Ordinance No. 12,675ORDINANCE NO. 12,675
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS,
AUTHORIZING CHANGE ORDER NO. 1 WITH ANGEL BROTHERS ENTERPRISES,
LTD, FOR THE 2007 STREET BOND PROGRAM - YEAR 5; AUTHORIZING
PAYMENT BY THE CITY OF BAYTOWN, IN THE AMOUNT OF FIFTY -SIX
THOUSAND AND NO /100 DOLLARS ($56,000.00); AND PROVIDING FOR THE
EFFECTIVE DATE THEREOF.
***************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council does hereby authorize Change Order No. 1 with Angel Brothers
Enterprises, LTD, for the 2007 Street Bond Program - Year 5. A copy of said change order is attached hereto,
marked Exhibit "A" and made a part hereof for all intents and purposes.
Section 2: That the City Council of the City of Baytown hereby authorizes the payment in an
amount of FIFTY -SIX THOUSAND AND NO/] 00 DOLLARS ($56,000.00) to Angel Brothers Enterprises,
LTD, for the change order authorized in Section 1 hereinabove.
Section 3: This ordinance shall take effect immediately from and after its passage by the City
Council of the City of Baytown. /j
INTRODUCED, READ and PASSED by the affirmative von of the City Council of the City of
Baytown this the 91h day of October, 2014. / I
■
APPROVED AS TO FORM:
ACID RAMIREZ, SR., ty ttorney
CARLOS,
RAKaren \Files \City CoundhOrdinances\2014 \00ober MhangeOrderNo 1 for2007StreetBondProgram-Year5.doc
V G
O
O vI
O
°
O
_
/ M
■
9
°
OF
CARLOS,
RAKaren \Files \City CoundhOrdinances\2014 \00ober MhangeOrderNo 1 for2007StreetBondProgram-Year5.doc
Exhibit "A"
CITY OF BAYTOWN
8�0� Change Order No. 1
'ter 2007 Street Bond Project - Year 5
September 26, 2014
Brief Description of Changes:
Replacement of an existing 6" waterline and associated appurtenances from Humble Street between Laredo Street
and Atlantic Street (755 L.F.). The existing waterline is shallow and under the existing pavement and the services are
interfering with the proposed paving improvements. Public Works Department requested that this line be placed
outside the limits of existing pavement.
Add or Delete Items:
Line
$ 3,649,490.00
Previous Change Orders $
$ _
This Change Order
Item No.
Description
Unit
Quantity
Unit Price
Total
54A
6" diameter PVC C -900 Water Line All
Depths, Com late in Place, the Sum of:
LF
755
45.00
$ 33,975.00
58
6" resilient seated gat valve with box,
Complete in Place, the Sum of.
EA
2
925.00
$ 1,850.00
62
Fire Hydrant Assembly, includes 6" Dia.
Lead, 6" Gate Valve, Complete in Place, the
Sum of:
EA
2
4,100.00
$ 8,200.00
64
Remove and Salvage Existing Fire Hydrant,
Complete in Place, the Sum of:
EA
1
500.00
$ 500.00
65
Remove and Salvage Existing Valve,
Complete in Place, the Sum of:
EA
1
150.00
$ 150.00
66
Install Short Side Water Service, Complete in
Place, the Sum of:
EA
10
340.00
$ 3,400.00
67
Install Long Side Water Service, Complete in
Place, the Sum of:
EA
11
575.00
$ 6,325.00
70
6" wet connection, including coupling and
appurtenances, Complete in Place, the Sum
of:
EA
2
450.00
$ 900.00
74
6" cut, plug, and abandon existing waterline.
Com lete in Place, the Sum of:
EA
2
350.00
$ 700.00
vta�
Contract Summary:
bb,000.UU
Original Contract Price $
$ 3,649,490.00
Previous Change Orders $
$ _
This Change Order
VIP 10N VII%.G
.11 S, /Ub,411U.UU
Original Contract Duration - Calendar Days 365
Previous Time Extensions C
This Change Order
Revised Contract Duration - Calendar Days 365
Angel Brothers
Director of Finance Date
ARKK Engineers, LLC
Director of Engineering Date
City Manager Date