Loading...
Ordinance No. 16,354 (Item 8.t.)ORDINANCE NO. 16,354 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO.2 FOR THE WEST DISTRICT WASTEWATER TREATMENT PLANT OPERATIONS BUILDING PROJECT WITH TEGRITY CONTRACTORS, INC, IN AN AMOUNT OF FORTY-FOUR THOUSAND TWO HUNDRED FIFTY-FIVE AND 12/100 DOLLARS ($44,255.12); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 for the West District Wastewater Treatment Plant Operations Building Project with Tegrity Contractors, Inc., in an amount of FORTY-FOUR THOUSAND TWO HUNDRED FIFTY-FIVE AND 12/100 DOLLARS ($44,255.12). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 1 Ith day of December, 202' TO FORM: RAOrdinances and Resolutions\Ordinance Drafts\202�42-1 l\Change Order No 2 West Distrtict Waste Water Treatment Plant Operations Building.Tegrity Contractors.kh.docx BAYTOWN Date of Issuance: Contractor: Designer: EXHIBIT „An CITY OF BAYTOWN PUBLIC WORKS & ENGINEERING 2123 Market St. Baytown, Texas 77520 CHANGE ORDER West District Wastewater Treatment Plant Operations Building 10/10/2025 Change Order No.: Tegrity Contractors, Inc CoB Project No.: Huitt Zollar Contract No.: 2 WWTP2304 4250148 Explanation: Tegrity Contractors, Inc. has submitted a change order in the amount of $44,255.12 for design revisions and clarifications issued after bid by Huitt-Zollars and the project's structural engineer. RFI #27 addresses a design conflict involving the door and window system, where the original drawings showed aluminum -framed doors adjacent to separate window units, but the door schedule depicted an integrated assembly; because the two systems were incompatible and no installation detail existed, the architect revised the design to a single continuous aluminum frame with updated glazing, and this cost is the responsibility of the designer. ASI #2 includes structural steel modifications issued by the structural engineer to correct design discrepancies discovered after bid, and is likewise a designer -responsible cost. ASI #3 provides clarification of the elevator shaft wall and directs specific construction details not previously defined, and this item is also the responsibility of the designer. RFI #46 removes the acid neutralization tank from the plumbing design after confirmation that it was not required by code, resulting in a credit applied to the City. These items collectively represent the total change order amount of $44,255.12. Description of Work Cost Time 1 RFI # 27 - Metal Door Frame/Glazing Door Changes $ 3,662.40 0 Days 2 ASI # 2 — Steel Changes $ 41,348.72 0 Days 3 ASI # 3 — Elevator Shaft Wall Clarification $ - 0 Days 4 RFI # 46 - Acid Neutralization Tank Credit $ (756.00) 0 Days 5 $ - 0 Days Please attach back-un documentation Cost & Time Change Summary Cost Time Original Contract: $ 4,997,777.00 450 Days Previous Change Order(s): $ 75,742.00 0 Days Contract prior to this change order: $ 5,073,519.00 0 Days Net increase (decrease) from this change order $ 44,255.12 0 Days Revised Contract: $ 5,117,774.12 450 Days Percent increase (decrease) this Change Ord + 0.9% Percent increase (decrease) all Change Order + 2.4% RECOMMENDED: By: Date: Design Engineer ACCEPTED*: By: A Date: Contractor 11 /20/25 11 /20/25 RECOMMENDED: By: -7,t / - Date: 11 /21 /2025 Frank Simoneaux, Jr, Director of Public Works & Engineering FINANCE APPROVAL: By:A G Date: 11/24/25 Teresa McKenzie, Chief Financial Officer Construction I of 2 D 16 Revised 9/2023 RECOMMENDED: By: _ ' -- Date: Project Manager VERIFIED: By:4f 'Y Date: Business Asset Team Member 11 /21 /2025 11 /21 /25 APPROVED: By: Date: Jason E. Reynolds, City Manager *Contractor agrees to perform change(s) included in this Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed. No payment to the Contractor (or Consultant) shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent, this Change Order governs. Upon execution by all parties, the following changes identified for the contract value and/or contract time shown, are made part of the contract. Construction 2 of 2 D 16 Revised 9/2023 Docusign Envelope ID: 4ABOF01 4-FA9D-4C1 3-88EO-AE3BC1 369005 ITY PCCO #03 Tegrity Contractors, Inc. Project: 24-150 - WWTP Operations Building 202 N. Allen Drive, Suite E 1510 East Freeway Allen, Texas 75013 Baytown, Texas 77521 Phone: (972) 562-6060 Prime Contract Change Order #03: PCCO - RFI #27 Glazing Door Change TO: City of Baytown FROM: Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 DATE CREATED: 4/24/2025 CREATED BY: Corinna Garcia (Tegrity Contractors, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED Brett Allen FROM: DESIGNATED REVIEWER: Corinna Garcia (Tegrity Contractors, Inc.) DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No DESCRIPTION: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: Allowance EXECUTED: No SCHEDULEIMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1:Prime Contract TOTAL AMOUNT: $3,662.40 Addition to include door frames for doors 206ANV18, 102AIW7, 208ANV21, 209A/W22, 212A/W 19 ($5040.00) Note: 1. Our original proposal includes the Door 212CIW20 door frame. Credit to move scope to Ray Glass -6 Aluminum Frame Frames 3/0 x 7/0 x 4-718" throat x type II x ASA x 3 Hinges x Clear Aluminum (-$1770) ATTACHMENTS: RFI # 27 - answered.pdf, Change order #1 Baytown WWTP Operations Blgd., Baytown TX.pdf, CREDIT INVOICE.pdf CHANGE ORDER LINE ITEMS: Budget Code Description Amount 1 08 4000.S Glazing add for door frames $5,040.00 2 08 1000.S Doors and Hardware Credit for door frames $(1,770.00) Subtotal: $3,270.00 CGI Fees (12.00% Applies to all line item types) (12.00% ): $392.40 Grand Total: $3,662.40 Tegrity Contractors, Inc. Page 1 of 2 Printed On: 4/24/2025 04:42 PM Docusign Envelope ID: 4ABOF014-FA9D-4C13-88EO-AE3BC13690C5 TECAITY PCCO #03 The original (Contract Sum) $4,997,777.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $4,997,777.00 The contract sum would be changed by this Change Order in the amount of $3,662.40 The new contract sum including this Change Order will be $5,001,439.40 The contract time will not be changed by this Change Order. City of Baytown Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 sar•a � by: sa" 5/14/2025 1 11:5 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE Tegrity Contractors, Inc. Page 2 of 2 Printed On: 4/24/2025 04:42 PM Docusign Envelope ID: 18C9827+7.-,�OOOF-4762-8AE4-121080096AD7 Ay Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 Phone: (972) 562-6060 PCCO #04 Project: 24-150 - WWTP Operations Building 1510 East Freeway Baytown, Texas 77521 Prime Contract Change Order #04: PCO #04 - ASI #2 TO: City of Baytown FROM: Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 DATE CREATED: 5/14/2025 CREATED BY: Corinna Garcia (Tegrity Contractors, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED Brett Allen FROM: DESIGNATED REVIEWER: Corinna Garcia (Tegrity Contractors, Inc.) DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: Allowance EXECUTED: No SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1:Prime Contract TOTAL AMOUNT: $41,348.72 DESCRIPTION: ASI 02- Structural Foundation Plan Second Floor Framing Plan Roof Framing Plan North elevation Tilt Up Wall Panels (1-4) South Elevation Tilt Up Wall Panels (2-4) East Elevation Tilt Up Wall Panels (3-4) West Elevation Tilt Up Wall Panels (4-4) Foundation Details (1-3) Foundation Details (2-3) Foundation Details (3-3) Framing Details (1-2) Framing Details (2-2) Tilt Up Wall Panel Details ATTACHMENTS: Baytown W4V T P ASI 2 CO.pdf, Estimate_4094_from_All_Steel_Welding_LLC.pdf, ASI 02 G710-3.14.2025 Signed.pdf CHANGE ORDER LINE ITEMS: 0 Budget Code Description Amount 1 05 0501.S Structural Steel Erection Erectors $10,250.00 2 05 OOOO.S Structural Steel Fabrication Steel $26,668.50 Subtotal: $36,918.50 CG/ Fees (12.00% Applies to all line item types) (12.00% ): $4,430.22 Grand Total: $41,348.72 Tegrity Contractors, Inc. Page 1 of 2 Printed On: 5/14/2025 11:06 AM Docusign Envelope ID: 18C98277-OOOF-4762-8AE4-121080096AD7 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. SIGNATURE DATE �unr e*w tiwr City of Baytown PCCO #04 Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 $4,997,777.00 $0.00 $4,997,777.00 $41,348.72 $5,039,125.72 Ft Sgned by: I'u1 Q" 5/14/2025 1 1:0 SIGNATURE DATE SIG DATE Tegrity Contractors, Inc. Page 2 of 2 Printed On: 5/14/2025 11:06 AM Docusign Envelope ID: 912CD67F-0977-4E29-9A71-9B857052348B W� PCCO #05 Tegrity Contractors, Inc. Project: 24-150 - WWTP Operations Building 202 N. Allen Drive, Suite E 1510 East Freeway Allen, Texas 75013 Baytown, Texas 77521 Phone: (972) 562-6060 Prime Contract Change Order #05: PCO #05 -ASI #3- Shaft Walls TO: City of Baytown FROM: Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 DATE CREATED: 5/14/2025 CREATED BY: Corinna Garcia (Tegrity Contractors, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED Brett Allen LOCATION: FROM: DESIGNATED REVIEWER: Corinna Garcia (Tegrity Contractors, Inc.) REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Allowance PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:Prime Contract TOTAL AMOUNT: $0.00 DESCRIPTION: Shaft Walls- No Added Cost ATTACHMENTS: CHANGE ORDER LINE ITEMS: N Budget Code Description Amount 1 Shaft Wails $0.00 Subtotal: $0.00 CG/ Fees (12.00% Applies to all line item types) (12.00% ): $0.00 Grand Total: $0.00 The original (Contract Sum) $4,997,777.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $4.997,777.00 The contract sum would be changed by this Change Order in the amount of """ $0.00 The new contract sum including this Change Order will be $4,997,777,00 The contract time will not be changed by this Change Order. SIGNATURE City of Baytown Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 DATE SIGNATURE DATE signed by: 5/19/2025 1 6:39 SIGNATURE DATE Tegrity Contractors, Inc. Page 1 of 1 Printed On: 5/14/2025 01:20 PM 1 ~� PCCO #06 Tegrity Contractors, Inc. Project: 24-150 - WWTP Operations Building 202 N. Allen Drive, Suite E 1510 East Freeway Allen, Texas 75013 Baytown, Texas 77521 Phone: (972) 562-6060 Prime Contract Change Order #06: PCO #06 - Deductive for Acid Tank & Labor TO: City of Baytown FROM: Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 DATE CREATED: 9/09/2025 CREATED BY: Corinna Garcia (Tegrity Contractors, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No DESCRIPTION: Deductive change order in the amount of $756 dollars. • $600 for the acid tank we are no longer installing • $156 for the labor to Install the acid tank LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: Allowance EXECUTED: No SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1:Pdme Contract TOTAL AMOUNT: ($756.00) ATTACHMENTS: Baytown WWTP deductive change order pdf, Baytown WWTP Project[1j.pdf CHANGE ORDER LINE ITEMS: 0 Budget Code Description Amount 1 22 OOOO.S Plumbing Misc. Deductive for Acid Tank & Labor $(756.00) Subtotal: $(756.00) CG/ Fees (12.00% Applies to all line item types) (0.00% ): $0.00 Grand Total: $(755.00) The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $4,997,777.00 $45,011.12 $5,042,788.12 ($756.00) $5,042,032.12 Tegrity Contractors, Inc. Pagel of 2 Printed On: 9/9/2025 04:35 PM City of Baytown PCCO #06 Tegrity Contractors, Inc. 202 N. Allen Drive, Suite E Allen, Texas 75013 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE Tegrity Contractors, Inc. Page 2 of 2 Printed On: 9/9/2025 04.35 PM