Ordinance No. 13,801ORDINANCE NO. 13,801
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, AUTHORIZING CHANGE ORDER NO. 2 WITH E.P. BRADY LTD,
FOR THE PARTIAL SERVICE AREA DIVERSION TO THE NORTHEAST
WASTEWATER TREATMENT PLANT SERVICE AREA ALTERNATIVE
PROJECT, IN THE AMOUNT NOT TO EXCEED SEVENTY-ONE THOUSAND
SEVENTY-FOUR AND 75/100 DOLLARS ($71,074.75); AND PROVIDING FOR
THE EFFECTIVE DATE THEREOF.
******************************************************************************
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize Change Order No. 2 with E.P.
Brady Ltd, for the Partial Service Area Diversion to the Northeast Wastewater Treatment Plant Service Area
Alternative Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a
part hereof for all intents and purposes.
Section 2: That the City Council of the City of Baytown hereby authorizes the payment in
an amount not to exceed SEVENTY-ONE THOUSAND SEVENTY-FOUR AND 75/100
DOLLARS ($71,074.75) to E.P. Brady Ltd, for the change order authorized in Section 1
hereinabove.
Section 3: This ordinance shall take effect immediately from and after its passage by the
City Council of the City of Baytown. e7
INTRODUCED, READ and PASSED by the affirmative vote the City Council of the City
of Baytown this the 28th day of June, 2018.
S
ATTEST:
LETICIA BRYSCH rty Clerk
?^on
APPROVED AS TO FORM:
ti A^
ACIO RAMIREZ, SR., ty Corney
C0BFS01\Lega1\Karen\Fi1es City Council.Ordinances\2018Uune 28.ChangeOrderNo2forPartialServiceAreaDiversionNEW WTPServiceAreaaltemativeProject doc
EXHIBIT A
CITY OF BAYTOWN
Change Order No. 2
BAYTOWN Partial Service Area Diversion to the Northeast
Wastewater Treatment Plant Service Area Alternative
6/4/2018
PO: 1706985
Brief Description of Changes:
Installation of gravity sewer south of I -10,10 -inch sanitary sewer crossing of I-10 and existing lift station, installation of
10" I iDPI: force main inside existing 24 -inch sanitary sewer, and deletion of "Contract A" based on redesign dated
2/25/18.
307 Calendar Days project duration will restart at execution date of Change Order 2.
Add or Delete Items:
Item
Description
Unit
Quantity
Unit Price
Total
1
Mobilization
LS
1
$ (35,000.00)
$ (35,000.00)
2
Flagmen
LS
1
$ (5,500.00)
$ (5,500.00)
3
Traffic Control and Regulation
LS
1
$ (2,500.00)
$ (2,500.00)
4
Storm Water Pollution Prevention
LS
1
$ (500.00)
$ (500.00)
5
Control of Groundwater
LS
1
$ (40,000.00)
$ (40,000.00)
7
Site Restoration
LS
1
$ (7,500.00)
$ (7,500.00)
8
Trench Excavation Protection
LS
1
$ (500.00)
$ (500.00)
10
Demolish and Remove Existing Sanitary
Sewer Manholes
EA
-16
$ 450.00
$ (7,200.00)
13
15 -foot Diameter FM discharge manhole (STA
12+51)
EA
-2
$ 91000.00
$ (18,000.00)
14
5 -foot Diameter Manhole (STA 12+91 and
STA 15+41)
EA
-1
$ 4,215.00
$ (4,215.00)
15
Extra Depth 5 -foot Diameter Manhole (STA
12+91 and STA 15+41)
VF
-17
$ 167.00
$ (2,839.00)
16
8 -foot Diameter Manhole
EA
-1
$ 37,500.00
$ (37,500.00)
17 1
Extra Depth 8 -foot Diameter Manhole
VF
-15
$ 351.00
$ (5,265.00)
18
6 -inch Manhole Drop Connection (STA 12+91)
EA
-5
$ 1,480.00
$ (7,400.00)
19
8 -inch Manhole Drop Connection (STA 15+41)
EA
-2
S 1,675.00
$ (3,350.00)
20
10 -inch Manhole Drop
EA
-1
S 1,675.00
S (1,675.00)
21
24 -inch Manhole Drop
EA
-1
$ 15,000.00
$ (15,000.00)
22
Cut and Plug 10 -inch Sanitary Sewer
EA
-25
$ 245.00
$ (6,125.00)
23
Cut and Plug 12 -inch Sanitary Sewer
EA
-2
$ 270.00
$ (540.00)
24
Cut and Plug 24 -inch Sanitary Sewer
EA
-8
$ 600.00
S (4,800.00)
25
Grout fill & Abandon 10 -inch Sanitary Sewer
LF
-4404
$ 8.15
S (35,892.60)
26 JGrout
fill & Abandon 12 -inch Sanitary Sewer
LF
-24
$ 9.50
S (228.00)
27
Grout fill & Abandon 24 -inch Sanitary Sewer
LF
-1060
$ 27.50
$ (29,150.00)
28
Remove and Dispose of Existing 6 -inch Force
Main
LF
-9
$ 30.00
$ (270.00)
EXHIBIT A
29
Remove and Dispose of Existing 6 -inch
Sani Sewer
LF
51
$ 40.00
$ 2,040.00
30
Remove and Dispose of Existing 8 -inch
Sanitary Sewer
LF
-14
$ 40.00
$ (560.00)
31
4 -inch Inside Diameter Sanitary Sewer Force
Main b Oen Cut Construction
LF
-7
$ 320.00
$ (2,240.00)
32
6 -inch Inside Diameter Gravity Sanitary
Sewer b en Cut Construction (STA 12+9)
LF
-56
$ 211.00
$ (11,816.00)
8 -inch Inside Diameter Gravity Sanitary
33
Sewer by Open Cut Construction (STA 15+41)
LF
-39
$ 110.00
$ (4,290.00)
10 -inch Inside Diameter Gravity Sanitary
34
Sewer by Open Cut Construction
LF
-12
$ 145.00
$ (1,740.00)
35
10 -inch Diameter Sanitary Sewer Force Main
by Oen Cut Construction (STA 12+40)
LF
-175
$ 125.00
$ (21,875.00)
36
10 -inch Inside Diameter Sanitary Sewer Force
Main
LF
-304
$ 110.00
$ (33,440.00)
10 -inch Inside Diameter Sanitary Sewer Force
37
Main with Restrained Joints by Trenchless
LF
474
$ 110.00
$ (52,140.00)
Construction at Existing Driveways
24 -inch Diameter Gravity Sanitary Sewer,
38
Depth < 12 -foot
LF
1062
$ 286.65
$ 304,422.30
39
24 -inch Diameter Gravity Sanitary Sewer,
Depth > 12 -foot
LF
-641
$ 286.65
$ (183,742.65)
24 -inch Diameter Gravity Sanitary Sewer, All
40
Depths, by Trenchless Construction at
LF
-100
$ 956.35
$ (95,635.00)
Driveway Crossings
24 -inch Diameter Gravity Sanitary Sewer Pipe
in 36 -inch Steel Casing, All Depths by
41
Trenchless Construction at Roadway and
LF
162
$ 1,354.15
$ 219,372.30
Drivewa Crossings
24 -inch Diameter Gravity Sanitary Sewer in
36 -inch Steel Casing by Open Cut
42
Construction up to 10 feet depth (top of pipe)
LF
-293
$ 971.70
$ (284,708.10)
STA 12+51 to STA 16+04
43
Temporary Plug 6 -inch Sanitary Sewer (STA
12+91)
EA
-1
$ 245.00
$ (245.00)
Temporary Plug 10 -inch Sanitary Sewer Force
44
Main (STA 12+40;STA 15+30;STA 16+20)
EA
-3
$ 245.00
$ (735.00)
Temporary Plug 24 -inch Sanitary Sewer (STA
45
16+18)
EA
-1
$ 600.00
$ (600.00)
10 -inch Inside Diameter Sanitary Sewer Force
46
Main with 18 -inch Steel Casing by Trenchless
LF
-145
$ 480.00
$ (69,600.00)
Construction (STA I1+00 to STA 12+51)
Remove Pavement and Install Temporary
47
Crushed Concrete
SY
-267
$ 26.00
$ (6,942.00)
EXHIBIT A
i otai $ (71,074.75)
10 -inch Inside Diameter HDPE Sanitary
48
Sewer Force Main
LF
132
$ 125.00
$ 16,500.00
10 -inch Inside Diameter HDPE Sanitary
49
Sewer Force Main inside Existing 24 -inch
LF
954
$ 110.00
$ 104,940.00
Sanitary Sewer.
18 -inch Inside Diameter Gravity Sanitary
50
Sewer by Open Cut Construction, Depth < 10'
SY
29
$ 500.00
$ 14,500.00
Remove and Dispose of Reinforced Concrete
51
Pavement, All Thicknesses
LF
54
$ 40.00
$ 2,160.00
Remove and Dispose of Asphalt Roadway
52
P
Pavement, All Thicknesses
SY
124
$ 20.00
$ 2,280.00
53
Remove and Dispose of Concrete Curb
LF
12
$ 250
$ 30.00
54
Reinforced Concrete Curb
LF
12
$ 25.00
$ 300.00
Reinforced Concrete Pavement Repair and
55
Replacement
SY
54
$ 175.00
$ 9,450.00
Asphalt Roadway Pavement Repair and
56
Replacement
SY
114
$ 40.00
$ 4,560.00
57
Remove and Replace Gravel Driveways
SY
125
$ 20.00
$ 2,500.00
Remove and Replace Asphalt Pavement
58
Driveways
SY
254
$ 45.00
$ 11,430.00
59
Grout Fill & Abandon 6 -inch Sanitary Sewer
LF
310
$ 8.15
$ 2,52650
60
Grout Fill & Abandon 8 -inch Sanitary Sewer
IF
310
$ 8.25
$ 2,55750
61
Cut and Plug 6 -Inch Sanitary Sewer
EA
2
$ 245.00
$ 490.00
62 JCut
and Plug 8 -inch Sanitary Sewer
EA
2
$ 270.00
$ 540.00
Connection at N. Main SL, Including 8 -foot
63
Diameter Manhole, Steel Casing Removal,
LS
1
$ 37,500.00
$ 37,500.00
and Conduit Routing
12" Waterline Adjustment at N. Main Street,
64
Including Connections, Waterline, Fittings
LS
1
$ 3,000.00
$ 3,000.00
and 2 Gate Valves
65
4 -foot Diameter Manhole
EA
1
$ 4,150.00
$ 4,150.00
66
Extra Depth 4 -foot Diameter Manhole
VF
1
$ 165.00
$ 165.00
10 -inch Diameter Gravity Sanitary Sewer Pipe
in 24 -inch Steel Casing, All Depths by
67
Trenchless Construction at Roadway and
LF
247
$ 910.00
$ 224,770.00
Driveway Crossings
$ -
i otai $ (71,074.75)
EXHIBIT A
Contract Summary:
Original Contract Price
$ 3,319,754.10
Previous
$ 593,456.10
This Change Order
$ (71,074.75)
Revised Contract Price
$ 3,842,135.45
Original Contract Duration
217
Previous Extensions
90
This Change Order
Revised Duration - Calendar Days
307
al�tAws
6/5/2018
Contractor: EP Br dy , Ltd. Date
_
.419
Consult T Profs -ia s, Inc. Date
Engineering Director
City Manager
Date
Date