Loading...
Ordinance No. 13,529ORDINANCE NO. 13,529 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 WITH E.P. BRADY LTD, FOR THE PARTIAL SERVICE AREA DIVERSION TO THE NORTHEAST WASTEWATER TREATMENT PLANT SERVICE AREA ALTERNATIVE PROJECT, IN THE AMOUNT NOT TO EXCEED FIVE HUNDRED NINETY- THREE THOUSAND FOUR HUNDRED FIFTY-SIX AND 10/100 DOLLARS ($593,456.10); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 with E.P. Brady Ltd, for the Partial Service Area Diversion to the Northeast Wastewater Treatment Plant Service Area Alternative Project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment in an amount not to exceed FIVE HUNDRED NINETY-THREE THOUSAND FOUR HUNDRED FIFTY-SIX AND 10/100 DOLLARS ($593,456.10) to E.P. Brady Ltd, for the change order authorized in Section 1 hereinabove. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of City Council of the City of Baytown this the 27th day of July, 2017. AT -TEST: � V LETICIA BRYSCH, City i3lbrk APPROVED AS TO FORM: [JA CHRIS PRESLEY, Mayor Pro Tem C: Users\Karcn.Homer\DesktopUuly 271ChangeOrderNol forPartialServiceAreaDiversionNEWWTPServiceAreaaltemativeProject.doc Exhibit "A" CITY OF BAYTOWN Change Order No.1 BMTOWNPartial Service Area Diversion to the Northeast Wastewater Treatment Plant Service Area Alternative 7/19/2017 PO: 1706985 Brief Description of Changes: Additional work to include limits of sanitary sewer included in Contract A. Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 Mobilization LS 1 $ 35,000.00 $ 35,000.00 2 Flagmen LS 1 $ 17,500.00 $ 17,500.00 3 Traffic Control and Regulation LS 1 $ 17,500.00 $ 17,500.00 4 Storm Water Pollution Prevention LS 1 $ 500.00 $ 500.00 5 Control of Groundwater LS 1 $ 40,000.00 $ 40,000.00 7 Site Restoration LS 1 $ 7,500.00 $ 7,500.00 8 Trench Excavation Protection LS 1 $ 500.00 $ 500.00 5 -foot Diameter FM discharge manhole (STA 13 12+51) EA 1 $ 9,000.00 $ 9,000.00 5 -foot Diameter Manhole (STA 12+91 and 14 STA 15+41) EA 2 $ 4,215.00 $ 8,430.00 Extra Depth 5 -foot Diameter Manhole (STA 15 12+91 and STA 15+41) 7 $ 167.00 $ 1,169.00 18 6 -inch Manhole Drop Connection (STA 12+91) EA 1 $ 1,480.00 $ 1,480.00 19 8 -inch Manhole Drop Connection (STA 15+41) EA 1 $ 1,675.00 $ 1,675.00 6 -inch Inside Diameter Gravity Sanitary 32 Sewer by Open Cut Construction (STA 12+9) LF 18 $ 211.00 $ 3,798.00 8 -inch Inside Diameter Gravity Sanitary 33 Sewer by Open Cut Construction (STA 15+41) LF 20 $ 110.00 $ 2,200.00 10 -inch Diameter Sanitary Sewer Force Main 35 by Open Cut Construction (STA 12+40) LF 25 $ 125.00 $ 3,125.00 24 -inch Diameter Gravity Sanitary Sewer Pipe in 36 -inch Steel Casing, All Depths by 41 Trend -less Construction at Roadway and LF 60 $ 1,354.15 $ 81,249.00 Driveway Crossings Dotal Contract Summary 593,456.10 Original Contract Price 24 -inch Diameter Gravity Sanitary Sewer in $ 3,319,754.10 Previous $ This Change Order $ 593,456.10 36 -inch Steel Casing by Open Cut $ 3,913,210.20 42 Construction up to 10 feet depth (top of pipe) LF 293 $ 971.70 $ 284,708.10 (STA 12+51 to STA 16+04) Temporary Plug 6 -inch Sanitary Sewer (STA 43 12+91) EA 1 $ 245.00 $ 245.00 Temporary Plug 10 -inch Sanitary Sewer Force 44 Main (STA 12+40;STA 15+30;STA 16+20) EA 3 $ 245.00 $ 735.00 Temporary Plug 24 -inch Sanitary Sewer (STA 45 16+18) EA 1 $ 600.00 $ 600.00 10 -inch Inside Diameter Sanitary Sewer Force 46 Main with 18 -inch Steel Casing by Trenchless LF 145 $ 480.00 $ 69,600.00 Construction (STA 11+00 to STA 12+51) Remove Pavement and Install Temporary 47 Crushed Concrete SY 267 $ 26.00 $ 6,942.00 Dotal Contract Summary 593,456.10 Original Contract Price $ 3,319,754.10 Previous $ This Change Order $ 593,456.10 Revised Contract Price $ 3,913,210.20 Original Contract Duration 217 Previous Extensions 0 This Change Order 90 Revised Duration - Calendar Days 307 Contractor: EP Brady, Ltd. Date 7/19/17 Engineering Director Consultant: KIT Professionals, Inc. Date 7/19/17 City Manager Date Date