SCADA UPGRADE PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
****************************************************************************************************
WHEREAS, the Baytown Area Water Authority's enabling legislation requires that the City Council approve
certain agreements before Baytown Area Water Authority (`BAWA") enters into the same; and
WHEREAS, on January 16, 2019, the Board of Directors of BAWA approved the Second Amendment to the
Professional Services Agreement with Hatch Associates Consultants, Inc., f/k/a Shrader Engineering Inc., for the BAWA
SCADA Upgrade Project; and
WHEREAS, the City of Baytown desires to approve such agreement; NOW THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the recitals set forth hereinabove are hereby found to be true and correct and are hereby
adopted.
Section 2: That the City Council of the City of Baytown, Texas, hereby approves the Second Amendment
to the Professional Services Agreement between the Baytown Area Water Authority and Hatch Associates Consultants,
Inc., f/k/a Shrader Engineering Inc., for the BAWA SCADA Upgrade Project, which amendment is attached hereto as
Exhibit "A" and incorporated herein for all intents and purposes.
Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of
the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the CityCouncil of the Cityof Baytown this the
24 n day of January, 2019. 1 !° - .
Mayor
ATTE
LE ICIA BRYSCH, City Clerk
APPROVED AS TO FORM:
NACIO RAMIREZ, SR., Cityorney
,JAY'!, s►+t?�'y`''`��.
I
r
y
RAKarenTiles •City CoundhOrdinances\2019Vanuary 24\ApprovingBAWAAmendment2forShraderEngineering. doc
Exhibit "A"
SECOND AMENDMENT
TO THE PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE BAYTOWN AREA WATER AUTHORITY AND SHRADER ENGINEERING,
INC., FOR THE BAYTOWN AREA WATER AUTHORITY WATER TREATMENT PLANT
SCADA UPGRADE PROJECT
STATE OF TEXAS
COUNTY OF HARRIS
This Second Amendment ("Second Amendment") to the Professional Services Agreement
between the Baytown Area Water Authority and Shrader Engineering, Inc., for the Baytown Area Water
Authority Water Treatment Plant SCADA Upgrade Project, dated March 2, 2016, is made by and between
the same parties on the date hereinafter last specified to authorize the additional services indicated herein
for the Baytown Area Water Authority Water Treatment Plant SCADA Upgrade Project (the "Project").
WITNESSETH:
WHEREAS, the Baytown Area Water Authority ('BAWA" or "Owner") and Hatch Associates
Consultants, Inc., f/k/a Shrader Engineering, Inc., (the "ENGINEER") did enter into an Agreement for
engineering services, dated March 2, 2016, for the Project ("Agreement"); and
WHEREAS, OWNER and the ENGINEER amended the Agreement on November 13, 2017, for
the ENGINEER to provide additional programming services as requested by BAWA for the Project (the
"First Amendment"); and
WHEREAS, OWNER and the ENGINEER desire to amend the Agreement for the ENGINEER
to provide additional engineering services for the plant water equipment to be connected to the upcoming,
new PLC -HSP as detailed herein;
NOW THEREFORE, for and in consideration of the mutual covenants and agreements herein
contained, the parties hereto do hereby mutually agree as follows:
1. Definitions. Unless a different meaning clearly appears from the context, words and phrases as
used in this Second Amendment shall have the same meanings as in the First Amendment and the
Agreement.
2. Amendments.
a. The scope of the services to be performed by the ENGINEER is hereby amended to include
the services detailed herein for the Project.
b. Exhibit A, Part 2 "Additional Services," Section A2.02 "Required Additional Services" of the
Agreement is hereby amended to add subsection B, which subsection shall read as follows:
PART 2 — ADDITIONAL SERVICES
A2.02 Required Additional Services
B. ENGINEER shall perform services necessary for the connection of the
following signals within the cabinet PLH-HSP:
Second Amendment, Page 1
1. Plant Water Pump No. 1 VFD - Comm: Ethernet Cable,
2. Plant Water Pump No. 2 VFD - Comm: Ethernet Cable,
3. Plant Water Pump No. 3 VFD - Comm: Ethernet Cable,
4. Plant Water Flow Transmitter - Power. Conductors (2 - #12 + GND),
5. Plant Water Flow Transmitter - Comm: 1PR#16 Twisted Shielded Pair,
6. Plant Water PS Suction Pressure - Comm: 1PR#16 Twisted Shielded
Pair, and
7. Plant Water PS Discharge Pressure - Comm: 1PR#16 Twisted Shielded
Pair.
Task 1: SCADA Design Services.
ENGINEER shall perform the following additional SCADA design tasks:
1. PLC and HMI control diagrams and design drawings to incorporate three
(3) VFDs, connected to an OWNER provided and OWNER -
programmed network switch within cabinet PLC -HSP. Three (3) open
Ethernet ports will be required.
2. PLC and HMI control diagrams and design drawings to incorporate one
(1) flow transmitter within cabinet PLC -HSP. The design will include
both power and communications cabling. Hatch will provide an
additional analog I/O module in the design if it is required.
3. PLC and HMI control diagrams and design drawings to incorporate
two (2) pressure transmitters within cabinet PLC -HSP. Hatch will
provide an additional analog 1/0 module in the design if it is required.
Task 2: SCADA and HMI Programming Services.
ENGINEER shall perform the following additional SCADA and HMI
Programming Services to incorporate the equipment into the SCADA/HMI
System:
1. Program the assigned IP addresses into each of three (3) VFD controllers.
2. Set up and configure the required VFD I/Os for operating the plant water
system.
3. Develop the PLC ladder -logic required for remote manual and automatic
control of the plant water system.
4. Modify the existing HMI graphics and displays to add monitoring and
control functionality for the plant water system.
5. Test the functionality of the HMI graphics and the PLC programming
with the plant water system field instrumentation and electrical devices
once they are all installed and wired
6. Ensure that the programs will provide means for control, data logging,
and alarms for the following items:
a. Pump Control - Automatic and Manual Start/Stop control.
Automatic control will have operator adjustable set -points for
start/stop operation of the plant water pumps. Set points are based
on plant water pressure.
b. PID speed control — each of the VFD speeds will be controlled via
a PID loop within the PLC. The PID loop will vary the VFD
Second Amendment, Page 2
speed to maintain a constant pressure within the plant water
system.
c. Data Logging and Trending The following information will be
stored and be available for the operator to view on the screen or
download in a spreadsheet format:
(1) VFD Speed on continuous intervals.
(2) System pressure readings on continuous intervals.
(3) Daily number of pump starts, elapsed time, and start/stop times
(4) System flow GPM readings on continuous intervals
d. Cumulative Totalized Flow and Daily Total Flow
e. Alarm Reporting and History The following alarms will be
reported to the Autodialer. Alarm history will be saved and
available for review.
(1) Pump fail to respond to call signal
(2) VFD Fault (all critical alarms from VFD will be monitored
over Ethernet)
(3) Extra Low, Low, High, and Extra High System Pressure
(4) Extra Low GST, Pump Lock -Out
(5) Extra Low, Low, High, and Extra High Flow
7. Troubleshoot and diagnose issues related to the PLC and HMI
programs and communications with field equipment and devices.
Task 3: Engineering Design Services.
ENGINEER shall perform the following additional engineering design services:
1. Power Supplies: The level detectors will be loop powered through
the 2 -wire shielded cable, so an external power supply will be
designed to power the devices. A location in one of the RIO
panels will be strategically chosen.
2. Conduits to GSTs: ENGINEER will design the conduit and
ductbank pathway from the chosen RIO panel/power supply to the
three (3) GSTs. Those conduits will run up to the top to an area
that will be chosen by BAWA for final connection and installation
of the level sensors.
3. Wiring: ENGINEER will design the 2 -wire shielded cables
required to connect the level sensors to both the power supply and
the 4-20mA spare analog inputs at the chosen RIO panel. If a
repeater is required, ENGINEER will also design the location of
the repeater.
4. OWNER -provided Equipment: ENGINEER's design shall include
the level sensor, installation bracket, outdoor display, and
manufacturer's cable between the level sensor and outdoor display
as OWNER -provided equipment that the contractor will install,
Second Amendment, Page 2
which will allow OWNER to purchase the equipment without markup
from the contractor.
c. Exhibit C, Article 4 "Payments to the ENGINEER," Section C4.03 "For Additional Services"
of the Agreement is hereby amended to read as follows:
C4.03 For Additional Services
A. OWNER shall pay ENGINEER for Additional Services as follows:
General. For services of ENGINEER's employees engaged directly on the
Project pursuant to paragraph A2.01 or A2.02 of Exhibit A of the Agreement,
except for services as a consultant or witness under paragraph A2.0l.A.13, an
amount based upon the actual hours worked plus Reimbursable Expenses.
Additional Services shall not be performed without the prior written consent of
the OWNER. Additional services which may be authorized in accordance with
Section A2.02.A shall not exceed $11,000. Additional services which may be
authorized in accordance with Section A2.02.13, including Reimbursable
Expenses shall not exceed the following:
3. Entire Agreement. The provisions of this Second Amendment, the First Amendment, and the
Agreement should be read together and construed as one agreement provided that, in the event of
any conflict or inconsistency between the provisions of this Second Amendment and the
provisions of the First Amendment and/or the Agreement, the provisions of this Second
Amendment shall control.
4. Interpretation. This Second Amendment has been jointly negotiated by the parties hereunder and
shall not be construed against a party hereunder because that party may have assumed primary
responsibility for the drafting of this Second Amendment.
5. Captions. Captions contained in the Agreement, the First Amendment, and the Second
Amendment are for reference only and, therefore, have no effect in construing the documents.
The captions are not restrictive of the subject matter of any section.
6. No Waiver. By this Second Amendment, BAWA does not consent to litigation or suit, and
BAWA hereby expressly revokes any consent to litigation that it may have granted by the terms
of this Second Amendment, the First Amendment, and/or the Agreement or any other contract or
agreement or addenda, any charter, or applicable state law. Nothing contained in this Second
Amendment. The First Amendment, or in the Agreement shall be construed in any way to limit or
to waive BAWA's sovereign immunity.
Second Amendment, Page 3
IN WITNESS WHEREOF, the parties hereto have executed this Amendment in multiple copies,
each of which shall be deemed to be an original, but all of which shall constitute but one and the same
amendment, this day of January 2019, the date of execution by the General Manager.
BAYTOWN AREA WATER AUTHORITY
By:
RICHARD L. DAVIS, General Manager
ATTEST:
LETICIA BRYSCH, Assistant Secretary
APPROVED AS TO FORM:
IGNACIO RAMIREZ, SR., General Counsel
HATCH ASSOCIATES CONSULTANTS,
INC., F/K/A SHRADER ENGINEERING,
INC.
By:
(Signature)
(Printed Name)
(Title)
(Signature)
(Printed Name)
(Title)
,COBFSO1�Legal\Karen\Files\Engineering\Engineering Agreements\Sluader Engineering Company\BAWA SCADA\SecondAmendment.doc
Second Amendment, Page 4