Loading...
Ordinance No. 13,214ORDINANCE NO. 13,214 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 8 WITH TURNER CONSTRUCTION COMPANY, FOR THE JOINT 911 EMERGENCY COMMUNICATIONS AND INFORMATION DATA SERVICES CENTER PROJECT, WHICH RESULTS IN A NET CONTRACT PRICE DEDUCTION OF FORTY -THREE THOUSAND FOUR HUNDRED SEVENTY -SEVEN AND 13/100 DOLLARS ($43,477.13); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ***************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 8 with Turner Construction Company, for the Joint 911 Emergency Communications and Information Data Services Center Project, which results in a net deduction of FORTY -THREE THOUSAND FOUR HUNDRED SEVENTY - SEVEN AND 13/100 DOLLARS ($43,477.13). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and�er its passage by the City Council of the City of Baytown. // INTRODUCED, READ and PASSED by the affirmative vote the City Council of the City of Baytown this the 9th day of June, 2016. / ` El 0 Lai IT's :• — APPROVED AS TO FORM: e 10 RAMIREZ. Mayor RAKarenTiles City Couneit•Ordinances\2016Uune 9',ChangeOrderNoWoint9l l EmergencyCommunicationsandlnformationDataServicesCen ter.doc Exhibit "A" IPA]]CITY OF BAYTOWN BAYTOWN Change Order No. 8(R3) �T Joint 911 Emergency Communication Data Services Center 5/27/2016 Brief Description of Changes: Below are credits for scope of work changes that were deleted from approved Change Order 7 and additional changes as below as requested by Baytown. Add or Delete Items: Item Description Unit QuantiN Unit Price Total 1 Additional Driveway access for Fairgrounds + culvert crossing, re- grading and seeding $ 8,387,000.00 $ (23,800.00) 2 Culvert crossing, re- grading and seeding for original driveway access to Fairgrounds $ 400,000.00 $ (9,400.00) 3 1 Misc. grading to allow positive drainage at the west property line with the Fairgrounds $ (2,120.00) 4 Secure hardened conduit at (2) gates $ - $ (2,170.00) 5 Dedication plaque fabrication /installation $0.00 3 $ (2,480.00) 6 Credit for original apron Previous Change Orders $ (11,428.93) 7 Remaining Contingency Amount This Change Order $ (2,426.43) 8 Added Metal Landscape Edging and Pavers Revised Contract Price $ 1,650.00 g Replacement of 911 Room Access Flooring Tiles. $ 150.00 11 Tiltwall Grouting (2) locations $ 2,700.00 12 Terracon Retesting at Mechanical Yard Concrete Pilaster $ (350,00) 13 Turner GC/ Insurance/ BR and Profit 5 6,198.23 Total Contract Summary: (43,477.13) Original Contract Duration - Calendar Days 275 Previous Time Extensions 74 Original Contract Revised Contract 1 Original Contract Hid $ 8,387,000.00 $ 8,387,000.00 2 Owner Contingency $ 400,000.00 Previous Contingency Authorization $ 397,573.57 This Contingency Authorization $ - Remaining Contingency $0.00 3 Change Orders Previous Change Orders $ 87,025.83 This Change Order $ (43,477.13) 4 Revised Contract Price $ 8,787,000.00 $ 8,430,548.70 Original Contract Duration - Calendar Days 275 Previous Time Extensions 74 This Change Order 8 Revised Contract Duration - Calendar Days Contractor Date Architect Date Di octor of E gineering Date City Manager Date 357 Turner City of Baytown 911 Joint Emergency Communications 8, Information Center Tiltwall Grouting No. Description Quantity Unit Unit Price 5/27/2016 Total Tiltwall Grouting 16 Grouting of the (2) Tiltwall Panel Joint by the Outdoor Break Area 1 LOT 1,900.00 1,900.00 17 Repair (2) weep holes and sealant 1 LOT 500.00 500.00 18 Repair Exterior Wall Paint 1 LOT 300.00 300.00 SUBTOTAL 2,700.00 General Conditions (see attached) 2,577.07 Insurance and Bonds 3.2% 168.87 Builders Risk I LOT 2,900 2,900.00 Profit - -- 5% 552.30 Total 8,898.23 Turner Project Name: Project #: Work Description: Change Order Request Time & Material Baytown 911 Date: 05/27/16 150101 PCO: Tiltwall Grouting Description Quantity Unit Monthly Unit Price Price Labor & Benefits Project Superintendent 16.0 HR 78.71 1,259.36 Project Engineer 4.0 HR 69.45 277.80 Field Engineer 0.0 HR 50.93 0.00 Project Manager 3.0 HR 137.91 413.73 Safety Inspection 0.0 HR 55.56 0.00 Local Office Support and Overhead 1.0 Lot 390.181 390.18 Materials, Supplies & Rentals Job Site Tools & Field Supplies 0.00 Lot 0.00 0.00 Job Site Temporary Fence Rental 0.00 Man Month 250.00 0.00 Job Site Trailer Rental 0.00 Man Month 977.78 0.00 Job Site Copier /Printer Rental 0.00 Man Month 250.00 0.00 Job Site Water Cooler Rental 0.00 Man Month 50.00 0.00 Job Site Temporary Toilet Rental 0.00 Man Month 275.00 0.00 Job Site General Office Supplies 0.00 Man Month 30.00 0.00 Job Site Internet Service Provider 0.00 Man Month 55.00 0.00 Job Site Rubbish Removal 0.00 EA 400.00 0.00 Job Site Postage / Express Deliveries 0.00 Lot 0.00 0.00 Job Site Utility Charges - Job Trailer 0.00 Man Month 400.00 0.00 Job Site Utility Charges - Building 0.00 Man Month 800.00 0.00 Safety Equipment/Traffic Control /Signage 600 Man Month 50.00 0.00 As -Built Prints & Records Retention 0.13 an Month 25.00 3.19 Technology Charges 0.13 Man Month 595.00 76.03 Cell Phones 0.13 Man Month 85.00 10.86 Travel Expenses 256.00 Mile 0.57 145.92 Survey 0.00 Lot__L 0.00 0.00 Total General Conditions Price 2,577.07 /"t,rner Representative Dat Owner Representative Date