Ordinance No. 13,373ORDINANCE NO. 13,373 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING THE FACILITIES EXTENSION AGREEMENT FOR THE UNDERGROUND EXTENSION OF ELECTRICAL POWER LINES ALONG SAN JACINTO BLVD. AND HUNT ROAD WITH CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN IN AN AMOUNT NOT TO EXCEED SEVEN HUNDRED TWENTY THOUSAND ONE HUNDRED NINETEEN AND NO /100 DOLLARS ($720,119.00); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown, Texas, hereby authorizes and directs the City Manager to execute the Facilities Extension Agreement for the underground extension of electrical power lines along San Jacinto Blvd. and Hunt Road with CenterPoint Energy Houston Electric, LLC. A copy of said agreement is attached hereto as Exhibit "A" and incorporated herein for all intents and purposes. Section 2: That the City Council of the City of Baytown authorizes payment to CenterPoint Energy Houston Electric, LLC, in an amount not to exceed SEVEN HUNDRED TWENTY THOUSAND ONE HUNDRED NINETEEN AND NO /100 DOLLARS ($720,119.00) in accordance with the agreement authorized in Section 1 hereinabove. Section 3: That the City Manager is hereby granted general authority to approve any change order involving a decrease or an increase in costs of FIFTY THOUSAND AND NO /100 DOLLARS ($50,000.00) or less, subject to the provision that the original contract price may not be increased by more than twenty five percent (25 %) or decreased by more than twenty five percent (25 %) without the consent of the contractor to such decrease. Section 4: This ordinance shall take effect immediately fii and after its passage by the City Council of the City of Baytown. '/ INTRODUCED, READ and PASSED by the affirmative/e f the City Council of the City of Baytown this the 8th day of December, 2016. _ APPROVED AS TO FORM: H. DONCARLOS, -4 0 N42A"N'eN to ry F N�OlJld6 �� ACIO RAMIREZ, SR., City Att R: \KaretffilesiCity Counci110rdinances\2016, emb 8'1 CenterPointFacilitiesExtensionAgreement .doc - - - -.— — Exh i bit- "A" Chapter 6: Company Specific Items CenterPoint Energy Houston Electric, LLC Applicable: Entire Service Area 6.3 AGREEMENTS AND FORMS 6.3.1 FACILITIES EXTENSION AGREEMENT Sheet No. 6.24 Page 1 of 2 CNP 8038 This Facilities Extension Agreement is entered into by and between City of Baytown. herein called "Retail Customer" and CenterPoint Energy Houston Electric, LLC, herein called "Company" (hereinafter referred to as Agreement) for the construction, extension, installation, modification, repair, upgrade, conversion, relocation, de- energization or removal of Company's Delivery System, including temporary facilities (hereinafter referred to as facilities extension or extension), as described herein. This Agreement covers the facilities extension to Retail Customer location on San Jacinto Boulevard south from I -10 and Hunt Rd.. The Company agrees to accept payment of $ 720.119.00 Dollars to be paid by the Retail Customer, as a Non - Refundable Construction Payment in connection with the Retail Customer request to extend Company facilities to the above described location as follows: As detailed in the T& C Package. Job # 77359724• All cable by the Companv for the extension of underground at Retail Customer expense. All civil engineered Plan & Profiles. duct bank, and manhole construction by the customer at Company suecificadons The securing of hermits required for construction are by the Retail Customer at his expense. This agreement includes no cost for the addition, modification or removal of any existing overhead facilities. Please contact the Comonnv's respective Service Center representative for any additional costs that may be associated with this hroieet • Unless otherwise stated by Company in writing, the Non - Refundable Construction Payment amount above is valid for twelve months. In consideration of said Non - Refundable Payment, to be paid to Company by Retail Customer prior to commencement of construction, Company agrees to install and operate lines and equipment necessary to distribute electric service to the identified location under the following General Conditions: • Company shall at all times have title to and complete ownership and control over facilities installed by Company. • Retail Customer must make satisfactory payment arrangements (if payment is required to proceed extend Company facilities) and sign and return this Agreement before Company can with the requested extension. • Extension of service facilities is contingent on acquisition of all necessary easements and rights of way Revision Number. 5th 306 Effective: 9 /1 /11 Chapter 6: Company Specific Items CenterPoint Energy Houston Electric, LLC Applicable: Entire Service Area I Sheet No. 6.24 Page 2 of 2 , CNP 8038 Nothing herein contained within this Agreement shall be construed as a waiver or relinquishment by Company of any right that it has or may hereafter have to discontinue service for or on account of default in the payment of any bill owing or to become owing thereafter for any other reason or cause stated in Company's Tariff. This Agreement shall not be binding upon Company unless and until it is signed by an authorized representative of the Company. CenterPoint Energy Houston Electric, LLC Norbert Gonzales (name printed or typed) Title Sr. En ' eering Specialist Date 11/11/2016 Please make check payable to CenterPoint Energy Title Date Citesof Baytown Retail Customer (name printed or typed) Revision Number: 5th 307 Effective: 9/1/11 I TERMS & CONDITIONS UNDERGROUND ELECTRIC SERVICE FOR CITY OF BAYTOWN SAN JACINTO BOULEVARD UNDERGROUND EXTENSION Job 477359724 Ccntcl-Point Energy (CNP) M. jor Underground Engineering P. O. Box 1700; Houston, Texas 77251 -1700 REFERENCE DRAWINGS: Preliminary Site Plan Received: Utility Plan & Profile Drawing: Received 06 /02/2016 REFERENCE CENTERPOINT ENERGY SPECIFICATIONS: Service Standards May 1, 2016 Ready -Mix Concrete 007- 221 -01 Reviewed And Agreed To By: Signature Title Date Print Name If tbis Ternls & Conditions package is signed by anyone other than an official from City of Bavtown it will not be considered valid. A valid signature will be considered an acceptance of all information contained within this Terms & Conditions package. CenterPoint Energy Houston, Texas WRITTEN NOG 11/1/2016 CHECKED NDG 11/11/2016 APPROVED RED C 11/1112016 FD0573 SHEET 1 OF 15 SHEETS NO. DATE ITEMS REVISED BY CH APP Job #77359724 GENERAL A. These Terms and Conditions are for the extension of underground conduit and conductors along San Jacinto Boulevard and into Hunt Rd. by the City of Baytown. The City of Baytown and /or its contractors/representatives are herein referred to as the Customer. B. The CNP Major Underground Engineering (MUG) representative is Norbert Gonzales at 713 -207 -6168 or Norbert. Gonzales@CenterPointEnergy.com. The CNP Service Area Consultant is Isaac 1. Atwood at 281 -425 -7312 C. The Customer must comply with all CNP Service Standards, the National Electrical Code, the National Electrical Safety Code, all Occupational Safety and Health Administration ( OSHA) requirements, the International Building Code and all local governing body codes. D. During installation of CNP equipment, CNP will make every effort to preserve the Customer's landscaping, parking areas, or other facilities. However, any cost that has been quoted to the Customer does not include any special replacements or repairs to these items. The Customer shall be solely responsible for any expenses associated with replacements or repairs to its facilities. E. The service arrangement outlined in these Terms and Conditions is based on the Customer request and customer drawings referenced on page 1. Any changes in the design as illustrated in the referenced drawings may impact GNP's ability to meet the Customer's requested service date. Any changes, additions, deletions, rearrangements, relocations, rerouting, reduction of clearances, etc., of the Customer's and/or GNP's service facilities illustrated in these Terms and Conditions shall have the MUG's approval and may require a revised Terns and Conditions. It is the Customer's responsibility to coordinate the location of all Customer installed facilities outlined in these Terms and Conditions with all other structures and/or appurtenances not shown in the referenced drawings. F. Contact the MUG representative concerning Customer drawing revisions, information submission, questions, Terms and Conditions revision requests, etc. G. Hard copy submittals may be mailed to the MUG representative (address — 3000A Harrisburg Blvd. — Houston, Texas 77003). Electronic submittals may be e- mailed to the MUD Engineering representative. The MUG representative will; "approve the submittals", "approve the submittals as noted" or "not approve the submittals". The Customer shall not install any item that requires CNP approval before receiving an official approval from the MUG. CNP shall not be responsible for any installed item that has not received MUG approval. REVISION NO. I SPECIFICATION NO. I I I I I SHEET 2 OF 15 SHEETS Job #77359724 ACCESS The Customer must provide a twelve foot (12') minimum width, fourteen foot (14') minimum vertical clearance, all weather, vehicle access road designed for HS -20-44 loading as recognized by the American Association of State Highway Officials (AASHO), for CNP personnel and equipment to the proposed manholes and terminal poles. If the access road has not been completed and passed final inspection (see Final Inspection, page 5) at the time the Customer requests the cable to be installed, the cable can only be set under the following conditions. A. The MUG has determined that the access route is dry and readily accessible to CNP's normal installation equipment. B. The Customer shall be responsible for all expenses associated with the repair and/or replacement of CNP pad mounted equipment damaged by additional construction activity. Damage to CNP equipment may result in delays to the Customer's requested service date. C. CNP will not complete the underground construction (i.e. pulling & terminating cable, energizing the service, etc.) until the access road and pad mounted equipment location have passed final inspection (see Final Inspection, page 5). The Customer must maintain these requirements for the life of the service. CNP will utilize the proposed San Jacinto Boulevard for the required access. PLAN AND PROFILE DRAWINGS The Customer must provide plan and profile drawings for the installation of all underground facilities around the construction area. The Customer is also required to obtain all applicable construction permits from the appropriate governing authorities. The plan and profile drawings must be in accordance with CNP standards attached. These drawings must be approved by CNP and the appropriate governing authorities before beginning the installation of underground facilities (duct bank, manholes, etc.). It is recommended that the Customer meet with the MUG representative to discuss the preparation of the drawings. The Customer shall supply CNP with mylar originals and electronic files of the approved final drawings CNP will keep the original approved drawings on file and furnish one (1) copy to the Customer. If the Customer requests additional copies, CNP will arrange to supply copies or reproducible mylars at the Customer's expense. If the actual installation differs from the proposed routing on the drawings, then the Customer shall provide CNP with one (1) set of bluelines, marked in red pencil, to indicate AS BUILT corrections. REVISION NO. I SPECIFICATION NO. I I I I I SHEET 3 OF 15 SHEETS Job #77359724 FACILITIES INSTALLED BY THE CUSTOMER All facilities are to be installed per the attached construction specifications. The Customer or its contractor is to request a preconstruction meeting prior to starting the required underground construction by calling the number listed below. All facilities shall be inspected by CNP after the conduit is installed, pads are formed, reinforcing rods installed, etc. but prior to the pouring of concrete. CNP recommends that the Customer complete the pouring of concrete on the day the facilities are inspected and approved. The Customer will insure that all inspected and approved facilities remain in the approved condition until the concrete pour has been completed. If there is damage to the inspected and approved facilities prior to the pouring of concrete, the facilities must be re- inspected by CNP before the Customer begins the pouring of concrete. CNP reserves the right to require the Customer to break out any unapproved concrete pours at its expense. CNP will make a reasonable attempt to complete all inspection requests. To insure that inspection requests can be fulfilled, they should be made twenty-four (24) hours in advance (Mon. - Fri.; between 9:00 am. and 3:00 p.m., holidays excluded) to the MUG at (713) 207 -6229. jQh #77359724 must be provided as the inspection identification number. PRECAST MANHOLES CNP will allow the Customer the option to install either poured -in -place or approved precast manholes. The use of precast manholes is approved for all locations where the vehicular loading does not exceed AASHO HS -2044 Highway Loading (72,000 pounds). CNP's current approved suppliers are: Oldcastle Precast, 13600 South Wayside Road, Houston, Texas 77048, (713) 934 -7900. Locke Solutions, 7600 S. Santa Fe Dr., Building I, Houston, Texas 77061, (832) 804 -7062. Forterm Pipe & Precast, 860 Airport FrwN Suite 300 Hurst, Texas 76054, (817) 581 -3005 (Forterra is currently only approved for small manholes) Three (3) copies of the supplier's drawing must be submitted to the Engineering contact, for approval prior to procurement and /or installation. CNP also recommends the installation of the required duct bell terminators by the manhole supplier on all precast manholes. Manholes are to be placed on a minimum of six inch (6') leveled base of sand or crushed rock to insure uniform distribution of soil pressure on the floor. CNP must inspect this requirement prior to the installation of the manhole inside the exposed pit. The use of precast necks is not approved. DUCTBANK INSTALLATION All proposed conduit for GNP's use is to be installed in straight runs, unless otherwise indicated on CNP drawings. Any conduit bends must be installed with a twenty foot (20) minimum radius, unless indicated otherwise on CNP drawings. Conduit turn-ups into any equipment pad and/or pole pedestal must have a minimum five foot (51 radius. Any deviations from these requirements shall have written approval from the MUG representative prior to installation. During installation, the minimum depth for a conduit run must be referenced to the final grade. FR NO. SPECIFICATION NO. SHEET 4 OF 15 SHEETS Job #77359724 DUCTSANK INSTALLATION (continued) The Customer is to delay installation of approximately the last twenty feet (2w) of the conduit run and the pole pedestal to any terminal pole until the pole has been set by CNP. Before trenching to the base of any terminal pole, the Customer must securely brace the pole. The Customer must request staking and setting of any terminal pole by contacting the Service Area Consultant. The Customer must provide a jet line in each conduit installed. This jet line shall extend a minimum of seven feet (7') beyond the end of each conduit. All conduit and manhole installation by the City of Baytown are proposed to be in public right of way, therefore no easements will be required. The conduits and manhole will not be surveyed or located by CNP after they are installed. No toning wire conductor installation will be required. However, if the proposed street right of ways are not declared public right ways, then CNP must secure easements over the conduit and manholes. The customer must then install toning conductor in all manholes and conduit for CNP to survey and locate the conduit for easements. Conduit ends shall be plugged with a duct cap or other type capping device. The use of rags to plug conduits is not acceptable. If the conduit is installed in stages, the Customer must keep each section of conduit capped until the new section is installed. If, prior to CNP using any conduit, the conduit is found to be blocked, the Customer will be responsible, at its expense, for removing the obstruction. CLEARANCES Final approval for the location of the manhole and terminal poles is contingent upon proper clearance, as determined by CNP, from cooling towers, vents, buildings, structures, etc., and other underground utilities. It is in the Customer's and CNP's best interest to have all service equipment in a contamination -free environment to avoid unscheduled outages and/or premature equipment failures. Therefore, prior to any construction, the Customer shall inform the MUG representative of any existing or future contamination or pollutants which may affect the equipment so that necessary clearances can be secured. The MUG representative shall be notified promptly if the Customer intends to install any obstructions such as walls, hedges, bushes, trees, etc., around the transformer and/or any associated equipment so that additional clearances and access can be secured. Any proposed enclosure surrounding CNP's equipment must be louvered, and both a profile and a cross - sectional view of the proposed louvered enclosure shall be submitted for approval prior to installation. If, in the future, there is a problem with contamination of CNP's equipment, or proper clearances are not maintained, CNP reserves the right to relocate the equipment at the Customer's expense. A one foot (1) minimum vertical clearance must be maintained between CNP duct banks and all non -CNP facilities crossing the duct bank. A five foot (5) minimum horizontal clearance must be maintained between CNP duct banks and other facilities running parallel to the duct bank. CNP will not allow joint trenching between CNP duct banks and other facilities. REVISION NO. I SPECMCATION NO. SHEET 5 OF 15 SHEETS Job #77359724 FINAL INSPECTION After the Customer has advised CNP that all "Customer installed" facilities pertaining to this service arrangement have been completed and inspected, a final on -site inspection will be made by a MUG representative. This final inspection will verify that all Customer installed facilities are in accordance with these Terms and Conditions. The Customer (or its contractor) and the Service Area Consultant will be advised of any needed corrections and/or changes. When all necessary corrections and/or changes have been completed, CNP's portion of the constriction may begin. INDEMNIFICATION AND LIABILITY LIMITS Indemnity: This indemnity is pursuant to Company's Tariff located on our website at www.centerpointenergy.com. RETAIL CUSTOMER ASSUMES THE RISK OF AND SHALL INDEMNIFY COMPANY AGAINST DAMAGES FOR INJURIES OR DEATH TO PERSONS OR LOSS TO RETAIL CUSTOMER'S PROPERTY, OR TO THE PROPERTY OF COMPANY, WHEN OCCASIONED BY ACTIVITIES OF RETAIL CUSTOMER OR THIRD PARTIES ON CUSTOMER'S PREMISES, RESULTING FROM THE INSTALLATION, EXISTENCE, REPLACEMENT, OR REPAIR OF COMPANY'S UNDERGROUND FACILITIES, AND AS FURTHER PROVIDED IN THE TERMS OF "LIMITS ON LIABILITY," SECTIONS 4.2 AND 5.2 OF THIS TARIFF. NOTWITHSTANDING ANY OF THE ABOVE, THE PROVISIONS REQUIRING A RETAIL CUSTOMER TO INDEMNIFY, FULLY PROTECT, OR SAVE COMPANY HARMLESS APPLY TO A GOVERNMENTAL ENTITY AS THIS TERM IS DEFINED IN CHAPTER 2251 OF THE TEXAS GOVERNMENT CODE, TO THE EXTENT OTHERWISE CONSISTENT WITH LAW; PROVIDED, HOWEVER, THAT ANY GOVERNMENTAL ENTITY THAT IS A RETAIL CUSTOMER TO WHICH THIS SUBSECTION 2.5 APPLIES MUST TAKE NECESSARY STEPS TO ENSURE THAT THE INDEMNiIFICATION REQUIREMENTS OF THIS SUBSECTION 2.5 DO NOT CREATE A "DEBT" IN VIOLATION OF ARTICLE XI, SECTION 7 OF THE TEXAS CONSTITUTION. SUCH STEPS MAY INCLUDE, BUT ARE NOT NECESSARILY LIMITED TO, A THIRD -PARTY INDEMNIFICATION IN WHICH THE CONTRACTOR PERFORMING THE WORK FOR THE GOVERNMENTAL ENTITY INDEMNIFIES THE COMPANY OR THE ESTABLISHMENT OF A SINKING FUND. (see Governmental Entity Addendum if applicable) REVISION NO. I SPECIFICATION NO. I I I I I SHEET 6 OF 15 SHEETS FINAL GRADE (ROAD. PARKING AREA, ETC.) SHEET 7 OF 15 JOB #77359T24 i MINIMUM 42" STEEr PUMP TUBE CASING IF 2- 2• 4- 9 -62 CONDUITS 9 -61 CONDUITS ^V � t }• 7F QLjLJ L 25 i 6 - 6' CONDUITS DRIVE #3 REBAR FOR SPACER ANCHOR .� (SEE NOTE 7) SPACER (SEE NOTE 2) #3 BARS 3' -0" L (SEE NOTE 5) . 4 i/�} L* � * 2 2 - 6' CONDUITS L 1 _e �/ NOTE. 2 BRICKS - THE CUSTOMER AND /OR ITS CONTRACTOR (BOTTOM OF oe 6 IS TO REQUEST A PRECONSTRUCTION MEETING TRENCH) � PRIOR TO STARTING CONSTRUCTION BY CALLING (713) 207 -6229. NOTESs 1. CONDUIT TO BE PVC. MINIMUM GRADE TYPE EB. 2. SPACERS SHOULD BE INSTALLED NOT MORE THAN 10' -0' APART. 3. CONDUITS TERMINATING AT MANHOLES SHOULD BE SLOPED 0.57 DOWN TOWARD MANHOLE. 4. ALL EXTERIOR CONCRETE COVER DIMENSIONS ARE MINIMUM. 5. CONCRETE SHALL BE IN ACCORDANCE WITH CNP SPECIFICATION 007-221-01, LATEST REVISION. 6. PLACE REINFORCING BARS IN 4 CORNERS OF THE CONCRETE WHERE SPACERS ARE USED. 7. ON COLD JOINT CONCRETE POUR USE 05 REBAR Q'-09 IN LENGTH. EXPOSED V -69. B. LENGTH OF REBAR FOR SPACER ANCHOR WILL VARY PER DUCT BANK HEIGHT. 9. CONDUITS ENDS SHALL BE PLUGGED WITH A DUCT CAP OR OTHER TYPE OF CAPPING DEVICE. 10. A ONE FOOT VERTICAL CLEARANCE MUST BE MAINTAINED BETWEEN CNP'S OUCTBANK AND ALL NON -CNP FACILITIES CROSSING THE OUCTBANK, I1. A FIVE FOOT HORIZONTAL CLEARANCE MUST BE MAINTAINED BETWEEN CNP'S OUCTBANK AND ALL NON -CNP FACILITIES RUNNING PARALLEL TO THE OUCTSANK IJOINT TRENCHING NOT PERMITTE01. THREE PHASE OUCTSANK 12. INSTALL JET LINE IN ALL CONDUITS AND A 014 AWG WIRE FEEDER IN ONE CONDUIT. BASED ON DISTRIBUTION STANDARD DLFS2C • SCRAP PVC SEE NOTE 5 R r i /—SEE NOTE 6 BY CNP BY CUSTOMER z 02 GROUND LINE o ' a' o 1 °I I I I I . �• J AI_ 1.1 v 10% ° ^I I I NON— THREADED PVC %_c COUPLING FBI ° I I I CONDUIT v ° 5'R Ia I CONCRETE ° I I I I LCI INLINE PLACEMENT OF CONDUIT N NOTES: 1. CONDUIT BENDS AT TERMINAL POLE SHALL BE PVC. 2. BRACE THE POLE SECURELY BEFORE TRENCHING. 3. INSTALL CONDUIT BENDS TO BASE OF POLE. ADD PORTIONS OF STRAIGHT CONDUIT AS NECESSARY TO OBTAIN THE PROPER HEIGHT ABOVE FINAL GRADE. 4. ATTACH COUPLING TO END OF CONDUIT. 5. INSERT. BUT 00 NOT GLUE . A SHORT PIECE OF SCRAP PVC CONDUIT INTO THE TOP COUPLING. TIE CONDUIT TO BRACKET. S. FORM AREA AROUND PEDESTAL TO THE TOP OF THE COUPLING. FORM PEDESTAL SO THAT NO CONCRETE WILL CONTACT POLE. 7. AFTER INSPECTION BY CNP, POUR CONCRETE TO TOP OF COUPLINGS. B. ALL CONDUITS SHALL HAVE A MINIMUM 4'CONCRETE COVER. SHEET B OF 15 JOB x 77359724 TOP VIEW OVERHEAD F---%q -- LINE DIRECTION . 0 TP *40463. TERMINAL POLE CONDUIT PLACEMENT MV & 35 KV BASED ON DISTRIBUTION STANDARD 65 -500 SHEET 9 OF 15 B JOB #77359724 pp GROUND ROD ---a' e � ` N m w PULLING I w - EYE py N jrf N � 6 V B" ' -0" V -se" PLAN VIEW B" STABILIZED SAND � +� tnPl naCT ral/f Wf TI nn \!L'® GROUND SECTION A -A NOTES: 1. CNP RECOMMENDS THE INSTALLATION OF THE REOUIRED DUCTBELL TERMINATORS BY THE MANHOLE SUPPLIER ON ALL PRECAST MANHOLES. 2. MANHOLES ARE TO BE PLACED ON A MINIMUM OF SIX (6) INCH LEVELED BASE OF SAND OR CRUSHED ROCK TO INSURE UNIFORM DISTRIBUTION OF SOIL PRESSURE ON THE FLOOR. 3. CNP MUST INSPECT THIS REQUIREMENT PRIOR TO THE INSTALLATION OF THE MANHOLE INSIDE THE EXPOSED PIT. 4. THE USE OF PRECAST NECKS IS NOT APPROVED. SECTION B —B MANHOLE #119019#11903 #11909 , #1 1910 SMALL TWO NAY MANHOLE 12KV & 35KV BASED ON DISTRIBUTION STANDARD MHB00 IN L_ 1' -0" MIN. TO HIGHEST CONDUIT w z 1' -0" MIN. TO LOWEST CONDUIT •: OL aI 1 m GROUND SECTION A -A NOTES: 1. CNP RECOMMENDS THE INSTALLATION OF THE REOUIRED DUCTBELL TERMINATORS BY THE MANHOLE SUPPLIER ON ALL PRECAST MANHOLES. 2. MANHOLES ARE TO BE PLACED ON A MINIMUM OF SIX (6) INCH LEVELED BASE OF SAND OR CRUSHED ROCK TO INSURE UNIFORM DISTRIBUTION OF SOIL PRESSURE ON THE FLOOR. 3. CNP MUST INSPECT THIS REQUIREMENT PRIOR TO THE INSTALLATION OF THE MANHOLE INSIDE THE EXPOSED PIT. 4. THE USE OF PRECAST NECKS IS NOT APPROVED. SECTION B —B MANHOLE #119019#11903 #11909 , #1 1910 SMALL TWO NAY MANHOLE 12KV & 35KV BASED ON DISTRIBUTION STANDARD MHB00 n O h I AL PROP 9-6° -1B 3' -2 %' PROP PVC PIPE SLEEVE 6" 51_46'x" I� `° 5'_45 /g PULLING EYE PROP 9 -6° VIEW I� PROP PROP rJ B-69 9-6° FOR m 1906 Lai 1908 _, 8° STABILIZED SAND 7 to a� v in :1. SHEET # 10 OF 15 JOB # 77353724 320 CASTING WITH COVER BRICK Iloi GROUT SECTION A -A I1° NOTES: I. CNP RECOMMENDS THE INSTALLATION OF THE REQUIRED DUCTBELL TERMINATORS BY THE MANHOLE SUPPLIER ON ALL PRECAST MANHOLES. 2. MANHOLES ARE TO BE PLACED ON A MINIMUM OF SIX (5) INCH LEVELED BASE OF SAND OR CRUSHED ROCK TO INSURE UNIFORM DISTRIBUTION OF SOIL PRESSURE ON THE FLOOR. 3. CNP MUST INSPECT THIS REQUIREMENT PRIOR TO THE INSTALLATION OF THE MANHOLE INSIDE THE EXPOSED PIT. 4. THE USE OF PRECAST NECKS IS NOT APPROVED. 1'-0 MIN•TO i• If COHDUIT LOWEST CONDUIT Amh PIPE SLEEVE SECTION B -B MANHOLE #11902911904, #11906 #11908 4#11912 9 #11913 #11914 SMALL FOUR WAY MANHOLE 12KV BASED ON DISTRIBUTION STANDARD MH400 PROP 9 -6' a M� re l.® 8' STABILIZED SAND III A ►1 \ /iriI_I [a 'a 'a OROIOID Roo U SECTION A -A NOTES: 1. CNP RECOMMENDS THE INSTALLATION OF THE REQUIRED DUCTBELL TERMINATORS BY THE MANHOLE SUPPLIER ON ALL PRECAST MANHOLES. 2. MANHOLES ARE TO BE PLACED ON A MINIMUM OF SIX (6) INCH LEVELED BASE OF SAND OR CRUSHED ROCK TO INSURE UNIFORM DISTRIBUTION OF SOIL PRESSURE ON THE FLOOR. 3. CNP MUST INSPECT THIS REQUIREMENT PRIOR TO THE INSTALLATION OF THE MANHOLE INSIDE THE EXPOSED PIT. 4. THE USE OF PRECAST NECKS IS NOT APPROVED. SHEET 11 OF 15 JOB #77359724 A 32' CASTING WITH COVEN BRICK 111 SMUT IQ!z, ; 11 L 11 11 u u u U SECTION B -8 MANHOLE #119059 #11911 #1 1916. #1 1917 SMALL THREE WAY MANHOLE 12KV & 35KV BASED ON DISTRIBUTION STANDARD 0 a PROP n 9�s 4; 3' -27, PROP 0 '0b1n 8" h GROUND R00 e S' -45® 1 I , „,� I ' PULI�lU6 - �•I CYCS- EEYYEE s f” 7' -0" 7' .{Sl" L-8 B" STABILIZED SAND s: �N A N PROP 1 9 -6r PLAN VIEW I -=i F--1 I GROUND ROD V SECTION A -A NOTES: I. CNP RECOMMENDS THE INSTALLATION OF THE REQUIRED DUCTBELL TERMINATORS BY THE MANHOLE SUPPLIER ON ALL PRECAST MANHOLES. 2. MANHOLES ARE TO BE PLACED ON A MINIMUM OF SEX (6) INCH LEVELED BASE OF SAND OR CRUSHED ROCK TO INSURE UNIFORM DISTRIBUTION OF SOIL PRESSURE ON THE FLOOR. 3. CNP MUST INSPECT THIS REQUIREMENT PRIOR TO THE INSTALLATION OF THE MANHOLE INSIDE THE EXPOSED PIT. 4. THE USE OF PRECAST NECKS IS NOT APPROVED. SHEET 12 OF 15 JOB #77359724 32° CASTING WITH COVER 11d" GROUT m 11 , 11 II i a u n -= u SECTION 8-8 ti MANHOLE 911907 SMALL THREE WAY MANHOLE 12KV & 35KV ON DISTRIBUTION STANDARD MHCOO V; PULLING EYES PULLING EYES 11 , 11 II i a u n -= u SECTION 8-8 ti MANHOLE 911907 SMALL THREE WAY MANHOLE 12KV & 35KV ON DISTRIBUTION STANDARD MHCOO zN a a PACP 9i' B' STABILIZED SM rt my YAC.tR A N SHEET 13 OF 15 JOB #77359724 a•I k It WDIMG ROD U SECTION A -A NOTES: 1. CNP RECOMMENDS THE INSTALLATION OF THE REQUIRED DUCTSELL TERMINATORS BY THE MANHOLE SUPPLIER ON AL l PRECAST MANHOLES. 2. MANHOLES ARE TO BE PLACED ON A MINIMUM OF SIX 16) INCH LEVELED BASE OF SAND OR CRUSHED ROCK TO INSURE UNIFORM DISTRIBUTION OF SOIL PRESSURE ON THE FLOOR. 3. CNP MUST INSPECT THIS REQUIREMENT PRIOR TO THE INSTALLATION OF THE MANHOLE INSIDE THE EXPOSED PIT. a. THE USE OF PRECAST NECKS IS NOT APPROVED. 11 N SECTION B -B 11 V MANHOLE #11915 SMALL THREE WAY MANHOLE 12KV & 35KV ON DISTRIBUTION STANDARD CenterPoint SI IEET • 14 OF 15 � MAJOR UNDERGROUND ENGINFFRING - ry��/ GI.NERAI I OCA "LION SKLTCH Yl I AI.IRFR7: a KEY IJAP CIRGUII FUN i ONAI LOCATION SLALE JOB Nl' C NTS NTS NTS NTS NTS 17351724 CITY Of BAYTOWN OR 19"I f 1 "Atli '11 ' I. 1 1 I CCW.aw 9 I CITY Of BAYTOWN OR 19"I f 1 "Atli '11 ' I. 1 I I CenterPoint SH EET 15 OF 15 )Q,QS MAJOR UNULRGROUNU ENGINEL -RING �— C,, - -- GI En - °xtvclr •'K S4�i8 s -a• Ka4D NI RAI I OL;AIION SICI ICH LAh16EIi1 NO I<.. Y MAP WWII 1 UNL.I IUNAL LUCAI IUN SCALE J0I7 NO I NTS NTS NTS NTS NTS 77359734 � t — — — — — — — — — - SCALL IS 1 2W I — — PRIMING WX34" I I I + � I it I ww Xcacwls ss I I I _ ✓] StuY• WGYY rW w � w Stf :S• N � Sit Y•fa i� 30.M t w fo n Std . '—�� — L vacx 1 I I 1 1 • sxovcw f -a• K Cb,at3 tOK 1M.94 )Q,QS nw•cw f-e' K CVUU13 CdC IKaS[D - °xtvclr •'K S4�i8 s -a• Ka4D I � t — — — — — — — — — - — — — — — — — — — — — — — — — — — — 1 I it I ACiK�/x�[i!lD fIUD -Wt %U t5- S1f 3•DI . 1 1 CITY OF BAYTOWN UHA1. /11 UY LAIIL JUNLU II I {jryIryjyy3 +jj $'�[ {,1�1y�y{{}}[pp ��� ����`�- .x7.1����IM�rrrrr�rrrrrr w.��.,,.... ■Jj( 1 r� �r HHO �► T, L, uaoH(((Aajw.rA w I % 4� 01% e�}} apt a ff I I C �«— i eavrw 04+66 01 00+0& V1S awainoe O1N M Md8 MHOMd GW Mild NMOIAlVO dO AM* *m mnG Wn011svicm ql4! M .an gill er130 8 e■o�b .. w".0jo.rw..v - --,.. W" gm I1I1 C w I3SVHd CW O109+K VIS i U.10H(((Aalw.rA NM0JAVG :10 AMD annoa�a3ar n Ito 131 i ! $�� C � a Ilbe a 3 9e a eBR e Arbil 6 $g 7 ��p�gWO ea 8 tV18 N{�R:u daIt v k� 16M Elm M—IMINO MENEM 01.1 1 1 R M11 I MEN wl 1,\\\\1 .1 W �11 ", " 0 h Mow ol i� � •1 � s�4{�a �a 111110111 OEM G or. Tmq�r * AM OL 11 In ml-ftw i �,! ON v I I SO PRO 'A W-1.1a i �: _- �1■III�I�f1lllrf�'��t-�i �����r rr � ���f:�u,i■ Ilion • �,� illllk i��� _' . �.... �������iriii r'.ii`"i���Tii�i'"ir��i��ii� OR UJOH(((Aaluu.r,i r Ny III ygaag ���apII §1� � N A IBM o9 +Z6 of oo +W V LS aavn3lrtoe oiwavr wve 3lldOad QNV NM1d NMOlAtle So Alto noH9H a alloaoa3Nn z� $ "bH 6 r�� I 9 QQ 6b 9 A fie ENORMOUS MIN Em i; 0 iil- I 1-i - MEN" M 'I �37 ii 1 I' =�1 Jim INN NINE ON Bull 0 MIN go m- WER nummil Pv PrVPM-gM m.1 w - w*I . s� N lnw wYr✓ +tis•hww.nwM+. `rwwi+MwN+wrw�www. Wl...r�w..�� +•�M�w �n r+r��1 wN ti�w w+w wb w.w� wow A�w� vwwr+wr +.www•.�Y r+� w �L L ..d. M-9 UJOH( <(AOIwI)l @ lip e <s �; I� (pyp - .wlamu unlwm 6 • . I I � � I ,3l I Y I if l x ' } 1 of I H I my.%% VJ om 1F .- I39VMd 00+LE 0109 +ZS V1S OWA3 flOG OINIDW We 31dOad aNV NYtd NMOLAM9 d0 AID mve mna aNncrdamaNn dv b $ L Bibb �� M M . 4 ogo P biz B I e 1.i W /Pd.P.%"-Pn 4Yi M r -.(^ - F� 1f d YRIV �M�rH rr����awr�r ��r�M Wr�A��H�Mw �rwwr��ar��r�YH�� r��r H���rw Hr�w \� Y�Arw<��r�rr��rrMMl�� WAN �rYlrrw MBA i i !! I -a uaoH <« Aalwr.A 10400 pg+tV Ol oo+L6 MJS WAMOS O1NIow tm BIIAO)1d cw NVgd NMOJ AV9 d0 AMD XNV910n0 aNnONSH30Nn b ;stilt b � 9LV4 23 bb �ep3a € ag A 2 42 wa N4 ..M�+ra em uu � 4 •.nr •••• •• - - -- w « 138V1W 030 1+1d9d o1 024v V1S 02d ON Mld Nvs ) M A �Uujotj<((Aajw MAROJAVS:10 A.UD mnousmaam ° 4 GWA30B O1NKV u awe fnm.n o_ 4 X11 pXi g[u Q� q� i�E ��ll 9C � ►'i ?!! s a a �i a�oS83C .aa2b yea ow ao own -4f w PN4ww� r �M�Pw1 w�i an MN lW4wMwN'lI4P"I � - wwMwf �9 Pa[if ai�lYfNf q 1wtW rw�r.�.�rarwww wwr nww w�.�www+ra.wwN YAM wwA r w rml.ww.1�.�+rw•i�N'+�r..r iw wrw Nr w nM Mew ww M.w•wwN � � Mr•. w+.. +ww r w�v,w.w Vi c b- o t U. u o 12 ga M d $ Y � b33 .rr r \ � 1 O � U n uao}j (((A9jw.rA µ if If d R'11 On .111 r, tl4 \ o \ bi o� d d O -V b` \ 1 m b O � { tl i i� wa �' b3tE r � tl r i ! a Z a III 3 13WWd aN3 0109+09 W1S GWtH 0H aMjMr M 31WONd aNV NW1d NMOUVO dO A11O HNW iLona .� CNnousmiaNn JAIN ile �� 101gig° a m 6.12 atl aw as � .war -NrMr� w�vl •. - ••vw - \ �•w rn Q�� tlao o-a-Nt +i�w MM1i � MMtl aiFra T 9111 LL N m a z U oo C 0. M�Ir. uaoH (((Aalw!)l a All aye $ $�$d,�.k #R3ee b. a .R 9 r :�M, ! ea B Sr i t I 9 To •L L a °a` a e GA-M OINMWfk NNc i IHBVFtd Z aNV i 8n13 OWAMrm OMOC WS 311d0M aNV NV d lip NMOLlVO 40 AM* HNde Lana a aNnOMV3aNn � 8; R Abit p be 6 A om I i ...�. ».�r...w �......... •.�... �....y..w..++e.�......�. �..�.... »... w. ».... w ».++w. �.. r.r...�• »r.......r r r.wr �.r.,.��.. � ERA � 6w E I f � 1. 11��lN' 6 A om I i ...�. ».�r...w �......... •.�... �....y..w..++e.�......�. �..�.... »... w. ».... w ».++w. �.. r.r...�• »r.......r r r.wr �.r.,.��.. � 0qt v m E a z 0 co m W a z U VEMOP nGUJOH (�MN GNowv3Nn ' 0211- �y A see �e a AN.'s E a hit, E .HO E o b�8 NONSENSE usill ' 'ANN 901MOUBMEN I I lqbjlnlilmm,mlr ML walullims-Er uREP m�����Mmm ­0 b w t Mtq roll W ti -toYpl N Mw. .erct.Wi tit�ea a -�.o. ""'M 9 enls ' ... GHVAMOS OMIOW wVs 5IwVe lona v U.10I { WIIre NMO1Ade do uiD aNf10a02MaNn OA YC•�f aup . -b Aem It .b 12 bb' s •�'� r �S� 6 6515 �� 6•a It H Eau � ! o mill 4 " 1 pY L- #g4 OA19 OLNIOVP NVS 3 1u e W m a —• U "TTT� F ® 113515"' � o • id� 8 Y� fit tw w..r.NPNw, wt � - ..nwi - b Y:M � �W maa a -,•1tt1 �tq�i. eWli Yp VYOY .Myi• w +wr —�.�.� r�wN v -err r�wti�M•r Aiwa �._.r� �_ �rr..r.N �W r.a w wr..r�.... �. wYw_�-w +.�..w.. w���.+.Y.ry._wr _.r.� +w M I 1 T"dgll [ Z i8 CA18 O1NIOW WS pY L- #g4 OA19 OLNIOVP NVS 3 1u e W m a —• U "TTT� F ® 113515"' � o • id� 8 Y� fit tw w..r.NPNw, wt � - ..nwi - b Y:M � �W maa a -,•1tt1 �tq�i. eWli Yp VYOY .Myi• w +wr —�.�.� r�wN v -err r�wti�M•r Aiwa �._.r� �_ �rr..r.N �W r.a w wr..r�.... �. wYw_�-w +.�..w.. w���.+.Y.ry._wr _.r.� +w M I 1 ■ ■� ■ NMI IM NNY11011 INN mil■■ ■�1 ■r . 100910011 `\■■ lid on WN �s } s!!uil+� 01 m N a F3y� �yL O ' �L L to .P. d MOO. ujoH (gAajw1X GOMM -1 Oroble IL oil 5e r b el �Qqj$ beef e.a J A /�R3 iiL d! SC I d ' 39VHd �Oaa a ro arnd aeon noe o uuDrr NVB )INVB lono NMOJ AVO :1O ALID aNnOVDV3aNn Y MO bum CHgNq 41�IA1 Nn� � bVOi� M9Y.C[ f 00+6 VI Ol NIS38 -LM WON 1NnH ....,., otivn�noe olra�rr ave NNV9 lOnO 1110 -{ (< <Ita�wi� °�,—°, Nnnoude �o "o ONnOWSHNNn pillu am ooews .w Bill, gs fill a,o $ i I vis —• °° ON3 0100+0 V1S ••�• �aevi+a "°®"• `"• :.: 1V3 avcmmnH GNvA3lno9olNlavrwo nalonNMOVe O All* (<Aalwl)l On OOSSVMNn ^ n nn uoaln we 1 y D �! hr ipg�ap`(� IL ai p pp O 4 i X 9C3 D R4 bfll 99��AD SU 98 D D'S his, J11's 0 bile 1� M/ 4W r _ •.w6• _ - w w IwwMYw M w ft .ru cc no mod 1 o AM f/ -IFIIW �• MIW w � �wOp VON Gea wrat•w .� �..... r...r.. �.w�.w...+.....1..w�...�r. wrw r r....�� r.w.++.l..w w. •r.w..w....r.ri.+� �..+w.w...�...,.�.rw.........�. r.�.... 1 ENO I1 ti 1� M/ 4W r _ •.w6• _ - w w IwwMYw M w ft .ru cc no mod 1 o AM f/ -IFIIW �• MIW w � �wOp VON Gea wrat•w .� �..... r...r.. �.w�.w...+.....1..w�...�r. wrw r r....�� r.w.++.l..w w. •r.w..w....r.ri.+� �..+w.w...�...,.�.rw.........�. r.�.... 1 ENO !lEI���lI 1� M/ 4W r _ •.w6• _ - w w IwwMYw M w ft .ru cc no mod 1 o AM f/ -IFIIW �• MIW w � �wOp VON Gea wrat•w .� �..... r...r.. �.w�.w...+.....1..w�...�r. wrw r r....�� r.w.++.l..w w. •r.w..w....r.ri.+� �..+w.w...�...,.�.rw.........�. r.�.... 1 w. oamo QN3 Ol NiEl38 1s3nnavoa.wnH � �••��•••••4O•,• ,„...,.. GWA3MO8O1NKr4rNVS xwe UJOH(((Ae w� NMOLItlBdOJIJI� GNnOV9H3n°Nn a gQ @ !s a blipA! Pill 21dI''a I gi I IN ■II��■ NPINUMMANN REMEME-ER