Loading...
BAWA Resolution No. 2017-15RESOLUTION NO. 2017-15 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY ACCEPTING THE BAYTOWN AREA WATER AUTHORITY PLANT WATER PUMP STATION PROJECT; AUTHORIZING FINAL PAYMENT OF THE SUM OF THIRTY-TWO THOUSAND SIX HUNDRED EIGHTY-ONE AND 07/100 DOLLARS ($32,681.07) TO R&B GROUP, INC., FOR SAID PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** WHEREAS, the Baytown Area Water Authority (`BAWA") contracted with R&B Group, Inc., for the Baytown Area Water Authority Plant Water Pump Station Project (the "Project"); and WHEREAS, all of the said improvements, as provided in the plans and specifications heretofore prepared by BAWA's engineer have been performed and completed in full accordance with all of the terms and conditions of the aforesaid contract; and WHEREAS, BAWA's engineer in the manner provided by the terms of the said contract and the plans and specifications thereof, has approved and accepted the Baytown Area Water Authority Plant Water Pump Station Project and has heretofore issued his Certificate of Final Acceptance and has certified same to BAWA's Board of Directors and recommended that it accept and receive said work and improvements as constructed and completed by the contractor; and WHEREAS, there remains due and owing to R&B Group, Inc., the sum of THIRTY- TWO THOUSAND SIX HUNDRED EIGHTY-ONE AND 07/100 DOLLARS ($32,681.07); NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY: Section 1: That the Board of Directors of the Baytown Area Water Authority hereby accepts and approves the above-described work and improvements, and finds and determines that all of said improvements have been completed as provided in the plans and specifications thereof, and in full accordance with all of the terms and provisions of the aforesaid contract. Section 2: That the Certificate of Final Acceptance heretofore issued by the Baytown Area Water Authority's engineer and certified to the Board of Directors of the Baytown Area Water Authority is hereby accepted and received. Section 3: That final payment to R&B Group, Inc., in the amount of THIRTY-TWO THOUSAND SIX HUNDRED EIGHTY-ONE AND 07/100 DOLLARS ($32,681.07) is hereby authorized. Section 4: This resolution shall take effect immediately from and after its passage by the Board of Directors of the Baytown Area Water Authority. INTRODUCED, READ and PASSED by the affirmative vote of the Board of Directors of the Baytown Area Water Authority this the 2nd day of August, 2017. I*ENDA BRADLEY SMITH, President A T: LETICIA BRYSCH, Assisl4t Secretary =0 / O� APPROVED AS TO FORM: T. d(WACIO RAMIREZ, SR., a eral Counsel R: KarenTiles BAWA Resolution\2017\August\FinalPayBaytownAreaWaterAuthorityPlantWaterPumpStationProject.doc 2