
Complete In place
1
EACH
$3 500A0
$3,=.00
25
IftsbU Short Side Water Service, Complete in place
2
PACH
6400A0
5800.00
26
Insall Lang Side Water Seav(cq Complete in Place
8
EACH
SL075A0
S8 600.00
32
6 -inch Cut Plug aid Abandon Exhling Wa sone
2
EACH
571000
51,90.00
38
Temporary Crossover and Driveways (Installation and Removal)
21
EACH
$195.00
"A" o0
39
Removal k Disposal of minimum Ern. 7 -Inch thU co naete pavement
(Camplele in Place)
4682
Sy
52.00
S9,3W AO
Al
9 hKh Diameter PVC C -M Waterlbw With All Fittings Wlrestralntts And
Appurtenances, All Depth+, Complete In Place
101
LF
647 s0
f6 41]60
43
6dnrhDiameter PVC C-9WWataEroWith All FR(fng@W/reslminlsAnd
All Depdm Complete In Flue
u
6 r3+50
$317,7MAppurtenances,
44
64 nit X 6 -Inch Wet Canned And Valva Complete In Plas
3
EACH
$3,885.00
$11,6.55.00
45
8 -in& X frinchTopping Skene And Valva Complete In Pies
2
EACH
S4,2aW
58,4WM
46
AddluonalTsafOcCanlml
1
is
35,750.00
55,7511.00
1 Od81nal CanuactPrice - --------
T Onvasr Contingency - -----
Pnrvlous GMUngency auawri Aunt
{Th:z ConlLigezny aulhurizalion
Rcmaminj;cmurgcncy -- �- -
4Ch=gT a Orders -
Prcvirua awage Orden
_. 7Ma d..g. nnlc:.--. ---- ----
a Iirvinet CuntraC 171ce _ _--_
Contract Duration - Calendar
Tune ExUsnslole
Rvvb¢dContract mUon•Calendar Days
6617A7857
$2,810,15250 $2,010,152.501
550,110.0.00 $.,
ST,NIU,152.:U33,322,5TI.V!
1
EnglnoaringMi for Data
C31y Manager Date