Loading...
Ordinance No. 13,961ORDINANCE NO. 13,961 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, APPROVING CHANGE ORDER NO. 3 TO THE BAYTOWN AREA WATER AUTHORITY 6 MGD SURFACE WATER TREATMENT PLANT PROJECT BETWEEN THE BAYTOWN AREA WATER AUTHORITY AND PLW WATERWORKS, LLC; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. **************************************************************************************************** WHEREAS, the Baytown Area Water Authority's enabling legislation requires that the City Council approve certain agreements before Baytown Area Water Authority ("BAWA") enters into the same; and WHEREAS, on December 5, 2018, the Board of Directors of BAWA approved Change Order No. 3 to the Baytown Area Water Authority 6 MGD Surface Water Treatment Plant Project between the Baytown Area Water Authority and PLW Waterworks, LLC; and WHEREAS, the City of Baytown desires to approve such change order; NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the recitals set forth hereinabove are hereby found to be true and correct and are hereby adopted. Section 2: That the City Council of the City of Baytown, Texas, hereby approves the Baytown Area Water Authority 6 MGD Surface Water Treatment Plant Project between the Baytown Area Water Authority and PLW Waterworks, LLC, which change order is attached hereto as Exhibit "A" and incorporated herein for all intents and purposes. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 13`h day of December, 2018. -, B �ONAPETILLO, Mayor ATT T: LETICIA BRYSCH Ci erk APPROVED AS TO FORM: NACIO RAMIREZ SR. Ci tt rney ► ' ' `•1C0BFS01\Lega1\Karen\Fi1es,City Council\Ordinances\2018\December 13\ApprovingBAWAChangeOrderNo3.doc Exhibit "A" BAYTOWN AREA WATER AUTHORITY Change Order No. 03 IGD SURFACE W ER TREATMENT PLANI PO: Date: 8 -Oct -18 The City has elected to add back into the Contract, the Generator & Associated Electrical Gear which was originally deleted from the Contract in Change Order No. 01. Add or Delete Items: Item Description Unit Quantily Unit Price Total CO 3.1 Generator & Associated Electrical Gear LS 1 1,658,000.00 $ 1,658,000.00 $ Dotal Contract Summarv: 1,658,000.00 OriLdnal Revised 1 Original Contract Price 1095 Previous Extensions $52,186,000.00 $52,186,000.00 2 Owner Contingency Revised Duratio5&alendar Days 1095 $0.00 Previous Change Orders This Change Order Remaining Contingency 3 Change Orders Previous Change Orders This change order ($6,054,777,09) $ 1,658,000.00 4 Revised Contract Price $52,186,000.00 $47,789,222.91 Original Contract Duration 1095 Previous Extensions 0 This Change Order 0 Revised Duratio5&alendar Days 1095 / 'r October 8, 2018 Contractor: PLW Waterkv4 Ks, LLC Date: Emilio Lope c tti. Executive Vice President t0fidIt. Consultant: Jo slCarter, Inc. Date: Engineering Director Date: City Manager Date: waterworks October 4, 2018 Jose Pastrana Engineer C.I.P Baytown Water Authority City of Baytown 2401 Market St. Baytown, Texas 77520 RE: Baytown Area Water Authority Construction of 6 MGD Surface Water Treatment Plant PLW Project No. P3T Change Order #003 RFV 3 Dear Mr. Pastrana, Please see attached revised spreadsheet and breakdown of cost associated with Change Order #003, as requested by the City of Baytown to only include the Generator. A subsequent Change Order will be requested for work associated with previous versions of Change Order #003. Line Item #014 — Add Generator and Gear — Change Order #001 deleted the Generator and associated Gear. BAWA/The City of Baytown elected to reinsert this item into the Contract. Please see the attached summary breakdown and change order No. 01 for additional information. ADD - $1,658,000.00 Direct Cost Subtotal: $1,658,000.00 Overhead and Profit Addition @15%: $0 Bonds/Insurance Addition @ 3%: $0 Change Order #003 Addition Total: $1,658,000.00 Please feel free to contact me at (713) 301-8637 if you have any further questions. Regards, �4�9- Katy Drown Project Manager 1726 Hughes Landing Blvd., Suite 1200 The Woodlands, TX 77380 (281) 907-8600 - Fax: (713) 621-0386 Equal Opportunity Employer SAWA 6 MGD Surface Water Treatment Plant rhanva nrdor ea A-1-1,.,.,.. Changed Change from VE to VE (CO ffl) Order 43 Items Description CO3 Unit City City Unit Price Total 1 PLW PreconNL Yes !• 0 0 5 30,000.00 S 2 Remove lime stabilized fill material No - 3 Eliminate earthwork at all future structures No 4 Substitute concrete [ra,rement at non main drive ;south OPS Yes 0 0 5 24,000.00 $ 5 Delete concrete pavement No 6 Remove undercut/claV liner from forebaV No 7 Delete scope associated with second sludge lagoon No 8 Delete horizontal control joints to be allowed for continuous pour walls No 9 Delete backwash clarifier No 10 Delete maintenance building No 11 Change 5 TVpe D Manholes to Type C No 12 Eaton Vs. Square D No 13 Delete redundant feeder and transformer No 14 Add generator and ear yrs LS a t $ 1,658,000.00 $ 1,658.000.00 15 Change ductbank concrete from 30001351 to 2000PSI No 16 Programming and SCADA Yes LS 01 0 $ 450,000.QO $ 17 Reroute sample waste stream system to sludge lagoon. Install 6" PVC -DL from samp -Filter No 18 Self -backwash concrete change and earthwork Yes LS tl 0 518,377.92 $ 19 Self -backwash filter additional formwork/shoring change Yes LS 0 0 $3,220.21 $ 20 Self -backwash filter reinforcinE chane Yes IS 0 0 $10,000.00 $ 21 Self -backwash filter additional platform, chain fence, (adder, etc. Yes LS 0 0 $12,060.00 $ 22Self-backwash filter additional lightinjL conduit & wire Yes LS I 0 0 $3,400.00 S 23 Self -backwash filter piping chane es LS 0 0 $19.001.37 $ 24 Self -backwash filter flow meter change to insert typees LS 0 0 $63,267.00 $ 25 Self -backwash filter actuator chane to remove stemes LS 0 0 $0.00 $ 26 Compacted regular backfill in pipe galleryes LS 0 0 $3,600.00 $ - 27 Chan a 4" to 6" DI -BW from backwash um to slud a la oes Ma LS 0 0 $9,960 $28 Add 40'x40'x6" crushed concrete pad at maintenance buildines CY 0 0 $604 S29 6" PVC•SS from SS to maintenance buildines LS 0 $17,928 S30 Add 40'of 2" PVCPW from "T" to maintenance bulldies LS 0 1 $4.000 $31 Stub out 4" PVC -SS and 2" PVC•PW at mai ntenance buildines LS 0 0 $600 $ 32 Electrical Sub Addtl. Bonding Yes LS 0 0 $6,350 $ 33 Credit for deleted InIets/SafetZ Ends as discussed Yes LS 0 1 ISi3,180) [JC TOTAL SUBiTQTpk - - t _ f OH&P 1594 items 4 and 14 removed ff36 S BONDS/INS. 3% Items 4 and 14 removed TOTAL $ 1,658,000.00 Baytown Area Water Authority Change Order No. 1 6 MGD Surface Water Treatment. Plant Rrrief Qescriptinn of Changes: This change order is issued as value engineering opttoita for the IIAWA 6 MGD Surface Water 1'reatmenl Plant ("The scope of Change Order NO. 01 is limited In itums 1.11, as shown in Request for llropnsal No, 1, doled March 28, 20111 and Addendum Nn 1 to Request for Proposal Nu. I dated April 16, 2018 Issued by )ones and Carter this s(atment was added after BAWA and Council approval) Add or Delete Items,; Item Description Unit Quantity Unit Price Total 1 Remove lime slabiliied Fill Materials from (toads 1 (275,000.00) S (275,01)0.00) 2 Eliminate earthwork at all futuro structures I (1,200,000.00) $ (1,200,000.00) 3 Substitute concrete pavement with crushed concrete pavement at non main drive and roads 48,242 1 (110,000.00) $ (110,000.00) q Delete Concrete Pavement 180110 1 (90,000.00) $ (90,(100.00) 5 Remove Clay Liner from fnrebay 1 (125,000.00) $ (125,000.00) 6 delete scope associated with second lagoon 1 (75,000.00) S (75,0110.00) 7 Delete horizontal control joints to allowed for continuous pour walls 1 (15,000.OD) S (15,000.00) 8 delete backwash clarifier I (fr.90,00D.1)0) S (650,000.00) 9 delete maintenance building 1 (850,000.00) $ (850,000.00) in Change 5 Type "D" Manholes to Type f 1 (72,000.00) $ (72,0110.00)• 11 Eatnn Vs. Square D package l (333,600.00) $ (333,600.(10) 12 Delete redundant feeder and transformer 1 (610,000.(111) $ (610,000.00)- 1.3 Delete generator and gear I (1,658,000.011) S (1.658,000.01)) 14 Change ductbank concrete from 3000psi to 2000psi l (30,000.00) $ (30,000.00) Total $ (6,093,600.(10) (zQati L$srrnmary Original Contract Price Previous Change Orders This Change Order Revised Contract Price Original Conlract Duralinn - Previous Time lixtensions I'his Change Order Revised Contract Duration - Calendar Days Pepper Lativkmu Dale r 0 F11011 Director of Flhimce Dale )ones and Carter Date S 52,186,OtI11.110 fi - $ (6,093,600.00) S 46.092,400.00 1(1`15 0 0 1095