HomeMy WebLinkAboutOrdinance No. 16,640 (Item 6.m.)ORDINANCE NO. 16,640 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NUMBER 2 TO THE PROFESSIONAL CONSULTING SERVICES AGREEMENT WITH CAROLLO ENGINEERS INC., FOR THE SOUTH MAIN DRAINAGE IMPROVEMENTS PHASE 2 PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN IN AN AMOUNT NOT TO EXCEED ONE HUNDRED SIXTY-EIGHT THOUSAND FOUR HUNDRED THIRTY-FOUR AND 75/100 DOLLARS ($168,434.75); MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown, Texas, hereby authorizes and directs the City Manager to execute and the City Clerk to attest to Change Order No. 2 of the Consulting Services Agreement with Carollo Engineers Inc., for the South Main Drainage Improvements Phase 2 Project. A copy of said agreement is attached hereto as Exhibit "A" and incorporated herein for all intents and purposes. Section 2: That the City Council of the City of Baytown authorizes payment to Carollo Engineers Inc., in an amount not to exceed ONE HUNDRED SIXTY-EIGHT THOUSAND FOUR HUNDRED THIRTY-FOUR AND 75/100 DOLLARS ($168,434.75); for professional services in accordance with the agreement authorized in Section 1 heremabove. Section 3: That the City Manager is hereby granted general authority to approve a decrease or an increase in costs by FIFTY THOUSAND AND NO/100 DOLLARS ($50,000.00) or less, provided that the amount authorized in Section 2 hereof may not be increased by more than twenty-five percent (25%). Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 22nd day of October, 2026. CHARLES JOHNSON, Mayor ATTEST: ANGELA JACKSON, City Clerk APPROVED AS TO FORM: SCOTT LEMOND, City Attorney R:\Ordinances and Resolutions\Ordinance Drafts\2026-10-22\Ord - Authorizing Change Order No. 2 to the Carollo Engineers PSA South Main drainage Improvements Phase 2 Project. vh.docx EXHIBIT A Consulting Services Contract Amendment South Main Drainage Improvements Phase 2 Proiect Date of Issuance: 07/06/2026 Consultant: Carollo Engineers, Inc. BAYT04VN Amendment No: 2 Project No: DRAI2002 Contact/PO#: 4250187/2103043 Explanation: The City of Baytown authorized professional engineering services with Carollo Engineers, Inc. on January 15, 2021, for the design and construction of the South Main Drainage Improvements Phase 2 Project. The project was placed on hold on January 1, 2024, after reaching approximately 90% design completion. The City now desires to resume the project by completing the final design, preparing the construction contract documents, and providing bidding and construction phase services. Prior to finalizing the design, the Carollo project team will conduct site visits to evaluate existing conditions and determine whether any changes have occurred during the project hiatus that require additional analysis or revisions to the construction documents. The proposed amendment includes the engineering effort necessary to complete the remaining design, perform site assessments, support the bidding process, and provide construction phase services. Based on the project's scope and complexity, the anticipated construction duration is approximately 14 months. Description of Work Cost Time 1. Reasses project conditions, resume design, complete preparation of the construction documents and proceed with the bid phase and construction phase services. $ 168,434.75 320 Days Total $ 168,434.75 320 Days Proposal Scope/Schedule: The additional scope of work and the schedule associated with the same, are attached hereto as Exhibit "A" and incorporated herein for all intents and purposes. Cost & Time Change Summary: Original Contract: Previous Amendment(s): Net increase (decrease) from this Amendment: Revised Contract: Percent increase (decrease) this Amendment (+34.77%) Percent increase (decrease) all Amendments (+38.11%) Cost Time $484,397.00 420 Days $ 16,191.00 0 Days $168,434.75 320 Days $669,022.75 740 Days [Remainder of Page Purposely Left Blank] R\Template\Design 1 of 2 D6. Revised 05/2026 Consultant agrees to perform changes(s) included in this Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Unless a different meaning clearly appears from the context, words and phrases as used in this Amendment, the terms and phrases as used herein shall have the same meanings as in the Agreement. The provisions of this Amendment and the Agreement and all previous amendments, if any, shall be read together and construed as one agreement provided that, in the event of any conflict or inconsistency, between the provisions of this Amendment and the provisions of the Agreement and any previous amendment, the provisions of this Amendment shall control. This Amendment has been jointly negotiated by the parties hereunder and shall not be construed against a party hereunder because that party may have assumed primary responsibility for the drafting of this Amendment. By this Amendment, the City does not consent to litigation or suit, and the City hereby expressly revokes any consent to litigation that it may have granted by the terms of this Amendment, the Agreement or any other contract or agreement or addenda, any charter, or applicable state law. Nothing contained in this Amendment or in the Agreement shall be construed in any way to limit or to waive the City's sovereign immunity. The persons executing this Agreement hereby represent that each party has the full power and authority to enter into and perform pursuant to the Amendment, and that each has been properly authorized and empowered to enter into the Amendment. Upon execution by all parties, the following changes identified for the Contract Value and/or Contract Time shown, are made part of the Contract. APPROVED• By: �, Y �. < 64 r Date: 9/29/2026 �nt Meera Victor Printed Name Senior Vice President Title APPROVED: JASON E. REYNOLDS, City Manager �E APPROVED AS TO CONTENT: By: CAROL HADDOCK, P.E., PWE Director Date: Date: 10/5/2026 APPROVED AS TO FUNDING: By: Date: TERESA McKENZIE, Chief Financial Officer By: Date: 9/29/2026 Project Manager Stephen Costello Printed Name By: P+AWY Date: 10/5/26 Business Asset Team Member Taylor Khoury Printed Name R\Template` Design 2 of 2 D6. Revised 05/2026 SCOPE OF WORK SOUTH MAIN STREET DRAINAGE IMPROVEMENTS PHASE 2 AMENDMENT NO. 2 (Final) Amendments to the original scope of services are herein highlighted in yellow with tasks previously completed noted. BACKGROUND The area along South Main Street, from West Texas Avenue to East Republic Avenue, is often subject to localized flooding during storm events. The flooding affects access to public and private property and has caused property damage. The City of Baytown (City) initiated a project to address the flooding; the resulting preliminary engineering report (PER) is dated October 21, 2019. The City is currently in the construction phase for Phase 1 of the project identified in the PER, which contains South Main Street from West Texas Avenue to West Gulf Avenue. Phase 2 improvements include South Main Street from the Phase 1 project limits (West Gulf Avenue) to East Republic Avenue, as well as drainage improvements associated with a Harris County Flood Control District (HCFCD)-owned drainage channel 0101-01-00, or Jailhouse Ditch, to approximately Lee Street. The current Phase 2 concept as proposed also includes detention storage to reduce peak flows to the drainage system, although the location of the detention has not been finalized. The Phase 2 project described herein includes the evaluation and confirmation of the PER, detailed design efforts, and bid phase and construction administration services to implement a solution to the localized flooding challenges. amendment No. 2 The City of Baytown authorized consulting services for the design and construction of Phase 2 on January 15, 2021. The project was subsequently put on hold on January 1, 2024. At that time the construction plans and specifications (construction contract documents) were 90% complete. The City desires to restart the project, complete preparation of the construction contract documents and move forward with Bid Phase and Construction Phase Services. DESIGN ENGINEERING SERVICES Task 1. Data Collection and Review (Completed) This task includes reviewing available data relevant to the project; identifying data gaps required to conduct a more detailed investigation; and collecting the additional data. Note that, prior to contacting any property owners regarding necessary rights of entry (ROE) for data collection, the City will convey information about the project and the upcoming request for ROE via letters or door hangers, or both. Following, the Consultant will initiate the necessary ROE and will alert the City to any challenges as soon as is possible. • The Consultant will review existing project documentation, particularly the hydrologic and hydraulic (H&H) model developed as part of the previous preliminary engineering effort and the Phase 1 as -built drawings. Based on an initial review, the existing H&H model (in XPSWMM) is populated for the drainage area east of S. Main Street but has little information for the area west of S. Main Street. Therefore, this effort will focus on information relevant to the area west of S. Main Street. Topographic survey data acquisition will occur in two stages. The first stage will include data collection in the project area that is already established. To reduce costs, the projec, team will collect data in the area selected for detention in a second stage, once the modeling effort has informed that decision. The Consultant will acquire topographic survey data and subsurface utility data consistent with the City and HCFCD Design Guidelines. All data gathered will be tied into the Texas Coordinate System of 1983, south central zone Tropical Storm Allison Flood Recovery Project (TSARP) benchmarks and vertical elevations provide in NAVD88, 2001 adjustment, with an additional reference for conversion to Geoid12A1, as required by HCFCD. The following is a summary of the first stage of survey activities: From right of way to right of way along South Main Street from 25-feet north of West Gulf Street and heading south to 200-feet south of East Republic Avenue, including 100 feet east and west at West/East Gulf Street and East Republic Avenue; flow lines and sizes of existing storm sewer along the alignment and intersecting the existing storm sewer; and other significant features along the project limits. Surveyor will incorporate all trees18-inches and larger as measured from 18-inches from ground level. Approximate right of way and property lines will be shown. (Approximately 1,045 LF) Along the Union Pacific Railroad (UPRR) property from Lee Drive to South Pruett Street, then from the northeast corner of George Washington Carver Elementary to the west property line of the City of Baytown tract (109 South Main Street), from the centerline of the railroad tracts to the south property line of the UPRR property. Incorporate the full limits of the existing ditch. Include the flowline elevation and sizes of all culverts and inlets and outfalls where the ditch connects with or has inflow from the storm sewer, incorporate the outfall at Lee College, and indicate the size of pipe and flowline elevation. Approximate property lineswill be shown. (Approximately 2,000 LF) - For validation purposes, survey in storm manholesand inlets and acquire rim elevation of manholes, flowline and top of inlet elevations, inverts and sizes of 10% of the accessible storm manholes and inlets for the area incorporated into the hydraulic model; approximate boundaries include Main Street to the west, Briarwood Drive to the south, 5. Alexander Drive to the east, and E Wright Street to the north. This will not include any topographic route surveying and the control will not be included in the survey control maps. (Approximately 20-25 structures with inverts and sizes) The following is a summary of the second stage of survey activities: Survey of the selected detention location, including 50' grid across property and at all grade changes. - Perform subsurface utility engineering to verify existing utility information at up to 5 locations identified by the Consultant. The GEOID12A model is intended to transform between NAD 83 (2011/PAII/MAII) and the respective vertical datums for the different regions. Source, httos GEOIDI2A,, Survey Control Maps will be developed along the project. These mapping products will be provided in PDF and AutoCAD format with layers and line types, etc. to meet HCFCD requirements (note design drawings in subsequent tasks will be provided in MicroStation format). Additionally, the Consultant will prepare line work for all utilities along the project limits in plan and profile for incorporation into the plan and profile sheets for the project and will locate bore hole locations used for the geotechnical data collection effort. All collected points will be reflected on the topographic survey. Geotechnical data collection efforts have already occurred for Phase 1 of the project in and along South Main Street, resulting in existing, geotechnical recommendations related to the proposed roadway repaving and storm sewer installation (e.g, concrete pavement thickness, including subgrade stabilization for the street pavement construction; bedding and backfill; and excavation trench stability and groundwater control for storm sewer installation and construction considerations). For Phase 2, specific to the project area in and along South Main Street, the Consultant will not collect additional geotechnical data and will provide a design consistent with the Phase 1 recommendations. The geotechnical data collected during Phase 1 will also be used to estimate depth to groundwater in the project area for use in developing detention concepts. Additional geotechnical data will be collected once the detention location and the extent of the Jailhouse Ditch modifications have been established for more accurate depth to groundwater and specific slope recommendations. The following is a summary of the geotechnical data collection effort: - Drilling and sampling four, 20-foot borings along Jailhouse Ditch and three, 20-foot borings within the proposed detention location. The sampling will be continuous at 2- foot intervals from ground surface to the explored depth. - Utilizing traffic control devices and personnel as appropriate during coring and drilling to maintain safety of the drilling crew and the public. - Repairing all boreholes consistent with native material. - Performing appropriate laboratory tests on selected representative samples to develop the engineering properties of the soil. - Performing engineering analyses to develop geotechnical recommendations for safe side slopes for the proposed Jailhouse Ditch improvements and the proposed detention location. - Submitting an updated geotechnical investigation report summarizing the methodologies used and resulting recommendations. The level of effort associated with the geotechnical data collection effort does not include site clearing, methods to address limited access, or erosion control devices. Forthe data collection efforts, as necessary, the Consultant will obtain utility clearance by calling Lone Star 811, referencing street name and Key Map block number, and marking the boring locations with paint and coordinating with representatives of utility companies; the Consultant will also contact the City's Public Works and Engineering Department (PWE) to reduce the risk to City utilities, as well. Deliverabl • Hard copies of the completed utility base profile (upon request) and final, signed and sealed versions of all survey deliverables • Updated AutoCAD topographic base plan of the full survey. • Updated utility base plan of the survey, as well as a preliminary set of survey control maps. • A digital, pdf copy of the draft geotechnical data report, to be included with the 30% design submittal. • A digital, pdf copy of the final geotechnical data report, to be included with the 90%design submittal. Project has been dormant for approximately two years. Design team will need to visit the kmendment No. 2 site to determine if any site conditions have changed that may require further analysis or construction contract document changes. The fee adjustment outlined in Exhibit B reflects time required to visit the site and assess existing site conditions. Task 2. Hydrologic and Hydraulic Model Verification and Update (Completed) • Using the data collected in the previous tasks, as well as 2018 LIDAR topographic contours, digital elevation model (DEM) and aerial information, and subdivision drainage and storm sewer plans where necessary and available, the Consultant will update the existing model to develop a baseline, existing conditions 2D H&H model. The Consultant will then develop three flow regimes for the existing conditions, one to simulate each of the 10-, 25-, and 100-year storm events, consistent with the requirements aligned with each type of conveyance. • The Consultant will develop a series of five, proposed conditions H&H modelsfor each of the three flow regimes modeled in the existing conditions scenario (i.e., 10-, 25-, and 100- year storm events). XPSWMM will be used to estimate flood impacts and level of service for each alternative for the 10-, 25-, and 100-year frequency storm events. Should there be any downstream base flood (100-year event) or water surface level increases that affect property owners other than the City, the design concept will be revised if and where possible such that this is not the case. The Consultant will model the proposed conditions based on the scenarios summarized in the following paragraphs; these scenarios may be tweaked based on the data collected in the previous tasks or other factors and can be refined as needed. - Scenario No.1: Increased Conveyance with Uosized Culvert. The Consultant will model a proposed 5-foot by 3-foot box culvert along South Main street. The additional conveyance will be modeled with general parameters of length, slope, depth, and material. The Consultant will perform a sensitivity analysis to understand the Phase I is designed for the 10-year storm event; thus the proposed, underground conveyance should be hydraulically consistent. Separately, the City requires open channels be designed for a 25-year storm event. magnitude of changes in the system when the size of the modified conveyance is altered. Scenarios 2, 3, and 4: Detention Basin Alternatives. The Consultant will model proposed detention at three locations; the Consultant will collaborate with City staff prior to selection of the alternative locations. The locations will be based on the existing conditions model, the previous preliminary engineering effort, professional judgement, and City input. The detention will be modeled with general parameters of achievable length, width, and depth and proposed outlet structure. Scenario 5: Revised Harris County Flood Control Ditch. The Consultant will model the effectiveness of an upsized HCFCD ditch (i.e., Jailhouse Ditch) that is parallel to the UPRR, west of 5. Main Street to approximately Lee Drive (at the culvert that directs the water under Lee College).The increased capacity of the ditch will be modeled with general parameters such as achievable width, depth, and slope. The Consultant will make assumptions as necessary at ditch crossings where survey information is unattainable. Deliverabl • Existing conditions H&H model for io-, -5-, and 100-year storm events Five, proposed conditions H&H models for 10-, 25-. and100-year storm events • Geographical Information System (GIS) data generated for the project, including hydraulic cross sections, in a GIS shapefile format. Task 3. Alternatives Analysis and 30 Percent Design (Completed) • The Consultant will conduct an alternatives analysis, integrating information gleaned from previous tasks, to select one preferred alternative. The Consultant will use the following criteria in terms relative to the other alternatives: - Schedule differentiators related to design, construction and permitting. - Cost differences based on a Class 4 opinion of probable construction cost (OPCC), as defined by the Association for the Advancement of Cost Engineering, International (AACEI). Class 4 is considered accurate to +50 to -30 percent and will be based upon a io percent design level. - Maintenance requirements/recommendations. - Aesthetics. - Constructability, including easement acquisition. - Permitting constraints. • Upon selection of the preferred alternative, the Consultant will provide a summary of efforts to date in a Technical Memorandum (TM) and will prepare a 30% design submittal. All design documents will be prepared in accordance with HCFCD standards. For the 30% design milestone, the Consultant will provide: a. Drawings consistent with a 30% level of design, including plan and profile sheets and topographic survey b. An OPCCupdated to a Budget Level or Class3 cost estimate as defined by the AACEI. Class 3 is considered accurate to +30 to -20 percent and will be based upon a 30% design level. c. A working project schedule through construction completion in MS Project format or equal d. Draft specifications table of contents e. Draft geotechnical report f. Utility coordination/conflict inventory g. Draft TM describing the modeling effort and alternatives analysis The 30 percent design submittal will be submitted to the City for review and comment, and comments will be provided at or subsequent to a design review workshop held at a standard project progress meeting. Deliverabl • Electronic copy of 30% design submittal package Task 4. Detailed Design • The Consultant will prepare a 60% design submittal based on data and feedback collected in response to the 30% submittal and through coordination with pertinent City staff. Specifically, the Consultant will request input from the City's PWE Operations staff so that maintenance is considered during design, resulting in proper access and straight -forward practices. One meeting has been included in this scope of work for that purpose. Additionally, the Consultant will initiate contractor outreach at this stage to obtain valuable feedback and to encourage high -quality contractors to bid the project. For the 60% design milestone, the Consultant will provide: a. Response to comments on 30% design deliverables b. Drawings consistent with a 60% level of design, including site plan sheets; grading plans; proposed, modified cross sections and profiles; and detail sheets showing typical details c. And OPCC updated to a budget level or Class 3 estimate as defined by the AACEI. It is considered accurate to +30 to -20 percent, based upon a 60% design deliverable d. Updated project schedule through construction completion e. Specifications f. Geotechnical report g. Updated utility coordination/conflict inventory h. Documentation appropriate for permitting needs at this level of design • The Consultant will prepare a 90% design submittal based on data and feedback collected in response to the 60% submittal. Upon receipt of City comments, the Consultant will initiate the preparation of final bid documents. Contractor outreach will continue through final design as necessary and appropriate. For the 90%/final design milestones, the Consultant will provide: a. Response to comments on the 60%/90% design submittals b. Drawings consistent with a 90%/final level of design c. An OPCC updated to a Control Level or Class 2 estimate as defined by the AACEI. It is considered accurate to +20 to-15 percent, based upon a 90/100 percent design deliverable d. Updated project schedule through construction completion e. Specifications f. Final (signed and sealed) geotechnical report g. Updated utility coordination/conflict inventory h. Verification of submittal to other agencies for necessary approvals (e.g., HCFCD, UPRR, etc.) Each of the design packages will be submitted to the City for review and comment, and comments will be provided at or subsequent to a design review workshop held at a standard project progress meeting. The level of effort is based on open cut construction methods for any pipeline design and City -standard erosion control stabilization vegetation. Deliverabl • Agenda, meeting materials, and meeting summary for the meeting with PWE Operations staff • Electronic copy of 60% design submittal package • Electronic copy of the 90% design submittal • Electronic copy of the final design submittal Additional costs required to complete the design include any existing site changes. ,mendment No. 2 Task 5. Stakeholder Coordination and Outreach (Completed to 85%) • The Consultant will initiate communication with impacted utilities early in (and maintain communication throughout) the design process to address any concerns and associated requirements. The following private utility companies will be contacted: AT&T, Centerpoint Energy, PS Lightwave, Phonoscope, Comcast, and Kinder Morgan, as well as any other private entity that is identified during data collection. Any required private company relocations will be implemented by the private utility in a manner consistent with the proposed construction schedule. If City -owned utility relocation is required, the Consultant will include the associated design effort with the design packages. The associated level of effort is based on the existing, up to 8-inches in diameter water and wastewater pipelines; the level of effort does not include relocation of electric utilities. • The Consultant will provide support for the City's public outreach effort, which will take place through the existing Baytown Engage platform (https:,/www baytownengage.com/). Support for public outreach will be similarto the effort currently seen on the Neighborhood Street Reconstruction website, which includes background information, frequently asked questions (and answers), and a PowerPoint presentation. The Consultant anticipates participation in and content development for one, online public outreach meeting. Deliverables • Copies of correspondence with utilities, including proof of design submittals (as appropriate). • Utility coordination/conflict inventory at each design milestone. • Design documents (plans and specifications) associated with City -owned utility relocation, incorporated in the project plan set. • Content for the website and public outreach meeting that meets the standard and format provided. Task 6. Permitting Support (Completed) • The Consultant will assist the City in determining the extent of the regulatory requirements associated with the project via data collection and agency coordination. To reduce costs, we are recommending a proactive approach to coordination with certain agencies early in the project planning process. Initial communication with agency staff will aid in determining jurisdictional boundaries. A complete list of agenciesto contact will be developed in cooperation with the City; we expect this list will include (but not be limited to) the United States Army Corps of Engineers (USACE), Texas Commission on Environmental Quality (TCEO), UPRR, and HCFCD. Based on professional experience, we anticipate the following will be necessary (and has been included in the level of effort): - Delineation of the jurisdictional sections of any proposed drainage improvements within the project area for the purpose of due diligence.The level of effort is based on a finding of no associated USACE (Section 404 of the Clean Water Act) permit needs beyond a preconstruction notification. - High-level review of site -specific historical and cultural resources information to ascertain whether additional, in-depth studies may be required for project implementation. - Review of state and federal databases to evaluate the potential presence and impact to threatened and endangered species of concern within and near the project area, as well. - Submittal of the summary of results of the desktop analysesto the Texas Historical Commission (THC), Texas Parks and Wildlife Department (TPWD), and the United States Fish and Wildlife Service (USFWS) via written correspondence (i.e., letters).The level of effort is based on no required efforts beyond notification. Phase 1 Environmental Site Assessment for the applicable portions of the project, specifically the selected detention site. - Registration of the project with the Texas Department of Licensing and Regulation (TDLR) and review of the 90%design documents with respect to the Texas Accessibility Standards (TAS). The level of effort does not include additional design componentsto address anyTAS compliance needs (e.g., handrail, etc.) beyond a sidewalk. - Compliance with theTCEO'sTexas Pollution Discharge Elimination System (TPDES) Construction General Permit via preparation the SWPPP (this effort is included with the design deliverables).The construction stormwater monitoring and reporting required byTCEO and all other activities required for compliance with the TPDES program will be the responsibility of the contractor. - Population and submittal for the City's stormwater permitting process Collaboration with/approvals from UPRR or HCFCD.The estimated level of effort is based on obtaining a letter of no objection from HCFCD and no need for HCFCD- specific permitting. Additionally, the level of effort is based on no necessary floodplain revisions, achievement of "no impact" (thus no Floodplain Administrator permit requirements), and no necessary critical habitat or presence/absence surveys. Deiverable • TPDES-compliant SWPPP (to be included in the design package). • Copies of letters submitted to THC, TPWD and USFWS. • Jurisdictional waters of the U.S. delineation. • Phase i Environmental Site Assessment • Documentation of the investigation efforts related to historical and cultural resources and threatened and endangered species lmendment No. 2 Task 7. Bid Phase Services (Pending) Bid phase services will include support services associated with facilitating contractor bidding of the project. The Consultant will develop a bid proposal and provide the Notice to Bidders (NTB) and list of bid itemsto the City'sproject manager in electronicform. The Consultant will attend one pre -bid conference and document/ answer questions received from prospective bidders. The Consultant will also assist the City in responding to pre -bid inquiries, issuing addenda (if necessary). The Consultant will also provide a Consultant's Recommendation of Award Letter that includes the following: a. Check for math errors and reconcile any mathematical discrepancies b. Review for unbalanced bid items c. Certify bid tabulation, including engineer's estimate d. Review of contractor's financial standing and references e. Explain any discrepancies between the engineer's estimate and the bids f. Recommend award The Consultant will document any substantial changes that affect the design (drawingsand specifications) through red -line markups. These markups will be used to develop conformed documents after the bid is awarded. Upon selection of a contractor, the Consultant will produce and transmit two full-size, two 8.5 x 11 drawings, and two Project Manuals in hard copy and one electronic format copy to the City's project manager in a format ready for execution with the City's Notice of Intent to Award (NOI). Deliverabl • Attendance at one pre -bid conference. • Responses to questions in addenda form. • Engineer's Recommendation of Award Letter, • Conformed documents. mendment No. 2 Task 8. Construction Administration Services (Pending) The Consultant will provide construction administration services forthe duration of the construction phase; this effort will include the following: a. Attend pre -construction meeting to provide information and answer questions b. Attend monthly progress meetings with construction manager and contractor c. Review and comment on contractor's requests for information (RFIs) and requests for change orders (RCOs), including coordination with the City's construction manager on change directives and change orders d. Review and approve monthly pay applications, coordinating with construction manager e. Provide interpretations and guidance for the contractor and the City's construction manager in resolution of problems f. Support delivery of the project in accordance with design documents. g. Provide ongoing, monthly construction oversight reports detailing the status of construction for the project. h. Review all contractor submittals to verify compliance with design documents and provide recommendations to the City. Provide on -site supervision and oversight of construction activities at a minimum on a bi- weekly basis. j. Coordinate with construction manager to review progress of work for substantial completion, including production of punch list and, following, substantiation that items are completed. Issue both certificate of substantial completion and final acceptance. k. Issue letter to the City recommending acceptance and release offinal payment I. Provide record drawings from contractor's as-builts in electronic format Further detail is provided in the subsequent paragraphs. Site Visits, Progress Meetings and Reports The Consultant will attend a pre -construction meeting with the City and contractor. Following, the Consultant will attend monthly progress meetings with the contractor through the construction phase of the project to receive the Contractor's report on the progress of construction, anticipated problems, and schedule for future work. The Consultant will prepare meeting summaries of each of these meetings. Additionally, The Consultant will perform bi- weekly on -site supervision, during which The Consultant will review the construction site and provide any recommendations to the City deemed necessary. The Consultant will submit monthly construction oversight reports to the City. Requ for Information (RFI) The Consultant will review and respond in writing to RFIs submitted by the contractor for compliance with the plans, specifications, and bid documents. Review of Change Orders Due to the nature of construction projects, site conditions may change from the time the project is designed to the time construction begins and/or may be different from what was previously believed. Therefore, the Consultant has included time to review and provide recommendationsto the City for contractor -generated change orders over the course of construction. Contractor Submi The Consultant team staff will review and comment on technical contractor submittalsfor compliance with the design documents. Possible submittalsinclude the following: shop drawings, material data (e.g. concrete mixes), and product data. All submittals will be submitted to the Consultant project manager for distribution to the review team; all reviews will be provided to the City's project manager for distribution to the contractor and project team members affected by the review. The Consultant will keep a record of the approved submittals that will be submitted to the City as part of the record drawings submittal. The Consultant's review of all shop drawings, samples and submittalswill be for general conformance with the design concept and general compliance with the requirements of the contract for construction. Incomplete submittals will be rejected. Pay Application The Consultant will review work in progress monthly with the contractor to determine status of work for payment purposes. The Consultant will review the contractor's draft pay request, request any additional documentation needed, and verify that work status is accurately reflected in the progress payment request. The Consultant will document review of pay request and provide a written recommendation to the City indicating the amount to be paid. The Consultant will also indicate any irregularities or challenges that require resolution. Substantial Completion Walk -Through and Final Completion Walk -Through The Consultant will lead a walk-through of the substantially completed project with the City and the contractor. During the walk-through, the Consultant will prepare a walk- through punch -list of items needing correction to comply with the design documents. Upon notification by the contractor that the discrepancies from the walk-through punch -list have been completed, the Consultant will schedule and participate in a final walk-through with the contractor and the City as required: The Consultant will provide a written summary of punch -list items that have been completed in accordance with the plans and specifications. Upon completion of the punch -list items, the Consultant will issue letter to the City recommending acceptance and release of final payment. Record Drawings The contractor will provide red -line mark ups of the final design plans based on construction and submit for use in developing record drawings. The contractor will be required to provide a certified survey of the new facilities, especially the water control elevations of new structures. The City's inspector and the Consultant will review and approve these markups and request any necessary corrections from the contractor; the Consultant will incorporate the approved markups in the final record drawings. The Consultant will submit an electric version of the marked -up construction drawings as record drawings to the City. Delivera le • Attendance at pre -construction meeting • Attendance at monthly construction progress meetings and construction meeting summaries • Responses to contractor submittals, RFIs, and requests for change order • Pay application review notes, and recommendationsto pay • Monthly construction oversight reports • Record drawings in electronic format • Walk-through punch -list • Certificate of substantial completion • Final Acceptance letter Original project scope assumed construction duration at 6 months. Based on the amendment No. 2 complexity of the project it is anticipated construction schedule to be 14 months. Fee revisions are outlined on Exhibit B. Task 9. Project Management Team coordination and management (including all subconsultants) will take place through a combination of client meetings, status reporting, and regular phone and e-mail communications with key project personnel. The project team will review project management protocols, discuss deliverables and the project schedule, and address project concerns throughout the project. The Consultant will be responsible for submitting monthly invoices and accompanying status reports, as well as providing informal status updates via email and conducting regular project meetings. Two, virtual meetings will occur prior to the start of Task 1: the Consultant internal team kickoff meeting and the external team kickoff meeting, which will include key personnel from both the Consultant and the City and will establish project expectations, create a communication plan, identify a schedule of activities, and refine the scope of work, if necessary. Following the initiation of the project and to ensure open and active communication regarding project -related items, the Consultant will lead monthly project meetings, alternating who attends monthly meetings in person and who attends virtually. These meetings will serve to communicate project status and maintain momentum and may serve as a vehicle for deliverable review and comment. Informal status updates will also be provided to the City via phone call or email when appropriate. Monthly invoices submitted through the Detailed Design task (i.e., through Task 6) will include a percent complete for labor (including subconsultant charges) by task, based on a lump sum contract. Monthly invoices submitted for the bid and construction phase assistance tasks (Tasks 7 and 8) will include a summary of hours by labor category by task (including subconsultant charges), based on an hourly not to exceed contract. The Consultant will submit invoices for reimbursable expenses based on a fee not to exceed contract. All monthly invoices will include a written project status update, which will support City reporting to HCFCD. The total duration of this effort is expected to be approximately 20 months, divided as follows: • Task 1, Data Collection and Review: total of approximately 6 months, occurring simultaneously with other tasks • Task 2. Hydrologic and Hydraulic Model Verification and Update: i month • Task 3, Alternatives Analysis and 30 Percent Design: total of approximately 4 months, occurring simultaneously with other tasks • Task 4, Detailed Design: approximately 5 months • Tasks, Stakeholder Coordination and Outreach: approximately 5 months • Task 6, Permitting Support: total of approximately 8 months, occurring simultaneously with other tasks • Task 7, Bid Phase Services: 2 months • Task 8, Construction Administration Services: 6 months Deliverables • Monthly progress reports and invoices • External project team kickoff meeting presentation \mendment No. 2 Original project scope assumed construction duration at 6 months. Based on the complexity of the project it is anticipated construction schedule to be 14 months. Fee revisions are outlined on Exhibit B. • Meeting minutes summarizing the progress meetings � ! | i | ) k | � �k ! k} �a £ a!, k! |� !: i� ! . J k o k k- o \! I•=}�� ) o ) \ | \ \ \ ) ) - ! \ " _ } } \ ■ \_ j | ]ƒ_!} 2 { - �!, !|