Loading...
Ordinance No. 13,779ORDINANCE NO. 13,779 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 WITH MIKE BRICKER & ASSOCIATES, INC., FOR THE EVERGREEN CLUBHOUSE RENOVATION PROJECT, IN THE AMOUNT OF EIGHTY-SIX THOUSAND SEVENTY-FOUR AND NO 100 DOLLARS ($86,074.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 with Mike Bricker & Associates, Inc., for the Evergreen Clubhouse Renovation Project, in the amount of EIGHTY-SIX THOUSAND SEVENTY-FOUR AND NO/100 DOLLARS ($86,074.00). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 24th day of May, 2018. 7�1' kA',� 61�� I:A-UkA ALVARADO, Mayor Pro Tem ATT ST: LETICIA BRYSCH, &ify Clerk APPROVED AS TO FORM: NACIO RA�IREZ�,SR. ty Attorney COBFSO P. LegahKarenTiles'. City Council.0rdinances\2018Way 24 ChangeOrderNol4EvergreenClubhouseRenovationProjectdoc Exhibit "A" BAYTOWN s Brief Description of Changes: Equip clubhouse with fire suppression system Add or Delete Items: CITY OF BAYTOWN Change Order No. 1 Evergreen Clubhouse Renovation May 12, 2018 Item Description Unit Quantity Unit Price Total 1 Fire sprinkler and exterior fire main LS 1 $ 86,074.40 I ULM Contract Summary: 4i bb,U MMU Ori inal Contract Price 1 $ 1,036,330.00 Previous Change Orders $ _ This Change Order 8 4 Revised Contract Price $ 1,122,404.40 Original Contract Duration - To be completed within days from the NTP 240 Previous Time Extensions 0 This Change Order 0 Revised Contract Duction - Calendar Days 240 Inc. ate. Director of Parks and Recreation Date Director of Finance Date City Manager Date Mike Bricker & Associates, Inc. CHANGE ORDER No. 00001 PO BOX 1467 Phone: 281- 337- 1856 Dickinson, Texas 77539 Fax: 281- 337- 5113 TITLE: Fire Sprinkler System DATE: 5/14/2018 PROJECT: Evergreen Park Clubhouse Renovations TO: Attn: Dustin Shubert City of Baytown 2401 Market Street Baytown, TX RE: CO To: COBT DESCRIPTION OF CHANCE Total cost this Change Order. $86,074.40 (Eighty six thousand and seventy four dollars and forty cents). JOB: CONTRACT NO: From: MBA Number: 00001 Item Description Stock# Quantity Units Unit Price Tax Rate Tax Amount Net Amount 00001 FimSprinkkrSystcm 1.0001 $86.074.40 0.00°/. 50.00 586.074.40 Unit Cost: $86,074.4Q Unit Tax: $0.0C Lump Sum: $0.0C Lump Tax: $0.0c Total: $86,074.4 The Original Contract Sum was .........»....»... .....»» » .». $1,036,330.00 Net Change by Previously Authorized Requests and Changes »»..........»..».....».».»..»...».».» $0.00 The Contract Sam Prior to This Change Order was ....».» $1,036,330.00 The Contract Sum Will be Increased ». ..... ....»....»...».....»...».».........».........».»»».........».» $86,074.40 The New Contract Sum Including This Change Order ..... $1,122,404.40 The Contract Time Will Not Be Changed.........».».»»........».».........».....................»....».»».». The Date of Substantial Completion as of this Change Order Therefore is ... ACCEPTED: City of Baytown By: Dustin Shubert Date: 5/14/2018 Mike Bricke &Assoc' rtes, Inc. By: 1 (%jA Mike ricke ,President Date: 5/14/2018 By: Date: 0 PW7a: � J Mike Bricker & Associates, Inc. CHANGE ORDER NO. 00001 PO BOX 1467 Phone: 281- 337-1856 Dickinson, Texas 77539 Fax: 281- 337- 5113 TITLE: Fire Sprinkler System DATE: 5/14/2018 PROJECT: Evergreen Park Clubhouse Renovations JOB: TO: Atm: Dustin Shubert CONTRACT NO: City of Baytown 2401 Market Street Baytown, TX RE: CO To: COBT From: MBA Number: 00001 DESCRIPTION OF CHANGE Cut and patching of existing walls FM 200 System and Pre action systems in IDF, Server room(SE) Alarm installation not included Total cost of above items: $69,958.00 Exterior Fire Line and riser by others and not included Miscellaneous material: $2,500.00 Back flo (Added) $5,200.00 Total: 577,658.00 Add Electrical for service panel: S1,246.00 P&OH: $7,170.40 The Original Contract Sum was »......»....»...».»».....»»»........»..»... .--»•»................•». $1,036,330.00 Net Change by Previously Authorized Requests and Changes .»...»..».»...........».».......».»... $0.00 The Contract Sum Prior to This Change Order was »...».. $1,036,330.00 The Contract Sum Will be Increased »...».......»»...»».....»......»..».»...... .........•»»»... $86,074.40 The New Contract Sum Including This Change Order .»» $1,122,404.40 The Contract Time Will Not Be Changed »».....»»».....»»..»......»..•»•»•»»• The Date Date of Substantial Completion as of this Change Order Therefore is »• ACCEPTED: City of Baytown By: Dustin Shubert Date: 5/14/2018 Fspra tM 0 Mike Bricjr & Asso 'ates, In By: �1 (iC By: Mike Bricker,President Date: 5/14/2018 Date: • I CHANGE ORDER Nuke Bricker & Assove aces, nc. PO BOX 1467 Phone: 281- 337-1856 Dickinson, Texas 77539 Fax: 291-337-5113 TITLE: Fire Sprinkler System DATE: 5/14/2018 PROJECT: Evergreen Park Clubhouse Renovations JOB: No. 00001 TO: Attn: Dustin Shubert CONTRACT NO: City of Baytown 2401 Market Street Baytown, TX RE: CO To: COBT From: MBA Number: 00001 DESCRIPTION OF CHANGE Please find the following cost for the described work: Fire Sprinkler System and Exterior Fire Main: Provide interior Fire System only: Starting 1 ft. above FF slab in Designated room approved by Architect closest to the exterior Fire line penetration wall Furnish sprinkler system for the protection of the clubhouse Materials as specified for project by Fire Sprinkler provider City of Baytown Approved design plans included Sprinkler for wet system to be concealed type with white plates Pipe to be black Schedule 10 for the main sprinkler system runs and threaded Schedule 40 on all other lines Outside canopy, attic spaces and front porte to be covered by Fire Sprinkler system All heads in canopy and front entry to be dry batrell sprinklers All heads in attic spaces to be Brass upright sprinklers Price includes all labor and material to install system Design Sprinkler Contractor Permit and Applicable fees includcd All equipment rentals included Work to be done during regular work hours Price is based on Auto Cad drawings from Architect and Engineer being provided to Sprinkler Contractor Paint exposed pipe Exclusions: Ordinary hazard design for office areas Drain down fees/Underground service to building and fire, riser to building Supervisory, Alarm system and controls other than existing Fire control system Ceiling removal TheOriginal Contract Sum was .»....».».»»......».»..»».».»...»»...».»»».....».-..»».»------- $1,036,330.00 Net Change by Previously Authorized Requests and Changes »»......»..»...» »..»• $0.00 The Contract Sum Prior to This Change Order was ......». $1,036,330.00 The Contract Sum Wifl be Increased».»............»....»....».»»....».»...».».».».».».»..»...»».». $86,074.40 The New Contract Sum Including This Change Order ..... $1,122,404.40 The Contract Time Will Not Be Changed....»...»................»..................................»......._....-- The Date of Substantial Completion as of this Change Order Therefore is ACCEPTED: City of Baytown Mike Bricker &Assoc' tes, Inc. By: By: ► � %IZ6N By: Dustin Shubert Mike Bricker,President Date: 5/14/2018 Date: 5/14/2018 Date: ��� Mike Bricker & Associates, Inc. TRANSN=AL No. 00001 PO BOX 1467 Dickinson. Texas 77539 Phone: 281-337- 1856 Fax: 281-337-5113 PROJECT: Evergreen Park Clubhouse Renovations TO: City of Baytown 2401 Market Street Baytown, TX ATTN: Paul Cranford DATE: 5/14/2018 REF: Revised - Fire sprinkler WE ARE SENDING: StIBMITTED FOR: ACTION TAKEN: ❑ Shop Drawings 9 Approval ❑ Approved as Submitted ❑ LAM" Your Use ❑ Approved as Noted ❑ Prints AS Requested ❑ Rearmed After Loan Change Order Review and Comment Resubmit ❑ Plans ❑ Submit ❑ Sam les SENT A•_ ❑ Returned Specifications ( Attached ❑ Returned for Correedans ❑ Offer Its Separate Cover via: E-mail E9 Due Date 5/17/2018 ITEM PACKAGE SUBMITTAL DRAWING REV. ITEM NO. COPIES DATE DESCRIPTION STATUS Co FIRE SPR CO 1 1 5/10/2019 Revised -Proposed required Firs OUT Sprinkler system and back flo Remarks: Revised with Back Flo cost: Please find for your review and approval the Change order for the Fire Sprinkler System for the Evergreen Recreational building. Per our meeting we have added cost for the required Back flo preventer and painting and Electrical connection for the exposed Sprinkler piping where needed, CC: Paul Cranford- City of Baytown, Bob Randall, Architect aveat- 4 Signed: 1 1&� Mike Brick r, de