BAWA Resolution No. 2018-25RESOLUTION NO. 2018-25 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY AUTHORIZING CHANGE ORDER NO. 3 WITH PEPPER LAWSON WATERWORKS, LLC, FOR THE BAWA 6 MGD SURFACE WATER TREATMENT PLANT PROJECT IN THE AMOUNT OF ONE MILLION SIX HUNDRED FIFTY-EIGHT THOUSAND AND NO:' 100 DOLLARS ($1,658,000.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY: Section 1: That the Board of Directors of the Baytown Area Water Authority does hereby authorize Change Order No. 3 with Pepper Lawson Waterworks, LLC, for the BAWA 6 MGD Surface Water Treatment Plant Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the Board of Directors of the Baytown Area Water Authority hereby authorizes the payment of an amount not to exceed ONE MILLION SIX HUNDRED FIFTY- EIGHT THOUSAND AND NO/100 DOLLARS ($1,658,000.00) to Pepper Lawson Waterworks, LLC, consistent with the change order authorized in Section 1. Section 3: This resolution shall take effect immediately from and after its passage by the Board of Directors of the Baytown Area Water Authority. INTRODUCED, READ and PASSED by the affirmative vote of the Board of Directors of the Baytown Area Water Authority this the 5a' day of December, 2018. AT LE ICIA BRYSCH, Assistant Secretary APPROVED AS TO FORM: NACIO RAMIREZ, S General Counsel /,BRENDA BRADLEY SMITH, President \COBFSO 1\Legal\Karen\Files\BAWA\Resolution\2018\December\ChangeOrderNo34BAWAEAST.docx Exhibit "A" BAYTOWN AREA WATER AUTHORITY Change Order No. 03 ,IGL) SURFACE W, R TREATMENT PLANT PO: Date: 8 -Oct -18 The City has elected to add back into the Contract, the Generator & Associated Electrical Gear which was originally deleted from the Contract in Change Order No. 01. Add or Delete Items: ItemDescri tion Unit uanti Unit Price Total CO 3.1 Generator & Associated Electrical Gear LS 1 1,658,000.00 $ 1,658,000.00 1e.H.n 1,658,000.00 October 8, 2018 Contractor: PLW Wate s, LLC Date: Emilio Lope c tti, Executive Vice President 1110(1, Consultant: J slCarter, Inc. Date: Engineering Director Date: City Manager Date: Original Contract Duration 1095 Previous Extensions 0 This Change Order 0 Revised Duratio alendar Days 1095 October 8, 2018 Contractor: PLW Wate s, LLC Date: Emilio Lope c tti, Executive Vice President 1110(1, Consultant: J slCarter, Inc. Date: Engineering Director Date: City Manager Date: waterworks October 4, 2018 Jose Pastrana Engineer C.I.P Baytown Water Authority City of Baytown 2401 Market St. Baytown, Texas 77520 RE: Baytown Area Water Authority Construction of 6 MGD Surface Water Treatment Plant PLW Project No. P3T Change Order 4003 REV 3 Dear Mr. Pastrana, Please see attached revised spreadsheet and breakdown of cost associated with Change Order #003, as requested by the City of Baytown to only include the Generator. A subsequent Change Order will be requested for work associated with previous versions of Change Order #003. Line item #014 — Add Generator and Gear — Change Order #001 deleted the Generator and associated Gear. BA WA/The City of Baytown elected to reinsert this item into the Contract. Please see the attached summary breakdown and change order No. 01 for additional information. ADD - $1,658,000.00 Direct Cost Subtotal: $1,658,000.00 Overhead and Profit Addition @15%: $0 Bonds/Insurance Addition @ 3%: $0 Change Order #003 Addition Total: $1,658,000.00 Please feel free to contact me at (713) 301-8637 if you have any further questions. Regards, 4 �9L_ Katy Drown Project Manager 1726 Hughes Landing Blvd., Suite 1200 The Woodlands, TX 77380 (261) 907-8600 • Fax: (713) 621.0386 Equal Opportunity Employer SAWA 6 MGD Surfarp Water Trpatmpnt Plant ri.a n nmar as n. .6a ... Changed Change from VE to VE (CO q1) Order k3 Items Description CO3 Unit city City Unit Price Total 1 PLW PrecanNE Yes t=. 0 0 $ 301000,00 $ 2 Remove lime stabilized fill material No 3 Eliminate earthwork at all future structures No 4 ubstitute concrete pavement at non main drive (south OPS) Yes 0 $ 24.000,00 S 5 Delete concrete pavement No 6 Remove undercut/day liner from foreba Ed No 7 Delete scope associated with second a lagoon No 8 Delete horizontal control joints to be allowed for continuous pour walls No 9 Delete backwash clarifier No 10 Delete maintenance building No 11 Change 5 Type D Manholes to Type C No 12 Eaton Vs. Square D No 13 Delete redundant feeder and transformer No 14 Add generatorand 8ear Yes L5 0 1 $ 1,658,000.00 $ 1,658,000.00 15 Change ductbank concrete from 3000PSI to 20001351 No 16 Pr ammin and SCADA Yes LS 0 0 S 450,000.QC S 17 Reroute sample waste stream system to sludge lagoon. Install 6" PVC -DL from sam No 18 Self -backwash filter concrete change and earthwork Yes LS 0 0 $18,377-92 S 19 Self -backwash filter additional formwork/shoring.change Yes i5 0 0 0.220.21 S 20 SelUl ckWash filter reinforcin, change Yes LS 0 0 $10,000.00 $ 21 Self -backwash filter additional platform, chain fence, ladder, etc Yes LS 0 0 $12,060.00 $ 22 Self -backwash filter additional li htin conduit & wire Yes LS 0 $3,400.00 $ 23Self•backwashfilter piping cha2ge Yes LS 0 0 $19.001.371$ 24 Self -backwash filter flow meter change to insert type Yes LS 0 0 $63,267,00 $ 25 Self -backwash filter actuator chane to remove stem Yes LS 0 0 $0.00 $ 26 Compacted regular backfill in pipe gallery Yes LS 0 0 $3,600.00 $ 27 Change 4" to6" DI -BW from backwash pump to sludge I oon and elan aced length Yes LS 0 0 $9,960 S 28 Add 40'x40'x6" crushed concrete pad at maintenance building Yes icy 0 0 5604 $ - 29 6" PVC•55 from 55 to maintenance buildingYes is 01 0 $17,928 7'- 30 Add 40' of 2" PVC. PW from "T" to maintenance building Yes Is 0 tl $4.000 $ 31 Stub out 4" PVC -SS and 2" PVC -PW at maintenance building Yes LS p p $6 $ 00 32 Electrical Sub Addtl. Sondin@ Yes LS 0 0 $6,350 $ 33 Credit for deleted Inlets/Safety Ends as discussed Yes LS 0 0 34 TOYAL 5UBTOTAt _ _ _ !. 3S OH&P 15% (items 4 and 14 removed)S 36 BONDS/INS. 3% (items 4 and 14 removed) $ 37 TOTAL I eee rv�n nn Baytown Area Nater Authority ' Change Order No. I 6 MGD Surface Water Treatmen( Plant JZrief Description of Changes: This change order is issued as value engineering opttomq for the RAWA 6 MGD Surface Water Treatment Plant ("The scope of Change Order N0.01 is limited In items 1-14, as shown in Request for Proposal No. 1, dared March 28, 2018 and Addendum Nn 1 to Request for Proposal No. 1 dated April 16, 201.9 issued by Jones and Carter this slatment was added afler BAWA and Council approval) Add or Delete Ilegm Item Description Unit Quantity Unit Price Total 1 RemnYC limostabiliifid Fill Mdlerials from Roads I (275,000.00) 5 (27"5,(00.110) 2 Gliminnte earthwork at all future stntctun s I (1,200,000.00) $ (1,200,000.00) 3 Substitute concrete pavement with crushed concrete pavement al non main drive and roads 48,242 1 (11U,(100.00) $ (110,000.00) 4 Delete Concrete Pavement 18000 1 (90,000.00) $ (90,1100.00) 5 Remove Clay Liner from (orebay 1 (125,000.00) $ (1 25,1100.00) 6 deleto scope associated with second lagoon 1 (75,000.00) 5 (75,0110.00) 7 Delete horizontal control joints to allowed for continuous pour walls 1 (15,000.00) S (13,000.00) 8 delete backwash clarifier t (rn-go00.uo) S (650,000.011) 9 delete maintenance building 1 (850,000.00) $ (850,000.00) III Change.i Type "D" Manholes to Type C 1 (72,000.00) $ (7ZMO.00) 11 Baton Vs. Square D package 1 (333,600.00) $ (333,600.00) 12 Delete redundant feeder and transformer 1 (610,000.011) $ (610,000.00), 13 Delete generator and gear 1 (1,658,000.10) S (1.658,000.011) 14 Clmnge ductbank concrete from 3000psi to 2000psi 1 (30,1Mn.00) $ (30,000.M) Total $ (( ,093,6W.00) dict $�rmmary,: Original Contract Price Previous Change Orders 'this Change Order Revised Contract Price Original Contract Duration - PreviousTtme hxtensions This Change Order Revised Contract Duration - Calendar Days 1, Pepper La%Ann Dale r OS/o Director of Pifiance Date ►ones and Carter Date 5 52,186,IX10.I111 fi - $ (fi,1193,600.00) $ 96092,400.00 11195 0 U 1095