Loading...
Ordinance No. 13,486ORDINANCE NO. 13,486 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 WITH ANGEL BROTHERS ENTERPRISES, LTD, FOR THE HUNT ROAD EAST PROJECT, WHICH REDUCES THE CONTRACT PRICE BY THREE THOUSAND EIGHT HUNDRED FIFTY AND NO/100 DOLLARS ($3,850.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ************************************************************************************ BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No.1 with Angel Brothers Enterprises, LTD, for the Hunt Road East Project, which reduces the contract price by THREE THOUSAND EIGHT HUNDRED FIFTY AND N0/100 DOLLARS ($3,850.00). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote Baytown this the 8t' day of June, 2017. ATTEST: (j LETICIA BRYSCH, CU Clerk APPROVED AS TO FORM: 7 u n NACIO RAMIREZ, SR., CVktfomey \ ' , I `- RAKaren\Files,City Council`•.0rdinances\2017Vune 8'ChangeOrderNolHuntRoadEastProject.doc its passage by the City City Council of the City of Mayor Exhibit "A" CITY OF BAYTOWN Change Order No.1 HL111t Rd. Cas, PO: 1703579 Date: 5/31/2017 This CO is for storm sewer changes on Independence Blvd. [hat are needed because the waterline at Garth Road isnot adjustable.11iis change order also includes a new concrete junction box to replace a large existing brick junction box behind the Boot Barn in the Independence Blvd. Eight of 1Vay. The existing brick box is caving in at the back will due to age and insufficient structural capacity. Add or Delete Items: Item Description Unit uanti Unit Price Total ADDITIONS -NEW ITEMS ]A 12X-1 RCB 130 LI' $779 ~100,730.00 2A 22'x6' JUNCTION BOX I FA 533,;00 $33,500.00 3A 10:X1 I - JUNCTION BOX IVANLET T'OP I EA $27,000 ~27,000.00 4A 31'X14' JUNCTION BOX 1 EA 574,000 $74,000.00 5A 14" SPLrr CASING 16 LF Still $1,280.00 6A 24" CASING (,MATERIAL ON HAND) I LS $9,900 $9,900.00 7A i\•IONOLITHIC CURB & GUTTER 135) LF $55 $7,425.00 SA 34"RCP TIE-IN TO PROP 10'X4' RCB I EA $750 $+750.00 9A 6" PVC DRAIN TIE-IN TO PROP 12;X4'RCB I FA 5351) +350.00 SUBTOTAL - ADDITIONS -NEW I"1'EMS 5254,955 ADDITIONS - EXISTING ITEM 7 LIME SLURRY 50 TN 5175.00 ~8,750 8 SUBGRADE ,NIANIPULATION 2370 SY 54.00 ~9,480 12 RE\I & DISP EXIST. ASPHALT & BASE 300 SY $5.50 ~1,650 13 10" BLACK BASE FORTRANSITION PVNIT 16i rN 582.00 513,530 1.1 2" HAIAC ROADWAY SURFACE 3:; TN $106.00 $3,710 25 STORM 141H ON BOX CULVERT 2 EA $1,400.00 $2,800 27 CURB INLET'S (5 Fl) 1 FA $2,350.00 52,350 SUBTOTAL -ADDITION -EXISTING urNis 5.12,270 DEDUCTIONS - EXISTING ITEMS 16 10X4' RCB -130 I_F $665.00 (�,•tih.•1;t�, 78 34'X14' JUNCTION BOX -1 LS $69,000.00 ($111',[1110) 29 14:X5' JUNCrFON BOX -1 I S $16,000.00 ($11000 30 25'X14' JUNCriON BOX -I LS $5O,00().00 x.0001 ;4 16" 1.1'L -2011 LF $62.00 (,1 _. ;110 �,9 24" STI. CASING, AUGER CONST. -165 LF $250.00 82 150 KVA TEMP GENERATOR -1 1-1' $1,000.00 93 HYDRO EXCAVATION(UTILITY LOCATE) -2 DAN' 53,400.00 8.4 BRACE TRAFFIC SIGNAL POLE -1 LS $8,800.00 86 FLEX BEAM GUARDRAIL, WOOD POST' -75 LF $125.00 ( c1.375 SUBTOTAL -DEDUCTIONS- EXIST. rrms (4;301,1)7,) TOTAL 153.550) 86 FLEX BEAM GUARDRAIL, WOOD POST .75 LF 5125.00 (59.."75) SUBTOTAL -DEDUCTIONS- EXIST. ITEMS TOTAL Oriainal Contract Price Change Orders Previous Change Orders Revised Contract Price Original Contract Duration Previous Extensions 0 This Change Order 0 Revised Duration - Calendar Days -e 'SI I t -t Contractor: Angel Brothers Date �" V4 Consulta Date $4,320,096.00 ($3,850) $4,320,096.00 ($301,075) (S3,850) Revised $4,320,09G $4,316,246.00 pt Engine ing Director Date City Manager Date