Ordinance No. 12,795ORDINANCE NO. 12,795
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS,
AUTHORIZING CHANGE ORDER NO.2 WITH ANGEL BROTHERS ENTERPRISES,
LTD, FOR THE 2007 STREET BOND PROGRAM - YEAR 5; AUTHORIZING
PAYMENT BY THE CITY OF BAYTOWN, IN THE AMOUNT OF SEVENTY -THREE
THOUSAND ONE HUNDRED SEVENTY -FOUR AND 501100 DOLLARS ($73,174.50);
AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
***************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize Change Order No. 2 with Angel Brothers
Enterprises, LTD, for the 2007 Street Bond Program - Year 5. A copy of said change order is attached hereto,
marked Exhibit "A" and made a part hereof for all intents and purposes.
Section 2: That the City Council of the City of Baytown hereby authorizes the payment in an
amount of SEVENTY -THREE THOUSAND ONE HUNDRED SEVENTY -FOUR AND 501100 DOLLARS
($73,174.50) to Angel Brothers Enterprises, LTD, for the change order authorized in Section 1 hereinabove.
Section 3: This ordinance shall take effect immediately from an fter its passage by the City
Council of the City of Baytown. f
INTRODUCED, READ and PASSED by the affirmative vote o the City Council of the City of
Baytown this the 12"' day of February, 2015.
AT ST:
LETICABRYSCH, City erk
APPROVED AS TO FORM:
e-WNACIO RAMIREZ, SR. ty Attorney
. DONCARLOS, Mayor
RA Karen\ Fi1es lCityCouncillOrdinances\2015 `•.February 1Z,. ChangeOrderNo2for2007StreetBondProgram- Year5.doc
Exhibit "A"
CITY OF BAYTOWN
Change Order No. 2
B
2007 Street Bond Project -Year 5
January 23, 2015
Receiv I
C"'rt Baytown
Engineering Dept
Brief Description of Changes:
Reconstruction of the intersection of Fairway Drive and Goose Creek as directed by the City.
Add Items:
Line
Item No.
Description
Unit
Quantity
Unit Price
Total
1
Mobilization
LS
1
10,000 00
$ 10,00U-00
5
Solid Sodding
SY
200
4.00
$ 80000
7
Inlet Protection Barrier
EA
4
90.00
$ 36000
10
Remove & Replace Existing Sign
EA
1
75.00
$ 7500
11
Remove & Replace Existing Mailbox
EA
3
75.00
$ 22500
12
Traffic Control
LS
1
1,500.00
$ 1,50000
13
Remove & Dispose Existing Concrete
Pavement
SY
910
2.20
$ 2,00200
17
Roadway Excavation / Undercut Subgrade
CY
375
15.50
$ 5,81250
22
6" Concrete Curb
LF
410
3.00
$ 1,230.00
24
Concrete Pavement Header T 1 811
LF
90
6.00
$ 540.00
25
6" Concrete Driveway
SY
95
61.00
$ 5,79500
27
6" Concrete Sidewalk
SY
35
58.00
$ 2.03000
31
Adjust Existing Sanity Sewer Manhole
EA
1
400.00
$ 400.00
79
Allowance for Material Testing
LS
01
50,000.00
$ 5,00000
84
6" Cement Stabilized send Subgrade
CY
425
41.00
$ 17.429'00
NEW
8" Concrete Pavement (High Early Strength)
SY
910
83.00
$ 75,530.00
auu -IOlaf AaorOOnS i 1L5,fL4.5U
Deduct Items:
Line
Item No.
Description
Unit
Quantity
Unit Price
Total
80
Allowance for Utili Relocates
LS
1
15,000.00
$ 15,000 00
81
Police Officers
HR
500
5.00
$ 2.50000
82
Extra Machine Excavation
CY
400
10.00
$ 4,000 00
83
lExtra Hand Excavation
CY
200
20.00
$ 4,00000
85
lExtra Select Backfill
CY
200
15.00
$ 3,00000
86
Well Pointing for StoRm Sewer All Sizes All
Depths
LF
250
20.00
$ 5,00000
87
Wet Condition Bedding for 48" RCP &
Smaller Storm Sewer
LF
250
15.00
$ 3,750.00
88
Wet Condtion Bedding for MH, Junction MH,
Conflict MH, All Sizes, All depths
EA
6
500.00
$ 3.00000
89
Solid Sheet Shoring System for Storm Sewer,
All Sizes, All Depths
LF
250
20.00
$ 5,00000
90
Installation and Removal of Piezometers
EA
8
100.00
$ 80000
95
Additional Water Service Line Tubing
LF
200
1 5.001
$ 1,000 00
98
Long Side Sanitary Sewer Service
Replacement
EA
10
850.00
$ 8,500.00
1001 buo -iorar ueaucnons
TOTAL Change Order No. 2 Amount
(Additions - Deductions)
i 55,55u.uu
$ 73,174.50
Contract Summary:
O ' inal Contract Price
$
3,649,490 -00
Previous Change Orders No. 1
$
56 000.00
This Chan a Order Add Items No. 2
$
128,724 50
This Change Order Deduct Items No. 2
$
55,550.00
This Change Order Total (No. 2)
neviseo Lonuaci once
$ 3,775,554.50
Original Contra lion - Calendar Da
365
Previous s
0
This Ph . 8noMer a"
seu burauon - �.aienaar bays
s
y I�tG -zoos
Brothers
Director of Finance Date
/�/� " r^�' /- _
" r" ,�: 1/2612015
ARKK Engineers, LLC
Director of Engineering Date
City Manager Date
355