Loading...
Ordinance No. 14,002ORDINANCE NO. 14,002 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 WITH ANGEL BROTHERS ENTERPRISES, LTD, FOR THE HUNT ROAD EAST OF GARTH ROAD TO N. MAIN STREET AND HUNT ROAD WEST FROM SAN JACINTO BLVD. TO JOHN MARTIN ROAD PROJECT, IN THE AMOUNT OF TWO HUNDRED FORTY-SEVEN THOUSAND ONE HUNDRED FIFTY-ONE AND NO/100 DOLLARS ($247,151.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. I with Angel Brothers Enterprises, LTD, for the Hunt Road East of Garth Road to N. Main Street and Hunt Road West from San Jacinto Blvd. to John Martin Road Project, in the amount of TWO HUNDRED FORTY-SEVEN THOUSAND ONE HUNDRED FIFTY-ONE AND NO/100 DOLLARS ($247,151.00). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 24h day of January, 2019. BRANDON CAPETILLO, Ma r ATTUST: LETICIA BRYSCH, City Clerk APPROVED AS TO FORM: ACIO RAMIREZ, SR., Ci ttorney RAKaren\Files\City Council'•.Ordinances\2019Vanuary 24+ChangeOrderNoMHuntRoad.doc Receive�"bit "a" JAN 0 4 2019 CITY OF BAYTOWN City of 6aytown Engineering Dept Change Order No. 1 BMTOWN Hunt Road Expansion East of Garth to N. Main Street and Hunt Road Expansion West from San - Jacinto Blvd. to John Martin Project (John Martin Water Line Extension) 1211412018 Brief Description of Changes: This change order provides for constructing a water line on John Martin Road to loop the water service from 1-10 (Buc-ee's) to Hunt Road and San Jacinto Blvd. ' Add or Increase Items: Item Description Unit Quantity Unit Price Total Water Line 68 12" AWWA C900, CL 150 DR 18 PVC Water Line LF 2,651 $ 34.00 $ 90,134.00 81A (New) 20" Steel - Bore and Case (John Martin) LF 65 S 197.00 S 12,805.00 81B (New) 20" Steel Casing by Open Cut (Hunt) LF 93 $ 160.00 $ 14,880.00 74 Ductile Iron Fittings Ton 1.0 $ 8,800.00 $ 8,800.00 72 12" RW Valve EA 6 $ 2,400.00 $ 14,400.00 71 Fire Hydrant, 4 Foot Bury, Mechanical Joint, 6" Valve Box and Tee EA 9 $ 4,400.00 S 39,600.00 66A New ITS&V on 12" EA 1 $ 7,500.00 $ 7,500.00 67 Tie -In 12" WL at Hunt Road EA 1 $ 500.00 $ 500.00 Water Line Total: S 188,619.00 Electrical 89A New 2-6" Conduits (Concrete Encased) for Electrical Duct Bank LF 110 S 62.00 $ 6,820.00 89B New 4-6" Conduits (Installed in Casing) for Electrical Duct Bank LF 83 $ 116.00 $ 9,628.00 89C New 6-6" Conduits (Concrete Encased) for Electrical Duct Bank LF 145 $ 50.00 $ 7,250.00 89D New 24" Steel Casing - Bored LF 83 $ 234.00 $ 19,422.00 Electrical Total: $ 43,120.00 Total: Contract Summary: 247,151.00 Original Contract Price $ 8,333,430.15 Previous Change Orders $ This Change Order 4, , Revised Contract Price S 8,580,581.15 Original Contract Duration - Calendar Das 480 Previous Time Extensions 0 This Change Order Revised Contract Duration - Calendar Days 480 Contrilctor to Director of Finance Date Cons, ant Date Director of Engineering Date City Manager Date Misc. Items Traffic Control Plan LS 1 51A New $ 2,200 00 $ 2,200.00 156 OSHA Trench Safety System for Excavation Depths over 5 Feet LF 2746 $ 2,00 S 5,492.00 155 Cement Stabilized Sand, for misc., As directed by Engineer, Paid by Ticket Ton 24 $ 30.00 $ 3,000.00 $ 720.00 $ 3,000.00 (New) SWPPP LS 1 151 Hydro -mulch Seeding for Disturbed Areas Acres 1 $ 1,500.00 $ 1,500.00 159 Material Testing LS 1 $ 2,500.00 $ 2,500.00 Misc. Items Total: $ 15,412.00 Bid Amount Total: $ _ Contingency: 1247,151.00 $ Total: Contract Summary: 247,151.00 Original Contract Price $ 8,333,430.15 Previous Change Orders $ This Change Order 4, , Revised Contract Price S 8,580,581.15 Original Contract Duration - Calendar Das 480 Previous Time Extensions 0 This Change Order Revised Contract Duration - Calendar Days 480 Contrilctor to Director of Finance Date Cons, ant Date Director of Engineering Date City Manager Date