2018 07 12 WS MinutesMINUTES OF THE REGULAR WORK SESSION OF THE
CITY COUNCIL OF THE CITY OF BAYTOWN
JULY 12, 2018
The City Council of the City of Baytown, Texas met in a Regular Work Session on Thursday,
July 12, 2018, at 5:30 P.M., in the Hullum Conference Room of the Baytown City Hall, 2401
Market Street, Baytown, Texas with the following in attendance:
Laura Alvarado
Council Member
Robert Hoskins
Council Member
Charles Johnson
Mayor Pro Tem
David Himsel
Council Member
Chris Presley
Council Member
Heather Betancourth
Council Member
Stephen DonCarlos Mayor
Rick Davis City Manager
Ignacio Ramirez City Attorney
Leticia Brysch City Clerk
Mayor DonCarlos convened the July 12, 2018, City Council Regular Work Session with a
quorum present at 5:30 P.M., all members were present with the exception of Council Member
Alvarado who arrived at 5:35 P.M. and Council Member Johnson who arrived at 5:48 P.M.
1. DISCUSSIONS
a. Receive an update regarding the Central District Wastewater Treatment Plant
Project.
City Engineer Jose Pastrana presented the item and stated that many years ago the City began a
project to renovate and make some improvements to the City's Central District Wastewater
Treatment Plant (the "Plant"). He noted that after many changes and reductions, the project is
99% complete. Mr. Pastrana introduced Mr. Trent Slovak, Engineer and Senior Vice President
of KIT Professionals, Inc. (KIT).
Mr. Slovak thanked the Council for their time and stated that he would be giving the Council an
overview of this project with before and after pictures of the facility to show the remarkable
transformation. Mr. Slovak stated that the project is a wastewater treatment plant located near
SH 146 and West Main, along East Creek.
He noted that in 2008, this project was envisioned to be an improvement project to replace some
pumps, increase the reliability of processes, and other items of this sort. At the time when the
project was finally scoped, Hurricane Ike hit Baytown, which caused a completed re -set of the
project. The new project would be designed to mitigate flooding, provide some improvements
City Council Regular Work Session Minutes
July 12, 2018
Page 2 of 6
and also extend the life span of the plant. So after Ike, the City received some monies from the
insurance and from FEMA, in order to get the plant back in to service, but because of the scope
of the new project and some delays in funding, the project was split into two parts: the lift station
portion and the treatment plant. This was a prudent thing to do because the City had money to
get the lift station out of harm's way, while at the same time prepare for the next phase.
Mr. Slovak noted that the project was bided in 2015, which came in over budget and lead to
some value engineering. KIT worked with the City and its contractor to get the price down, and
still get the needed improvements. He noted that the original bid was about $20 million with a
value engineering of 4.2 million, which resulted in an adjusted contract of $16.5 million. When
construction commenced, this was an estimated 760 -day project, but when the storm hit on
September 13`h that changed everything. Mr. Slovak noted that Ike's storm surge was probably,
a 12 foot to 12 -and -a -half -foot elevation storm surge, which resulted in portions of the plant
being submerged. Fortunately, the plant's major unit processes were not submerged, but they did
have significant damage. The lift station gets down to an elevation of 5.5, which is like two
levels down, so, everything; the pumps, motors, electrical equipment, everything was ruined.
The City, within a day or so after the storm, immediately got portable pumps out there in order to
maintain service.
Mr. Slovak showed before and after pictures of the lab building and noted that building has been
elevated and brought up to code and some improvements in the sledge sticker area to allow for
easier and safer access to valves and other mechanisms. Other improvements included the
addition of handrails all the way around the process area the elevation of electrical pumps,
pumps and cycling were replaced along with steps and hand rails to go over the entry pass. Mr.
Slovak noted that the chlorination area was particularly hit hard by the storm, and noted that this
building has also been elevated along with the sulfur dioxide and flooring cylinders. A non -
potable water system was added, which is a great investment as this is used for wash down
water, for spray water and it saves a lot of valuable treated water.
Mr. Slovak stated that the project mitigates future flooding, enhances the performance reliability
of the system, and extends the life of the plant, which is good asset management. The City does
not have to build a new plant, but have instead upgraded this one.
Mr. Slovak noted that KIT worked really well with the City; particularly Engineering and Public
Works, and with the Contractor. He noted that they were able to accomplish the mission of this
project and save some money in the process. He further noted that during the construction, the
recycling facility located at the same facility was kept operational; the contractor said they had
85,000 hours without a lost time accident, and most importantly there were no citizen
complaints. Mr. Slovak closed his presentation by noting that the City had done a great job in
investing and being stewards of this valuable infrastructure.
Mayor DonCarlos asked if the tanks could be painted green or red to match the facility. City
Manager Davis stated that staff would look into some more aesthetically pleasing alternatives for
the tanks and fence at the plant.
City Council Regular Work Session Minutes
July 12, 2018
Page 3 of 6
b. Receive an update regarding the implementation of automatic side -loaders for the
City of Baytown.
Public Works Director Frank Simoneaux presented the item and stated that last year, the City
entered into a new agreement with Waste Management. He noted that as part of the negotiations,
the City agreed to a provision that would allow Waste Management to collect recycle materials
with automatic side -loading trucks. Waste Management has now elected to start using the
automatic side levers in Baytown and Ms. Shanna Lopez, Municipal Solutions Manager for
Waste Management, is going to explain that process. Mr. Simoneaux clarified that this change
does not impact trash collection in any way, only the recycling materials at this time.
Ms. Lopez stated that Waste Management has new recycling trucks that are going to be hitting
the ground in Baytown, an example of which is parked out in front of City Hall, if anyone is
interested in seeing it. She noted that they are aiming to go live with this new service by mid-
August and again noted that this will be for recycling carts, and will not touch the garbage
services.
Ms. Lopez stated that they wanted to make sure the residents do not get alarmed and think that
they are getting more carts delivered or anything like that and notes that they will be moving
forward with this service using the existing recycling carts that are out there now.
Ms. Lopez also stated that she is working with the City's public affairs team to get some facts
and information out to residents through the water bill, postcard, and social media with
information that will focus on the types of materials that can be recycled and the placement of
the carts on the curb in order to allow for the side -loader to access them.
In response to a question regarding boxes that don't fit in the cart, Mr. Lopez stated that residents
can cut boxes down to get them within the cart so they can be recycled, but reminded Council
that the drop-off center is always available to take large amounts of materials and/or they can call
Waste Management for a special pickup.
Ms. Lopez also stated that some residents still have the old 18 -gallon bins and noted that they
have addressed about 100 of those as the idea is to switch as many of those out to carts, in order
to keep the driver within the truck. Ms. Lopez stated that for safety reasons, they do not want the
drivers exiting the truck, so the use of the bins and placement of said bins is very important. He
further noted that Waste Management has identified some areas around the City that the side -
loading truck will not fit, so those areas will still be handled with regular truck and staff. She also
noted that if there are special circumstances; such as elderly, disabled, etc., Waste Management
will address these on a work one-on-one basis. Ms. Lopez clarified that most of the bins will
work with the side -loader with the exception of the small blue bins that were originally handed
out to residents for recycling purposes.
Ms. Lopez thanked the Council for their attention and welcomed them to take a look at the new
side -loader truck at their convenience.
City Council Regular Work Session Minutes
July 12, 2018
Page 4 of 6
C. Receive and discuss a presentation regarding funding options, fees and issuance of
bonds for water and wastewater capital projects.
City Manager Rick Davis presented the item and stated that some weeks ago, staff presented
Council with some information regarding the status of the City's wastewater fund, and promised
to return with a plan of how to make that fund sustainable and provide the resources for future
capital associated with some of the City's SSOI projects and annexation projects.
Finance Director Wade Nickerson stated that as Mr. Davis said, the Council received a
presentation from the Public Works Director Frank Simoneaux regarding the need for the capital
improvements. He noted that over the next five (5) years, the City has about 44 million dollars
in sewer wastewater projects alone that do not include water projects. He noted that these
projects are related to the SSOI Program, services related to the recent annexations, and some
new development pieces.
Mr. Nickerson stated that in looking at the approach to try and fund these projects, part of what
staff looked for was the idea that somehow the City has some new revenue strings in other funds,
like the general fund that may be tapped into; therefore, one of the first things staff did was
reduced the transfer from the water and sewer fund to the general fund by a million dollars. So
essentially, staff cut the amount in half, in order to free up a million dollars in the water and
sewer fund in order to help fund some of these capital projects.
Mr. Nickerson noted that the City also continues to do our pay as we go through projects. The
City has a lot of projects that have been done every year and those have been stopped for now, in
order to use these funds for these big outstanding new projects that need to be completed within
a designated timeframe. He noted that the City will still undertake small repairs and other
miscellaneous things.
Mr. Nickerson noted that the third thing that staff looked at was the fund balance working
capital, which staff usually aims to maintain somewhere around the 60 to 90 -day fund balance
working capital. Staff has decided to budget that closer to the 50 days, which frees up some
additional funding and frees -up approximately three-quarters of a million dollars that can go
towards funding these projects.
Mr. Nickerson also stated that staff is proposing a 4% water and sewer fund increase for FY19,
which will give the City a new revenue stream to maintain the operations and also allow the City
the ability to issue some debt to begin dealing with these big projects. This recommended
increase will give result in an estimated $20 million dollars that can be used towards these
special projects in the first two years that being 2019 and 2020.
Mr. Nickerson noted that in order to complete $44 million worth of projects, the City may need
to undertake additional bonding in the near future; potential in 2020 or 2021 and the hope is that
this first bond issuance will be enough to get through a couple years of these construction
projects. Mr. Nickerson noted that a lot of what dictates future rate increases for water and sewer
City Council Regular Work Session Minutes
July 12, 2018
Page 5 of 6
rates will be costs from Houston, who provides water to BAWA, and then of course those costs
get passed on to the water and sewer fund and capital outlay.
Mr. Nickerson noted that there is always interest in what the average customer will pay on an
average utility bill. Staff looked at this item and the increase to the water and sewer fund will be
basically for a 5,000 gallon per month home, which is basically our average. The City is about
4.86 thousand gallons per month that staff rounded up to 5,000 gallons per month to get an
average water bill. If the recommended increase is approved, the average bill will see a $2.66
increase per month. This proposed new rate was compared to surrounding cities and Baytown is
at the top with the highest rate. However, these cities do not really compare to Baytown as it
relates to its complexity and uniqueness. When comparing Baytown to the cities that Burton and
Associates used in its rate analysis, all had more similarities at it relates to its infrastructure,
systems, population, size, and number of clientele. So when looking at these cities, Baytown is a
little closer in the middle of the group; it is still a little bit on the higher end, but there are quite a
few that have higher rates. Mr. Nickerson noted that as it relates to the elderly and people on
fixed incomes their bills are going to go up basically an estimated dollar and 10 cents. However,
of course if 10,000 or 12,000 gallons are used, the cost will be higher.
City Manager, Rick Davis noted that the increases being recommended are driven by the need to
address projects in three main categories: (1) Sewer System Overflow Improvements (SSOI),
which mandated TCEQ projects, (2) extension of water and sewer lines to the newly annexed
areas and (3) which is not necessarily a project, but does impact them, is the City's ability to
maintain its enterprises funds sustainability, separate from the City's general fund. Mr. Davis
noted that he does not like moving money over from the general fund to subsidized or pad the
water enterprise fund because at one point in the future, that will go away, and Council will be
left with an unsustainable enterprise, which would result in extremely high rate increases.
Therefore, staff has brought Council a blended action plan that can help get the City where it
needs to be in order to achieve a sustainable enterprise while completing these very expensive
mandated projects. Mr. Davis reminded the Council that the water projects are mandated by
TCEQ within a certain time frame and failure to follow through could result in very costly fines.
Additionally, he noted that state law gives cities four years from the date of annexation to extend
the necessary services to newly annexed areas, or the residents can, if they so choose to, request
de -annexation.
The Council briefly discussed the different projects, funding options and noted that the City's
water and sewer rates were already higher than surrounding cities and were sensitive to that
issue. The Council asked if there were other cities that Baytown could better compare to than the
surrounding cities, which have a much smaller water and wastewater system.
Public Work Director Frank Simoneaux stated that it is difficult to compare the City of Baytown
to other cities as there are a number of factors unique to Baytown that make its system so
different. Mr. Simoneaux noted that because the topography in this area is so flat, more lift
stations are required to move the water throughout the city; an example being College Station
that is closer to Baytown in size and population, but unlike Baytown has very few lift stations
because of its topography and having gravity on its side. Baytown, on the other hand has 400 lift
City Council Regular Work Session Minutes
July 12, 2018
Page 6 of 6
stations around the city to help move the water throughout its flat and spread out jurisdiction. He
also noted that College Station gets its water exclusively from ground water wells that are not
treated, while Baytown uses surface water that has to be treated, and is thus more expensive.
Mr. Davis noted that unfortunately, the current Council has inherited a large, aging and complex
infrastructure that has not been upgraded in decades and it falls on the current Council and
Administration to fix these very expensive issues. He further noted that the blended plan
presented looks at multiple funding sources in order to not have significantly rate increase to the
City's water and sewer rates. Mr. Davis also reminded the Council that the rate increase is not to
deal with operational costs, but large projects related to the City's infrastructure that are very
costly; such as lift stations. Mr. Davis stated that staff has tentatively programmed the blended
plan into the budget, which will be delivered to the Council at their next meeting.
d. Discuss any or all of the agenda items on the City Council Regular Meeting Agenda
for July 12, 2018, which is attached below.
This item was not taken.
2. ADJOURN
With there being no further business to discuss, Mayor DonCarlos adjourned the July 12, 2018,
City Council Regular Work Session at 6:29 P.M.