Loading...
Ordinance No. 13,655ORDINANCE NO. 13655 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, APPROVING THE CONSTRUCTION CONTRACT BETWEEN BAYTOWN AREA WATER AUTHORITY AND PEPPER LAWSON WATERWORKS, LLC, FOR THE BAWA 6 MGD SURFACE WATER TREATMENT PLANT PROJECT AND APPROVING CHANGE ORDER NO. 1 FOR SUCH PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. **************************************************************************************************** WHEREAS, the Baytown Area Water Authority's enabling legislation requires that the City Council approve the agreement before Baytown Area Water Authority (`BAWA") enters into the same; and WHEREAS, on December 6, 2017, the Board of Directors of BAWA approved a construction contract with Pepper Lawson Waterworks, LLC, for the BAWA 6 MGD Surface Water Treatment Plant Project and approved Change Order No. 1 for such project; and WHEREAS, the City of Baytown desires to approve such agreement; NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the recitals set forth hereinabove are hereby found to be true and correct and are hereby adopted. Section 2: That the City Council of the City of Baytown, Texas, hereby approves the construction contract between the Baytown Area Water Authority and Pepper Lawson Waterworks, LLC, for the BAWA 6 MGD Surface Water Treatment Plant Project and approves Change Order No. 1 for such project, which change order is attached hereto as Exhibit "A" and incorporated herein for all intents and purposes. Section 3: This ordinance shall take effect immediately from ander its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the�C Councilofthe City of Baytown this the 14°i day of December, 2017. 1 ATT T: LETICIA BRYSCH, City Clerk APPROVED AS TO FORM: a NACIO RAMIREZ, SR., V Attomey DONCARLOS, Mayor .cobfsOI.legalUCaren\Files',CityCouncillOrdinances\201TDecember WApprovingBEAST.doc EXHIBIT A Baytown Area Water Authority ,--JOT �V_ Change Order No. 1 6 MGD Surface Water Treatment Plant Brief Description of Changes: This change order is issued as value engineering options for the BAWA 6 MGD Surface Water Treatment Plant Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 Remove lime stabilized Fill Materials from Roads 1 (275,000.00) $ (275,000.00) 2 Eliminate earthwork at all future structures 1 (1,200,000.00) $ (1,200,000.00) 3 Substitute concrete pavement with crushed concrete pavement at non main drive and roads 48,242 1 i (110,000.00) $ (110,000.00) 4 Delete Concrete Pavement 18000 1 (90,000.00) $ (90,000.00) 5 Remove Clay Liner from forebay 1 (125,000.00) $ (125,000.00) 6 delete scope associated with second lagoon 1 (75,000.00) $ (75,000.00) 7 Delete horizontal control joints to allowed for continuous pour walls 1 (15,000.00) $ (15,000.00) 8 delete backwash clarifier 1 (650,000.00) $ (650,000.00) 9 delete maintenance building 1 (850,000.00) $ (850,000.00) 10 Change 5 Type "D" Manholes to Type C 1 (72,000.00) $ (72,000.00) 11 Eaton Vs. Square D package 1 (333,600.00) $ (333,600.00) 12 Delete redundant feeder and transformer 1 (610,000.00) $ (610,000.00) 13 Delete generator and gear 1 (1,658,000.00) $ (1,658,000.00) 14 Change ductbank concrete from 3000psi to 2000psi 1 (30,000.00) $ (30,000.00) 1ota1 $ (6,093,600.00) Contract Summary Original Contract Price $ 52,186,000.00 Previous Change Orders $ This Change Order $ (6,093,600.00) Revised Contract Price $ 46,092,400.00 Original Contract Duration - 1095 Previous Time Extensions 0 This Change Order 0 Revised Contract Duration - Calendar Days 1095 Pepper Lawson Date Director of Finance Date Consultant City Engineer Date General Manager Date