HomeMy WebLinkAboutOrdinance No. 16,625 (Item 7.j.)ORDINANCE NO. 16,625
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, AUTHORIZING A PROFESSIONAL SERVICES AGREEMENT WITH
DCCM NORTH AMERICA, LLC. FOR THE OAK LEAF DRIVE
RECONSTRUCTION, STAPLES LIFT STATION IMPROVEMENTS, AND CEDAR
LANDING LIFT STATION IMPROVEMENTS PROJECTS RELATED TO THE
STATE OF TEXAS GENERAL LAND OFFICE COMMUNITY DEVELOPMENT
BLOCK GRANT -MITIGATION -METHOD OF DISTRIBUTION (CDBG-MIT-
MOD) GRANT NO. 24-065-089-E765; AUTHORIZING PAYMENT BY THE CITY
OF BAYTOWN IN AN AMOUNT NOT TO EXCEED FIVE -HUNDRED, ONE -
THOUSAND, THREE -HUNDRED, FIFTY-FIVE AND 00/100 DOLLARS
($501,355.00); ALLOWING FOR GRANT FUNDS IN THE AMOUNT OF THREE -
HUNDRED, TWENTY-NINE THOUSAND, NINE -HUNDRED, SIXTY-THREE
AND 00/100 ($329,963.00); MAKING OTHER PROVISIONS RELATED
THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council of the City of Baytown, Texas, hereby authorizes and directs
the City Manager to execute and the City Clerk to attest to a Professional Services Agreement with DCCM
North America, LLC. ("DCCM") for the Oak Leaf Drive Reconstruction, Staples Lift Station
Improvements, and Cedar Landing Lift Station Improvements Projects related to the State of Texas General
Land Office Community Development Block Grant -Mitigation -Method of Distribution (CDBG-MIT-
MOD) Grant No. 24-065-089-E765. A copy of said agreement is attached hereto as Exhibit "A" and
incorporated herein for all intents and purposes.
Section 2: That the City Council of the City of Baytown authorizes payment to DCCM in an
amount not to exceed FIVE -HUNDRED, ONE -THOUSAND, THREE -HUNDRED, FIFTY-FIVE AND
00/100 DOLLARS ($501,355.00 for consulting services in accordance with the agreement authorized in
Section 1 hereinabove.
Section 3: That the City Council of the City of Baytown authorizes the City to accept
THREE -HUNDRED, TWENTY-NINE THOUSAND, NINE -HUNDRED, SIXTY-THREE AND 00/100
($329,963.00) in grant funds (or an any other amount provided by the GLO, or any other potential grant
funders).
Section 4: This ordinance shall take effect immediately from and after its passage by the City
Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of
Baytown this the 8th day of October, 2026.
CHARLES JOHNSON, Mayor
ATTEST:
ANGELA JACKSON, City Clerk
APPROVED AS TO FORM:
SCOTT LEMOND, City Attorney
R:\Ordinances and Resblutions\Ordinance Drafts\2026-10-08\Ord-DCCM NA-SL.docx
EXHIBIT A
AGREEMENT FOR CONSULTING SERVICES
STATE. OF TEXAS §
COUNTY OF HARRIS §
This Agreement (this "Agreement") is entered into by and between DC CM North America. LLC.
(hereinafter "Consultant") and the City of Baytown; a home -rule municipality located in Harris
and Chambers Counties, Texas (the "City").
1. Scope of Services/Consultant Fees
This Agreement authorizes Consultant to perform Engineering services for the Oak Leaf Drive
Reconstruction Project, Staples Lift Station Project, and the Cedar Landing Lift Station Project
(the "Work") for and on behalf of the City.
This Agreement shall commence on the date of execution by the City Manager or
his designee and shall terminate the earlier of: (a) completion of the Work in
accordance with this Agreement, including Exhibits; (b) fifteen (15) months
following execution by the City Manager or his designee; or (c) Termination of
this Agreement under Paragraph 11.
The scope of the Work is detailed in Exhibit "A."
Compensation and professional tees are detailed in Exhibit " B."
d. The time schedules for the Work are specified in Exhibit "C."
Consultant understands and agrees that the Work shall be funded in whole, or in
part, with Community Development Block Grant Mitigation Program ("CDBG-
MIT-MOD") funds and, therefore, the Work and this Agreement are subject to the
laws and regulations of the CDBG-MIT-MOD 24-065-089-E765 program.
including, but not limited to, 2 CFR Part 200 and 24 CFR Part 570.
Consultant shall comply with all federall)-required contract ternis including, but
not limited to, the following:
Certifications and Representations of Offerors. Non -Construction Contract
(Form HUD-5369-C), attached as Exhibit "D;"
ii. General Conditions for Non -Construction Contracts (From HUD-5370-C),
attached as Exhibit "E
iii. Byrd Anti -Lobbying :Amendment Certification attached as Exhibit "F"
iv. 2 CFR 200.332;
Ap,reement for Consultin_ Ser%ices, Page I RED'. 7.29.2026
v. 2 CFR 200.318(a):
vi. 2 CFR 200.318 (c)(i);
vii. 24 CFR 135.5;
viii. I qual Opportunity Act; and
ix. Solid Waste Disposal Act.
Where context warrants, the terms "Authority," "Housing Authority," and/or "HA"
shall mean the City.
g. Consultant acknowledges and agrees and shall confirm such that its vendors and
subcontractors are not debarred from receiving state or federal funds at each of the
following web addresses: Texas Comptroller's Vendor Performance Program at
httt)st)uLSing, rlri)C_rams: \ cridor-Performa.nt;C-
tracl:ing dcbatre4l-vendors.php and the Federal General Services Administration's
System for Award Management at hun�:.'sLrii.u�icontent h��rne.
h. Each of these Exhibits "A" through "E" is incorporated into this Agreement by
reference for all purposes.
2. Compensation and Professional Fees
a. The City shall pay Consultant in installments based upon monthly progress reports
and detailed invoices submitted by the Consultant as detailed in Exhibit "B.*'
i. Oakleaf Drive Reconstruction Project (RDWY2401) ...............$277,103.00
ii. Staples Lift Station Project (LFST2402).................................. $112,619.00
iii. Cedar Landing Lift Station Project(LFST2403)........... ............ $1 1 1,633.00
iv. N/A........................................................................................................$0.00
v. N/A ........................................................................................................ $0.00
%'i. Total..........................................................................................$501,355.00
b. For an agreed contract amount identified as "Lump Sum," "Not to Exceed" and
"Reimbursable," Consultant shall not exceed the fixed contractual amount without
%%ritten authorization in the form of a contract amendment.
C. Reimbursable Expenses are itemized by work category. Reimbursable Expenses
shall be invoiced Al- COST, %ti ithout subsequent markup by Consultant. All
invoices containing a request for Reimbursable Expenses shall include copies of
the original expense receipts itemized per allowable category.
Allowable Reimbursable Expenses include:
(a) Hard copy reproductions. copies, and/or binding costs:
(b) Postage;
Agreement for Professional Services. Page 2 Rev. 7?9 2026
(c) Mileage, for travel from Consultant's local office to meetings at the
City or jobsite only if Consultant does not have a local office within
a fifty (50) mile radius of Baytown. Mileage shall be charged at the
current IRS rates;
(d) Travel Expenses, mileage from local office to state or federal
regulatory agency office beyond 100 miles; and
(e) Lodging expenses for destinations beyond 100 miles from
Consultant's local oftice AND when business hours exceed eight
hours within one business day OR when Consultant's services
require more than one eight -hour day at the destination; provided
such expenses have been approved in writing by the City.
ii. Disallowed Expenses include travel expenses for professional expertise
traveling into the Greater Houston Area from Consultant's office outside the
Greater Houston Area.
d. Consultant shall invoice based upon total services actually completed during the
applicable month. Invoices and all required or requested backup information shall
be tendered no more often than once a month. Consultant shall not invoice the City
for services or expenses that were incurred more than sixty (60) days before the
date of the invoice. Failure to timely invoice the City for services or expenses shall
result in Consultant's invoice being denied.
e. In the event of a disputed or contested invoice, the City may withhold from payment
that portion so disputed or contested, and the undisputed portion will be paid.
3. Personnel of Consultant
a. Consultant's Project Manager
Consultant shall designate Miles Fabian. P.E. to serve as Project Manager for the
Work performed under this Agreement. Any change of Project Manager shall
require thirty (30) days advance written approval from the City's Representative.
b. Licensed and Registered Architects/Engineers
Consultant shall keep full-time registered architects and/or engineers licensed in
the State of Texas on staff and assigned to the Work for the duration of its
performance of the Work.
C. Data on Consultant's Employees
Prior to commencement of the Work. Consultant shall forward to the Cite a detailed
resume of the personnel that will be assigned to the Work. Such personnel shall
include, but not be limited to, architects and/or engineers as applicable.
d. Rejection of Consultant's Employees
The City reserves the right to approve or reject from the Work any employees of
Consultant.
Aureement for Professional Services, Pave Rev. 7.29.2026
4. Designation and Duties of the City's Representative
The City's Directorol'Public Works and Engineering or his designee shall act as the
City's Representative.
b. The City's Representative shall use his best efforts to provide nonconfidential Cite
records for Consultant's usage on the Work and to provide access to City's property
and easements. However, the City does not guarantee the accuracy or correctness
of the documents so provided. Notwithstanding the foregoing. Consultant shall be
entitled to use and rely upon information provided by the City in performing the
services required under this Agreement only to the extent and level specified by the
City in writing for each document provided. Nothing contained herein shall be
construed to require the City to provide such records in any certain format. "file
fonnat in which the existing data and documentation will be provided shall be at the
sole discretion of the City.
Standards of Performance
a. Consultant shall perform all services under this Agreement with the care and skill
ordinarily used by members of Consultant's profession practicing under the same
or similar circumstances, time and locality. Opinion of probable cost shall be based
upon the Consultant's experience and represent its best judgment as an experienced
and qualified professional. Each submittal of opinion of probable cost shall be
commensurate with the project design.
Consultant shall be responsible for the technical accuracy of its services and
documents resulting therefrom, and the City shall not be responsible for discovering
deficiencies therein. Consultant shall correct such deficiencies without additional
compensation.
b. Codes and Standards
All references to codes. standards. environmental re,ulations and/or
material specifications shall be to the latest revision, includint, all effective
supplements or addenda thereto, as of the date that the order for any
necessary equipment is made by the City or that the construction specified
is bid by the City.
Ifany such equipment is specially manufactured, it shall be identified to the
City, and the Contractor and the Seller shall present sufficient data to the
C it} to support the design and the suitability of the equipment.
iii. All materials specified on any City project shall be in accordance \\ith City,
ASTM, ACL and AASHT0 specifications. and with other recognized
standards. Proprietary material or other materials for which no generall}
:agreement for Professional Services. Passe 4 Rev. 7.29.2026
recognized standards exist may be used provided there has been at least five
(5) years of proven experience in the field, and such satisfactory
documentation has been approved by the City's Representative.
iv. The Work shall be designed and furnished in accordance with the most
current codes and/or standards adopted by city, state. or federal government
or in general custom and usage by the profession and shall comply with
Texas Department of Licensing and Regulation's rules and regulations,
including the Texas Accessibility Standards.
y. The codes and standards used in the profession set forth minimum
requirements. These may be exceeded by the Contractor or Consultant if
superior methods are available for successful operation of equipment and/or
for the construction project on which the Work is performed. Any
alternative codes or regulations used shall have requirements that are
equivalent to or better than those in the above -listed codes and regulations.
Consultant shall state the alternative codes and regulations used.
vi. Consultant agrees the services it provides as an experienced and qualified
architect/engineer will reflect the professional standards, procedures and
performances common in the industry for this project. Consultant further
agrees that any analysis, reports, preparation of drawings, the designation or
selection of materials and equipment, the selection and supervision of
personnel and the performance of other services under this Agreement will
be pursuant to the standard of performance common in the profession.
vii. Consultant shall promptly correct any defective analysis caused by
Consultant at no cost to City. The City's approval, acceptance, use of or
payment for all or any part of Consultant's services hereunder or of the Work
itself shall in no k\ay alter Consultant's obligations or the City's rights under
this Agreement. As applicable; Consultant shall provide the City with record
"as -built" drawings relating to the Work in an electronic format that is
acceptable to the City. City shall be in receipt of record drawings. if
applicable, prior to final payment.
viii. Consultant has no control over the cost of labor. materials, equipment or
services furnished by others, other than its subconsultants. Data projections
and estimates are based upon Consultant's opinion based on experience and
judgment. Consultant cannot and does not guarantee that actual costs and/or
quantities realiied will vary from the data projections and estimates prepared
by Consultant.
ix. Consultant shall submit all final construction documents in both hard cop)
and electronic format. Plans shall be AUtoCAD compatible and all other
documents shall be Microsoft Office compatible. The software versions
used shall be compatible to current City standards. Other support
Aizreement for Professional Services. Page 5 Rev. 7.29 2026
documents, for example, structural calculations, drainage reports and
geotechnical reports, shall be submitted in hard copy only. All Record
Drawings electronic files shall be submitted to the City in PDF/TIF format.
6. Schedule
Consultant shall not proceed with the Work or any stage thereof until written notice to proceed is
provided b) the City's Representative. Consultant's obligation to render services specified in
Exhibit "B" will be for the entire period necessary for the final completion of the construction of
the Work. If the Consultant contributes to any delay in the schedule. Consultant will have no right
to seek and shall not be entitled to any additional compensation.
7. Instruments of Service
Upon execution of this Agreement, Consultant grants to the City an ownership interest in the
Instruments of Service. Consultant shall obtain similar interests from the City and Consultant's
consultants consistent with this Agreement. Consultant shall be required to tender to City all
Instruments of Service. With such ownership interest, it is expressly understood by the parties hereto
that the City may use the Instruments of Service for any purposes which the City sees fit, including,
but not limited to, subsequent construction, reconstruction, alteration, and/or repairs of the Project.
As a condition to the Cit_y's use of the Instruments of Service. the City hereby expressly agrees to
remove Consultant's name and all references to Consultant and its consultants from the Documents.
Provided that this Agreement is not terminated for cause by the City, the City shall release any and
al I claims which the City could make arising out of or in connection with any reuse of the documents
by the City.
8. Insurance
Consultant shall procure and maintain at its sole cost and expense for the duration of the
Agreement, insurance against claims for injuries to persons or damages to property which may
arise from or in connection with the performance of the Work hereunder b) Consultant, its agents,
representatives, volunteers. employees or subconsultants.
a. Consultant's insurance coverage shall be primary insurance with respect to the Cite,
its officials, employees and agents. Any insurance or self-insurance maintained by
the City, its officials, employees or agents shall be considered in excess of
Consultant's insurance and shall not contribute to it. Further. Consultant shall
include all subconsultants, agents and assigns as additional insureds under its policy
or shall furnish separate certificates and endorsements for each such person or
entity. All coverages for subconsultants and assigns shall be subject to all of the
requirements stated herein.
The follo"ing is a list of standard insurance policies along %Kith their respective
minimum coverage amounts required in this Agreement:
Commercial General Liability
■ General Aggregate: $2.000.000
■ Products & Completed Operations Aggregate: $2,000.000
■ Personal & Advertising InjurS: $1.000,000
A,ureement for Professional Ser, ices. Page 6 Rev. 7?9.2026
■ Per Occurrence: $1,000,000
■ Fire Damage $500,000
■ Waiver of Subrogation required
■ Coverage shall be broad form
■ No coverage shall be deleted Isom standard policN without
notification of individual exclusions being attached for review and
acceptance
ii. Business Automobile Policy
■ Combined Single Limits: $1,000,000
■ Coverage for "Any Auto"
■ Waiver of Subrogation required
iii. Errors and Omissions
■ Limit: $1,000,000 for this project
■ For all architects. engineers, and/or design companies
■ Claims -made form is acceptable
■ Coverage will be in force for one (1) year after completion of the
Project
■ Waiver of Subrogation required
iv. Workers' Compensation
■ Statutory Limits
■ Employer's Liability $500,000
■ Waiver of Subrogation required
b. The following shall be applicable to all policies of insurance required herein.
Insurance carrier for all liabllltN p011cies must have an A.M. Best Rating of
A:Vlll or better.
ii. Only insurance carriers licensed and admitted to do business in the State of
Texas will be accepted.
iii. Liability policies must be on occurrence form. Errors and Omissions can
be on claims -made form.
iv. Each insurance police shall be endorsed to state that coverage shall not be
suspended, voided, canceled or reduced in coverage or in limits except after
thirty (30) days prior written notice by mail. return receipt requested, has
been oiven to the Cite.
V. I'he City. its officers, agents and employees are to be added as Additional
Insureds to all liability policies. �N ith the exception of the Workers'
Compensation and Errors and Omissions Policies required herein.
,agreement for Professional Services, Page 7 Rev. 7.1-9.2026
vi. Upon request and ti<ithout cost to the City, certified copies of all insurance
policies and/or certificates of insurance shall be furnished to the Cit}.
vii. Upon request and without cost to the City, loss runs (claims listing) of any
and/or all insurance coverages shall be furnished to the City.
viii. All insurance required herein shall be secured and maintained in a company
or companies satisfactory to the City, and shall be carried in the name of
Consultant. Consultant shall provide copies of insurance policies and
endorsements required hereunder to the City on or before the effective date
of this Agreement.
9. Indemnification and Release
CONSULTANT AGREES TO AND SHALL INDEMNIFY AND HOLD
HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS,
AND EMPLOYEES (HEREINAFTER REFERRED TO AS THE
"CITY") FROM AND AGAINST ANY AND ALL CLAIMS, LOSSES,
DAMAGES, CAUSES OF ACTION, SUITS AND LIABILITY OF
EVERY KIND, INCLUDING ALL EXPENSES OF LITIGATION,
COURT COSTS, AND ATTORNEY'S FEES, FOR INJURY TO OR
DEATH OF ANY PERSON, FOR DAMAGE TO ANY PROPERTY OR
.FOR ANY BREACH OF CONTRACT TO THE EXTENT ARISING
OUT OF OR IN CONNECTION WITH AN ACT OF NEGLIGENCE,
INTENTIONAL TORT, INTELLECTUAL PROPERTY
INFRINGEMENT, OR FAILURE TO PAY A SUBCONTRACTOR OR
SUPPLIER COMMITTED BY THE CONSULTANT OR THE
CONSULTANT'S AGENT, CONSULTANT UNDER CONTRACT, OR
ANOTHER ENTITY OVER WHICH THE CONSULTANT
EXERCISES CONTROL (COLLECTIVELY, CONSULTANT'S
PARTIES). IT IS THE EXPRESS INTENTION OF THE PARTIES
HERETO, BOTH CONSULTANT AND THE CITY, THAT THE
INDEMNITY PROVIDED FOR IN THIS PARAGRAPH IS
INDEMNITY BY CONSULTANT TO INDEMNIFY AND PROTECT
THE CITY FROM. THE CONSEQUENCES OF CONSULTANT'S
PARTIES' OWN WILLFUL MISCONDUCT, JOINT OR SOLE
NEGLIGENCE AS WELL AS THE CONSULTANT'S PARTIES'
INTENTIONAL TORTS, INTELLECTUAL PROPERTY
INFRINGEMENTS, AND FAILURES TO MAKE PAYMENTS
ARISING OUT OF OR IN CONNECTION WITH THIS
AGREEMENT. SUCH INDEMNITY SHALL NOT APPLY,
HOWEVER, TO LIABILITY ARISING FROM THE PERSONAL
At-,reement fix Professional Services. Pa,,e 8 Rev. 7.29.2026
INJURY, DEATH, OR PROPERTY DAMAGE OF PERSONS THAT
IS CAUSED BY OR RESULTS FROM THE NEGLIGENCE OF ANY
PERSON OTHER THAN THE CONSULTANT'S PARTIES. IN THE
EVENT THAT ANY ACTION OR PROCEEDING IS BROUGHT
AGAINST THE CITY FROM WHICH THE CITY IS INDEMNIFIED,
CONSULTANT FURTHER AGREES AND COVENANTS TO
DEFEND THE ACTION OR PROCEEDING BY LEGAL COUNSEL
ACCEPTABLE TO THE CITY. THE INDEMNITY PROVIDED
HEREINABOVE SHALL SURVIVE THE TERMINATION AND/OR
EXPIRATION OF THIS AGREEMENT-, SUBJECT TO THE
LIMITATIONS IN TEXAS LOCAL GOVERNMENT CODE
SECTION 271.904 AND TEXAS CIVIL PRACTICE AND REMEDIES
CODE SECTION 130.002.
By this Agreement, the City does not consent to litigation or suit, and the City hereby
expressly revokes any consent to litigation that it may have granted by the terms of
this Agreement or any other contract or agreement, any charter, or applicable state
law. Nothing herein shall be construed so as to limit or waive the City's sovereign
immunity. Consultant assumes full responsibility for its services performed
hereunder and hereby releases, relinquishes and discharges the City, its officers,
agents, and employees from all claims, demands, and causes of action of eery kind
and character, including the cost of defense thereof, for any injury to or death of any
person (whether they be either of the parties hereto, their employees, or other third
parties) and any, loss of or damage to property (whether the property be that of either
of the parties hereto, their employees, or other third parties) that is caused by or
alleged to be caused by, arising out of, or in connection with Consultant's serices to
be performed hereunder. This release shall apply with respect to Consultant's
services regardless of whether said claims, demands, and causes of action are covered
in whole or in part by insurance.
10. Subcontractors and Subconsultants
Consultant shall receive written approval of the C`ity's Representative prior to the use of any
subcontractors or subconsultants. A cop) of all proposed contracts with Subconsultants anti/or
subcontractors shall be given to the Cit) before execution ol'such contracts.
11. Termination of Consultant
I he City. besides all other rights or remedies it ma\ ha\e. shall have the right to terminate this
Agreement without cause upon "ritten notice from the City Manager or his designee to Consultant
of the City's election to do so. Furthermore. the Cit) mad immediately and "ithout notice terminate
this Agreement if Consultant breaches this Agreement. A breach of this Agreement shall include,
but not be limited to. the follokving:
(a) failing to pay insurance premiums. liens. claims or other charoes:
Aureement for Professional Services. PaLe 9 Re%_ 7.29.1-026
(b) failing to pay any payments due the cit?, state, or federal government from
Consultant or its principals, including, but not limited to, any taxes, fees,
assessments, liens, or any payments identified in this .Agreement;
(c) the institution of voluntary or involuntary bankruptcy proceeding against
Consultant.
(d) the dissolution of Consultant;
(e) refusing or failing to prosecute the Work or any separable part with the diligence
that will ensure its completion within the time specified in this Agreement,
(f) failing to complete Work within the time period specified in this Agreement; and/or
(g) the violation of any provision of this Agreement.
Upon delivery of any notice of termination required herein, Consultant shall discontinue all
services in connection with the performance of the Agreement. Within ten (10) days after receipt
of the notice of termination. Consultant shall submit a final statement showing in detail the services
satisfactorily performed and accepted and all other appropriate documentation required herein for
payment of services. At the same time that the final statement is tendered to the City. Consultant
shall also tender to the City's Representative all of Consultant's instruments of service. including
all drawings, special provisions, field survey notes, reports, estimates, and any and all other
documents or work product generated by Consultant under this Agreement, whether complete or
not, in an acceptable form and format together with all unused materials supplied by the City. No
final payment will be made until all such instruments of service and materials supplied are so
tendered.
If this Agreement is terminated for cause. Consultant shall be liable for any damage to the City
resulting therefrom. This liability includes any increased costs incurred by the City in completing
Consultant's services. The rights and remedies of' the City in this section are in addition to any
other rights and remedies provided by law or under this Agreement.
12. Records
Within ten (10) days of the City's request and at no cost to the City. the City will be entitled to
review and receive a copy of all documents that indicate work on the Project that is subject to this
Agreement.
13. Supervision of Consultant
Consultant is an independent contractor, and the ('it\ neither reserves nor possesses any right to
control the details of the Work performed b\ C'o►isultant under the terms of this Agreement.
14. Billing
The Cit} shall have thirty (30) days to pay Consultant's invoices from the date of receipt of such
invoices and necessary backup information. All invoices must identify with specificity the work
or services performed and the date(s) of such work or services. In the event of a disputed or
contested invoice. the parties understand and agree that the City may withhold the portion so
contested, but the undisputed portion will be paid. Consultant shall invoice the City for work
performed no more than once a month and may not invoice the City for work not performed.
Invoices shall be received by the City no later than sixty (60) calendar days from the date Consultant
and/or its subconsultants perform the services or incur the expense. Failure by Consultant to compl}
Aereement for Professional Services. Nee 10 Rev. 7.29.2026
with this requirement shall result in Consultant's invoice being denied and the City being relieved
from any liability for payment of the late invoice.
The City shall pay Consultant the maximum rate permitted by Chapter 2251 of the Texas
Government Code on any past due payment not received within thirty (30) days after the
payment due date. In accordance with S 2251.043, in a formal administrative or judicial action
to collect an invoice payment or interest due under this chapter, the opposing party, which may
be the City or Consultant, shall pay the reasonable attorney fees of the prevailing party.
15. Indebtedness
If Consultant, at any time during the term of this Agreement, incurs a debt. as the word is defined
in section 2-662 of the Code of Ordinances of the City of Baytown, it shall immediately notify the
City's Director of Finance in writing. If the City's Director of Finance becomes aware that
Consultant has incurred a debt, the City's Director of Finance shall immediately notify Consultant
in writing. if Consultant does not pay the debt within thirty (30) days of either such notification,
the City's Director of Finance may deduct funds in an amount equal to the debt from any payments
owed to Consultant under this Agreement, and Consultant waives any recourse therefor.
16. Verifications
If Consultant has ten (10) or more full-time employees and Consultant's total compensation
under this Agreement has a value of One -Hundred "thousand Dollars ($100,000.00) or more,
Consultant makes the following verifications in accordance %%ith Chapters 2271 and 2274 of the
I exas Government Code:
a. Consultant does not boycott Israel and will not boycott Israel during the term of the
contract to be entered into with the City of Baytown;
b. Consultant does not boycott energy companies and will not boycott energy
companies during the term of the contract to be entered into with the City of
Baytown; and
Consultant does not have a practice, policy, guidance, or directive that
discriminates a,ainst a firearm entity or firearm trade association and will not
discriminate during the term of the contract against a Firearm entity or firearm trade
association.
17. Reputation in the Community
Consultant shall retain a high reputation in the community for providing professional
architectural!engineering services. Consultant shall forward a copy of any current petition or
complaint in any court of law kahich (a) asserts a claim for $50,000 or more for errors or omissions
in providing architectural/engineering services and/or (b) seeks to deny Consultant the right to
practice architecture/engineering or to perform any other services in the state of Texas.
Aereement for Professional Services, Patie I I Re%. 7 29.2026
18. Payroll and Basic Records
a. Consultant shall maintain payrolls and basic payroll records during the course of
the work performed under this Agreement and shall preserve them for a period of
three(3) years from the completion of the work called for under this Agreement for
all personnel working on such work. Such records shall contain the name and
address of each such employee, social security number, correct classification,
hourly rates of wages paid, daily and weekly number of hours worked. deductions
made and actual wages paid.
Consultant shall make the records required to be maintained under the preceding
subsection (a) of this section available at no cost to the City for inspection, copying
or transcription or its authorized representatives within fifteen (15) days of the
City's request therefor. Should the City request copies of the records, Consultant
may redact employee social security numbers and/or addresses. Consultant shall
permit such representatives to interview Consultant's employees during working
hours on the job.
19. Governing Law
This Agreement has been made under and shall be governed by the laws of the State of Texas.
The parties further agree that performance and all matters related thereto shall be in Harris County.
Texas.
20. Notices
Unless otherwise provided in this Agreement, any notice provided for or permitted to be given
must be in writing and delivered in person or by depositing same in the United States mail. postpaid
and registered or certified, and addressed to the party to be notified, with return receipt requested,
or by delivering the same to an officer of such party. Notice deposited in the mail as described
above shall be conclusively deemed to be effective, unless otherwise stated in this Agreement,
from and after the expiration of three (3) days after it is so deposited.
For the purpose of notice, the addresses of the parties shall be as follows unless properly changed
as provided for herein below:
For the City:
For Consultant:
CITY OF BAYTOWN
Attn: City Manager
P. O. Box 424
Baytown. Texas 77522-0424
DCCM North America, LLC
Attn: Miles Fabian, P.E.
1710 Seamist Drive
Houston. 'texas 77008
A_reement for Prot'essional Services: Page 12 Rey. 7.29.2026
Each party shall have the right from time to time at any time to change its respective address
and each shall have the right to specify a new address, provided that at least fifteen (15) days
written notice is given of such new address to the other party.
21. No Third -Party Beneficiary
This Agreement shall not bestow any rights upon any third party, but rather, shall bind and benefit
Consultant and the City only. No person or entity not a signatory to this Agreement shall be
entitled to rely on Consultant's performance of its services hereunder, and no right to assert a claim
against Consultant by assignment of indemnity rights or otherwise shall accrue to a third party as
a result of this Agreement or the performance of Consultant's services hereunder.
22. No Right to Arbitration
Notwithstanding anything to the contrary contained in this Agreement, the City and Consultant
hereby agree that no claim or dispute between the City and Consultant arising out of or relating to
this Agreement shall be decided by any arbitration proceeding, including, without limitation, any
proceeding under the Federal Arbitration Act (9 U.S.C. Sections 1-14), or any applicable State
arbitration statute, including, but not limited to. the Texas General Arbitration Act, provided that
in the event that the City is subjected to an arbitration proceeding notwithstanding this provision.
Consultant consents to be joined in the arbitration proceeding if Consultant's presence is required
or requested by the City of complete relief to be recorded in the arbitration proceeding.
23. Waiver
No waiver by either party to this Agreement of an) term or condition of this Agreement shall be
deemed or construed to be a waiver of an} other tenn or condition or subsequent waiver of the
same term or condition.
24. Complete Agreement
This Agreement represents the entire and integrated agreement between the City and Consultant
in regard to the subject matter hereof and supersedes all prior negotiations, representations or
agreements, whether written or oral, on the subject matter hereof. This Agreement may only be
amended by written instrument approved and executed by both of the parties. The City and
Consultant accept and agree to these terms.
25. No Assignment
Consultant may not sell or assign all or part interest in this Agreement to another party or parties
without the prior express written approval of the City (Manager or his designee of such sale or
assignment. The Cit) may require any records or financial statements necessary in its opinion to
ensure such sale or assignment will be in the best interest of the City.
26. Headings
Tile headings used in this Agreement are for general reference onl% and do not ha%e special
significance.
AUreement for Professional Services. Nee 13 Rev. 7.29,2026
27. Severability
All parties agree that should any provision of this Agreement be determined to be invalid or
unenforceable, such determination shall not affect any other term of this Agreement, which shall
continue in full force and effect.
28. Ambiguities
In the event of any ambiguity in any of the terms of this Agreement, it shall not be construed for
or against any party hereto on the basis that such party did or did not author the same.
29. Authority
The officers executing this Agreement on behalf of the parties hereby represent that such officers
have full authority to execute this Agreement and to bind the party he/she represents.
IN WITNESS WHEREOF. the parties hereto have executed this Agreement in multiple
copies, each of which shall be deemed to be an original, but all of which shall constitute but one
and the same Agreement on the _ day of , 20_, the date of execution by the
City Manager or his designee of the City of Baytown.
CITY OF BAYTOWN
(Signature)
(Printed Name)
(Title)
ATTEST:
ANGELA JACKSON. City Clerk
APPROVED AS TO FORM:
(Signature)
(Printed Name)
(Title)
A- "Teement for Professional Services. Page 14 Rev. 7.29 2026
CONS[. 1LTANT:
DCCM NORTH .AMERICA, LLC
Y0'j 5 %l;��
(Signature)
Youssef A. Laham
(Printed Name)
President, Infrastructure & Power
("Title)
STATE OF Texas §
Harris §
COUNTY OF§
Before me on this day personally appeared Youssef A. Laham in his.'her
capacity as President, Infrastructure & Power O fDCCM NA LLCOfl behalf'of Such
x❑ known to me;
❑ proved to me on the oath of or
❑ proved to me through his/her current
(description of identification card or other document issued by the federal
government or any state government that contains the photograph and signature of
the acknowledging person }
(check one)
to be the person whose name is Subscribed to the foregoing instrument and acknowledged to rile
that he/she executed the same for the purposes and consideration therein expressed.
SUBSCRIBED AND SWORN before me this 25 day of August 2026.
LINDA ESPARZA LAGUNES Notary Public, State of Texas N- ota�1
Publie of Texas
Comm. Expires04-22-2028
�9,•...}
Notary ID 13244760-9
Agreement for Professional Services, Page 15 Rev. 7.29.2026
W-1 tm 9=
gym
EXHIBIT A
Scope of Work for Professional Engineering Services
CDBG-MIT-MOD 24-065-089-E765
Oak Leaf Drive Reconstruction, Staples Lift Station and Cedar Landing Lift Station
The proposed professional engineering services include the completion of the Design, Bid, and
Construction Phases of the Oak Leaf Drive reconstruction project, as well as the Cedar Landing and
Staples Lift Station Mitigation and Rehabilitation project. The detailed scope of work is as follows
Oak Leaf Drive Reconstruction
Reconstruction of approximately 1645 linear feet (LF) of Oak Leaf Drive from North Twisted Oak Drive
southwest to West Twisted Oak Drive. Work shall include roadway reconstruction. driveway replacement
utility line relocations (as necessary), and roadside ditch drainage improvements.
DCCM will provide the professional design services listed below.
• Coordinating with the City of Baytown Public Works Department staff
• Attending Project Coordination Meetings (as needed)
• Protect Schedule Development and Monthly Status Report with Monthly Invoicing
• Coordination with external regulatory and permitting agencies
• Coordination with GLO, Grant Manager and City's Grant Coordinator
• Coordination with subconsultant firms
• Topographic Survey
• Geotechnical Engineering
• Final design of the following elements
o Roadway Cross -Section and Elevation Sheets
o Roadway and Drainage Plan & Profile Sheets
0 Project Layout and Construction Staging
o Utility Relocation Plans
o Demolition plans
o Storm Water Pollution Prevention Plans
o Traffic Control Plans & Details
o Signing & Striping Plans & Details (as required)
o 60% Milestone
• 60% Design Plans
■ Specifications List
■ Opinion of Probable Construction Cost (OPCC)
0 90% Milestone
• 90% Design Plans
• Bid Form and Front -End Documents
■ Project Specifications
■ OPCC
0 100% Milestone
• 100% Design Plans for City Signature
• Final Project Manual for Bid Set
■ OPCC
• Bid Phase (Civil Scope)
Attend pre -bid meeting
Answer Contractor Questions
Provide Addendums for bidding as necessary
Review contractor bids
o Review Bid Tab
o Provide Engineer's Recommendation
Construction Phase Services
o Attend a pre -construction conference conducted by the City
o Attend monthly construction meetings (monthly, approximately 6).
• These meetings will coincide with regularly scheduled construction site visits for
DCCM to observe construction progress. Any observed deviations from the
contract documents will be reported to the City.
Review construction shop drawings and submittals furnished by the Contractor for
conformance with design documents
Review requests for information (RFI's) and change order requests furnished by the
Contractor
Attend the substantial completion walkthrough and produce the punch list
Attend final walkthrough and confirm project completion
o Furnish the City with a set of "As Builts" based on markups provided by the contractor
Cedar Landing and Staples Lift Station Mitigation and Rehabilitation
Staples Lift Station
Rehabilitation and mitigation work shall include installation of new conduit and conductors, new
emergency diesel backup pump on elevated platform manual transfer switch, fence replacement
and necessary associated appurtenances.
Cedar Landing Lift Station
Rehabilitation and mitigation work shall include installation of new conduit and conductors
replacement of the existing emergency diesel backup pump with new platform, relocation of the
pump station control panel, and necessary associated appurtenances.
DCCM will provide the professional design services listed below.
• Coordinating with the City of Baytown Public Works Department staff
• Attending Project Coordination Meetings (as needed)
• Project Schedule Development and Monthly Status Report with Monthly Invoicing
• Coordination with external regulatory and permitting agencies
• Coordination with GLO, Grant Manager and City's Grant Coordinator
• Coordination with subconsultant firms
• Topographic Survey
• Geotechnical Engineering
• Final design of the following elements:
c Civil Site Layout and Construction Staging
Elevated Platform Structural Design
Diesel Pump Mechanical Sheets
Demolition plans
Storm Water Pollution Prevention Plans
Electrical Drawings (Site Layout, Conduit Schedules Control Diagrams, One -Line
Diagrams)
60% Milestone
■ 60% Design Plans
• Specifications List
• Opinion of Probable Construction Cost (OPCC)
90% Milestone
• 90% Design Plans
• Bid Form and Front -End Documents
• Project Specifications
• OPCC
100% Milestone
• 100% Design Plans for City Signature
■ Final Project Manual for Bid Set
■ OPCC
Bid Phase (Civil Scope)
o Attend pre -bid meeting
o Answer Contractor Questions
o Provide Addendums for bidding as necessary
• Review contractor bids
o Review Bid Tab
Provide Engineer's Recommendation
Construction Phase Services
o Attend a pre -construction conference conducted by the City
o Attend monthly construction meetings (monthly, approximately 6).
• These meetings will coincide with regularly scheduled construction site visits for
DCCM to observe construction progress. Any observed deviations from the
contract documents will be reported to the City.
Review construction shop drawings and submittals furnished by the Contractor for
conformance with design documents
Review requests for information (RFI s) and change order requests furnished by the
Contractor
Attend the substantial completion walkthrough and produce the punch list
o Attend final walkthrough and confirm project completion
o Furnish the City with a set of 'As Builts" based on markups provided by the contractor
Quality Assurance/Quality Control/Change Control and Milestone Tracking Processes:
DCCM Management team has the resources to ensure quality assurance, project budget
management, cost control, change and milestone tracking for the project by utilizing Deltek
Vantagepoint software, a premier project driven software. At the start of every project, the level of
effort and scheduling is determined, and a project budget is created at inception for ultimate control
and tracking.
Our accounting system complies with all Federal and State governing regulations and is GAAP
compliant. DCCM system of internal control is reliable to safeguard company assets, to accomplish
the company's client goals and objectives, and to properly report financial activity.
The Quality Plan defines the processes and the methodologies that DCCM employees shall apply
throughout the realization of the Oak Leaf Drive and Lift Stations Rehabilitation project. It forms a
common standard for the entire project lifecycle.
Qualitv Assurance:
Our program of Quality Assurance (QA) involves regular in-house reviews of our observations set at
specific milestones which meet our clients expectations ensuring the customer receives the best
quality possible from our Inspection Team and defines roles and responsibilities to test performance
and ensure a successful project and deliverables to our customer.
Quality Control:
The DCCM Team is committed to the application of responsible and professional Quality Control
(QC) for all project deliverables, including sub -consultant deliverables, to ensure the accuracy and
proper installation of the Storm Facilities & Paving process.
Quality Control activities involving weekly in-house project updates and peer review of the project
shall be performed continually throughout the life of the project with the Executive Management
Principal in Charge to verify that the Inspections, and project deliverables are of high quality and meet
or exceed Client quality standards.
Schedule
The detailed construction schedule is included as Exhibit C.
Fee Summary
We propose to complete the proposed scope of work on a reimbursable fee not to exceed $501,355
Progress invoices will be submitted monthly. Please see the itemized fee calculations on Exhibit B. The
total fees not to exceed are itemized as follows:
Task No. Task Description
401
Final Design Phase — Oak Leaf Drive
402
Final Design Phase — Staples Lift Station
403
Final Design Phase — Cedar Landing Lift Station
601
Bid Phase — Oak Leaf Drive
602
Bid Phase — Staples Lift Station
603
Bid Phase — Cedar Landing Lift Station
701
Construction Phase — Oak Leaf Drive
702
Construction Phase — Staples Lift Station
703
Construction Phase — Cedar Landing Lift Station
Total Fee
$230,767
$80, 364
$79, 377
$7,264
$6,110
$6,110
$39,072
$26,145
$26,146
Total Fee $501,355
w
w
LL
J
Q
Z
O
ti
w
U.
O
w
a
U)
w
W
LL
J
Q
Z
O
N
ui
LL
0
ly
IL
w
w
LL- w
J 0
Q H
Z u
g z
N d
W m
L
O a
Q' c
a a
0 u
Z
Q
Z o
O L)
F atl
Q co
( co
Z C
w C
a
o
O
U m
N
O
N
kD
N
O
N
Y
J
7
W
z
Y
a
SS321008d
c
A
J
N011vana
W
D
�
a
31VG 3na
J
O
O n
N
31V0
IL
IA
N
C
N
ldvlS
>
A
m
J
Y
A
N
r
r
yO
W
�
z
n
O
W
3-l111
y
w
o
=
N
z
NSVl
g
a
-
a
w
a
E
z
'c
E
�e
�
m
z
o
EXHIBIT D
Certifications and
Representations
of Offerors
Non -Construction Contract
U.S. Department of Housing OMB Approval No. 2577-0180 (exp. 7/30/`86)
and Urban Development
Office of Public and Indian Housing
Public reporting burden for this collection of information is estimated to average 5 minutes per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
This form includes clauses required by OMB's common rule on bidding/otfering procedures, implemented by HUD in 24 CFR 86.36. and those requirements
setforth in Executive Order 11625 for small, minority, women -owned businesses, andcertifications for independent price determination, and conflict of interest.
The form is required for nonconstruction contracts awarded by Housing Agencies (HAs). The form is used by bidders/offerors to certify to the HA's Contracting
Officer for contract compliance. If the form were not used, HAs would be unable to enforce their contracts Responses to the collection of Information are
required to obtain a benefit or to retain a benefit. The information requested does not lend itself to confidentiality.
1. Contingent Fee Representation and Agreement
(a) The bidder/offeror represents and certifies as part of its bid/
offer that, except for full-time bona fide employees working
solely for the bidder/offeror, the bidder/offeror:
(1) [ ] has, IX ] has not employed or retained any person or
company to solicit or obtain this contract; and
(2) [ ] has, Q( ] has not paid or agreed to pay to any person
or company employed or retained to solicit or obtain this
contract any commission, percentage, brokerage, or other
fee contingent upon or resulting from the award of this
contract.
(b) If the answer to either (a)(1) or (a) (2) above is affirmative,
the bidder/offeror shall make an immediate and full written
disclosure to the PHA Contracting Officer.
(c) Any misrepresentation by the bidder/offeror shall give the
PHA the right to (1) terminate the resultant contract; (2) at its
discretion, to deduct from contract payments the amount of any
commission, percentage, brokerage, or other contingent fee; or
(3) take other remedy pursuant to the contract.
2. Small, Minority, Women -Owned Business Concern Rep-
resentation
The bidder/offeror represents and certifies as part of its bid/offer
that it:
(a) [ ] is, [X ] is not a small business concern. "Small business
concern," as used in this provision, means a concern, includ-
ing its affiliates, that is independently owned and operated,
not dominant in the field of operation in which it is bidding,
and qualified as a small business under the criteria and size
standards in 13 CFR 121.
(b) [ ] is, [X ] is not a women -owned small business concern.
"Women -owned," as used in this provision, means a small
business that is at least 51 percent owned by a woman or
women who are U.S. citizens and who also control and
operate the business.
(c) [ ] is, [X ] is not a minority enterprise which, pursuant to
Executive Order 11625, is defined as a business which is at
least 51 percent owned by one or more minority group
members or, in the case of a publicly owned business, at least
51 percent of its voting stock is owned by one or more
minority group members, and whose management and daily
operations are controlled by one or more such individuals.
For the purpose of this definition, minority group members are:
(Check the block applicable to you)
[ ] Black Americans [ ] Asian Pacific Americans
[ ] Hispanic Americans [ ] Asian Indian Americans
[ ] Native Americans [ ] Hasidic Jewish Americans
3. Certificate of Independent Price Determination
(a) The bidder/offeror certifies that—
(1) The prices in this bid/offer have been arrived at indepen-
dently, without, for the purpose of restricting competi-
tion, any consultation, communication, or agreement
with any other bidder/offeror or competitor relating to (i)
those prices, (ii) the intention to submit a bid/offer, or
(iii) the methods or factors used to calculate the prices
offered;
(2) The prices in this bid/offer have not been and will not be
knowingly disclosed by the bidder/offeror, directly or
indirectly, to any other bidder/offeror or competitor be-
fore bid opening (in the case of a sealed bid solicitation)
or contract award (in the case of a negotiated solicitation)
unless otherwise required by law; and
(3) No attempt has been made or will be made by the bidder/
offeror to induce any other concern to submit or not to
submit a bid/offer for the purpose of restricting competition.
(b) Each signature on the bid/offer is considered to be a certifi-
cation by the signatory that the signatory:
(1) Is the person in the bidder/offeror's organization respon-
sible for determining the prices being offered in this bid
or proposal, and that the signatory has not participated
and will not participate in any action contrary to subpara-
graphs (a)(I) through (a)(3) above; or
(2) (i) Has been authorized, in writing, to act as agent for the
following principals in certifying that those principals
have not participated, and will not participate in any
action contrary to subparagraphs (a)(1) through (a)(3)
above (insert full name of person(s) in the bidder/offeror's
organization responsible for determining the prices of-
fered in this bid or proposal, and the title of his or her
position in the bidder/offeror's organization);
(ii) As an authorized agent, does certify that the princi-
pals named in subdivision (b)(2)(i) above have not par-
ticipated, and will not participate, in any action contrary
to subparagraphs (a)(1) through (a)(3) above; and
Previous edition is obsolete 1 of 2 form HUDndboo C 460 8
page ref. Handbook 7460 8
(iii) As an agent, has not personally participated, and will
not participate in any action contrary to subparagraphs
(a)(1) through (a)(3) above.
(c) If the bidder/offeror deletes or modifies subparagraph (a)2
above, the bidder/offeror must furnish with its bid/offer a
signed statement setting forth in detail the circumstances of
the disclosure.
4. Organizational Conflicts of Interest Certification
(a) The Contractor warrants that to the best of its knowledge and
belief and except as otherwise disclosed, it does not have any
organizational conflict of interest which is defined as a
situation in which the nature of work under a proposed
contract and a prospective contractor's organizational, fi-
nancial, contractual or other interest are such that:
(i) Award of the contract may result in an unfair competi-
tive advantage;
(ii) The Contractor's objectivity in performing the con-
tract work may be impaired; or
(iii) That the Contractor has disclosed all relevant infor-
mation and requested the HA to make a determination
with respect to this Contract.
(b) The Contractor agrees that if after award he or she discovers
an organizational conflict of interest with respect to this
contract, he or she shall make an immediate and full disclo-
sure in writing to the HA which shall include a description of
the action which the Contractor has taken or intends to
eliminate or neutralize the conflict. The HA may, however,
terminate the Contract for the convenience of HA if it would
be in the best interest of I -IA.
(c) In the event the Contractor was aware of an organizational
conflict of interest before the award of this Contract and
intentionally did not disclose the conflict to the HA, the HA
may terminate the Contract for default.
(d) The Contractor shall require a disclosure or representation
from subcontractors and consultants who may be in a position
to influence the advice or assistance rendered to the HA and
shall include any necessary provisions to eliminate or neutralize
conflicts of interest in consultant agreements or subcontracts
involving performance or work under this Contract.
S. Authorized Negotiators (RFPs only)
The offeror represents that the following persons are authorized
to negotiate on its behalf with the PHA in connection with this
request for proposals: (list names, titles, and telephone numbers
of the authorized negotiators):
6. Conflict of Interest
In the absence of any actual or apparent conflict, the offeror, by
submission of a proposal, hereby warrants that to the best of its
knowledge and belief, no actual or apparent conflict of interest
exists with regard to my possible performance of this procure-
ment, as described in the clause in this solicitation titled "Orga-
nizational Conflict of Interest."
7. Offeror's Signature
The offeror hereby certifies that the information contained in
these certifications and representations is accurate, complete,
and current.
1 UJS ) V �----- g 1 Z 6 Z
Signature & Date:
"Typed or Printed Name:
Youssef A. Laham
Title:
President, Infrastructure & Power
Previous edition is obsolete form HUD-5369-C (8/93)
page 2 of 2 ref. Handbook 7460.8
EXHIBIT E
General Conditions for
Construction
U.S. Department of Housing and
Urban Development
Office of Public and Indian Housing
OMB Approval No. 2577-0157 (exp. 11/30/2023)
Applicability. This form is applicable to any
construction/development contract greater than $150,000.
Public reporting burden for this collection of information is estimated to average 1 hour. This includes the time for collecting, reviewing.
and reporting the data. The information requested is required to obtain a benefit. This form includes those clauses required by OMB's
common rule on grantee procurement, implemented at HUD in 2 CFR 200, and those requirements set forth in Section 3 of the Housing
and Urban Development Act of 1968 and its amendment by the Housing and Community Development Act of 1992, implemented by
HUD at 24 CFR Part 75. The form is required for construction contracts awarded by Public Housing Agencies (PHAs). The form is used by
Housing Authorities in solicitations to provide necessary contract clauses. If the form were not used, PHAs would be unable to enforce
their contracts. There are no assurances of confidentiality. HUD may not conduct or
sponsor, and an applicant is not required to respond to a collection of information unless it displays a currently valid ONIB control number.
T
Clause Page
1. Definitions 2
Clause
Page
9
Administrative Requirements
Period
2.1
Contractor's Responsibility for Work
2 25. T75ntract
3.1
Architect's Duties, Responsibilities and Authority
2 26.
Order of Precedence
9
4.1
Other Contracts
3 27.
Payments
9
Construction Requirements28.
Contract Modifications
10
5.1
Preconstruction Conference and Notice to Proceed
3
1 29. Changes
10
6.
Construction Progress Schedule
3
30. Suspension of Work
11
7.
Site Investigation and Conditions Affecting the Work
3
31. Disputes
11
8.
Differing Site Conditions
4
32. Default
11
9.
Specifications and Drawings for Construction
4
33. Liquidated
12
10.
As -Built Drawings
5
34. Termination of Convenience
12
11,
Material and Workmanship
5
35. Assignment of Contract
12
12.
Permits and Codes
5
36 Insurance
12
13.
Health, Safety, and Accident Prevention
6
37 Subcontracts
13
14.
Temporary Buildings and Transportation Materials
6
38 Subcontracting with Small and Minority Firms,
Women's Business Enterprise, and Labor Surplus
13
15.
Availability and Use of Utility Services
6
39. Equal Employment Opportunity
13
16.
protection of Existing Vegetation, Structures,
Equipment, Utilities, and Improvements
6
Employment. Training, and Contracting
40 Opportunities for Low -Income Persons, Section 3 of
the Housing and Urban Development Act of 1968
14
17.
Temporary Buildings and Transportation Materials
7
41. Interest of Members of Congress
is
18,
Clean Air and Water
7
42. Interest of Members, Officers, or Employees and
Former Members, Officers, or Employee,
15
19,
Energy Efficiency
7
43. Limitations on Payments Made to Influence
15
20,
Inspection and Acceptance of Construction
7
44. Royalties and Patents
15
21.
Use and Possession Prior to
8
45. Examination and Retention of Contractor's Records
15
22.
Warranty of Title
8
46. Labor Standards -Davis -Bacon and Related Acts
15
23.
Warranty of
8
47. Non -Federal Prevailing Wage Rates
19
24.
Prohibition Against
9
48 Procurement of Recovered
19
Liens
Materials
Previous editions are obsolete Page 1 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
1. Definitions
(a) "Architect" means the person or other entity engaged by
the PHA to perform architectural, engineering, design,
and other services related to the work as provided for in
to
the contract. When a PHA uses an engineer to act in this
Services
capacity, the terms "architect" and "engineer" shall be
synonymous. The Architect shall serve as a technical
own
representative of the Contracting Officer. The Architect's
authority is as set forth elsewhere in this contract.
work to
(b) "Contract" means the contract entered into between the
PHA and the Contractor. It includes the forms of Bid, the
if,
Bid Bond, the Performance and Payment Bond or Bonds
or other assurance of completion, the Certifications,
the
Representations, and Other Statements of Bidders (form
HUD-5370), these General Conditions of the Contract for
until
Construction (form HUD-5370), the applicable wage rate
shall
determinations from the U.S. Department of Labor, any
the
special conditions included elsewhere in the contract, the
satisfactory
specifications, and drawings. It includes all formal
the
changes to any of those documents by addendum,
change order, or other modification.
(c) "Contracting Officer" means the person delegated the au-
thority by the PHA to enter into, administer, and/or
terminate this contract and designated as such in writing
to the Contractor. The term includes any successor
Contracting Officer and any duly authorized
and
representative of the Contracting Officer also designated
in writing. The Contracting Officer shall be deemed the
authorized agent of the PHA in all dealings with the
Contractor.
(d) "Contractor" means the person or other entity entering
completed
into the contract with the PHA to perform all of the work
the
required under the contract.
(e) "Drawings" means the drawings enumerated in the
and
schedule of drawings contained in the Specifications and
as described in the contract clause entitled Specifications
all
(a) The Contractor shall furnish all necessary labor,
materials, tools, equipment, and transportation necessary
for performance of the work. The Contractor shall also
furnish all necessary water, heat, light, and power not
made available to the Contractor by the PHA pursuant
the clause entitled Availability and Use of Utility
herein.
(b) The Contractor shall perform on the site, and with its
organization, work equivalent to at least [i (12 percent
unless otherwise indicated) of the total amount of
be performed under the order. This percentage may be
reduced by a supplemental agreement to this order
during performing the work, the Contractor requests
reduction and the Contracting Officer determines that
reduction would be to the advantage of the PHA.
(c) At all times during performance of this contract and
the work is completed and accepted, the Contractor
directly superintend the work or assign and have on
work site a competent superintendent who is
to the Contracting Officer and has authority to act for
Contractor.
(d) The Contractor shall be responsible for all damages to
persons or property that occur as a result of the
Contractor's fault or negligence, and shall take proper
safety and health precautions to protect the work, the
workers, the public, and the property of others. The
Contractor shall hold and save the PHA, its officers
agents. free and harmless from liability of any nature
occasioned by the Contractor's performance. The
Contractor shall also be responsible for all materials
delivered and work performed until completion and
acceptance of the entire work, except for any
unit of work which may have been accepted under
contract.
(e) The Contractor shall lay out the work from base lines
bench marks indicated on the drawings and be
responsible for all lines. levels, and measurements of
and Drawings for Construction herein.
work executed under the contract. The Contractor
shall
(f) "HUD" means the United States of America acting through
verify the figures before laying out the work and will be
the Department of Housing and Urban Development
held responsible for any error resulting from its
failure to
including the Secretary, or any other person designated to
do so.
act on its behalf. HUD has agreed, subject to the provisions of an (f) The Contractor shall confine all operations
(including
Annual Contributions Terms and Conditions (ACC), to
storage of materials) on PHA premises to areas
provide financial assistance to the PHA, which includes
authorized or approved by the Contracting Officer.
assistance in financing the work to be performed under
(g) The Contractor shall at all times keep the work area,
this contract. As defined elsewhere in these General
including storage areas, free from accurnulations of
Conditions or the contract documents, the determination
waste materials. After completing the work and
before
of HUD may be required to authorize changes in the work
the
or for release of funds to the PHA for payment to the
materials
Contractor. Notwithstanding HUD's role, nothing in this
property of
contract shall be construed to create any contractual
the
relationship between the Contractor and HUD.
(g) "Project" rneans the entire project, whether construction
or rehabilitation, the work for which is provided for in
whole or in part under this contract.
(h) "PHA" means the Public Housing Agency organized
under applicable state laws which is a party to this
and
contract.
(j) "Specifications" means the written description of the
obligation
technical requirements for construction and includes the
elsewhere
criteria and tests for determining whether the
((��)) requirements are met.
Author.' means materials, workmanship, and manufacture
and fabrication of components.
2. Contractor's Responsibility for Work
final inspection, the Contractor shall (1) remove from
premises all scaffolding, equipment, tools, and
(including rejected materials) that are not the
the PHA and all rubbish caused by its work; (2) leave
work area in a clean, neat, and orderly condition
satisfactory to the Contracting Officer; (3) perform all
specified tests; and, (4) deliver the installation in
complete and operating condition.
(h) The Contractor's responsibility will terminate when all
work has been completed, the final inspection made,
the work accepted by the Contracting Officer. The
Contractor will then be released from further
except as required by the warranties specified
in the contract.
3. Architect's Duties, Responsibilities, and
(a) The Architect for this contract, and any successor,
shall
be designated in writing by the Contracting Officer.
Previous editions are obsolete Page 2 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
(b) The Architect shall serve as the Contracting Officer's
technical representative with respect to architectural,
6. Construction Progress
Schedule engineering, and design matters related to the work
performed under the contract. The Architect may provide
(a) The Contractor shall, within five days after the work
direction on contract performance. Such direction shall be
commences on the contract or another period of time
within the scope of the contract and may not be of a
determined by the Contracting Officer, prepare and
nature which: (1) institutes additional work outside the
submit to the Contracting Officer for approval three
copies
scope of the contract; (2) constitutes a change as defined
the
in the Changes clause herein; (3) causes an increase or
dates
decrease in the cost of the contract; (4) alters the
Construction Progress Schedule; or (5) changes any of
the other express terms or conditions of the contract.
The
(c)The Architect's duties and responsibilities may include but
shall not be limited to:
percentage of
(1) Making periodic visits to the work site, and on the
during
basis of his/her on -site inspections, issuing written
schedule
reports to the PHA which shall include all observed
may
deficiencies. The Architect shall file a copy of the
other
report with the Contractor's designated representative
submits
at the site;
(2) Making modifications in drawings and technical
specifications and assisting the Contracting Officer in
the preparation of change orders and other contract
modifications for issuance by the Contracting Officer;
(3) Reviewing and making recommendations with respect
to - (i) the Contractor's construction progress
and
schedules; (ii) the Contractor's shop and detailed
Contractor is
drawings: (rii) the machinery, mechanical and other
shall
equipment and materials or other articles proposed
including
for use by the Contractor; and, (iv) the Contractor's
Officer,
price breakdown and progress payment estimates;
circumstance,
and,
to
(4) Assisting in inspections, signing Certificates of
days
Completion, and making recommendations with
and to
respect to acceptance of work completed under the
contract.
deems
of a practicable schedule showing the order in which
Contractor proposes to perform the work, and the
on which the Contractor contemplates starting and
completing the several salient features of the work
(including acquiring labor, materials, and equipment).
schedule shall be in the form of a progress chart of
suitable scale to indicate appropriately the
work scheduled for completion by any given date
the period. If the Contractor fails to submit a
within the time prescribed, the Contracting Officer
withhold approval of progress payments or take
remedies under the contract until the Contractor
the required schedule.
(b) The Contractor shall enter the actual progress on the
chart as required by the Contracting Officer, and
immediately deliver three copies of the annotated
schedule to the Contracting Officer. If the Contracting
Officer determines, upon the basis of inspection
conducted pursuant to the clause entitled Inspection
Acceptance of Construction, herein that the
not meeting the approved schedule, the Contractor
take steps necessary to improve its progress,
those that may be required by the Contracting
without additional cost to the PHA. In this
the Contracting Officer may require the Contractor
increase the number of shifts, overtime operations,
of work, and/or the amount of construction plant,
submit for approval any supplementary schedule or
schedules in chart form as the Contracting Officer
necessary to demonstrate how the approved rate of
4. Other Contracts progress will be regained.
(c) Failure of the Contractor to comply with the requirements
The PHA may undertake or award other contracts for of the Contracting Officer under this clause shall be
additional work at or near the site of the work under this grounds for a determination by the Contracting Officer
that
contract. The Contractor shall fully cooperate with the
sufficient
other contractors and with PHA employees and shall
carefully adapt scheduling and performing the work under
this contract to accommodate the additional work, heeding
terminate the
any direction that may be provided by the Contracting
Officer. The Contractor shall not commit or permit any act
clause
the Contractor is not prosecuting the work with
diligence to ensure completion within the time
specified in the Contract. Upon making this
determination, the Contracting Officer may
Contractor's right to proceed with the work, or any
separable part of it, in accordance with the Default
that will interfere with the performance of work by any of this contract.
other contractor or by PHA employees
Construction 7. Site Investigation and Conditions Affecting the Work
(a) The Contractor acknowledges that it has taken steps
S. Pre -construction Conference and Notice to Proceed reasonably necessary to ascertain the nature and
location of the work, and that it has investigated and satisfied itself
(a) Within ten calendar days of contract execution, and prior as to the general and local conditions which can affect
the
to the commencement of work, the Contractor shall work or its cost, including but not limited to, (1)
conditions
attend a preconstruction conference with representatives
of the PHA, its Architect, and other interested parties
water,
convened by the PHA. The conference will serve to
weather,
acquaint the participants with the general plan of the
the
construction operation and all other requirements of the
ground:
contract. The PHA will provide the Contractor with the
needed
date, time, and place of the conference.
(b) The contractor shall begin work upon receipt of a written
itself as
Notice to Proceed from the Contracting Officer or
designee. The Contractor shall not begin work prior to
receiving such notice.
bearing upon transportation, disposal, handling. and
storage of materials; (2) the availability of labor,
electric power, and roads;(3) uncertainties of
river stages, tides, or similar physical conditions at
site; (4) the conformation and conditions of the
and (5) the character of equipment and facilities
preliminary to and during work performance. The
Contractor also acknowledges that it has satisfied
to the character, quality, and quantity of surface and
subsurface materials or obstacles to be encountered
insofar as this information is
Previous editions are obsolete Page 3 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
reasonably ascertainable from an inspection of the site,
shall
including all exploratory work done by the PHA, as
well as from the drawings and specifications made
a part of this contract. Any failure of the
Contractor to take the actions described and
acknowledged in this paragraph will not relieve
the Contractor from responsibility for estimating
properly the difficulty and cost of successfully
performing the work, or for proceeding to
successfully perform the work without additional
expense to the PHA.
(b) The PHA assumes no responsibility for any
conclusions or interpretations made by the
Contractor based on the information made
available by the PHA. Nor does the PHA assume
responsibility for any understanding reached or
representation made concerning conditions which
can affect the work by any of its officers or agents
before the execution of this contract, unless that
understanding or representation is expressly
stated in this contract.
B. Differing Site Conditions
(a) The Contractor shall promptly. and before the
conditions are disturbed, give a written notice to the
Contracting Officer of (1) subsurface or latent physical
conditions at the site which differ materially from those
indicated in this contract, or (2) unknown physical
conditions at the site(s), of an unusual nature, which
differ materially from those ordinarily encountered and
generally recognized as inhering in work of the
character provided for in the contract.
(b) The Contracting Officer shall investigate the site
conditions promptly after receiving the notice. Work
shall not proceed at the affected site, except at the
Contractor's risk, until the Contracting Officer has
provided written instructions to the Contractor. If
the conditions do materially so differ and cause an
increase or decrease in the Contractor's cost of,
or the time required for, performing any part of
the work under this contract, whether or not
changed as a result of the conditions, the
Contractor shall file a claim in writing to the PHA
within ten days after receipt of such instructions
and, in any event, before proceeding with the
work. An equitable adjustment in the contract
price, the delivery schedule, or both shall be
made under this clause and the contract modified
in writing accordingly.
(c) No request by the Contractor for an equitable
adjustment to the contract under this clause shall be
allowed, unless the Contractor has given the written
notice required: provided, that the time prescribed in
(a) above for giving written notice may be extended
by the Contracting Officer.
(d) No request by the Contractor for an equitable
adjustment to the contract for differing site conditions
shall be allowed if made after final payment under this
contract.
9. Specifications and Drawings for
Construction
(a) The Contractor shall keep on the work site a copy
of the drawings and specifications and shall at all
times give the Contracting Officer access thereto.
Anything mentioned in the specifications and not
shown on the drawings, or shown on the drawings
and not mentioned in the specifications, shall be
promptly submitted to the Contracting Officer, who
of like effect as if shown or mentioned in both. In
case of difference between drawings and
specifications, the specifications shall govern. In
case of discrepancy in the figures, in the
drawings, or in the specifications, the matter shall
be
promptly make a determination in writing. Any
adjustment by the Contractor without such a
determination shall be at its own risk and expense.
The Contracting Officer shall furnish from time to
time such detailed drawings and other information
as considered necessary, unless
otherwise provided.
(b) Wherever in the specifications or upon the
drawings the words "directed", "required", "ordered",
"designated", "prescribed", or words of like import
are used, it shall be understood that the "direction",
"requirement", "order", "designation", or
"prescription", of the Contracting Officer is intended
and similarly the words "approved", "acceptable".
"satisfactory", or words of like import shall mean
"approved by". or "acceptable to", or "satisfactory
to" the Contracting Officer, unless otherwise
expressly stated.
(c) Where "as shown" "as indicated", "as detailed", or
words
of similar import are used, it shall be understood that
the reference is made to the drawings
accompanying this contract unless stated
otherwise. The word "provided" as used herein
shall be understood to mean "provide complete in
place" that is "furnished and installed".
(d) "Shop drawings" means drawings, submitted to the
PHA by the Contractor, subcontractor, or any lower tier
subcontractor, showing in detail (1) the proposed
fabrication and assembly of structural elements and
(2) the installation (i.e., form, fit, and attachment
details) of materials of equipment. It includes
drawings, diagrams. layouts, schematics, descriptive
literature, illustrations, schedules, performance and
test data, and similar materials furnished by the
Contractor to explain in detail specific portions of the
work required by the contract. The PHA may duplicate.
use, and disclose in any manner and for any purpose
shop drawings delivered under this contract.
(e) If this contract requires shop drawings, the
Contractor shall coordinate all such drawings, and
review them for accuracy, completeness, and
compliance with other contract requirements and
shall indicate its approval thereon as evidence of
such coordination and review. Shop drawings
submitted to the Contracting Officer without evidence
of the Contractor's approval may be returned for
resubmission. The Contracting Officer will indicate an
approval or disapproval of the shop drawings and if
not approved as submitted shall indicate the PHA's
reasons therefore. Any work done before such
approval shall be at the Contractor's risk. Approval by
the Contracting Officer shall not relieve the
Contractor from responsibility for any errors or
omissions in such drawings, nor from responsibility
for complying with the requirements of this contract,
except with respect to variations described and
approved in accordance with (f) below.
(f) If shop drawings show variations from the contract
requirements, the Contractor shall describe such
variations in writing, separate from the drawings, at
the time of submission. If the Architect approves any
such variation and the Contracting Officer concurs.
the Contracting Officer shall issue an appropriate
modification to the contract, except that, if the
variation is minor or does not involve a change in
price or in time of performance, a modification need
not be issued.
(g) It shall be the responsibility of the Contractor, to
make timely requests of the PHA for such large scale
and full size drawings, color schemes, and other
additional information, not already in his possession,
which shall be
Previous editions are obsolete Page 4 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
required in the planning and production of the work. Such
requests may be submitted as the need arises, but each
Contracting
such request shall be filed in ample time to permit
appropriate action to be taken by all parties involved so
as to avoid delay.
(h) The Contractor shall submit to the Contracting Officer for
approval four copies (unless otherwise indicated) of all
information
shop drawings as called for under the various headings
of these specifications. Three sets (unless otherwise
the
indicated) of all shop drawings, will be retained by the
risk
PHA and one set will be returned to the Contractor. As
required by the Contracting Officer, the Contractor, upon
completing the work under this contract, shall furnish a
complete set of all shop drawings as finally approved.
These drawings shall show all changes and revisions
made up to the time the work is completed and accepted.
(i) This clause shall be included in all subcontracts at any tier.
on
It shall be the responsibility of the Contractor to ensure
represented, its
that all shop drawings prepared by subcontractors are
submitted to the Contracting Officer.
10. As -Built Drawings
machinery and mechanical and other equipment.
When required by this contract or by the
Officer, the Contractor shall also obtain the
Contracting Officer's approval of the material or
articles which the Contractor contemplates
incorporating into the work. When requesting
approval, the Contractor shall provide full
concerning the material or articles. Machinery,
equipment, material, and articles that do not have
required approval shall be installed or used at the
of subsequent rejection.
(2) When required by the specifications or the
Contracting Officer, the Contractor shall submit
appropriately marked samples (and certificates
related to them) for approval at the Contractor's
expense, with all shipping charges prepaid. The
Contractor shall label, or otherwise properly mark
the container, the material or product
place of origin, the name of the producer, the
Contractor's name, and the identification of the
construction project for which the material or product
is intended to be used.
(3) Certificates shall be submitted in triplicate, describing
(a) "As -built drawings." as used in this clause, means each sample submitted for approval and certifying
drawings submitted by the Contractor or subcontractor at that the material, equipment or accessory
complies
any tier to show the construction of a particular structure
or work as actually completed under the contract. "As -built
of
drawings" shall be synonymous with "Record
drawings."
of
(b) As required by the Contracting Officer, the Contractor
contract
shall provide the Contracting Officer accurate information
to be used in the preparation of permanent as -built
with contract requirements. The certificates shall
include the name and brand of the product, name
manufacturer, and the location where produced.
(4) Approval of a sample shall not constitute a waiver
the PHA right to demand full compliance with
requirements. Materials, equipment and accessories
may be rejected for cause even though samples
have
drawings. For this purpose. the Contractor shall record on
been approved.
one set of contract drawings all changes from the
(5) Wherever materials are required to comply with
installations originally indicated, and record final locations
recognized standards or specifications, such
of underground lines by depth from finish grade and by
specifications shall be accepted as establishing the
accurate horizontal offset distances to permanent surface
technical qualities and testing methods. but shall
not
improvements such as buildings, curbs. or edges of
govern the number of tests required to be made
nor
walks.
modify other contract requirements. The
Contracting
(c)This clause shall be included in all subcontracts at any
Officer may require laboratory test reports on items
tier. It shall be the responsibility of the Contractor to
submitted for approval or may approve materials
on
ensure that all as -built drawings prepared by
subcontractors are submitted to the Contracting Officer
11. Material and Workmanship
compliance of
(a) All equipment, material. and articles furnished under this
contract shall be new and of the most suitable grade for
materials
the purpose intended, unless otherwise specifically
provided in this contract. References in the contract to
equipment, material, articles, or patented processes by
into
trade name, make, or catalog number, shall be regarded
materials
as establishing a standard of quality and shall not be
the basis of data submitted in certificates with
samples. Check tests will be made on materials
delivered for use only as frequently as the Contracting
Officer determines necessary to insure
materials with the specifications. The Contractor will
assume all costs of retesting materials which fail to
meet contract requirements and/or testing
offered in substitution for those found deficient.
(6) After approval, samples will be kept in the Project
office until completion of work. They may be built
the work after a substantial quantity of the
they represent has been built in and accepted.
construed as limiting competition. The Contractor may, at
its option, use any equipment, material, article, or
concerning
process that, in the judgment of, and as approved by the
Contracting Officer, is equal to that named in the
specifications, unless otherwise specifically provided in
35. this contract.
(b) Approval of equipment and materials.
(1) The Contractor shall obtain the Contracting Officer's
approval of the machinery and mechanical and other
all
equipment to be incorporated into the work. When
regulations,
requesting approval, the Contractor shall furnish to the
Contracting Officer the name of the manufacturer, the
model number, and other information concerning the
applicable
performance, capacity, nature, and rating of the
(c) Requirements concerning lead -based paint. The
Contractor shall comply with the requirements
lead -based paint contained in the Lead -Based Paint
Poisoning Prevention Act (42 U.S.C. 4821-4846) as
implemented by 24 CFR Part
12. Permits and Codes
(a) The Contractor shall give all notices and comply with
applicable laws, ordinances, codes, rules and
Notwithstanding the requirement of the Contractor to
comply with the drawings and specifications in the
contract, all work installed shall comply with all
codes and regulations as amended by any
Previous editions are obsolete Page 5 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
waivers. Before installing the work, the Contractor shall
examine the drawings and the specifications for
14. Temporary Heating
compliance with applicable codes and regulations
bearing on the work and shall immediately report any
The Contractor shall provide and pay for temporary
discrepancy it may discover to the Contracting Officer.
heating, covering, and enclosures necessary to
properly
Where the requirements of the drawings and
protect all work and materials against damage by
specifications fail to comply with the applicable code or
dampness and cold, to dry out the work, and to
facilitate
regulation, the Contracting Officer shall modify the
the completion of the work. Any permanent heating
contract by change order pursuant to the clause entitled
equipment used shall be turned over to the PHA in the
Changes herein to conform to the code or regulation.
condition and at the time required by the
specifications. (b) The Contractor shall secure and pay for all permits, fees,
and licenses necessary for the proper execution and
15. Availability and Use of Utility
Services completion of the work. Where the PHA can arrange for
the issuance of all or part of these permits, fees and
(a) The PHA shall make all reasonably required amounts
of
licenses, without cost to the Contractor, the contract
utilities available to the Contractor from existing
outlets
amount shall be reduced accordingly.
and supplies. as specified in the contract. Unless
13. Health, Safety, and Accident Prevention
for by
(a) In performing this contract, the Contractor shall:
reasonable
(1) Ensure that no laborer or mechanic shall be required
to work in surroundings or under working conditions
furnished
which are unsanitary, hazardous, or dangerous to
his/her health and/or safety as determined under
construction safety and health standards promulgated
by the Secretary of Labor by regulation;
(2) Protect the lives, health, and safety of other persons,
the
(3) Prevent darnage to property, materials. supplies, and
equipment; and.
work
(4) Avoid work interruptions.
(b) For these purposes, the Contractor shall:
otherwise provided in the contract, the amount of
each
utility service consumed shall be charged to or paid
the Contractor at prevailing rates charged to the PHA or,
where the utility is produced by the PHA, at
rates determined by the Contracting Officer. The
Contractor shall carefully conserve any utilities
without charge.
(b) The Contractor, at its expense and in a manner
satisfactory to the Contracting Officer, shall install and
maintain all necessary temporary connections and
distribution lines, and all meters required to measure
amount of each utility used for the purpose of
determining charges. Before final acceptance of the
by the PHA, the Contractor shall remove all the
temporary connections, distribution lines, meters,
and
(1) Comply with regulations and standards issued by the
associated paraphernalia.
Secretary of Labor at 29 CFR Part 1926. Failure to
comply may result in imposition of sanctions pursuant
16. Protection of Existing Vegetation, Structures,
to the Contract Work Hours and Safety Standards Act
Equipment, Utilities. and
Improvements (Public Law 91-54, 83 Stat. 96). 40 U.S.C. 3701 et
seq.: and
(a) The Contractor shall preserve and protect all
structures,
(2) Include the terms of this clause in every subcontract
equipment, and vegetation (such as trees, shrubs, and
so that such terms will be binding on each
grass) on or adjacent to the work site, which are not
to be
subcontractor.
(c) The Contractor shall maintain an accurate record of
this
exposure data on all accidents incident to work performed
under this contract resulting in death, traumatic injury,
specifically
occupational disease. or damage to property, materials,
vegetation
supplies, or equipment, and shall report this data in the
trees
manner prescribed by 29 CFR Part
the
1904.
(d) The Contracting Officer shall notify the Contractor of any
clean
noncompliance with these requirements and of the
corrective action required. This notice, when delivered to
the Contractor or the Contractor's representative at the
removed under this contract, and which do not
unreasonably interfere with the work required under
contract.
(b) The Contractor shall only remove trees when
authorized to do so, and shall avoid damaging
that will remain in place. If any limbs or, branches of
are broken during performance of this contract, or by
careless operation of equipment, or by workmen, the
Contractor shall trim those limbs or branches with a
cut and paint the cut with a tree -pruning compound as
directed by the Contracting Officer.
(c) The Contractor shall protect from damage all existing
site of the work, shall be deemed sufficient notice of the
and
noncompliance and corrective action required. After
of
receiving the notice, the Contractor shall immediately
take corrective action. If the Contractor fails or refuses to
take corrective action promptly, the Contracting Officer
may issue an order stopping all or part of the work until
satisfactory corrective action has been taken. The
secure,
Contractor shall not base any claim or request for
parts
equitable adjustment for additional time or money on any
the
stop order issued under these circumstances.
(e) The Contractor shall be responsible for its subcontractors'
compliance with the provisions of this clause. The
Contractor shall take such action with respect to any
work
subcontract as the PHA, the Secretary of Housing and
Urban Development, or the Secretary of Labor shall
award of
direct as a means of enforcing such provisions.
improvements and utilities (1) at or near the work site
(2) on adjacent property of a third party, the locations
which are made known to or should be known by the
Contractor. Prior to disturbing the ground at the
construction site, the Contractor shall ensure that all
underground utility lines are clearly marked.
(d) The Contractor shall shore up, brace, underpin,
and protect as necessary all foundations and other
of existing structures adjacent to, adjoining, and in
vicinity of the site, which may be affected by the
excavations or other operations connected with the
construction of the project.
(e) Any equipment temporarily removed as a result of
under this contract shall be protected, cleaned, and
replaced in the same condition as at the time of
this contract.
Previous editions are obsolete Page 6 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
(f) New work which connects to existing work shall
correspond in all respects with that to which it connects
and/or be similar to existing work unless otherwise
1251
required by the specifications.
(g) No structural members shall be altered or in any way
performed. weakened without the written authorization of the
Contracting Officer, unless such work is clearly specified
in the plans or specifications.
(h) If the removal of the existing work exposes discolored or
unfinished surfaces, or work out of alignment, such
surfaces shall be refinished, or the material replaced as
necessary to make the continuous work uniform and
Act
harmonious. This, however, shall not be construed to
the
The contactor shall comply with the Clean Air Act, as
amended, 42 USC 7401 et seq., the Federal Water
Pollution Control Water Act, as amended, 33 U.S.C.
et seq., and standards issued pursuant thereto in the
facilities in which this contract is to be
19. Energy Efficiency
The Contractor shall comply with mandatory standards
and policies relating to energy efficiency which are
contained in the energy conservation plan issued in
compliance with the Energy Policy and Conservation
(Pub.L. 94-163) for the State in which the work under
require the refinishing or reconstruction of dissimilar
contract is performed.
finishes previously exposed, or finished surfaces in good
condition, but in different planes or on different levels
20. Inspection and Acceptance of
Construction when brought together by the removal of intervening
work, unless such refinishing or reconstruction is
(a) Definitions. As used in this clause -
specified in the plans or specifications.
(1) "Acceptance" means the act of an authorized
(i) The Contractor shall give all required notices to any
representative of the PHA by which the PHA approves
adjoining or adjacent property owner or other party before
and assumes ownership of the work performed under
this
the commencement of any work.
contract. Acceptance may be partial or complete.
(j) The Contractor shall indemnify and save harmless the
(2) "Inspection" means examining and testing the work
PHA from any damages on account of settlement or the
performed under the contract (including, when
loss of lateral support of adjoining property, any damages
appropriate, raw materials, equipment, components,
and
from changes in topography affecting drainage, and from
all loss or expense and all damages for which the PHA
may become liable in consequence of such injury or
damage to adjoining and adjacent structures and their
premises.
(k) The Contractor shall repair any damage to vegetation,
scientific
structures, equipment, utilities, or improvements,
including those that are the property of a third party,
resulting from failure to comply with the requirements of
that
this contract or failure to exercise reasonable care in
performing the work. If the Contractor fails or refuses to
repair the damage promptly, the Contracting Officer may
have the necessary work performed and charge the cost
intermediate assemblies) to determine whether it
conforms to contract requirements,
(3) "Testing" means that element of inspection that
determines the properties or elements, including
functional operation of materials, equipment, or their
components, by the application of established
principles and procedures.
(b) The Contractor shall maintain an adequate inspection
system and perform such inspections as will ensure
the work performed under the contract conforms to
contract requirements. All work is subject to PHA
inspection and test at all places and at all reasonable
times before acceptance to ensure strict compliance
with
to the Contractor. the terns of the contract.
(c) PHA inspections and tests are for the sole benefit of
the
17. Temporary Buildings and Transportation of Materials PHA and do not: (1) relieve the Contractor
of
(a) Temporary buildings (e.g., storage sheds, shops, offices.
for
sanitary facilities) and utilities may be erected by the
Contractor only with the approval of the Contracting
Officer and shall be built with labor and materials
furnished by the Contractor without expense to the PHA.
The temporary buildings and utilities shall remain the
not
property of the Contractor and shall be removed by the
nor
Contractor at its expense upon completion of the work.
With the written consent of the Contracting Officer, the
buildings and utilities may be abandoned and need not
be removed.
the
(b) The Contractor shall, as directed by the Contracting
Officer, use only established roadways, or use temporary
additional
roadways constructed by the Contractor when and as
authorized by the Contracting Officer. When materials are
responsibility for providing adequate quality control
measures: (2) relieve the Contractor of responsibility
loss or damage of the material before acceptance; (3)
constitute or imply acceptance; or, (4) affect the
continuing rights of the PHA after acceptance of the
completed work under paragraph (j) below.
(d) The presence or absence of the PHA inspector does
relieve the Contractor from any contract requirement.
is the inspector authorized to change any term or
condition of the specifications without the Contracting
Officer's written authorization. All instructions and
approvals with respect to the work shall be given to
Contractor by the Contracting Officer.
(e) The Contractor shall promptly furnish, without
charge, all facilities, labor, and material reasonably
needed for performing such safe and convenient
transported in prosecuting the work, vehicles shall not be
loaded beyond the loading capacity recommended by the
manufacturer of the vehicle or prescribed by any federal,
when
state, or local law or regulation. When it is necessary to
Contractor
cross curbs or sidewalks, the Contractor shall protect them
from damage. The Contractor shall repair or pay for the
perform
repair of any damaged curbs, sidewalks, or roads.
18. Clean Air and Water
the
inspections and tests as may be required by the
Contracting Officer. The PHA may charge to the
Contractor any additional cost of inspection or test
work is not ready at the time specified by the
for inspection or test, or when prior rejection makes
reinspection or retest necessary. The PHA shall
all inspections and tests in a manner that will not
unnecessarily delay the work. Special, full size, and
performance tests shall be performed as described in
contract.
Previous editions are obsolete Page 7 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
(f) The PHA may conduct routine inspections of the
prior
construction site on a daily basis.
the
(g)
correct
an
work found by the PHA not to conform to contract
price
requirements, unless the PHA decides that it is in its
interest to accept the work with an appropriate
accordingly. adjustment in contract price. The Contractor shall
promptly segregate and remove rejected material from
the premises.
(h)
The Contractor warrants good title to all materials,
rejected work, the PHA may (1) by contract or otherwise,
replace or correct the work and charge the cost to the
Contractor, or (2) terminate for default the Contractor's
right to proceed.
other
(i) If any work requiring inspection is covered up without ap-
lien
occupied without proper remuneration therefore. If
possession or use by the PHA delays the progress of
The Contractor shall, without charge, replace or
work or causes additional expense to the Contractor,
equitable adjustment shall be made in the contract
or the time of completion, and the contract shall be
modified in writing
22. Warranty of Title
If the Contractor does not promptly replace or correct
supplies, and equipment incorporated in the work and
agrees to deliver the premises together with all
improvements thereon free from any claims, liens or
charges, and agrees further that neither it nor any
person, firm or corporation shall have any right to a
proval of the PHA, it must, if requested by the Contracting
upon the premises or anything appurtenant
thereto. Officer, be uncovered at the expense of the Contractor.
If
at any time before final acceptance of the entire work, the
23. Warranty of
Construction PHA considers it necessary or advisable, to examine
work already completed by removing or tearing it out, the
(a) In addition to any other warranties in this contract, the
Contractor, shall on request, promptly furnish all
(j )
Contractor warrants, except as provided in paragraph
necessary facilities, labor, and material. If such work is
of this clause, that work performed under this
contract
found to be defective or nonconforming in any material
conforms to the contract requirements and is free of
any
respect due to the fault of the Contractor or its
performed
defect in equipment, material, or workmanship
subcontractors, the Contractor shall defray all the
by the Contractor or any subcontractor or supplier at
any
expenses of the examination and of satisfactory
reconstruction. If, however, such work is found to meet
final
the requirements of the contract, the Contracting Officer
shall make an equitable adjustment to cover the cost of
warranty
the examination and reconstruction, including, if
otherwise
completion of the work was thereby delayed, an
extension of time.
(j) The Contractor shall notify the Contracting Officer, in
writing, as to the date when in its opinion all or a
designated portion of the work will be substantially
Contractor's
completed and ready for inspection. If the Architect
real or
determines that the state of preparedness is as
represented, the PHA will promptly arrange for the
require -
inspection. Unless otherwise specified in the contract, the
PHA shall accept, as soon as practicable after completion
or
and inspection, all work required by the contract or that
portion of the work the Contracting Officer determines and
designates can be accepted separately. Acceptance shall
be final and conclusive except for latent defects, fraud,
gross mistakes amounting to fraud, or the PHA's right
indicated)
under any warranty or guarantee.
21. Use and Possession Prior to Completion
of
(a)
(e) If the Contractor fails to remedy any failure, defect, or
tier. This warranty shall continue for a period of
(one year unless otherwise indicated) from the date of
acceptance of the work. If the PHA takes possession of
any part of the work before final acceptance, this
shall continue for a period of (one year unless
indicated) from the date that the PHA takes
possession.
(b) The Contractor shall remedy, at the Contractor's
expense. any failure to conform, or any defect. In
addition, the Contractor shall remedy, at the
expense. any damage to PHA -owned or controlled
personal property when the damage is the result of—
(1) The Contractor's failure to conform to contract
ments: or
(2) Any defects of equipment, material, workmanship
design furnished by the Contractor.
(c) The Contractor shall restore any work damaged in
fulfilling the terms and conditions of this clause. The
Contractor's warranty with respect to work repaired or
replaced will run for (one year unless otherwise
from the date of repair or replacement.
(d) The Contracting Officer shall notify the Contractor, in
writing, within a reasonable time after the discovery
any failure, defect or damage.
The PHA shall have the right to take possession of or use
any completed or partially completed part of the work.
notice,
Before taking possession of or using any work, the
Contracting Officer shall furnish the Contractor a list of
the
items of work remaining to be performed or corrected on
those portions of the work that the PHA intends to take
possession of or use. However, failure of the Contracting
Officer to list any item of work shall not relieve the
contract,
Contractor of responsibility for complying with the terms of
the contract. The PHA's possession or use shall not be
normal
))deemed an acceptance of any work under the contract.
(b(2) Require all warranties to be executed in writing, for the
Contractor shall be relieved of the responsibility for (1) the
loss of or damage to the work resulting from the PHA's
possession or use, notwithstanding the terms of the
paragraph
clause entitled Permits and Codes herein; (2) all
at
maintenance costs on the areas occupied; and, (3)
furnishing heat, light, power, and water used in the areas
damage within a reasonable time after receipt of
the PHA shall have the right to replace, repair or
otherwise remedy the failure, defect, or damage at
Contractor's expense.
(f) With respect to all warranties, express or implied, from
subcontractors, manufacturers, or suppliers for work
performed and materials furnished under this
the Contractor shall:
(1) Obtain all warranties that would be given in
commercial practice;
While the PHA has such possession or use, the
benefit of the PHA; and,
(3) Enforce all warranties for the benefit of the PHA.
(g) In the event the Contractor's warranty under
(a) of this clause has expired, the PHA may bring suit
its own expense to enforce a subcontractor's,
manufacturer's or supplier's warranty.
Previous editions are obsolete Page 8 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
(h) unless a defect is caused by the negligence of the
breakdown
Contractor or subcontractor or supplier at any tier, the
must be
Contractor shall not be liable for the repair of any defect of
one
material or design furnished by the PHA nor for the repair
of any darnage that results from any defect in PHA
employed
furnished material or design.
the
(i) Notwithstanding any provisions herein to the contrary, the
construed
establishment of the time periods in paragraphs (a) and
contract
(c) above relate only to the specific obligation of the
profit
Contractor to correct the work, and have no relationship
to the time within which its obligation to comply with the
the
contract may be sought to be enforced, nor to the time
work
within which proceedings may be commenced to
approved establish the Contractor's liability with respect to its
obligation other than specifically to correct the work.
Administrative
Inspection and Acceptance of Construction clause of this
approved by
contract with respect to latent defects, gross mistakes or
fraud.
basis for determining progress payments. The
shall be approved by the Contracting Officer and
acceptable to HUD. If the contract covers more than
project, the Contractor shall furnish a separate
breakdown for each. The values and quantities
in making up this breakdown are for determining
amount of progress payments and shall not be
as a basis for additions to or deductions from the
price. The Contractor shall prorate its overhead and
over the construction period of the contract.
(d) The Contractor shall submit, on forms provided by
PHA, periodic estimates showing the value of the
performed during each period based upon the
submitted not later than days in advance of
(j) This warranty shall not limit the PHA's rights
under the the date set for payment and are subject to
correction and
revision as required. The estimates must be
the Contracting Officer with the concurrence of the
Architect prior to payment. If the contract covers
more
than one project, the Contractor shall furnish a
24. Prohibition Against Liens
separate progress payment estimate for each.
(e) Along with each request for progress payments and the
The Contractor is prohibited from placing a lien on the
required estimates, the Contractor shall furnish the
PHA's property. This prohibition shall apply to all
following certification, or payment shall not be
made: I
subcontractors at any tier and all materials suppliers.
hereby certify, to the best of my knowledge and
belief,
that:
(1) The amounts requested are only for performance in accordance
with the specifications, terms, and
25. Contract Period
conditions of the contract;
(2) Payments to subcontractors and suppliers have
been made from previous payments received
underthe
this contract within calendar days of the
contract, and timely payments will be made from
the
effective date of the contract, or within the time schedule
certification,
established in the notice to proceed issued by the
Contracting Officer.
include
26. Order of Provisions
supplier in accordance with the terms and conditions of the
In the event of a conflict between these General
Conditions and the Specifications, the General
Conditions shall prevail. In the event of a conflict between
the contract and any applicable state or local law or
regulation, the state or local law or regulation shall
prevail; provided that such state or local law or regulation
does not conflict with, or is less restrictive than applicable
federal law, regulation, or Executive Order. In the event of
such a conflict, applicable federal law, regulation, and
Executive Order shall prevail.
27. Payments
shall retain ten (10) percent of the amount of progress
(a) The PHA shall pay the Contractor the price as provided in
proceeds of the payment covered by this
in accordance with subcontract agreements, and,
(3) This request for progress payments does not
any amounts which the prime contractor intends
to
withhold or retain from a subcontractor or
subcontract.
Name:
Title:
Date:
(f) Except as otherwise provided in State law, the PHA
payments until completion and acceptance of all work
this contract.
of 50
(b) The PHA shall make progress payments approximately
every 30 days as the work proceeds, on estimates of
work accomplished which meets the standards of quality
satisfactory,
established under the contract, as approved by the
the
Contracting Officer, The PHA may, subject to written
Officer
determination and approval of the Contracting Officer,
make more frequent payments to contractors which are
PHA
qualified small businesses.
percentage
(c)Before the first progress payment under this contract, the
the
under the contract; except, that if upon completion
percent of the work, the Contracting Officer, after
consulting with the Architect, determines that the
Contractor's performance and progress are
the PHA may make the remaining payments in full for
work subsequently completed. If the Contracting
subsequently determines that the Contractor's
performance and progress are unsatisfactory, the
shall reinstate the ten (10) percent (or other
as provided in State law) retainage until such time as
Contractor shall furnish, in such detail as requested by
Contracting Officer determines that performance and
the Contracting Officer, a breakdown of the total contract
progress are satisfactory.
price showing the amount included therein for each
(g) The Contracting Officer may authorize material
delivered
principal category of the work, which shall substantiate
on the site and preparatory work done to be taken
into
the payment amount requested in order to provide a
consideration when computing progress payments.
Previous editions are obsolete Page 9 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
Material delivered to the Contractor at locations other than
the site may also be taken into consideration if the
the
Contractor furnishes satisfactory evidence that (1) it has
acquired title to such material; (2) the material is properly
stored in a bonded warehouse, storage yard, or similar
of
suitable place as may be approved by the Contracting
Officer; (3) the material is insured to cover its full value;
and (4) the material will be used to perform this contract.
Before any progress payment which includes delivered
PHA. material is made, the Contractor shall furnish such
documentation as the Contracting Officer may require to
assure the protection of the PHA's interest in such
materials. The Contractor shall remain responsible for
notice
such stored material notwithstanding the transfer of tale
indicated
to the PHA.
within
(h)
the general scope of the contract including changes:
made shall, at the time of payment become the sole
designs);
property of the PHA, but this shall not be construed as (1)
work;
relieving the Contractor frorn the sole responsibility for all
material and work upon which payments have been made
or the restoration of any damaged work; or, (2) waiving the
the
right of the PHA to require the fulfillment of all of the terms
of the contract. In the event the work of the Contractor has
in
been damaged by other contractors or persons other than
employees of the PHA in the course of their employment,
Contracting
the Contractor shall restore such damaged work without
cost to the PHA and to seek redress for its damage only
from those who directly
notice
caused it.
(i) The PHA shall make the final payment due the Contractor
a
under this contract after (1) completion and final
acceptance of all work; and (2) presentation of release of
or
all claims against the PHA arising by virtue of this contract,
a
other than claims, in stated amounts, that the Contractor
an
has specifically excepted from the operation of the release.
Each such exception shall embrace no more than one
claim, the basis and scope of which shall be clearly
required
defined. The amounts for such excepted claims shall not
be included in the request for final payment. A release may
the
also be required of the assignee if the Contractor's claim to
adjustment
amounts payable under this contract
for a
has been assigned.
proposal
(j) Prior to making any payment, the Contracting Officer may
require the Contractor to furnish receipts or other
days
evidence of payment from all persons performing work
notice
and supplying material to the Contractor, if the
Contracting Officer determines such evidence is
adjustment
responsibilities of the parties (e.g.. change in the PHA
address). All other contract modifications shall be in
form of supplemental agreements signed by the
Contractor and the Contracting Officer.
(c) When a proposed modification requires the approval
HUD prior to its issuance (e.g., a change order that
exceeds the PHA's approved threshold), such
modification shall not be effective until the required
approval is received by the
29. Changes
(a) The Contracting Officer may, at any time, without
to the sureties, by written order designated or
to be a change order, make changes in the work
All material and work covered by progress payments
(1) In the specifications (including drawings and
(2) In the method or manner of performance of the
(3) PHA -furnished facilities, equipment, materials,
services, or site; or,
(4) Directing the acceleration in the performance of
work,
(b) Any other written order or oral order (which, as used
this paragraph (b), includes direction, instruction,
interpretation, or determination) from the
Officer that causes a change shall be treated as a
change order under this clause; provided, that the
Contractor gives the Contracting Officer written
stating (1) the date, circumstances and source of the
order and (2) that the Contractor regards the order as
change order,
(c) Except as provided in this clause, no order, statement
conduct of the Contracting Officer shall be treated as
change under this clause or entitle the Contractor to
equitable adjustment.
(d) If any change under this clause causes an increase or
decrease in the Contractor's cost of, or the time
for the performance of any part of the work under this
contract, whether or not changed by any such order,
Contracting Officer shall make an equitable
and modify the contract in writing. However, except
adjustment based on defective specifications, no
for any change under paragraph (b) above shall be
allowed for any costs incurred more than 20 days (S
for oral orders) before the Contractor gives written
as required. In the case of defective specifications for
which the PHA is responsible, the equitable
necessary to substantiate claimed costs.
by
(k)
for
payment or disputes arising there under between the
Contractor and its subcontractors or material suppliers;
or, (2) withhold any moneys for the protection of the
subcontractors or material suppliers. The failure or
clause,
refusal of the PHA to withhold moneys from the
paragraph
Contractor shall in nowise impair the obligations of any
surety or sureties under any bonds furnished under this
contract.
may
28. Contract Modifications
(a)
any
term or condition of this contract. Any contract
modification shall be authorized in writing.
(b)
adjustment shall be submitted in the form of a lump sum
unilaterally (1) pursuant to a specific authorization stated
in a contract clause (e.g., Changes); or (2) for
administrative matters which do not change the rights or
shall include any increased cost reasonably incurred
The PHA shall not; (1) determine or adjust any claims
the Contractor in attempting to comply with
the defective specifications.
(e) The Contractor must assert its right to an adjustment
under this clause within 30 days after (1) receipt of a
written change order under paragraph (a) of this
or (2) the furnishing of a written notice under
(b) of this clause, by submitting a written statement
describing the general nature and the amount of the
proposal. If the facts justify it, the Contracting Officer
extend the period for submission. The proposal may be
included in the notice required under paragraph (b)
above. No proposal by the Contractor for an
equitable
Only the Contracting Officer has authority to modify
adjustment shall be allowed if asserted after final
payment under this contract.
(f) The Contractor's written proposal for equitable
The Contracting Officer may modify the contract
proposal supported with an itemized breakdown of all
increases and decreases in the contract in at least the
following details:
Previous editions are obsolete Page 10 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
(1) Direct Costs. Materials (list individual items, the
other
quantity and unit cost of each, and the aggregate
Contractor
cost); Transportation and delivery costs associated
or
with materials; Labor breakdowns by hours or unit
costs (identified with specific work to be performed):
any
Construction equipment exclusively necessary for the
Contractor
change; Costs of preparation and/ or revision to shop
of
drawings resulting from the change; Worker's
requirement
Compensation and Public Liability Insurance;
suspension
Employment taxes under FICA and FUTA; and. Bond
stated, is
Costs when size of change warrants revision.
(2) Indirect Costs. Indirect costs may include overhead,
but
general and administrative expenses, and fringe
benefits not normally treated as direct costs.
(3) Profit. The amount of profit shall be negotiated and
may vary according to the nature, extent, and
complexity of the work required by the change. The
allowability of the direct and indirect costs shall be
demand
determined in accordance with the Contract Cost
Principles and Procedures for Cornmercial Firms in Part
in a
31 of the Federal Acquisition Regulation (48 CFR 1-31),
contract
as implemented by HUD Handbook 2210.18, in effect on
the date of this contract. The Contractor shall not be
allowed a profit on the profit received by any
subcontractor. Equitable adjustments for deleted work
the
shall include a credit for profit and may include a credit for
other
indirect costs. On proposals covering both increases and
when
decreases in the amount of the contract, the application of
indirect costs and profit shall be on the net -change in
requirements
direct costs for the Contractor or subcontractor
performing the work.
(g)
(b) Except for disputes arising under the clauses entitled
for time extension (if any), and shall include sufficient
herein,
information and dates to demonstrate whether and to
what extent the change will delay the completion of the
breach
contract in its entirety.
shall be
(h)
30resolved under this clause.
days after their receipt, or notify the Contractor of the
and
date when such action will be taken.
decision.
(i) Failure to reach an agreement on any proposal shall be a
dispute under the clause entitled Disputes herein.
Officer.
Nothing in this clause, however, shall excuse the
otherwise
Contractor from proceeding with the contract as changed.
the
(j) Except in an emergency endangering life or property, no
change shall be made by the Contractor without a prior
order from the Contracting Officer.
been so suspended, delayed, or interrupted by any
cause, including the fault or negligence of the
or for which any equitable adjustment is provided for
excluded under any other provision of this contract.
(c) A claim under this clause shall not be allowed (1) for
costs incurred more than 20 days before the
shall have notified the Contracting Officer in writing
the act or failure to act involved (but this
shall not apply as to a claim resulting from a
order); and. (2) unless the claim, in an amount
asserted in writing as soon as practicable after the
termination of the suspension, delay, or interruption,
not later than the date of final payment under the
contract.
31. Disputes
(a) "Claim," as used in this clause, means a written
or written assertion by one of the contracting parties
seeking, as a matter of right, the payment of money
sum certain, the adjustment or interpretation of
terms, or other relief arising under or relating to the
contract. A claim arising under the contract, unlike a
claim relating to the contract, is a claim that can be
resolved under a contract clause that provides for
relief sought by the claimant. A voucher, invoice, or
routine request for payment that is not in dispute
submitted is not a claim. The submission may be
converted to a claim by complying with the
of this clause, if it is disputed either as to Lability or
amount or is not acted upon in a reasonable time.
The Contractor shall include in the proposal its request
Labor Standards - Davis Bacon and Related Acts,
all disputes arising under or relating to this contract,
including any claims for damages for the alleged
thereof which are not disposed of by agreement,
The Contracting Officer shall act on proposals within
(c) All claims by the Contractor shall be made in writing
submitted to the Contracting Officer for a written
A claim by the PHA against the Contractor shall be
subject to a written decision by the Contracting
(d) The Contracting Officer shall, within 60 (unless
indicated) days after receipt of the request, decide
claim or notify the Contractor of the date by which the
decision will be made.
(e) The Contracting Officer's decision shall be final unless
30. Suspension of Work
(a)
mediator or arbitrator, or (3) files suit in a court of
writing to suspend, delay, or interrupt all or any part of the
within
work of this contract for the period of time that the
the
Contracting Officer determines appropriate for the
convenience of the PHA.
performance
(b)
anof this contract, pending final resolution of any request for
unreasonable period of time, suspended, delayed, or
relating to
interrupted (1) by an act of the Contracting Officer in the
administration of this contract, or (2) by the Contracting
Officer's failure to act within the time specified (or within a
reasonable time if not specified) in this contract an
adjustment shall be made for any increase in the cost of
performance of the contract (excluding profit) necessarily
work, or
caused by such unreasonable suspension, delay, or
will
interruption and the contract modified in writing
accordingly. However, no adjustment shall be made
complete
under this clause for any suspension. delay, or
may, by
interruption to the extent that performance would have
to
the Contractor (1) appeals in writing to a higher level
in
the PHA in accordance with the PHA's policy and
procedures, (2) refers the appeal to an independent
The Contracting Officer may order the Contractor in
competent jurisdiction. Such appeal must be made
(30 unless otherwise indicated) days after receipt of
Contracting Officer's decision.
(f) The Contractor shall proceed diligently with
If the performance of all or any part of the work is, for
relief, claim, appeal, or action arising under or
the contract, and comply with any decision of the
Contracting Officer.
32. Default
(a) If the Contractor refuses or fails to prosecute the
any separable part thereof, with the diligence that
insure its completion within the time specified in this
contract, or any extension thereof, or fails to
said work within this time, the Contracting Officer
written notice to the Contractor, terminate the right
Previous editions are obsolete Page 11 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
proceed with the work (or separable part of the work) that completion of the work together with any increased
costs
has been delayed. In this event, the PHA may take over
occasioned the PHA in completing the work,
the work and complete it, by contract or otherwise, and
(c) If the PHA does not terminate the Contractor's right
to
may take possession of and use any materials,
proceed, the resulting damage will consist of
liquidated
equipment, and plant on the work site necessary for
damages until the work is completed or
accepted. completing the work. The Contractor and its sureties
shall
be liable for any damage to the PHA resulting from the
34. Termination for
Convenience Contractor's refusal or failure to complete the work within
the specified time, whether or not the Contractor's right to
(a) The Contracting Officer may terminate this contract
in
proceed with the work is terminated. This liability includes
whole, or in part, whenever the Contracting Officer
any increased costs incurred by the PHA in completing
determines that such termination is in the best
interest of
the work.
(b) The Contractor's right to proceed shall not be terminated
or the Contractor charged with damages under this
clause if —
upon
(1) The delay in completing the work arises from
unforeseeable causes beyond the control and without
the fault or negligence of the Contractor. Examples of
Contractor
such causes include (i) acts of God, or of the public
enemy, (ii) acts of the PHA or other governmental
entity in either its sovereign or contractual capacity,
cost of
(iii) acts of another contractor in the performance of a
total
contract with the PHA, (iv) fires, (v) floods, NO
Contractor; (2)
epidemics, (vii) quarantine restrictions, (viii) strikes.
(ix) freight embargoes, (x) unusually severe weather,
orders for
or (xi) delays of subcontractors or suppliers at any tier
to
arising from unforeseeable causes beyond the control
the
and without the fault or negligence of both the
Contractor and the subcontractors or suppliers, and
and
(2) The Contractor, within days (10 days unless otherwise
or
indicated) from the beginning of such delay (unless
extended by the Contracting Officer) notifies the
cost of
Contracting Officer in writing of the causes of delay.
to
The Contracting Officer shall ascertain the facts and
PHA;
the extent of the delay. If, in the judgment of the
on the
Contracting Officer, the findings of fact warrant such
action. time for completing the work shall be extended
claim
by written modification to the contract. The findings of
the Contracting Officer shall be reduced to a written
decision which shall be subject to the provisions of
the Disputes clause of this contract.
clause of
(c) If, after termination of the Contractor's right to proceed, it
is determined that the Contractor was not in default, or
that the delay was excusable, the rights and obligations
of the parties will be the same as if the termination had
been for convenience of the PHA.
interest in
the PHA. Any such termination shall be effected by
delivery to the Contractor of a Notice of Termination
specifying the extent to which the performance of the
work under the contract is terminated, and the date
which such termination becomes effective.
(b) If the performance of the work is terminated, either in
whole or in part, the PHA shall be liable to the
for reasonable and proper costs resulting from such
termination upon the receipt by the PHA of a properly
presented claim setting out in detail: (1) the total
the work performed to date of termination less the
amount of contract payments made to the
the cost (including reasonable profit) of settling and
paying claims under subcontracts and material
work performed and materials and supplies delivered
the site, payment for which has not been made by
PHA to the Contractor or by the Contractor to the
subcontractor or supplier; (3) the cost of preserving
protecting the work already performed until the PHA
assignee takes possession thereof or assumes
responsibility therefore; (4) the actual or estimated
legal and accounting services reasonably necessary
prepare and present the termination claim to the
and (5) an amount constituting a reasonable profit
value of the work performed by the Contractor.
(c) The Contracting Officer will act on the Contractor's
within days (60 days unless otherwise indicated) of
receipt of the Contractor's claim.
(d) Any disputes with regard to this clause are expressly
made subject to the provisions of the Disputes
this contract.
35. Assignment of Contract
The Contractor shall not assign or transfer any
this contract; except that claims for monies due or
to
33. Liquidated Damages become due from the PHA under the contract may
be
assigned to a bank, trust company, or other financial
(a) If the Contractor fails to complete the work within the time
specified in the contract, or any extension, as specified in
the clause entitled Default of this contract, the Contractor
contract
shall pay to the PHA as liquidated damages, the sum of
remaining
$ Contracting Officer insert amount] for
each day of delay. If different completion dates are
specified in the contract for separate parts or stages of the
work, the amount of liquidated damages shall be
assessed on those parts or stages which are delayed. To
the extent that the Contractor's delay or nonperformance
is excused under another clause in this contract,
of
liquidated damages shall not be due the PHA. The
and
Contractor remains liable for damages caused other than
by delay.
or
(b) If the PHA terminates the Contractor's right to proceed,
the resulting damage will consist of liquidated damages
single
until such reasonable time as may be required for final
less
institution. Such assignments of claims shall only be
made with the written concurrence of the Contracting
Officer. If the Contractor is a partnership, this
shall inure to the benefit of the surviving or
member(s) of such partnership as approved by the
Contracting Officer,
36. Insurance
(a) Before commencing work, the Contractor and each
subcontractor shall furnish the PHA with certificates
insurance showing the following insurance is in force
will insure all operations under the Contract!
(1) Workers' Compensation, in accordance with state
Territorial Workers' Compensation laws.
(2) Commercial General Liability with a combined
limit for bodily injury and property damage of not
than $ [Contracting Officer insert
amount]
Previous editions are obsolete Page 12 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
per occurrence to protect the Contractor and each
Fi rm
subcontractor against claims for bodily injury or death
and damage to the property of others. This shall cover
the use of all equipment, hoists, and vehicles
on the site(s) not covered by Automobile Liability
with
under (3) below. If the Contractor has a "claims made"
policy, then the following additional requirements
apply: the policy must provide a "retroactive date"
contracting
which must be on or before the
execution date of the Contract; and the extended
this
reporting period may not be less than five years
following the completion date of the Contract.
acts or
(3) Automobile Liability on owned and non -owned motor
vehicles used on the site(s) or in connection therewith
or
for a combined single limit for bodily injury and
property damage of not less than $
[Contracting Officer insert amount] per occurrence.
(b) Before commencing work, the Contractor shall furnish the
PHA with a certificate of insurance evidencing that
applicable
Builder's Risk (fire and extended coverage) Insurance on
all work in place and/or materials stored at the building
site(s), including foundations and building equipment, is
and
in force. The Builder's Risk Insurance shall be for the
HUD. benefit of the Contractor and the PHA as their interests
may appear and each shall be named in the policy or
Firms,
�
olici s as an insured. The Contractor in installing urpelus
equipment supplied by the PHA shall carry insurance on
such equipment from the time the Contractor takes
possession thereof until the Contract work is accepted by
ensure
the PHA. The Builder's Risk Insurance need not be
to
carried on excavations, piers, footings, or foundations
business
until such time as work on the superstructure is started. It
need not be carried on landscape work. Policies
shall furnish coverage at all times for the full cash
value of all completed construction, as well as
materials in place and/or stored at the site(s).
whether or not partial payment has been made by
the PHA. The Contractor may terminate this
insurance on buildings as of the date taken over
for occupancy by the PHA. The Contractor is not
required to carry Builder's Risk Insurance for
modernization work which does not involve
structural alterations or additions and where the
PHA's existing fire and extended coverage policy
can be endorsed to include such work.
(c) All insurance shall be carried with companies which
are financially responsible and admitted to do
business in the State in which the project is
located. If any such insurance is due to expire
during the construction period, the Contractor
(including subcontractors, as applicable) shall not
permit the coverage to lapse and shall furnish
evidence of coverage to the Contracting Officer. All
certificates of insurance, as evidence of coverage,
shall provide that no coverage may be canceled or
non -renewed by the insurance company until at
least 30 days prior written notice has been given to
the Contracting Officer.
(2) "Subcontractor" means any supplier, vendor, or
that furnishes supplies, materials, equipment, or
services to or for the Contractor or another
subcontractor.
(b) The Contractor shall not enter into any subcontract
any subcontractor who has been temporarily denied
participation in a HUD program or who has been
suspended or debarred from participating in
programs by any agency of the United States
Government or of the state in which the work under
contract is to be performed.
(c) The Contractor shall be as fully responsible for the
omissions of its subcontractors, and of persons either
directly or indirectly employed by them as for the acts
omissions of persons directly employed by the
_Contractor.
(d) The Contractor shall insert appropriate clauses in all
subcontracts to bind subcontractors to the terms and
conditions of this contract insofar as they are
to the work of subcontractors.
(e) Nothing contained in this contract shall create any
contractual relationship between any subcontractor
the PHA or between the subcontractor and
38. Subcontracting with Small and Minority
Women's Business Enterprise, and Labor
Area Firms
The Contractor shall take the following steps to
that, whenever possible, subcontracts are awarded
small business firms, minority firms, women's
enterprises, and labor surplus area firms:
(a) Definitions. As used in this contract -
(1) "Subcontract" means any contract, purchase
order, or other purchase agreement, including
modifications and change orders to the
foregoing, entered into by a subcontractor to
furnish supplies, materials, equipment, and
services for the performance of the prime
contract or a subcontract.
37. Subcontracts
(a) Placing qualified small and minority businesses
and women's business enterprises on solicitation
lists;
(b) Ensuring that small and minority businesses and
women's business enterprises are solicited whenever
they are potential sources;
(c)Dividing total requirements, when economically
feasible, into smaller tasks or quantities to permit
maximum participation by small and minority
businesses and women's business enterprises;
(d) Establishing delivery schedules, where the
requirements of the contract permit, which encourage
participation by small and minority businesses and
women's business enterprises; and
(e) Using the services and assistance of the U.S.
Small Business Administration, the Minority
Business Development Agency of the U.S.
Department of Commerce, and State and local
governmental small business agencies.
Previous editions are obsolete
(1/2014)
Replaces form HUD-5370-A
39. Equal Employment Opportunity
During the performance of this contract, the
Contractor/ Seller agrees as follows;
(a) The Contractor/Seller shall not discriminate against
any employee or applicant for employment because of of
race color, religion, sex, sexual orientation, gender identity,
disability, or national origin.
(b) The Contractor/Seller shall take affirmative action to
ensure that applicants are employed, and that
employees
are treated during employment without regard to their
race, color, religion, sex, sexual orientation, gender identity,
disability, or national origin. Such action shall
include, but not be limited to, (1) employment, (2)
upgrading demotion, (4) transfer, (5) recruitment or
recruitment advertising, (6) layoff or
termination, (7) rates of pay or other forms of
compensation, and (8) selection for
trainino,including apprenticeship
Page 13 of 19 form HUD-5370
(c) The Contractor/Seller agrees to post in conspicuous
places available to employees and applicants for
employment the notices to be provided by the
Contracting Officer setting forth the provisions of this
nondiscrimination clause.
(d) The Contractor/Seller shall, in all solicitations or
advertisements for employees placed by or on behalf of
the Contractor/Seller, state that all qualified applicants
will receive consideration for employment without
regard to race, color, religion, sex, or national origin.
(e) The Contractor/Seller shall send, to each labor union
or representative of workers with which it has a
collective bargaining agreement or other contract or
understanding, the notice to be provided by the
Contracting Officer advising the labor union or workers'
representative of the Contractor's commitments under
this clause, and post copies of the notice in
conspicuous places available to employees and
applicants for employment.
(f) The Contractor/Seller shall comply with Executive
Order 11246, as amended, and the rules, regulations,
and orders of the Secretary of Labor.
(g) The Contractor/Seller shall furnish all information and
reports required by Executive Order 11246, as amended
Section 503 of the Rehabilitation Act of 1973, as
amended, and by rules, regulations, and orders of the
Secretary of Labor, or pursuant thereto. The
Contractor/Seller shall permit
access to its books, records, and accounts by the
Secretary of Labor for purposes of investigation to
ascertain compliance with such rules, regulations,
and
orders.
(h) In the event of a that the Contractor/Seller is in non-
compliance with the nondiscrimination clauses of this contract or
with any of such rules, regulations, or orders, this contract may
be canceled, terminated or suspended in whole or in part and the
contractor/seller may be declared ineligible for further
Government contracts in accordance with procedures authorized
in Executive Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in
Executive Order 11246 of September 24, 1965, or by rule,
regulation, or order of the Secretary of Labor, or as otherwise
provided by law.
(i)The contractor/seller will include the provisions of
paragraphs (a) through (h) in every subcontract or purchase
order unless exempted by rules, regulations, or orders of the
Secretary of Labor issued pursuant to section 204 of Executive
Order 11246 of September 24, 1965, so that such provisions
will be binding upon each sub[contractor/seller) or vendor. The
[contractor/seller] will take such action with respect to any
subcontract or purchase order as may be directed by the
Secretary of Labor as a means of enforcing such provisions in
cluding sanctions for noncompliance: Provided, however, that
in the event the [contractorlseller] becornes involved in, or is
threatened with, litigation with a subcontractor or vendor as a
result of such direction, the [contractor/seller] may request the
United States to enter into such litigation to protect the
interests of the United States.
(j) Compliance with the requirements of this clause
shall be to the maximum extent consistent with,
but not in derogation of, compliance with section
7(b) of the Indian Self -Determination and
Education Assistance Act and the Indian
Preference clause of this contract.
40. Employment, Training, and Contracting
Opportunities for Low -Income Persons,
Section 3 of the Housing and Urban
Development Act of 1968.
(a) The work to be performed under this contract is
subject to the requirements of Section 3 of the Housing
and Urban Development Act of 1968, as amended, 12
U.S.C. 1701u (section 3). The purpose of section 3 is to
ensure that employment and other economic
opportunities generated by HUD assistance or HUD -
assisted projects covered by Section 3, shall, to the
greatest extent feasible, be directed to low- and very low-
income persons, particularly persons who are recipients
of HUD assistance for
housing.
(b) The parties to this contract agree to comply with
HUD's regulations in 24 CFR Part 75, which implement
Section 3. As evidenced by their execution of this
contract, the parties to this contract certify that they
are under no contractual or other impediment that
would prevent them from complying with the Part 75
regulations.
(c) The contractor agrees to send to each labor
organization or representative of workers with which
the contractor has a collective bargaining agreement or
other understanding, if any, a notice advising the labor
organization or workers' representative of the
contractor's commitments under this section 3 clause
and will post copies of the notice in conspicuous places
at the work site where both employees and applicants
for training and employment positions can see the
notice. The notice shall describe the Section 3
prioritization requirements and shall state the minimurn
perof labor hour requirements established in the
Benchmark Notice centages (). FR-6085-N-04
(d)
(e) The contractor agrees to include this section 3
clause in every subcontract subject to compliance with
regulations in 24 CFR Part 75, and agrees to take
appropriate action, as provided in an applicable
provision of the subcontract or in this section 3 clause,
upon a finding that the subcontractor is in violation of
the regulations in 24 CFR Part 75. The contractor will
not subcontract with any subcontractor where the
contractor has notice or knowledge that the
subcontractor has been found in violation of the
regulations in 24 CFR Part 75.
(f)
(g) Noncompliance with HUD's regulations in 24 CFR
Part 75 may result in sanctions, termination of this
contract for default, and debarment or suspension from
future HUD assisted contracts.
(h) Contracts, subcontracts, grants, or subgrants
subject to
Section 7(b) of the Indian Self -Determination and
Education Assistance Act (25 U.S.C. 5307(b))
organizations
Previous editions are obsolete Page 14 of 19 form HUD-5370
(1/2014)
Replaces form HUD-5370-A
41. Interest of Members of Congress
No member of or delegate to the Congress of the United
contract,
States of America shall be admitted to any share or part of
this contract or to any benefit that may arise therefrom.
papers,
42. Interest of Members, Officers, or Employees and
examination,
Former Member
(a) The PHA, HUD, or Comptroller General of the United
States, or any of their duly authorized
representatives
shall, until 3 years after final payment under this
have access to and the right to examine any of the
Contractor's directly pertinent books, documents,
or other records involving transactions related to this
contract for the purpose of making audit,
s, Officers, or Employees excerpts, and transcriptions.
(b) The Contractor agrees to include in first -tier subcontracts
No member, officer, or employee of the PHA, no member under this contract a clause substantially the same
as
of the governing body of the locality in which the project
is situated, no member of the governing body of the
locality in which the PHA was activated, and no other
public official of such locality or localities who exercises
(a)
any functions or responsibilities with respect to the
under the
project, shall, during his or her tenure, or for one year
settlement
thereafter, have any interest, direct or indirect, in this
contract, or
contract or the proceeds thereof,
PHA,
paragraph (a) above. "Subcontract," as used in this
clause, excludes purchase orders not exceeding
$10,000.
(c) The periods of access and examination in paragraphs
and (b) above for records relating to (1) appeals
Disputes clause of this contract, (2) litigation or
of claims arising from the performance of this
(3) costs and expenses of this contract to which the
HUD, or Comptroller General or any of their duly
43. Limitations on Payments made to Influence Certain authorized representatives has taken exception shall
Federal Financial Transactions continue until disposition of such appeals, litigation,
claims, or exceptions.
(a) The Contractor agrees to comply with Section 1352 of
Title 31, United States Code which prohibits the use of 46
Related Acts Federal appropriated funds to pay any person for
influencing or attempting to influence an officer or
the
employee of any agency. a Member of Congress, and
shall
officer or employee of Congress, or an employee of a
Member of Congress in connection with any of the
following covered Federal actions: the awarding of any
Federal contract; the making of any Federal grant; the
making of any Federal loan; the entering into of any
cooperative agreement; or the modification of any
not
Federal contract, grant, loan, or cooperative agreement
(b) The Contractor further agrees to comply with the
payroll
requirement of the Act to furnish a disclosure (OMB
the
Standard Form LLL, Disclosure of Lobbying Activities) if
Part
any funds other than Federal appropriated funds
benefits
(including profit or fee received under a covered Federal
transaction) have been paid, or will be paid, to any person
the
for influencing or attempting to influence an officer or
is
employee of any agency, a Member of Congress, an
of
officer or employee of Congress, or an employee of a
exist
Member of Congress in connection with a Federal
contract, grant, loan, or cooperative agreement.
44. Royalties and Patents
or
Labor Standards - Davis -Bacon and
If the total amount of this contract exceeds $2,000.
Federal labor standards set forth in the clause below
apply to the development or construction work to be
performed under the contract.
(a) Minimum Wages.
(1) All laborers and mechanics employed under this
contract in the development or construction of the
project(s) involved will be paid unconditionally and
less often than once a week, and without subsequent
deduction or rebate on any account (except such
deductions as are permitted by regulations issued by
Secretary of Labor under the Copeland Act (29 CFR
3)), the full amount of wages and bona fide fringe
(or cash equivalents thereof) due at time of payment
computed at rates not less than those contained in
wage determination of the Secretary of Labor which
attached hereto and made a part hereof, regardless
any contractual relationship which may be alleged to
between the Contractor and such laborers and
mechanics. Contributions made or costs reasonably
anticipated for bona fide fringe benefits under
Section
1(b)(2) of the Davis -Bacon Act on behalf of laborers
The Contractor shall pay all royalties and license fees. It
shall defend all suits or claims for infringement of any
costs
patent rights and shall save the PHA harmless from loss
often
on account thereof; except that the PHA shall be
which
responsible for all such loss when a particular design,
process or the product of a particular manufacturer or
manufacturers is specified and the Contractor has no
the
reason to believe that the specified design, process, or
wage
product is an infringement. If, however, the Contractor
has reason to believe that any design, process or product
in
specified is an infringement of a patent, the Contractor
shall promptly notify the Contracting Officer. Failure to
give such notice shall make the Contractor responsible
classification
for resultant loss.
the
mechanics are considered wages paid to such
laborers or
mechanics, subject to the provisions of 29 CFR
5.5(a)(1)(iv); also, regular contributions made or
incurred for more than a weekly period (but not less
than quarterly) under plans, funds, or programs
cover the regular weekly period, are deemed to be
constructively made or incurred during such weekly
period. Such laborers and mechanics shall be paid
appropriate wage rate and fringe benefits in the
determination for the classification of work actually
performed, without regard to skill, except as provided
29 CFR 5.5(a)(4). laborers or mechanics performing
work in more than one classification may be
compensated at the rate specified for each
for the time actually worked therein; provided, that
employer's payroll records accurately set forth the
time
45. Examination and Retention of Contractor's Recordsspent in each classification in which work is
performed. The wage determination (including any
additional classification and wage rates conformed
under 29 CFR 5.5(a)(1)(ii) and the Davis -Bacon
poster (WH-1321) shall
Previous editions are obsolete Page 15 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
be posted at all times by the Contractor and its
subcontractors at the site of the work in a prominent and
accessible place where it can be easily seen by the
workers.
that
(2) (i) Any class of laborers or mechanics, including
have
helpers, which is not listed in the wage
determination and which is to be employed under
assets
the contract shall be classified in conformance with
the wage determination. HUD shall approve an
additional classification and wage rate and fringe
its
benefits therefor only when all the following criteria
have been met: (A) The work to be performed by
or
the classification requested is not performed by a
classification in the wage determination; and (B)
The classification is utilized in the area by the
construction industry; and (C) The proposed wage
rate, including any bona fide fringe benefits, bears
a reasonable relationship to the wage rates
contained in the wage
determination.
trainees,
(ii) If the Contractor and the laborers and mechanics
to be employed in the classification (if known), or
the
their representatives, and HUD or its designee
agree on the classification and wage rate
helper,
(including the amount designated for fringe
development
benefits where appropriate), a report of the action
the
taken shall be sent by HUD or its designee to the
notice to
Administrator of the Wage and Hour Division,
necessary to
Employee Standards Administration, U.S.
advance,
Department of Labor, Washington, DC 20210.
ceased.
The Administrator, or an authorized
representative, will approve. modify, or disapprove
on
every additional classification action within 30 days
of receipt and so advise HUD or its designee or will
notify HUD or its designee within the 30-day period
that additional time is necessary.
be
(iii) In the event the Contractor, the laborers or
the
mechanics to be employed in the classification or
their representatives. and HUD or its designee do
in
not agree on the proposed classification and wage
Such
rate (including the amount designated for fringe
social
benefits, where appropriate), HUD or its designee
shall refer the questions, including the views of all
interested parties and the recommendation of HUD
anticipated
or its designee, to the Administrator of the Wage
and Hour Division for determination. The
(B) of
Administrator, or an authorized representative, will
issue a determination within 30 days of receipt and
so advise HUD or its designee or will notify HUD or
its designee within the 30-day period that
additional time is necessary.
amount of any costs reasonably anticipated in
providing bona fide fringe benefits under a plan or
program; provided. that the Secretary of Labor has
found, upon the written request of the Contractor,
the applicable standards of the Davis -Bacon Act
been met. The Secretary of Labor may require the
Contractor to set aside in a separate account
for the meeting of obligations under the plan or
program.
(b) Withholding of funds. HUD or its designee shall, upon
own action or upon written request of an authorized
representative of the Department of Labor, withhold
cause to be withheld from the Contractor under this
contract or any other Federal contract with the same
prime Contractor, or any other Federally -assisted
contract subject to Davis -Bacon prevailing wage
requirements, which is held by the same prime
Contractor, so much of the accrued payments or
advances as may be considered necessary to pay
laborers and mechanics, including apprentices,
and helpers, employed by the Contractor or any
subcontractor the full amount of wages required by
contract. In the event of failure to pay any laborer or
mechanic, including any apprentice, trainee, or
employed or working in the construction or
of the project, all or part of the wages required by
contract, HUD or its designee may, after written
the Contractor, take such action as may be
cause the suspension of any further payment,
or guarantee of funds until such violations have
HUD or its designee may, after written notice to the
Contractor, disburse such amounts withheld for and
account of the Contractor or subcontractor to the
respective employees to whom they are due.
(c) Payrolls and basic records.
(1) Payrolls and basic records relating thereto shall
maintained by the Contractor during the course of
work and preserved for a period of three years
thereafter for all laborers and mechanics working
the construction or development of the project.
records shall contain the name, address, and
security number of each such worker, his or her
correct classification, hourly rates of wages paid
(including rates of contributions or costs
for bona fide fringe benefits or cash equivalents
thereof of the types described in section 1(b)(2)
the Davis -Bacon Act), daily and weekly number of
hours worked, deductions made, and actual wages
paid. Whenever the Secretary of Labor has found,
under 29 CFR 5.5(a)(1)(iv), that the wages of any
laborer or mechanic include the amount of costs
(MThe wage rate (including fringe benefits where
a
appropriate) determined pursuant to
the
subparagraphs (a)(2)(ii) or (iii) of this clause shall
be paid to all workers performing work in the
provide
classification under this contract from the first day
program
on which work is performed in classification.
(3) Whenever the minimum wage rate prescribed in the
contract for a class of laborers or mechanics includes
a fringe benefit which is not expressed as an hourly
incurred
rate, the Contractor shall either pay the benefit as
stated in the wage determination or shall pay another
bona fide fringe benefit or an hourly cash equivalent
of
thereof.
trainee
(4) If the Contractor does not make payments to a trustee
or other third person, the Contractor may consider as
in
part of the wages of any laborer or mechanic the
Previous editions are obsolete Page 16 of 19
Replaces form HUD-5370-A
reasonably anticipated in providing benefits under
plan or program described in section 1(b)(2)(B) of
Davis -Bacon Act, the Contractor shall maintain
records which show that the commitment to
such benefits is enforceable, that the plan or
is financially responsible, and that the plan or
program has been communicated in writing to the
laborers or mechanics affected, and records which
show the costs anticipated or the actual cost
in providing such benefits. Contractors employing
apprentices or trainees under approved programs
shall maintain written evidence of the registration
apprenticeship programs and certification of
programs, the registration of the apprentices and
trainees. and the ratios and wage rates prescribed
the applicable programs
form HUD-5370 (1/2014)
(2) (i) The Contractor shall submit weekly for each week
in which any contract work is performed a copy of
all payrolls to the Contracting Officer for
work at
transmission to HUD or its designee. The payrolls
they
submitted shall set out accurately and completely
and
all of the information required to be maintained
apprenticeship
under subparagraph (c)(1) of this clause. This
information may be submitted in any form desired.
Optional Form WH-347 (Federal Stock Number
and
029-005-00014-1) is available for this purpose and
may be purchased from the Superintendent of
a
Documents, U.S. Government Printing Office,
Washington, D.C. 20402. The Contractor is
such an
responsible for the submission of copies of
payrolls by all subcontractors. (Approved by the
certified
Office of Management and Budget under OMB
(where
Control Number 1214-0149.)
(ii) Each payroll submitted shall be accompanied by a
of
"Statement of Compliance," signed by the
craft
Contractor or subcontractor or his or her agent
who pays or supervises the payment of the
force
persons employed under the contract and shall
on a
certify the following:
(A) That the payroll for the payroll period contains
the information required to be maintained
applicable
under paragraph (c) (1) of this clause and that
such information is correct and complete:
addition,
(B) That each laborer or mechanic (including each
helper, apprentice, and trainee) employed on
the contract during the payroll period has been
paid the full weekly wages earned, without
rebate, either directly or indirectly, and that no
performing
deductions have been made either directly or
that in
indirectly from the full wages earned, other
wage
than permissible deductions as set forth in 29
journeyman's
CFR Part 3: and
(C) That each laborer or mechanic has been paid
observed.
not less than the applicable wage rates and
rate
fringe benefits or cash equivalents for the
apprentice's
classification of work performed, as specified
the
in the applicable wage determination
incorporated into the contract.
fringe
(iii) The weekly submission of a properly executed
certification set forth on the reverse side of
program
Optional Form WH-347 shall satisfy the
be
make such records available may be grounds for
debarment action pursuant to 29 CFR 5.12.
(d) (1) Apprentices. Apprentices will be permitted to
less than the predetermined rate for the work
performed when they are employed pursuant to
individually registered in a bona fide
program registered with the U.S. Department of
Labor, Employment and Training Administration,
Office of Apprenticeship and Training, Employer
Labor Services (OATELS), or with a State
Apprenticeship Agency recognized by OATELS, or if
person is employed in his or her first 90 days of
probationary employment as an apprentice in
apprenticeship program, who is not individually
registered in the prograrn, but who has been
by OATELS or a State Apprenticeship Agency
appropriate) to be eligible for probationary
employment as an apprentice. The allowable ratio
apprentices to journeymen on the job site in any
classification shall not be greater than the ratio
permitted to the Contractor as to the entire work
under the registered program. Any worker listed
payroll at an apprentice wage rate, who is not
registered or otherwise employed as stated in this
paragraph, shall be paid not less than the
wage rate on the wage determination for the
classification of work actually per -formed. In
any apprentice performing work on the job site in
excess of the ratio permitted under the registered
program shall be paid not less than the applicable
wage rate on the wage determination for the work
actually performed. Where a contractor is
construction on a project in a locality other than
which its program is registered, the ratios and
rates (expressed in percentages of the
hourly rate) specified in the Contractor's or
subcontractor's registered program shall be
Every apprentice must be paid at not less than the
specified in the registered program for the
level of progress, expressed as a percentage of
journeyman hourly rate specified in the applicable
wage determination. Apprentices shall be paid
benefits in accordance with the provisions of the
apprenticeship program. If the apprenticeship
does not specify fringe benefits, apprentices must
requirements for submission of the "Statement of
Compliance" required by subparagraph (c)(2)(0) of
classification. If
this clause.
(iv) The falsification of any of the above certifications
the
may subject the Contractor or subcontractor to civil
be
or criminal prosecution under Section 1001 of Title
18 and Section 3729 of Title 31 of the United
States Code.
(3) The Contractor or subcontractor shall make the
longer
records required under subparagraph (c)(1) available
for inspection, copying, or transcription by authorized
performed
representatives of HUD or its designee, the
Contracting Officer, or the Department of Labor and
shall permit such representatives to interview
employees during working hours on the job. If the
the
Contractor or subcontractor fails to submit the
they
required records or to make there available, HUD or
registered in
its designee may, after written notice to the
Contractor, take such action as may be necessary to
cause the suspension of any further payment,
advance, or guarantee of funds. Furthermore, failure
on
to submit the required records upon request or to
under
paid the full amount of fringe benefits listed on the
wage determination for the applicable
the Administrator of the Wage and Hour Division
determines that a different practice prevails for
applicable apprentice classification, fringes shall
paid in accordance with that determination. In the
event OATELS, or a State Apprenticeship Agency
recognized by OATELS, withdraws approval of an
apprenticeship program, the Contractor will no
be permitted to utilize apprentices at less than the
applicable predetermined rate for the work
until an acceptable
program is approved.
(2) Trainees. Except as provided in 29 CFR 5.16,
trainees will not be permitted to work at less than
predetermined rate for the work performed unless
are employed pursuant to and individually
a program which has received prior approval,
evidenced by formal certification by the U.S.
Department of Labor, Employment and Training
Administration. The ratio of trainees to journeymen
the job site shall not be greater than permitted
Previous editions are obsolete Page 17 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
the plan approved by the Employment and Training
any
Administration. Every trainee must be paid at not less
States
than the rate specified in the approved program for the
the
trainee's level of progress, expressed as a percentage
of the journeyman hourly rate specified in the
prescribed
applicable wage determination. Trainees shall be paid
fringe benefits in accordance with the provisions of the
used
trainee program. If the trainee program does not
"mechanics"
mention fringe benefits, trainees shall be paid the full
amount of fringe benefits listed in the wage
determination unless the Administrator of the Wage
contract
and Hour Division determines that there is an
employment of
apprenticeship program associated with the
corresponding journeyman wage rate in the wage
determination which provides for less than full fringe
is
benefits for apprentices. Any employee listed on the
hours
payroll at a trainee rate who is not registered and
participating in a training plan approved by the
and
Employment and Training Administration shall be paid
not less than the applicable wage rate in the wage
determination for the classification of work actually
performed. In addition, any trainee performing work on
the job site in excess of the ratio permitted under the
registered program shall be paid not less than the
applicable wage rate in the wage determination for the
work actually performed. In the event the Employment
and Training Administration withdraws approval of a
(in
training program, the Contractor will no longer be
District
permitted to utilize trainees at less than the applicable
such
predetermined rate for the work performed
until an acceptable program is approved.
(3) Equal employment opportunity. The utilization of
watchmen
apprentices, trainees, and journeymen under this
provisions
clause shall be in conformity with the equal
the
employment opportunity requirements of Executive
Order 11246, as amended. and 29 CFR Part 30.
excess
(e) Compliance with Copeland Act requirements. The
Contractor shall comply with the requirements of 29 CFR
Part 3, which are hereby incorporated by reference in this
contract.
https://www.dol.gov/whd/
(f) Contract termination; debarment. A breach of this contract
clause may be grounds for termination of the contract and
for debarment as a Contractor and a subcontractor as
provided in 29 CFR 5.12.
withhold or
(g) Compliance with Davis -Bacon and related Act
requirements. All rulings and interpretations of the Davis -
Bacon and related Acts contained in 29 CFR Parts 1, 3,
Federal
(2) No part of this contract shall be subcontracted to
person or firm ineligible for award of a United
Government contract by virtue of section 3(a) of
Davis -Bacon Act or 29 CFR 5.12(a)(1).
(3) The penalty for making false statements is
in the U. S. Criminal Code, 18 U.S.C. 1001.
(j) Contract Work Hours and Safety Standards Act. As
in this paragraph, the terms "laborers" and
include watchmen and guards.
(1) Overtime requirements. No contractor or
subcontractor contracting for any part of the
work which may require or involve the
laborers or mechanics, including watchmen and
guards, shall require or permit any such laborer or
mechanic in any workweek in which the individual
employed on such work to work in excess of 40
in such workweek unless such laborer or mechanic
receives compensation at a rate not less than one
one-half times the basic rate of pay for all hours
worked in excess of 40 hours in such workweek.
(2) Violation; liability for unpaid wages; liquidated
damages. In the event of any violation of the
provisions set forth in subparagraph (j)(1) of this
clause, the Contractor and any subcontractor -
responsible therefor shall be liable for the unpaid
wages. In addition, such Contractor and
subcontractor shall be liable to the United States
the case of work done under contract for the
of Columbia or a territory, to such District or to
territory), for liquidated damages. Such liquidated
damages shall be computed with respect to each
individual laborer or mechanic (including
and guards) employed in violation of the
set forth in subparagraph (j)(1) of this clause, in
sum of $27 for each calendar day on which such
individual was required or permitted to work in
of the standard workweek of 40 hours without
payment of the overtime wages required by
provisions set forth in subparagraph (j)(1) of this
clause. DOL posts current fines at:
govcontracts/cwhssa. htinkm p
(3) Withholding for unpaid wages and liquidated
damages. HUD or its designee shall upon its own
action or upon written request of an authorized
representative of the Department of Labor
cause to be withheld, from any moneys payable on
account of work performed by the Contractor or
subcontractor under any such contract or any
and 5 are herein incorporated by reference in this
other -
contract,
Contract
(h) Disputes concerning labor standards. Disputes arising out
of the labor standards provisions of this clause shall not
be
be subject to the general disputes clause of this contract.
liabilities of
Such disputes shall be resolved in accordance with the
procedures of the Department of Labor set forth in 29
provisions
CFR Parts 5, 6, and 7. Disputes within the meaning of
this clause include disputes between the Contractor (or
insert
any of its subcontractors) and the PHA, HUD, the U.S.
this
Department of Labor, or the employees or their
designee
representatives.
(i) Certification of eligibility.
(1) By entering into this contract, the Contractor certifies
that neither it (nor he or she) nor any person or firm
any
who has an interest in the Contractor's firm is a
these
person or firm ineligible to be awarded contracts by
the United States Government by virtue of section
3(a) of the Davis -Bacon Act or 29 CFR 5.12(a)(1).
contract with the same prime Contractor, or any
Federally -assisted contract subject to the
Work Hours and Safety Standards Act, which is held
by the same prime Contractor, such sums as may
determined to be necessary to satisfy any
such Contractor or subcontractor for unpaid wages
and liquidated damages as provided in the
set forth in subparagraph (j)(2) of this clause.
(k) Subcontracts. The Contractor or subcontractor shall
in any subcontracts all the provisions contained in
clause, and such other clauses as HUD or its
may by appropriate instructions require, and also a
clause requiring the subcontractors to include these
provisions in any lower tier subcontracts. The prime
Contractor shall be responsible for the compliance by
subcontractor or lower tier subcontractor with all
provisions.
Previous editions are obsolete Page 18 of 19 form HUD-5370 (112014)
Replaces form HUD-5370-A
47. Non -Federal Prevailing Wage Rates
(a) Any prevailing wage rate (including basic hourly rate and
any fringe benefits), determined under State or tribal law
to be prevailing, with respect to any employee in any
trade or position employed under the contract, is
inapplicable to the contract and shall not be enforced
against the Contractor or any subcontractor, with respect
to employees engaged under the contract whenever
such non -Federal prevailing wage rate exceeds:
(1) The applicable wage rate determined by the Secretary
of Labor pursuant to the Davis -Bacon Act (40 U.S.C.
3141 et seq.) to be prevailing in the locality with
respect to such trade;
(b) An applicable apprentice wage rate based thereon
specified in an apprenticeship program registered with
the U.S. Department of Labor (DOL) or a DOL-
recognized State Apprenticeship Agency; or
(c)An applicable trainee wage rate based thereon specified
in a DOL-certified trainee program.
48. Procurement of Recovered Materials.
(a) In accordance with Section 6002 of the Solid Waste
Disposal Act, as amended by the Resource Conservation
and Recovery Act, the Contractor shall procure items
designated in guidelines of the Environmental Protection
Agency (EPA) at 40 CFR Part 247 that contain the highest
percentage of recovered materials practicable, consistent
with maintaining a satisfactory level of competition, The
Contractor shall procure items designated in the EPA
guidelines that contain the highest percentage of
recovered materials practicable unless the Contractor
determines that such items: (1) are not reasonably
available in a reasonable period of time: (2) fail to meet
reasonable performance standards, which shall be
determined on the basis of the guidelines of the National
Institute of Standards and Technology, if applicable to the
item; or (3) are only available at an
unreasonable price.
(0) Paragraph (a) of this clause shall apply to items
purchased under this contract where: (1) the
Contractor purchases in excess of $10,000 of the item
under this contract; or (2) during the preceding
Federal fiscal year, the Contractor: (i) purchased any
amount of the items for use under a contract that was
funded with Federal appropriations and was with a
Federal agency or a State agency or agency of a
political subdivision of a State; and (ii) purchased a
total of in excess of 510,000 of the item both under
and outside that contract.
Previous editions are obsolete Page 19 of 19 form HUD-5370 (1/2014)
Replaces form HUD-5370-A
EXHIBIT F
BYRD AN H-LOBBYING AMFNDML:N I CI:R IIFICA I ION
Aereement for Professional Services. Page 16 Rev. 7.10.2026
CITY ()F 1)A)"T(.AN'\
n-,1V-!', 0 &x\ 4-14
BAYTOW Pa_ ,---rnx Texx773221-0424
Fxx
BYRD ANTI-LOBBYINGAAIENDME�T C ERTIFICATIO-N
Contra Ctors --A-ho apply or bi-cl for all a-'xartl of S 100.000 of iliore shi 11 filt- the recithrej c ti-tifjokition, Each
tier certifies to the her above that it vvill not aim! has nor used Federal appropriated Axis to pay any pemm,
or orgiLlizatioll for inflitelicin;' or attelliptirl.,g to infIti'mce in officcr or -:111ployeeof aliyag-tticy. a Member
of Congres5. officer or Cillployee of Collgreis. Or an Clilployee of IMelliber of (-ongre's in conlitctioll "vi-:11
obtaining any Federal comiocc. grant. or ally other anvard covered by :'I U.S.c. .Z, 1352.
Each tier shall also disclose any lobbying, ',vith ann-Federal filll(k that TAk-di Place ill Cot-ineCtioll xit.11
,-)I)- e C a lec froill tier to tier 111) to the recipient n 110 in
.iiiluig any Federal i--,vard. Stich disclostil- ; ill. f ol -rc I
turn bill fore, and the cti-rificariont, S) to the x.vardill? otgcilcy'
APPENT)IX A. 44 C.F.R. PART IS — CERTIFIC ATIO'.\ R.B-3.ARDING LOBBYING — REQUIR-ED
FOR C ONTRA( T%,
OVER S100.000 Ccricanonfior Cowracts, Graws. Loans, and Coopeonrive-4peeplifits
The undaQwd Mhfits. TO the best Of his or her 1jin,"Jed?t and belief. That:
20 No Federal- piqvimbied SO, have been paid of "ill be paid. by or oil behalf of the nndei-si=-qL.-d. to
any periion for Liffileliciag Or itteillphilrd I'l Liflaelict all officer or ellipIc"yee of an agalcy. a Nknib. of
ChngreiY an oh6cer oreiiiplo.,-ec of Coup-ei, or an crilployee of a Member of in ollne ti
c 11I
nth die awaxcling offally' Fed -oral con -Last. the making of alry Fedmal gmnL the nwkh4 of any Fedual
loam Aw enudrig Lao of any coopeiatim agreenlem, and the extensiom mnewal.
mntrldllitlaOr modification of arty Fedcral comma, gala. lomi. or cooperaii-vit agreellitnr
50 If alit' RM other than Woulappopimed WA Mv been laid or "A be paid io any pm son W
illflltt-licni-.z or aitelllptln to illf111'-1iQe nn officer v, of any il?eiicy. pi Menlbtr of('oiigrei all
Officer or enVloyee of Wapt", o, an empiope of a 1\1tillb-ti. of Coilgreii in Comilectioll ..vith rhli
Federal contract grant loan. of cooperative agreenlent. the Uriclempled S.1-11111 complete and Ilbnur
Standard Farm-LLL. -Disclomwe Form to Popmi Lobting7in accordance ivith its hi5nitedculs.
91 The tiiidei-iipled WA inTmi Ut lie -mvWpm ' 2e of tali certiScanon be included hi the award
doamwmi kw all sttb:ird� a-, all h;:rs (LICILI(ling stibconti-acti,, stib=,lan:+. ail,i colitr..Icts nimitr grala,
loans. an-1 cooperative agreemenm) and that Al RdmvcyhnB shall cern'- awl Move accoMogly.
This certificaiion is a inateri.al l'eJ)LtselHa-i0ll Of fact upon Midl rehmze no; placed "Ka dli; nanuctim)
"as nude or entered into. Siibnui i ion of 10 ceMminm k a prereltiAM TVJ m: king or emering Lao W
amnsaction Aposed by section 130. title 31- U.S. C'0d--- --k11Y P:13011 cc, file rlle re tt r q i - d
certification dial-1 be subj ect toll chi! peualq- of not less than S 10900 anti not iii'me thall S 14:1i).(11:10 f':'l- e".ch
inch failitre
Atueement for Professional Services. Page 17 Rev. 7.20.2026
GITY()ILBAYTOWN
BA1'TOW1' _.2 ...z
t3a:zo.: r. Tee.,_ ", 1.1 j {
he 1. oimactol c:l'Clfle� of a f111111i Cil: ;IU111t11I]1C'o� ;,(lii tteClllSC\' JI .3cI1 :1?Ce111e11i O? iI� C21C1f1c21CN?!1 tillil
(ii.cio.11l'C. li ;i11i' 1.11 ail 1i11(111. !I)C l 1)llh'acior 1111i1a'iLillik and ;1zntCi Tim! the plof ? I U S.C. Chap.
'S. Ada illll nnal'.'e Ren-ieclle, t+JI False (.Iii11i ;,ilil `iaielllellii. ;,I?Lit;' 0.� ihl� Ceitl�lC.iili)11 2iilil dhcic+�lll'e. if
, OUS S C-, ---
tiipature of :Authorized Representative
Youssef A. Laham
Printed Name and Title
08/25/2026
r).,t,
(713) 869-3433 / ylaham@dccm.com
Phone- Nulnl,er Entail Addresc
R.1SColl'•('ontraclsSCon(rttcl Templates'.Archueculral or Engineering Semces Agreement femplate-C L)BG (Illlablc).ducx
Atsreement for Professional Services. Pave 18 Rev. 7.20.2026