HomeMy WebLinkAboutOrdinance No. 16,487 (Item 6.l.)ORDINANCE NO. 16,487 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 3 IN THE AMOUNT OF THIRTY-SIX THOUSAND, EIGHT -HUNDRED, SIXTY AND 08/100 DOLLARS ($36,860.08) FOR THE WEST DISTRICT WASTEWATER TREATMENT PLANT OPERATIONS BUILDING PROJECT WITH TEGRITY CONTRACTORS, INC,; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 3 in the amount of THIRTY-SIX THOUSAND, EIGHT -HUNDRED, SIXTY AND 08/100 DOLLARS ($36,860.08) for the West District Wastewater Treatment Plant Operations Building Project with Tegrity Contractors, Inc. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 28`h day of May, 2026. I-- C ES JO S yor A EST: d •�� as f.f nL, 0 1� a •r� ANGELA J SON; City@ttk A a o � w Jat( .., V'� • ryatlntl Ofla9t'�Ga ` '1.,. L. APPROVED AS TO 1 I: )f STIN HOLMES, Assistant City Attorney VOrdinances and Resolutions%Ordinance Drafts\2026-05-2Wrd-Change Order 3-Tegrity-SLdocx EXHIBIT A CITY OF BAYTOWN PUBLIC WORKS & ENGINEERING 2123 Market St. f Baytown, Texas 77520 BET ER BMTOWN CHANGE ORDER West District Wastewater Treatment Plant Operations Building Date of Issuance Contractor: Designer: 4/22, 2026 Tegrity Contractors, Inc Huitt Zollar Change Order No.: CoB Project No.: Contract No.: 3 W WTP2304 4250148 Explanation: This change order addresses scope modifications required to resolve design omissions and conflicts identified during construction. The original construction documents did not include a specification for the Thermostatic Mixing Valve (TMV) system, which was later determined to be necessary to meet applicable plumbing and safety standards, resulting in additional material costs (RFI#51). Conflicts between the framing layout and plumbing requirements for restroom carrier installations on the first and second floors were identified, requiring design revisions and associated material and labor adjustments (RFI #72 and #73). A required elevator hoistway guide rail was not included in the original plans, and was subsequently addressed through a design -team approved solution (RFI#71). These items were not included in the original bid documents and are necessary to provide a complete and functional facility. Description of Work I Thermostatic Mixing Valve System (RFI#51) 2 Framing Layout for Wall Mount Toilets (RFI#72 & 73) 3 Elevator Hoistway Guide Rail (RFI#71) Please attach back-up documentation Cost & Time Change Summary Original Contract: Previous Change Order(s): Contract prior to this change order: Net increase (decrease) from this change order Revised Contract: Percent increase (decrease) this Change Order Percent increase (decrease) all Change Orders RECOMM QED: By: Date: 5/12/2026 Design Engineer ACCEPTER*: By: / , c {Date: S/12/2026 Contractor RECOMMENDED: By: Date: 05i12 2026 Project Manager V E Rr"r c' 5'12 26 By:_**A"Y— Date: Business Asset Team Member + 0.74°o + 3.100 Cost Time $ 2,943.43 0 Days $ 2,941.65 0 Days $ 30,975.00 20 Days Cost Time $ 4,997,777.00 450 Days $ 119,997.12 0 Days $ 5,117,774.12 0 Days $ 36,860.08 20 Days $ 5,154,634.20 470 Days C 1� Dlplta6� n,V by Sharon Valente RECOf.1Q,MENDE�' ON �:SheronValientepbaptownorg. CN.$Mron Valente. OU-Public Works �J�t1l V B aron. client y: U rs, oU Pubic Works Dept.. DC ytown. -net Date Sharon Valiante, Interim Director, Public Works & Engineering FINANCE APPROVAL: By G ate: 05/20/2026 Teresa McKenzie, Cht f Financial Officer APPROVED: By Date: Jason E. Reynolds. City Manager Construction I of D16 Revised 9 2023 *Contractor agrees to perform change(s) included in this Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed. No payment to the Contractor (or Consultant) shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent, this Change Order governs. Upon execution by all parties, the following changes identified for the contract value and/or contract time shown, are made part of the contract. Construction 2 of 2 D 16 Revised 9/2023 TrE PCCO #08 f Tegrity Contractors, Inc. Project: 24-150 - WWTP Operations Building 202 N. Allen Drive, Suite E 1510 East Freeway Allen, Texas 75013 Baytown, Texas 77521 Phone: (972) 562-6060 Prime Contract Change Order #08: PCO #08 - TMV-1 TO: City of Baytown FROM: Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 DATE CREATED: 12/08/2025 CREATED BY: Corinna Garcia (Tegrity Contractors, Inc.) CONTRACT STATUS: Approved REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No LOCATION: REVIEWED BY: REVIEW DATE: 02/11/2026 PAID DATE: CHANGE REASON: Allowance EXECUTED: No SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1:Prime Contract TOTAL AMOUNT: $2,943.43 DESCRIPTION: The TMV spec was not provided. We have now been provided a spec and material has increased. ATTACHMENTS: Baytown WWTP TMV change order,docx, RFI 051 TMV HZ Response_250916 L).pdf CHANGE ORDER LINE ITEMS: # I Budget Code Description Amount 1 122 OOOO.S Plumbing Misc. TMV-1 $2,803.27 Subtotal: $2,803.27 CG/ Fees (12.00% Applies to all line item types) (5.00% ): $140.16 Grand Total: $2,943.43 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum will be increased by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $4,997,777.00 $48,829.82 $5,046,606.82 $2,943.43 $5,049,550.25 Tegrity Contractors, Inc. Page 1 of 2 Printed On: 2/11/2026 03:42 PM City of Baytown PCCO #08 Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE Tegrity Contractors, Inc. Page 2 of 2 Printed On: 2/11/2026 03:42 PM Public Works & Engineering Project: WW2304 West District Wastewater Treatment Plant ft2123 Market St Operations Building Baytown, Texas 77520 1510 E IH 10 BAYTOWN P. (281) 420-7154 Baytown, Texas 77521 RFI #51: TMV-1 Revision 0 Status Open To Johana Campos (City of Baytown) From Corinna Garcia (Tegrity Contractors) Date Initiated Sep 10, 2025 Due Date Sep 15, 2025 Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number Reference TW Mechanical Linked Drawings Received From Copies To Brett Allen (Tegrity Contractors), Johana Campos (City of Baytown), Monica Cisneros (City of Baytown), Rafael Errisuriz (City of Baytown), Corinna Garcia (Tegrity Contractors), Daniel Garduno (Huitt-Zollars), Patrick Hearne (Raba Kistner), Ryan Napitupulu (Huitt-Zollars), Rusty Robinson (Tegrity Contractors), Roger Roulette Jr (Tegrity Contractors), Faisal Saeed (City of Baytown) Leon Westerbeck (Huitt-Zollars) Activity Question Question from Corinna Garcia Tegrity Contractors on Thursday, Sep 4, 2025 at 04:01 PM CDT We are in need of description and model number for the TMV-1. There is no information given. Shown on a detailed drawing P-502. Attachments tmv-1.pdf Awaiting an Official Response Public Works & Engineering Page 1 of 1 Printed On: Sep 11, 2025 10:29 AM CDT HUITT RFI Transmittal HZ ZOLLARS Denver, CO PROJECT: City of Baytown WDWWTP Ops DATE SENT 9/11/2025 Bldg Phase 2 R315027.02 SUBJECT: RFI 051 TMV-1 RFI ID: 51 TYPE: RFI TRANSMITTAL ID: 00170 ACTION Answered VIA: Client CM System F R' NAP _ C:OMPANY EMA pdigiovanni@Huitt- Paul DiGiovanni 303.740.7325 Zollars.com COMPANY Ryan Napitupulu rnapitupulu@Huitt- 713.622.1180 Zollars.com R-PMAR,KS:. Provide Leonard Next Generation ECO-MIX Model TM-1520B-LF-DT-IT-TC or approved equal. Response by: Paul DiGiovanni, PE (CO, TX), HZI, 9/11/2025 DESCRIPTION OF CONTENTS QTY DATED '�C:ALE SIZE 1 6/2/2016 1017 Leonard TM-1520B- LF-DT. pdf Page 1 of 1 TW MECHANICAL 1005 Airline Dr, Ste A Katy, TX 77943 (P) 281,371,3388 (F) 281.599.3338 MPL## M-42141 TACLA104079C October 17, 2025 202 N Allen Drive, Suite E Allen, TX 75013 Attn: Brett Allen Ref: Baytown West District WWTP Brett, We are issuing a change order in the amount of $2803.27 dollars for the new TMV thaw was specked. • The budget for the original TMV was $2,500 • The new TMV that they specked is 4,821.15 • The 10 percent markup is $482.12 Sincerely, �(wafftGit2 ;naw/cIT Jonathan Parker Project Manager TW MECHANICAL Jonathanl@twmechanical.com Thermostatic Mixing Valve (TMV) Calculation $4,821.15 - new TMV + $482.12 - 10% markup sum=$5,303.27 $5,303.27 - Sum of New TMV - $2,500.00 - Reduction of amount previously budgeted SUM= $2,803.27 Regulated by the Texas State Board of Plumbing Examiner;. P.O. Boa 4200. Austin; rexas 72,765 4200. Phone: 512 936-5200 Todd] Wilkins MPL442141 PCCO #09 Tegrity Contractors, Inc. Project: 24-150 - WWTP Operations Building 202 N. Allen Drive, Suite E 1510 East Freeway Allen, Texas 75013 Baytown, Texas 77521 Phone: (972) 562-6060 Prime Contract Change Order #09: PCO #09 - Framing Change Order TO: City of Baytown FROM: Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 DATE CREATED: 1/22/2026 CREATED BY. Corinna Garcia (Tegrity Contractors, Inc.) CONTRACT STATUS: Approved REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No DESCRIPTION: LOCATION: REVIEWED BY: REVIEW DATE: 02/12/2026 PAID DATE: CHANGE REASON: Allowance EXECUTED: No SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1:Prime Contract TOTAL AMOUNT: $2,491.65 Materials and labor associated with added framing and reworking framing as needed per RFI #72 & #73 for 1st floor and 2nd floor restrooms ATTACHMENTS: WWTP Baytown - RFI 72 and 73 Framing Change Order Breakdown.xism, RFI 072_WC Carriers In Chase FLoor 1_HZ Response 260116 (1).pdf, RFI 073_Restroom 204A HZ Response260116 (1).pdf CHANGE ORDER LINE ITEMS: # I Budget Code Description Amount 1 109 2000.S Framing and Drywall Framing Change Order $2,373.00 Subtotal: $2,373.00 CG/ Fees (5.00% Applies to all line item types) (5.00% ): $118.65 Grand Total: $2,491.65 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum will be increased by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $4,997,777.00 $51, 773.25 $5,049,550.25 $2,491.65 $5,052,041.90 Tegrity Contractors, Inc. Page 1 of 2 Printed On: 2/12/2026 09:24 AM � ECYE JT - MORRIS City of Baytown PCCO #09 Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE Tegrity Contractors, Inc. Page 2 of 2 Printed On: 2/12/2026 09:24 AM COP Subcontractor Breakdown Summary Millard Drywall Customer: Tegrity Contractors Project Name: WWTP Baytown COP No. 3 Project #: TC10125 Reference Doc: RFI #72 & RFI #73 Date: 1/20/26 Description: Materials and labor associated with added framing and reworking framing as needed per RFI #72 & #73 for 1st floor and 2nd floor restrooms. Excludes* Any other areas or scopes of work not noted in these RFI's. 1. CRAFT LABOR COSTS 2. MATERIALS COSTS 3. EQUIPMENT COSTS 4. OVERHEAD 15% 5. ALLOWANCE FOR PROFIT 0% 6. SUBCONTRACTORS a. Subcontractor 1 $ b. Subcontractor 2 $ C. $ d. $ 7. OVERHEAD ON SUB 10% 8. ALLOWANCE FOR PROFIT ON SUB 5% $ 1,850 $ 213 SUBTOTAL 1,2,& 3 $ 2,063 SUBCONTRACT SUBTOTAL 6 $ TOTAL COST 1 THRU 8 $ 2,373 3/12/2026 Page 1 of _ WWTP-Baytown--RFI-72-and-73-Framing-Change-Order-Breakdown Public Works & Engineering Project: WW2304 West District Wastewater Treatment Plant I 2123 Market St Operations Building �Baytown, Texas 77520 1510 E IH 10 BAYTOWN P. (281) 420-7154 Baytown, Texas 77521 RFI #72: WC CARRIERS IN CHASE FLOOR 1 Revision 0 Status Open To Leon Westerbeck (Huitt-Zollars) From Corinna Garcia (Tegrity Contractors) Ryan Napitupulu (Huitt-Zollars) Date Initiated Jan 14, 2026 Due Date Jan 28, 2026 Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number Reference Linked Drawings Received From Copies To Brett Allen (Tegrity Contractors), Johana Campos (City of Baytown), Monica Cisneros (City of Baytown), Rafael Errisuriz (City of Baytown), Corinna Garcia (Tegrity Contractors), Daniel Garduno (Huitt-Zollars), Patrick Hearne (Raba Kistner), Ryan Napitupulu (Huitt-Zollars), Rusty Robinson (Tegrity Contractors), Roger Roulette Jr (Tegrity Contractors), Faisal Saeed (City of Baytown) , Leon Westerbeck (Huitt-Zollars) Activity Question Question from Corinna Garcia Tegrity Contractors on Wednesday, Jan 14, 2026 at 01:22 PM CST There is currently not enough space on the first floor in the plumbing chase for the Men's (103) and Women's (104) Restrooms to fit the waste main in the chase since the plumbing toilet fixtures are offset. We recommend adding a furring out wall at the north wall of the Women's Restroom to match the north wall as shown in the Men's Restroom and shift the carriers so that they are back-to-back (see attached sketch RED markups). Another option would be to widen the entire plumbing chase 24" inches but this would significantly affect the adjacent rooms. Attachments RFI BAYTOWN WWTP WC CARRIERS IN CHASE FLOOR 1.docx, Men 103 and Women 104 Restrooms.pdf Awaiting an Official Response Proposed solution to add a furr out wall at the north wall of the Women's Restroom to match the north wall of the Men's Restroom is acceptable. Ryan Napitupulu Huitt-Zollars Inc. 1 /16/26 Public Works & Engineering Page 1 of 1 Printed On: Jan 14, 2026 01:51 PM CST Public Works & Engineering 2123 Market St Baytown, Texas 77520 BAYTOWN P: (281) 420-7154 Revision To Date Initiated Location Cost Impact Spec Section Drawing Number Linked Drawings Received From 0 Project: WW2304 West District Wastewater Treatment Plant Operations Building 1510 E IH 10 Baytown, Texas 77521 RFI #73: Restroom 204 A Leon Westerbeck (Huitt-Zollars) Ryan Napitupulu (Huitt-Zollars) Jan 14, 2026 Copies To Brett Allen (Tegrity Contractors), Johana Campos (City of Baytown), Monica Cisneros (City of Baytown), Lionel Elder (Tegrity Contractors), Rafael Errisuriz (City of Baytown), Corinna Garcia (Tegrity Contractors), Patrick Hearne (Raba Kistner), Ryan Napitupulu (Huitt-Zollars), Rusty Robinson (Tegrity Contractors), Roger Roulette Jr (Tegrity Contractors) , Faisal Saeed (City of Baytown), Jonathon Traigle (City of Baytown), Leon Westerbeck (Huitt-Zollars) Activity Status Open From Corinna Garcia (Tegrity Contractors) Due Date Jan 28, 2026 Project Stage Schedule Impact Cost Code Reference Question Question from Corinna Garcia Tegrity Contractors on Wednesday, Jan 14, 2026 at 11:52 AM CST The current 6" metal stud wall does not permit sufficient space for the new toilet carrier. Please see the attached sketch (blue) with the proposed plumbing chase and relocation of east wall as an acceptable solution for the new plumbing toilet carrier with the intent to maintain the ADA requirements for the 5-0" circular clearance. In addition, the door frame with 5-3/4" jamb depth for door no. 204A has been approved, ordered, and expected to be delivered on Friday, 01/16/26. The drawings call out an 8" metal stud frame. Is it acceptable to relocate the entry door at Restroom 204 to the south wall so that we do not have to reorder, repurchase, and wait on extended long lead time to fit A8 wall partition. See markups in red on the attached sketch. Attachments Restroom 204A.pdf Awaiting an Official Response Proposed solution is acceptable. Refer to attached sketch. New RR plan west wall finish face will be 7-3/4" from previous finish face. Plan west wall to align with adjacent wall. Entry door relocation to plan south wall is acceptable. Ryan Napitupulu Huitt-Zollars Inc. 1 /16/26 Public Works & Engineering Page 1 of 1 Printed On: Jan 14, 2026 02:01 PM CST 1' - 0' cm 0 al M N 3' - fi' ALIGN 1 7 3/4' Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 Phone: (972) 562-6060 PCCO #13 Project: 24-150 - WWTP Operations Building 1510 East Freeway Baytown, Texas 77521 Prime Contract Change Order #13: PCO #13 - Guardrail Additions/ Elevator Hoistway TO: City of Baytown FROM: Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 DATE CREATED: 2/23/2026 CREATED BY: Corinna Garcia (Tegrity Contractors, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No DESCRIPTION: Guardrail addition and Elevator Hostway correction. RFI 70 ATTACHMENTS: BWTP Price Change - TC.pdf CHANGE ORDER LINE ITEMS: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: Allowance EXECUTED: No SCHEDULE IMPACT: 20 days REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1:Prime Contract TOTAL AMOUNT: $30,975.00 # Budget Code Description Amount 1 05 0501.S Structural Steel Erection Guardrail Additions $22,500.00 2 05 OOOO.S Structural Steel Fabrication Elevator Hoistway $7,000.00 Subtotal: $29,500.00 CG/ Fees (12.00% Applies to all line item types) (5.00% ): $1,475.00 Grand Total: $30,975.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 20 days. $4,997,777.00 $54,887.55 $5,052,664.55 $30,975.00 $5,083,639.55 Tegrity Contractors, Inc. Page 1 of 2 Printed On: 2/23/2026 03:05 PM City of Baytown PCCO #13 Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE Tegrity Contractors, Inc. Page 2 of 2 Printed On: 2/23/2026 03:05 PM Public Works & Engineering Project: WW2304 West District Wastewater Treatment Plant I 2123 Market St Operations Building ' Baytown, Texas 77520 1510 E IH 10 BAYTOWN P. (281) 420-7154 Baytown, Texas 77521 RFI #71: Elevator Guide Rail Revision 0 Status Open To Leon Westerbeck (Huitt-Zollars) From Corinna Garcia (Tegrity Contractors) Ryan Napitupulu (Huitt-Zollars) Date Initiated Jan 12, 2026 Due Date Jan 26, 2026 Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number Reference Linked Drawings Received From Copies To Brett Allen (Tegrity Contractors), Johana Campos (City of Baytown), Monica Cisneros (City of Baytown), Rafael Errisuriz (City of Baytown), Corinna Garcia (Tegrity Contractors), Ryan Napitupulu (Huitt-Zollars), Rusty Robinson (Tegrity Contractors), Roger Roulette Jr (Tegrity Contractors) , Faisal Saeed (City of Baytown), Leon Westerbeck (Huitt-Zollars) Activity Question Question from Corinna Garcia Tegrity Contractors on Friday, Jan 9, 2026 at 01:19 PM CST After elevator installer inspections the structural steel needed for the guide rails was insufficient. there is a total of 3 needed per the elevator installer. The steel for the 3rd column will match the steel originally design but in moving this steel please provide a detail of how to anchor the bottom into the concrete slab. Suggestion: Steel angels that will be wedge anchored into the slab and then angle size and required weld for base connection. Upper connection will match previous connection detail. Attachments 24-150 - RFI # _ - Elevator Guide Rail addition.pdf Awaiting an Official Response Please provide angles and anchors similar to RFI 60. Thanks, Daniel Garduno, Structural E.I.T. Concept Engineers Inc. 01.15.2026 Public Works & Engineering Page 1 of 1 Printed On: Jan 12, 2026 02:21 PM CST CHANGE ORDER/ PRICE ADJUSTMENT Project/Job: Baytown Water Treatment Plant Change Description: Guardrail addition. Description Guardrail addition - labor & equipment (summary) Breakdown (16 hours): 1 Foreman @ $90/hr = $1,440.00; 4 Iron Workers @ $70/hr = $4,480.00; 2 Welding Machines @ $35/hr = $1,120.00. Labor: $6,880 Material: $15,620 Total: $22,500 Hours Rate Amount 16 See $62880.00 breakdown $69880.00 CHANGE ORDER /PRICE ADJUSTMENT Project/Job: Baytown Water Treatment Plant Change Description: Elevator hoistway conflict correction Description Hours Elevator hoistway conflict correction Breakdown: 16 hours: 1 Foreman @ $90/hr = $1,440.00; 4 Iron Workers @ $70/hr = $4,480.00; 2 Welding 16 (+8) Machines @ $35/hr = $1,120.00. Torch: 8 hours @ $15/hr = $120.00. Subtotal: $7,000.00 Total: $7,000.00 Amount Due: $7,000.00 Rate See breakdown Amount $79000.00 $79000.00