Loading...
Ordinance No. 13,318ORDINANCE NO. 13,318 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 WITH SKE CONSTRUCTION, LLC, FOR THE GARTH ROAD WATERLINE REHABILITATION PROJECT, IN THE AMOUNT OF TWO HUNDRED SIXTY - FIVE THOUSAND SEVEN HUNDRED SIXTY -TWO AND 81/100 DOLLARS ($265,762.81); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. *********************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 with SKE Construction, LLC, for the Garth Road Waterline Rehabilitation Project, A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: That the City Council of the City of Baytown hereby authorizes the payment in an amount of TWO HUNDRED SIXTY -FIVE THOUSAND SEVEN HUNDRED SIXTY -TWO AND 81/100 DOLLARS ($265,762.81) to SKE Construction, LLC, for the change order authorized in Section 1 hereinabove. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative voof the City Council of the City of Baytown this the 13th day of October, 2016. \, ATT ST: L TICIA BRYSCH, Ci Clerk APPROVED AS TO FORM: ACID RAMIREZ, SR., Ci Attorney S,7EPHEN H. DONCARLOS, 6 p(TOWAl ' 01 ~•~ T h �Or�TE OF 1lcobfs0lllegal\Karen\Files.City Council. Ordinanccs\2016 October 13` ChangeOrderNol4GarthRoadWaterlineRehabilitationProject .doc Exhibit "A" CITY OF BAYTOWN Change Order No.1 Gat-th Rd Waterline Rehabilitation BAYS 8/31/2016 Brief Description of Changes: This change order is necessary due to unforeseen conditions, which require the directional drilling method in lieu of pipe bursting, to place the new water line below all existing utilities and pipelines. The drilling will be from the intersection of Garth Road and Cedar Bayou Lynchburg to the southern limits of the adjacent pipeline corridor (located just south of Cedar Bayou Lynchburg). Add or Delete Items: Item Description Unit Quantity Unit Price Total 1 T6", install pipe burst HDPE pre chlorinated water line, upsize 12 to 16", complete in place LF -963 181.00 $ (174,303.00) 2 12 , install pipe burst prechionnated water line, in place of same of one size smaller water line, complete in place LF -15 109.00 $ (1,635.00) 3 12" flow stop, complete in place EA -2 9,850.00 $ (19,700.00) 4 3/4" service tap, install on 12 " -16" waterline, complete in place EA -14 1,050.00 $ (14,700.00) 5 1" service tap, install on 8 " -16" water line, complete in place EA 0 1,200.00 $ 6 1.5" service tap, install on 8 " -16" water line, complete in place EA 3 1,425.00 $ 4,275.00 7 2" service tap, install on 8 " -16" water line, complete in place EA -2 2,225.00 $ (4,450.00) 8 Reconnect service -short & long side, all depths EA -18 749.00 $ (13,482.00) 9 Extra length for service laterals after 10' LF -170 11.00 $ (1,870.00) 10 Install 16" tee, to any size, complete in place EA 8 3,250.00 $ 26,000.00 11 Install 4" to 8" tee, to any size, complete in place EA -2 2,200.00 $ (4,400.00) 12 Extra Cement stab. Sand backfill 2.0 sacks /tn TON - 307.39 33.00 $ (10,143.87) 13 Point rpr /obst. Rmv - pipe bursting, all depths EA -7 1,275.00 $ (8,925.00) 14 Well point, all depths, extra length over 20 LF EA -3 2,300.00 $ (6,900.00) 15 Well point, all depths, extra length over 20LF LF -82 29.00 $ (2,378.00) 16 Trench safety, all depths LF 757 11.00 $ 8,327.00 17 Install 16" mechanical joint wet connection, to any size, complete in place EA 6 3,550.00 $ 21,300.00 18 Install 10" wet connection to any size, complete in place EA -2 2,000.00 $ (4,000.00) 19 Install 12" wet connection to any size, complete in place EA 3 2,685.00 $ 8,055.00 20 Install 12" tapping sleeve, to any size, complete in place EA -4 3,875.00 $ (15,500.00) 21 Install 16" tapping sleeve, to any size, complete in place EA -1 4,000.00 $ (4,000.00) 22 Install 16" gate valve and valve box, complete in place EA -7 9,800.00 $ (68,600.00) 23 Post TV Inspection - included tapes and written report (to verify no sewer line damage from laterals) LF -1000 1.00 $ (1,000.00) 24 Relocate mailboxes, road signs, etc, as necessary to accomplish work EA -3 200.00 $ (600.00) 25 Rmv /rpl up to 5" concrete sidewalk /driveway (includes saw cutting, reinforcement) SY -200 129.00 $ (25,800.00) 26 Rmv /rpl up to 8" concrete sidewalk /driveway /pavement (incl. saw cut, reinf., base repair) SY -243 168.00 $ (40,824.00) 27 Rmv /rpl up to 2" HMAC, Type D (incl. saw cut, tack, coat, base repair) SY -96 115.00 $ (11,040.00) 28 1" rock with no fines for bedding (incidental to point repairs) TON 108.49 32.00 $ 3,471.68 29 Annular and void space grouting CY -50 85.00 $ (4,250.00) 30 Sodding SY 1050 5.00 $ 5,250.00 31 Remove and replace Fire Hyddant assmebly, to include gate valve and bo EA -4 3,100.00 $ (12,400.00) 32 Install new Fire Hydrant assembly, to include gate valve and box, complete in place EA 5 6,000.00 $ 30,000.00 33 Insertion Valves (6" thru 8 ") EA 5 8,190.00 $ 40,950.00 34 Insertion Valves (10" thru 12 ") EA 3 13,650.00 $ 40,950.00 35 16" Connection to 30" (Hanson) BAWA Transmission line LS 0 72,525.00 $ - 36 Contingency allowance (to be used at the direction of the City Engineer) I LS - 0.44895 100,000.00 $ (44,895.00) Pothole and exploratory digging LS 2 20,000.00 1 $ 40,000.00 Total $ 265,762.81 Original Contract Price $ 1,260,945.00 Previous $ This Change Order $ 265,762.81 Revised Contract Price $ 1,526,707.81 Original Contract Duration 240 Previous Extensions 365 This Change Order 0 Revised Duration - Calendar Days 605 Contractor Date Engineering Director Date Consultant Date City Manager Date Drill 16" HDPE LF 1270 339.00 $ 430,530.00 24" Steel Casing at Pipeline LF 130 75.00 $ 9,750.00 16" Insertion Valve EA 2 34,000.00 $ 68,000.00 Relocate/Replace Shipley's Donut sign EA 1 15,000.00 $ 15,000.00 8" MJ gate valve EA 2 2,750.00 $ 5,500.00 12" MJ Gate Valve EA 1 4,200.00 1 $ 4,200.00 Total $ 265,762.81 Original Contract Price $ 1,260,945.00 Previous $ This Change Order $ 265,762.81 Revised Contract Price $ 1,526,707.81 Original Contract Duration 240 Previous Extensions 365 This Change Order 0 Revised Duration - Calendar Days 605 Contractor Date Engineering Director Date Consultant Date City Manager Date