Ordinance No. 13,486ORDINANCE NO. 13,486
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS,
AUTHORIZING CHANGE ORDER NO. 1 WITH ANGEL BROTHERS ENTERPRISES,
LTD, FOR THE HUNT ROAD EAST PROJECT, WHICH REDUCES THE CONTRACT
PRICE BY THREE THOUSAND EIGHT HUNDRED FIFTY AND NO/100 DOLLARS
($3,850.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
************************************************************************************
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize Change Order No.1 with Angel Brothers
Enterprises, LTD, for the Hunt Road East Project, which reduces the contract price by THREE THOUSAND
EIGHT HUNDRED FIFTY AND N0/100 DOLLARS ($3,850.00). A copy of said change order is attached
hereto, marked Exhibit "A" and made a part hereof for all intents and purposes.
Section 2: This ordinance shall take effect immediately from and
Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote
Baytown this the 8t' day of June, 2017.
ATTEST:
(j
LETICIA BRYSCH, CU Clerk
APPROVED AS TO FORM:
7 u n
NACIO RAMIREZ, SR., CVktfomey
\
' , I `-
RAKaren\Files,City Council`•.0rdinances\2017Vune 8'ChangeOrderNolHuntRoadEastProject.doc
its passage by the City
City Council of the City of
Mayor
Exhibit "A"
CITY OF BAYTOWN
Change Order No.1
HL111t Rd. Cas,
PO: 1703579
Date: 5/31/2017
This CO is for storm sewer changes on Independence Blvd. [hat are needed because the waterline at Garth Road isnot
adjustable.11iis change order also includes a new concrete junction box to replace a large existing brick junction box
behind the Boot Barn in the Independence Blvd. Eight of 1Vay. The existing brick box is caving in at the back will due
to age and insufficient structural capacity.
Add or Delete Items:
Item
Description
Unit
uanti
Unit Price
Total
ADDITIONS -NEW ITEMS
]A
12X-1 RCB
130
LI'
$779
~100,730.00
2A
22'x6' JUNCTION BOX
I
FA
533,;00
$33,500.00
3A
10:X1 I - JUNCTION BOX IVANLET T'OP
I
EA
$27,000
~27,000.00
4A
31'X14' JUNCTION BOX
1
EA
574,000
$74,000.00
5A
14" SPLrr CASING
16
LF
Still
$1,280.00
6A
24" CASING (,MATERIAL ON HAND)
I
LS
$9,900
$9,900.00
7A
i\•IONOLITHIC CURB & GUTTER
135)
LF
$55
$7,425.00
SA
34"RCP TIE-IN TO PROP 10'X4' RCB
I
EA
$750
$+750.00
9A
6" PVC DRAIN TIE-IN TO PROP 12;X4'RCB
I
FA
5351)
+350.00
SUBTOTAL - ADDITIONS -NEW I"1'EMS
5254,955
ADDITIONS - EXISTING ITEM
7
LIME SLURRY
50
TN
5175.00
~8,750
8
SUBGRADE ,NIANIPULATION
2370
SY
54.00
~9,480
12
RE\I & DISP EXIST. ASPHALT & BASE
300
SY
$5.50
~1,650
13
10" BLACK BASE FORTRANSITION PVNIT
16i
rN
582.00
513,530
1.1
2" HAIAC ROADWAY SURFACE
3:;
TN
$106.00
$3,710
25
STORM 141H ON BOX CULVERT
2
EA
$1,400.00
$2,800
27
CURB INLET'S (5 Fl)
1
FA
$2,350.00
52,350
SUBTOTAL -ADDITION -EXISTING urNis
5.12,270
DEDUCTIONS - EXISTING ITEMS
16
10X4' RCB
-130
I_F
$665.00
(�,•tih.•1;t�,
78
34'X14' JUNCTION BOX
-1
LS
$69,000.00
($111',[1110)
29
14:X5' JUNCrFON BOX
-1
I S
$16,000.00
($11000
30
25'X14' JUNCriON BOX
-I
LS
$5O,00().00
x.0001
;4
16" 1.1'L
-2011
LF
$62.00
(,1 _. ;110
�,9
24" STI. CASING, AUGER CONST.
-165
LF
$250.00
82
150 KVA TEMP GENERATOR
-1
1-1'
$1,000.00
93
HYDRO EXCAVATION(UTILITY LOCATE)
-2
DAN'
53,400.00
8.4
BRACE TRAFFIC SIGNAL POLE
-1
LS
$8,800.00
86
FLEX BEAM GUARDRAIL, WOOD POST'
-75
LF
$125.00
( c1.375
SUBTOTAL -DEDUCTIONS- EXIST. rrms
(4;301,1)7,)
TOTAL
153.550)
86 FLEX BEAM GUARDRAIL, WOOD POST .75 LF 5125.00 (59.."75)
SUBTOTAL -DEDUCTIONS- EXIST. ITEMS
TOTAL
Oriainal Contract Price
Change Orders
Previous Change Orders
Revised Contract Price
Original Contract Duration
Previous Extensions 0
This Change Order 0
Revised Duration - Calendar Days
-e 'SI I t -t
Contractor: Angel Brothers Date
�" V4
Consulta Date
$4,320,096.00
($3,850)
$4,320,096.00
($301,075)
(S3,850)
Revised
$4,320,09G
$4,316,246.00
pt
Engine ing Director Date
City Manager
Date