Ordinance No. 16,353 (Item 8.s.)ORDINANCE NO. 16,353
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,
TEXAS, AUTHORIZING CHANGE ORDER NO. 4, WHICH AMENDS THE
CONSTRUCTION MANAGER -AT -RISK CONTRACT FOR THE PUBLIC
SAFETY FACILITY PROJECT, WITH DUROTECH, INC., WHICH REDUCES
THE CONTRACT PRICE BY FOUR HUNDRED FORTY-FOUR THOUSAND
TWO HUNDRED EIGHTY-ONE AND 69/100 DOLLARS ($444,281.69);
AUTHORIZING THE CLOSEOUT OF THE GUARANTEED MAXIMUM
PRICE OF THE CONSTRUCTION MANAGER -AT -RISK CONTRACT, AND
PROVIDING FOR THE EFFECTIVE DATE THEREOF.
******************************************************************************
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS:
Section 1: That the City Council of the City of Baytown, Texas, does hereby authorize
Change Order No. 4, which amends the Construction Manager -at -Risk Contract for the Public
Safety Facility Project, with Durotech, Inc., which reduces the contract price by FOUR
HUNDRED FORTY-FOUR THOUSAND TWO HUNDRED EIGHTY-ONE AND 69/100
DOLLARS ($444,281.69) and authorizing the closeout of the Guaranteed Maximum Price of the
Construction Manager -at -Risk Contract. A copy of said change order is attached hereto, marked
Exhibit "A" and made a part hereof for all intents and purposes.
Section 2: This ordinance shall take effect immediately from and after its passage by
the City Council of the City of Baytown.
INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the
City of Baytown this the 1 lth day of December, 202_`
ATTEST:LO
�pYTO6V�, r�®
,•
b
A
ANGE J CKSON, City Clerkg
APPROVE A TO FOIE)
SCOTT LEMOND, City Attorney
R:\Ordinances and Resolutions\Ordinance Drafts\2025-12-11 \Ordinance Authorizing Change Order No 4-Durotech-Public Safety
Facility.vh.docx
EXHIBIT "A"
1!9�
BAYTOWN
Date of Issuance:
CITY OF BAYTOWN
PUBLIC WORKS & ENGINEERING
2123 Market St.
Baytown, Texas 77520
CHANGE ORDER
Baytown Public Safety Facility Project
Change Order No.:
Contractor: Durotech, Inc. CoB Project No.:
Designer: BVG4 Architects P.O./Contract No.:
Exol2n3ti0R:
This change order encompasses the following:
Closing out the total costs for The Guaranteed Maximum Price (GMP) for the construction of the Baytown Public Safety Facility Project.
Phase IA: Demolition, Site Imrovements and Procurement of Materials.
Phase I B: Vehicle Service Center.
Phase 2 and 3: Administration Building.
4
FAC11901
2103500/4250183
Description of Work
Bid Tab Items:
Cost
Time
1 General Conditions,
Bonds & Insurance
$ 211,988.47
Days
2 General Site Requirements
010250
TEMP PROJECT SIGNAGE PHASE I A
($I,514.28)
Days
010500
TRAFFIC CONTROL PHASE IA - CREDIT
($10,000.00)
Days
010501
TREE PROTECTION PHASE I A - CREDIT
($12,713.00)
Days
010270
EQUIP FUEL & TANK PHASE I B
(S 170.00)
Days
010273
TEMP WATER SITE PHASE IB
(S1,244.82)
Days
010275
QMS/SAFETY PHASE I B
($21,706.50)
Days
010280
FIELD ENGINEERING & LAYOUT PH 1 B
($12,946.50)
Days
010287
MATERIAL HANDLING/HOISTTNG PH I
($21,044.80)
Days
010455
CPR -AO 1 -TEMP. FENCING -COURT PARKING
$1,890.00
Days
010475
CPR -AO 1 -EROSION CONTROL -COURT PARKING
$1,016.00
Days
010476
COMMISSIONING COORDINATOR PHASE I - CREDIT
(f44,000.00)
Days
010477
MOCK UPS PHASE I -CREDIT
($7,500.00)
Days
010401
MOCK UPS PHASE 2 & 3
($12,000.00)
Days
010411
TEMPORARY TREE & PLANT PROTECTION 2 & 3
($10,550.00)
Days
3 Existing Conditions
022100
SURVEYS PHASE 2 & 3
($7,500.00)
Days
026000
REMOVAL & DISPOSAL OF CONTAMINATED SOILS PHASE 2 & 3
(f 11,480.00)
Days
027500
CREDIT FOR WELL PLUG CONCRETE
($9,900.00)
Days
027501
FRACKING TANK FOR WELL PLUG
$3,500.00
Days
4 Concrete
030068
CONCRETE MISCELLANEOUS PH IB
($3,078.20)
Days
030075
CPR -AO 1 - COURT PARKING - POUR BACK
$15,203.00
Days
030080
CPR-A03 - ADDITIONAL PIERS & STRUCTURAL DETAILS
$15,768.00
Days
030085
CPR-A05 - ADDED PAVING AT BUILDING T
$6,930.00
Days
030086
CPR-A10 - BUILDING T - ADDED PARKING
$8.362.00
Days
030087
CPR-A13 - BUILDING T - TRAFFIC CONTROL PAD
$1,720.00
Days
030170
BUILDING M - BRICK JAMB RETURNS AT OPENINGS
$245,577.00
Days
030171
CPR-B18 - GENERATOR YARD FOUNDATION
$80,395.00
Days
030172
CPR-BI7-TILT WALL CORING
$3,226.00
Days
030173
CPR-B41 -CONCRETE BETWEEN CURB AND SIDEWALK
S17,160.00
Days
Construction
I of 6
D 16 Revised 912023
030174
CPR-B43 - BUILDING M - MONUMENT FOUNDATION
$40,000.00
Days
030213
CPR-B54 - DEMO & POUR BACK TO INCREASE INLET PIPE
$9,794.00
Days
030214
CPR-B55 - REMOVE SIGN & ADD PAVING/CURB
$19,971.00
Days
5 Masonry
041035
BUILDING D - AMMO STORAGE
$13,765.00
Days
041036
CPR-B64 - MASONRY SCREEN WALL & MONUMENT CREDIT
($41,727.00)
Days
6 Metals (Structural Steel, Rails, and Panels)
050040
CPR-A05 - ADDITIONAL BOLLARDS
$2,400.00
Days
050041
TIMBER MATTS PHHSE I B - CREDIT
($31,559.00)
Days
050042
DOWNSPOUT BOOTS - CREDIT
($13,838.95)
Days
7 Woods (Rough
Carpentry and Millwork)
061025
CPR-BOI - BUILDING M - CHILD CARE AREA
S21,953.00
Days
061026
CPR-BO2 - BUILDING M - MILLWORK CHANGES
$112,511.00
Days
061027
CPR-B03 - BUILDING M - MILLWORK CHANGES
($1,178.00)
Days
061028
CPR-B 10 - BUILDING M - MILLWORK CHANGES
$15,499.00
Days
8 Thermal and Moisture Protection
070065
CPR-AI6 - BLDG T - FLASHING FOR HVAC CONDENSATE
$2,500.00
Days
071019
PROJECTED MATERIAL ESCALATION - PHASE 2
($27,676.00)
Days
071057
ROOFING MATERIAL ESCALATION - PHASE 2
($90,064.00)
Days
9 Openings (Doors and Glazing)
080023
ACCESS DOORS PHASE I - CREDIT
($1,028.00)
Days
081026
CPR-B26 - BUILDING M - HARDWARE INSTALL
$1,683.00
Days
081136
ASI-13007 - BUILDING M - DOOR & HARDWARE REVISIONS
$16,658.00
28 Days
091137
CPR-B 13 - BUILDING M - CASED OPENINGS
$2,853.00
Days
081138
CPR-B 16 - BUILDING M - MEZZANINE DOORS
$12,012.00
Days
081139
CPR-B20- BUILDING M-HARDWARE REVISIONS
$14,507.00
Days
081 140
CPR-822 - BUILDING M - INCREASE OPENING 1716 WIDTH
$3,302.00
Days
081141
CPR-B26 - BUILDING M - HARDWARE & ACCESS CONTROL
$11,680.00
21 Days
081142
CPR-B40 - BUILDING M - ADD MAGLOCK TO SLIDING DOOR 1303B
S945.00
Days
081055
ACCESS DOORS PHASE 3
(S377.00)
Days
080035
BUILDING T - REPLACE DOOR T32B W/ COILING DOOR
$5,756.00
Days
081041
ADD REMOTE ACCES TO SALLY PORT DOORS
$1,352.00
Days
084200
CPR-B46 - BUILDING M - SALLYPORT AC HARDWARE
S4,781.00
Days
081090
CPR-801 - BUILDING M - CHILD CARE AREA GLAZING
$17,717.00
Days
081091
ASI-B004 - BUILDING M - REVISED OPENINGS
$37,935.00
7 Days
081092
ASI-B007 - BUILDING M - DOOR & HARDWARE REVISIONS
$1,747.00
Days
081093
CPR-BO7 - BUILDING M - REVISED RECEPTION WALLS
$2,948.00
Days
081094
BUILDING M - MISSILE E GLASS PREMIUM
$57,156.00
Days
081095
CPR-B22 - BUILDING M - CONFERENCE ROOM WINDOWS
$33,134.00
Days
081096
CPR-B62 - BUILDING M - METAL PANELS & SPANDREL FILM
$10,600.00
Days
10 Finishes (Gypsum
Board, Tiling, Resilient Flooring)
091215
GYPBOARD/FRAMING MATERIAL ESCALATION - PHASE 2
(S125,000.00)
Days
091220
CPR-B01 - BUILDING M - CHILD CARE. AREA
$4,981.00
Days
091221
CPR-807 - BLDG M - REVISED RECEPTION WALLS
$3,319.00
Days
091222
CPR-B 10 - BLDG M - ADDED BULLET BOARD
$13,386.00
9 Days
091223
CPR-B19 - BLDG M - LOCKER FURROUT & COLUMN COVER
$45,304.00
Days
Construction
2 of 6
D 16 Revised 92023
091224 CPR-B22 - BLDG M - FURROUTS
$13,680.00
Days
091335 CPR-BOI - BUILDING M - CHILD CARE AREA
$6,935.00
Days
091336 CPR-BO2 - BUILDING M - FINISH CHANGES
S271,000.00
35 Days
091337 CPR-B 19 - BUILDING M - TILE CHANGES
$11,048.00
Days
090026 CPR-A13 - BLDG T - ACT CEILING ROOM T41
$2,649.00
Days
091431 CPR-B 15 - BLDG M - ENTRY VESTIBULE CEILING
$9,460.00
Days
091432 CPR-Bl7 - BLDG M - VESTIBULE HVAC REVISIONS
$2,000.00
Days
091433 CPR-B51 - ADD ACT PANELS AT BRIEFING & CONF
$18,711.00
Days
091436 CPR-BO2 - BUILDING M - FINISH CHANGES
$6, I33.00
Days
091082 CPR-B 19 - BUILDING M - CARPET CHANGES
$24,423.00
Days
091115 CPR-B02 - BUILDING M - VINYL WALL COVERING CREDIT
($55,300.00)
Days
11 Specialties (Signage, Toilet Accessories, Protective Covers)
101018 CPR-B43 - BUILDING M - SIGNAGE PACKAGE
$34,686.00
Days
101019 CPR-1343 - BUILDING M - MONUMENT SIGNS & LETTERING
$31,443.00
Days
101015 CPR-B01 - CHILD CARE AREA TOILET ACCESSORIES
$826.00
Days
101016 CPR-B 16 - BUILDING M - MIRRORS & ACCESSORIES
$4,128.00
Days
101017 CPR-B20 - BUILDING M - TOILET ACCESSORY REVISIONS
$738.00
Days
101022 CPR-B50 - LETTERING FOR DIVISIONAL SIGNAGE
$13,974.00
Days
101023 CPR-B53 - POSTER PICTURE FRAMES
S575.48
Days
101024 CPR-B58 - REPLACE LOBBY SHARPS CONTAINER
$1,194.00
Days
101008 WALL & DOOR PROTECTION PHASE 2
($25,000.00)
Days
12 Equipment (Appliances)
111002 CPR-B21 R - BUILDING M - KITCHEN EQUIPMENT
$45,775.63
Days
121010 BICYCLE RACKS PHASE 3
$
(10,970.00)
Days
121002 CPR-1321R - BUILDING M - EQUIPMENT
$
131,309.45
Days
125100 CPR-B29 - ADDITIONAL FFE
$
6,599.56
Days
125101 CPR-B34 - BLDG M - MOVE IN EVIDENCE STORAGE
$
4,601.50
Days
125102 CPR-B35 - ADDING SECURITY SHUTTER TO SHELVING UNIT EVIDENCE
$
3,784.00
Days
13 Furnishings (Window Shades and Floor Mats)
121003 CPR-B22 - BUILDING M - CONFERENCE ROOM BLINDS
$
4,311.00
Days
125103 CPR-1352 - ADDING SHADES FOR E SIDE WINDOWS
$
9,687.00
Days
125194 CPR-1357 - DIGITAL FORENSIC ROOM FURNITURE
$
4,767.00
Days
125193 CPR-1363 - BLDG M - ADD SHADES TO FD DOORS
$
1,992.00
Days
14 Special Construction/Pre-Engineered Metal Buildings
130076 ERECTION PREMIUM TIME - CREDIT
$
(46,840.00)
Days
FARADAY ROOM
134927 SHOP DRAWINGS
$
10,000.00
Days
134928 MATERIALIFABRICATION
$
23,625.00
Days
134929 SHIELD DELIVERY
$
7,500.00
Days
134930 INSTALLATION
$
21,125.00
Days
134931 CLOSEOUT
$
5,000.00
Days
15 Conveying Equipment
141004 PREMIUM TIME- INSTALLATION ELEVATORS
$
(12,000.00)
Days
141011 ELEVATOR DAMAGES
$
(17,529.00)
Days
16 Fire Suppression Systems
$
Days
17 Plumbing
Construction 3 of 6
D16 Revised 9/2023
220040
CPR-A02 - PLUMBING MODIFICATIONS - BLDGS U, V, X
221070
CPR-B0l -CHILD CARE AREA
221071
CPR-BO4 - BLDG M - PLUMBING CHANGES
221072
ASI-BO13 - BLDG M - FLOOR DRAINS
221073
CPR-BO6 - BLDG M - REVISED FIXTURES
221074
CPR-B67 - UNDER -COUNTER ICE FILTRATION
I8 HVAC
230050
ASI-AO13-REVISED DUCTWORK
230051
CPR-B66 - BUILDING T - RETURN AIR
231030
CPR-B01 -CHILD CARE AREA
231031
CPR-BO4 - BLDG M - HVAC CHANGES
231032
CPR-B 17 - BLDG M - ENTRY VESTIBULE REVISIONS
231033
BLDG D - AMMO STORAGE
231034
CPR-B39 - TEMP CONTROL ROOMS 3301 & 3326
19 Electrical
260110
CPR-A02 - ELECTRICAL MODIFICATIONS - BLDGS U,V X
260115
CPR-AO6 - ADDTL POWER FOR VEHICLE LIFTS - BLDG T
260120
CPR-A07 - DISCONNECTS FOR BLDGS U, V, X
260121
CPR-AO9 - BUILDING T - ADDED POWER
260125
CENTERPOINT GAS LINE RELOCATION
260126
CPR -A 13 - BUILDING T - ROUGH IN DATA
260127
ASI-AO13- BUILDING T- REVISED POWER
260128
ELECTRICAL PREMIUM TIME PH I - CREDIT
261069.
ELEC- PREMIUM TIME PH 2 & 3
261070
ELEC - MATERIAL ESCALATION - PHASE 2 & 3
261071
ADDITIONAL TEMP. LIGHTING - PHASE 2 & 3
261073
PERMANENT POWER PHASE 2 & 3
261075
CPR-BOI -CHILD CARE AREA
261076
CPR-BO4 - BLDG M - ELECTRICAL CHANGES
261077
ASI-BOOI - BLDG M - REVISED LIGHT FIXTURES
261078
CPR-B08 - BLDG M - ADDED GFCI
261079
CPR-B 12 - BLDG M - REVISED TV & ELEC. OUTLETS
261080
CPR-B 14 - BLDG M - ADDED TV LOCATIONS
261081
CPR-B 15 - BLDG M - ENTRY VESTIBULE LIGHTING
261082
CPR-B23 - BLDG M - FARADAY ROOM
261083
CPR-B24 - BLDG M - LOBBY STAIR OUTLETS
261084
CPR-B25 - BLDG M - REVISED TECHNOLOGY DWGS
261085
CPR-B44 - CONDUITS TO COURT PARKING LOT CAMERAS
261086
CPR-B47 - BUILDING M - LIGHTING CONTROL SWITCHES
261087
CPR-848 - BUILDING M - CHANGE WIRE SIZE
261088
CPR-B56 - DOG KENNEL ADD LIGHTS & OUTLET
20 Communications (Structured Cabling and AV System)
270006
CPR -A 13 - BUILDING T - ADDED PHONES
271010
CPR-BO6 - BLDG M - REVISED DATA LOCATIONS
271011
CPR-B 14 - BLDG M - ADDED TV LOCATIONS
271012
CPR-B21R - BLDG M - EQUIPMENT
Consvuciion
$ 14,046.00
Days
$ 39,422.00
Days
$ 5,096.00
Days
$ 79,749.00
Days
$ 32,924.00
Days
$ 3,191.12
Days
$ 2,228.00
Days
$ 12,433.00
Days
S 9,263.00
Days
S 9,670.00
Days
S 3,527.00
Days
S 9,300.00
Days
$ 2,051.00
Days
$ 18,875.11
Days
$ 9,937.92
Days
$ 10,598.80
Days
$ 3,555.00
Days
$ 18,365.00
Days
$ 2,712.00
Days
S 8,436.00
Days
$ (78,140.00)
Days
$ (100,161.00)
Days
$ (254,000.00)
Days
$ (15,000.00)
Days
$ 172,693.24
Days
$ 1,708.00
Days
$ 19,117.00
Days
$ 61,703.00
14 Days
$ 1,931.00
Days
$ 16,983.00
Days
S 24,794.00
21 Days
$ 12,100.00
Days
$ 6,582.00
Days
$ 13,051.00
Days
S 3,145.00
14 Days
$ 11,327.86
Days
S 3,951.49
Days
S 1,390.32
Days
S 1,811.26
Days
$ 4,990.00
Days
$ 37,005.00
42 Days
$ 96,971.00
21 Days
$ 9,355.50
Days
4 of 6 D 16 Revised 9I2023
271013
CPR-B25 - BLDG M - ADDED DATA & WIRE MANAGERS
$
37,529.00
Days
271014
CPR-B27 - BLDG M - FARADAY ROOM MODIFICATIONS
S
7,631.00
Days
271015
CPR-B27 - BLDG M - FARADAY ROOM MODIFICATIONS
S
16,356.59
Days
271016
CPR-B3I- BLDG M- NETWORK SWITCHES
$
153,432.09
Days
271017
CPR-B68 - BLDG M - CABLING FOR HOLDING CAMERAS
S
2,652.85
Days
21 Electronic Safety and Security
280015
PROVIDE POLES FOR CCTV - PHASE 1 B
S
2,733.00
Days
281036
CPR-B26 - BUILDING M - ACCESS CONTROL CHANGES
$
22,584.00
35 Days
281037
CPR-B36 - BLDG B - ADDING ACCESS CONTROL TO MARSHALL OFFICE
$
4,653.00
Days
281038
CPR-846 - BUILDING M - ADD AC TO SALLY PORT DOOR
$
4,865.00
Days
281055
PROVIDE POLES FOR CCTV - PHASE 2
S
2,733.00
Days
281090
CPR-B01 -CHILD CARE AREA FIRE ALARM
S
3,505.00
Days
281056
CPR-B68 - CAMERAS FOR HOLDING AREA
S
4,780.00
Days
22 Earthwork
310710
CPR-AOI - EARTHLWORK & UTILITIES - COURT PARKING
$
181,765.00
Days
310715
CPR-A05 - GRADING REVISIONS
$
7,1 13.00
Days
310716
CPR -A 10 - BUILDING T - ADDED PARKING
s
7,827.00
Days
311030
CPR-B 18 - GENERATOR YARD FOUNDATION
$
22,890.00
Days
311031
CPR-B64 - FENCE PANELS IN LIEU OF MASONRY SCREEN
S
20,866.00
Days
311032
CPR-864 - OPTEX SENSORS ON GATES
$
3,200.00
Days
23 Exterior Improvements
321011
CPR-B59 - ADDED BOLLARD COVERS
$
6,230.00
Days
321012
CPR-B59 - ADDED CONCRETE WHEEL STOPS
S
12,350.00
Days
321013
CPA-B65 - ADDITIONAL WHEEL STOPS
E
950.00
Days
320027
CPR -AI I - BUILDING T - CHAIN LINK DIVIDERS
S
10,568.00
Days
320028
CPR -AI I - BUILDING T - TIRE STORAGE
$
10,537.00
Days
320029
CPR -A 12 - BUILDING T - GATE AT MEZZANINE
s
1,990.00
Days
321025
CPR-BOI - CHILD CARE AREA FENCING
S
(3,914.10)
Days
320032
CONCRETE FENCE CREDIT -PHIB
S
(113,775.00)
Days
320033
CONCRETE FENCE - ENGINEERING & RESTOCKING
$
35,500.00
Days
320130
AFTEC CONCRETE FENCE - PHASE 1 B
$
45,011.00
Days
321032
CONCRETE FENCE CREDIT - PHASE 2
S
(167,167.00)
Days
321033
AFTEC CONCRETE FENCE - PHASE 2
$
129,433.00
Days
320090
CPR-AI4-REDUCED LANDSCAPING
$
(12,098.00)
Days
320091
BENDA BOARD AT GRAVEL TRACK
$
34,972.00
Days
320095
CPR -A 15 - MEXICAN BEACH PEBBLES
$
18,053.00
Days
24 Utilities
331132
CPR-B33 - BLDG M - CHILD CARE DRAINAGE
S
17,71 1.00
Days
25 Allowances
350015
CONSTRUCTION CONTINGENCY PHASE IA
$
(100,000.00)
Days
350020
CONSTRUCTION CONTINGENCY PHASE I
$
(300,000.00)
Days
350025
CONSTRUCTION CONTINGENCY PHASE 2 & 3
S
(931,898.78)
Days
360DO2
SITE ELEC. CONDUIT ALLOW. PHASE IA
$
(75,000.00)
Days
360100
COURTS DRAINAGE ALLOW. PH IA
S
(200,000.00)
Days
360600
SIGNAGE ALLOWANCE PHASE I B
E
Days
360650
SIGNAGE ALLOWANCE PHASE 2 & 3
$
(60,000.00)
Days
Construction
5 of 6
D16 Revised 92023
360700 FARADAY ROOM ALLOWANCE. PHASE 2 & 3
$
(110,000.00)
Days
360705 POLICE & FIRE DEPT. SHIELDS SIGN ALLOW. PHASE 2 & 3
$
(40,000.00)
Days
360710 BUILDING D RENOVATIONS ALLOW. PHASE 2 & 3
$
(20,000.00)
Days
360715 EXISTING SOIL CONDITIONS ALLOW. PHASE 2 & 3
$
(100,000.00)
Days
000000 UNALLOCATED FUNDS
$
(590,668.00)
Days
26 Construction Manager At Risk Fee 2.3 %
$
Days
27 Pre -Construction Fee
$
-
Days
Please attach back-up documentation
Cost & Time Chanee Summary
Cost
Time
Original Contract:
$ 89,000.00
974 Days
Previous Change Order(s):
$ 60,331,410.00
0 Days
Contract prior to this change order:
$ 60,420,410.00
0 Days
Net increase (decrease) from this change order
$ (444,281.69)
247 Days
Revised Contract:
S 59,976,128.31
1221 Days
Percent increase (decrease) this Change Order -499.2
Percent increase (decrease) all Change Orders 67288.9a/
RECOMMENDED.
RECOMMENDED:
By:
Date: 11-24-2025
By: ' a✓ . - Date: 11 /24/2025
Architect-
Franck Simoneauy Jr., Director of Public Works & Engineering
ACCEP C
I Date: ' V
FINANCE APPROVAL:
By: u 11 Date: 11/25/25
Contractor
Teresa McKenzie, Chief Financial Officer
RECOMMENDED:
APPROVED:
By: — - Date: 1,1r24r2025
By: Date:
Project Manager
Jason E. Reynolds, City Manager
VERIFIED:
By: 46-K- "Y Date: 11/24/25
Business Asset Team Member
eConuactm agrees to perform chwge(s) included in this Chaage Order fur the p6e. and time indicated. The prices for changes im:ludd all costs.—ianed with this Choose Order.
No work is to be done aril this change order is executed No payment to the Coonactm (m Convuhan0 shall he nude for work included in the change order mail the Con —ors pay estimate is updated.
Revise the project plans and sp.ificathma as referenced and inso6r as the original project im.mg, and sp«ificmioru are im,nsiatutt, this Change Order gosvms. Upon ex —lion by all parties, the 4sllnwing changes identified for the connect value and/or
contract time shown, we nude pant of the contact.
Construction 6 of 6 D 16 Revised 9/2023
Back-up documentation:
I
GENERAL CONDITIONS BONDS & INSURANCES
$ 21 1,988.47
010250
TEMP PROJECT SIGNAGE PHASE 1A
$ (1,514.28)
010500
TRAFFIC CONTROL PHASE 1A - CREDIT
$ 10,000.00)
010501
TREE PROTECTION PHASE 1A - CREDIT
$ (12,713.00)
010270
EQUIP FUEL & TANK PHASE 1 B
$ (170.00)
010273
ITEMP WATER SITE PHASE 1B
$ 1,244.82
010275
QMSISAFETY PHASE 1B
$ (21,706.50)
010280
FIELD ENGINEERING & LAYOUT PH 1B
$ (12,946.50)
010287
MATERIAL HANDLING/HOISTING PH 1B
$ 21,044.80
010455
CPR-A01 - TEMP. FENCING - COURT PARKING
$ 1,890.00
010475
CPR-A01 - EROSION CONTROL - COURT PARKING
$ 1,016.00
010476
lCOMMISSIONING COORDINATOR PHASE 1B - CREDIT
$ (44,000.00)
010477
MOCK UPS PHASE 1 B - CREDIT
$ 7,500.00
010401
MOCK UPS PHASE 2 & 3
$ 12,000.00
010411
TEMPORARY TREE & PLANT PROTECTION 2 & 3
$ (10,550.00)
022100
SURVEYS PHASE 2 & 3
$ (7,500.00)
026000
REMOVAL & DISPOSAL OF CONTAMINATED SOILS PHASE 2 & 3
$ (11,480.00
027500
1 CREDIT FOR WELL PLUG CONCRETE
$ (9,900.00)
027501
IFRACKING TANK FOR WELL PLUG
$ 3,500.00
030068
CONCRETE MISCELLANEOUS PH 1B
$ 3,078.20)
030075
CPR-A01 - COURT PARKING - POUR BACK
$ 15,203.00
030080
CPR-A03 - ADDITIONAL PIERS & STRUCTURAL DETAILS
$ 15,768.00
030085
CPR-A05 - ADDED PAVING AT BUILDING T
$ 6,930.00
030086
CPR-A10 - BUILDING T - ADDED PARKING
$ 8,362.00
030087
CPR -Al 3 - BUILDING T - TRAFFIC CONTROL PAD
$ 1,720.00
030170
BUILDING M - BRICK JAMB RETURNS AT OPENINGS
$ 245,577.00
030171
CPR-B18 - GENERATOR YARD FOUNDATION
$ 80,395.00
030172
CPR-B17 - TILT WALL CORING
$ 3,226.00
030173
CPR-B41 - CONCRETE BETWEEN CURB AND SIDEWALK
$ 17,160.00
030174
CPR-B43 - BUILDING M - MONUMENT FOUNDATION
$ 40,000.00
030213
CPR-B54 - DEMO & POUR BACK TO INCREASE INLET PIPE
$ 9,794.00
030214
CPR-B55 - REMOVE SIGN & ADD PAVING/CURB
$ 19,971.00
041035
BUILDING D - AMMO STORAGE
$ 13,765.00
041036
CPR-B64 - MASONRY SCREEN WALL & MONUMENT CREDIT
$ (41,727.00)
050040
CPR-A05 - ADDITIONAL BOLLARDS
$ 2,400.00
050041
TIMBER MATTS PAHSE 1B -CREDIT
$ (31,559.00)
050042
DOWNSPOUT BOOTS - CREDIT
$ 13,838.95
061025
CPR-B01 - BUILDING M - CHILD CARE AREA
$ 21,953.00
061026
CPR-B02 - BUILDING M - MILLWORK CHANGES
$ 112,511.00
061027
CPR-B03 - BUILDING M - MILLWORK CHANGES
$ (1,178,00)
061028
CPR-B10 - BUILDING M - MILLWORK CHANGES
$ 15,499.00
070065
CPR-A16 - BLDG T - FLASHING FOR HVAC CONDENSATE
$ 2,500.00
071019
PROJECTED MATERIAL ESCALATION - PHASE 2
$ (27,676.00)
071057
ROOFING MATERIAL ESCALATION - PHASE 2
$ 90,064.00)
080023
ACCESS DOORS PHASE 1 B - CREDIT
$ (1,028.00)
081026
CPR-B26 - BUILDING M - HARDWARE INSTALL
$ 1,683.00
081136
ASI-13007 - BUILDING M - DOOR & HARDWARE REVISIONS
$ 16,658.00
081137
CPR-B13 - BUILDING M - CASED OPENINGS
$ 2,853.00
081138
CPR-B16 - BUILDING M - MEZZANINE DOORS
$ 12,012.00
081139
CPR-B20 - BUILDING M - HARDWARE REVISIONS
$ 14,507.00
081140
CPR-B22 - BUILDING M - INCREASE OPENING 1716 WIDTH
$ 3,302.00
081141
CPR-B26 - BUILDING M - HARDWARE & ACCESS CONTROL
$ 11,680.00
081142
CPR-B40 - BUILDING M - ADD MAGLOCK TO SLIDING DOOR 1303B
$ 945.00
081055
ACCESS DOORS PHASE 3
$ 377.00
080035
BUILDING T - REPLACE DOOR T32B WI COILING DOOR
$ 5,756.00
081041
ADD REMOTE ACCES TO SALLY PORT DOORS
$ 1,352.00
81042.00
CPR-B46 - BUILDING M - SALLYPORT AC HARDWARE
$ 4,781.00
081090
CPR-B01 - BUILDING M - CHILD CARE AREA GLAZING
$ 17,717.00
081091
ASI-6004 - BUILDING M - REVISED OPENINGS
$ 37,935.00
081092
ASI-13007 - BUILDING M - DOOR & HARDWARE REVISIONS
$ 1,747.00
081093
CPR-B07 - BUILDING M - REVISED RECEPTION WALLS
$ 2,948.00
081094
BUILDING M - MISSILE E GLASS PREMIUM
$ 57,156.00
081095
CPR-B22 - BUILDING M - CONFERENCE ROOM WINDOWS
$ 33,134.00
081096
CPR-B62 - BUILDING M - METAL PANELS & SPANDREL FILM
$ 10,600.00
091215
GYPBOARDIFRAMING MATERIAL ESCALATION - PHASE 2
$ 125,000.00
091220
CPR-B01 - BUILDING M - CHILD CARE AREA
$ 4,981.00
091221
CPR-B07 - BLDG M - REVISED RECEPTION WALLS
$ 3,319.00
091222
CPR-B10 - BLDG M - ADDED BULLET BOARD
$ 13,386.00
091223
CPR-1319 - BLDG M - LOCKER FURROUT & COLUMN COVER
$ 45,304.00
091224
CPR-B22 - BLDG M - FURROUTS
$ 13,680.00
091335
CPR-1301 - BUILDING M - CHILD CARE AREA
$ 6,935.00
091336
CPR-B02 - BUILDING M - FINISH CHANGES
$ 271,000.00
091337
CPR-B19 - BUILDING M - TILE CHANGES
$ 11,048.00
090026
CPR -Al 3 - BLDG T - ACT CEILING ROOM T41
$ 2,649.00
091431
CPR-B15 - BLDG M - ENTRY VESTIBULE CEILING
$ 9,460.00
091432
CPR-B17 - BLDG M - VESTIBULE HVAC REVISIONS
$ 2,000.00
91433.00
CPR-B51 - ADD ACT PANELS AT BRIEFING & CONF
$ 18,711.00
091436
CPR-802 - BUILDING M - FINISH CHANGES
$ 6,133.00
091082
CPR-B19 - BUILDING M - CARPET CHANGES
$ 24,423.00
091115
CPR-B02 - BUILDING M - VINYL WALL COVERING CREDIT
$ 55,300.00
101018.00
CPR-B43 - BUILDING M - SIGNAGE PACKAGE
$ 34,686.00
101019.00
CPR-B43 -BUILDING M -MONUMENT SIGNS & LETTERING
$ 31,443.00
101015.00
CPR-B01 -CHILD CARE AREA TOILET ACCESSORIES
$ 826.00
101016.00
CPR-B16 - BUILDING M - MIRRORS & ACCESSORIES
$ 4,128.00
101017.00
CPR-B20 - BUILDING M - TOILET ACCESSORY REVISIONS
$ 738.00
101022.00
CPR-B50 - LETTERING FOR DIVISIONAL SIGNAGE
$ 13,974.00
101023.00
CPR-B53 - POSTER PICTURE FRAMES
$ 575.48
101024.00
CPR-B58 -REPLACE LOBBY SHARPS CONTAINER
$ 1,194.00
101008.00
WALL & DOOR PROTECTION PHASE 2
$ (25,000.00)
111002.00
CPR-B21R - BUILDING M - KITCHEN EQUIPMENT
$ 45,775.63
121002.00
CPR-B21R - BUILDING M - EQUIPMENT
$ 131,309.45
121003.00
CPR-B22 - BUILDING M - CONFERENCE ROOM BLINDS
$ 4,311.00
121010.00
1 BICYCLE RACKS PHASE 3
$ 10,970.00
125100.00
CPR-B29 -ADDITIONAL FFE
$ 6,599.56
125101.00
CPR-B34 -BLDG M -MOVE IN EVIDENCE STORAGE
$ 4,601.50
125102.00
CPR-B35 - ADDING SECURITY SHUTTER TO SHELVING UNIT EVIDENCE
$ 3,784.00
125103.00
CPR-B52 - ADDING SHADES FOR E SIDE WINDOWS
$ 9,687.00
125194.00
CPR-B57 - DIGITAL FORENSIC ROOM FURNITURE
$ 4,767.00
125193.00
CPR-B63 - BLDG M - ADD SHADES TO FD DOORS
$ 1,992.00
130076.00
ERECTION PREMIUM TIME - CREDIT
$ 46,840.00
134927.00
SHOP DRAWINGS
$ 10,000.00
134928.00
MATERIAL/FABRICATION
$ 23,625.00
134929.00
SHIELD DELIVERY
$ 7,500.00
134930.00
INSTALLATION
$ 21,125.00
134931.00
ICLOSEOUT
$ 5,000.00
141004.00
PREMIUM TIME - INSTALLATION ELEVATORS
$ (12,000.00)
141011.00
DAMAGES
$ (17,529.00
220040.00
CPR-A02 - PLUMBING MODIFICATIONS - BLDGS U, V, X
$ 14,046.00
221070.00
CPR-801 - CHILD CARE AREA
$ 39,422.00
221071.00
CPR-B04 - BLDG M - PLUMBING CHANGES
$ 5,096.00
221072.00
ASI-6013 - BLDG M - FLOOR DRAINS
$ 79,749.00
221073.00
CPR-806 - BLDG M - REVISED FIXTURES
$ 32,924.00
221074.00
CPR-867 - UNDER -COUNTER ICE FILTRATION
$ 3,191.12
230050.00
ASI-A013 - REVISED DUCTWORK
$ 2,228.00
230051.00
CPR-B66 - BUILDING T - RETURN AIR
$ 12,433.00
231030.00
CPR-B01 -CHILD CARE AREA
$ 9,263.00
231031.00
CPR-804 - BLDG M - HVAC CHANGES
$ 9,670.00
231032.00
CPR-B17 - BLDG M - ENTRY VESTIBULE REVISIONS
$ 3,527.00
231033.00
BLDG D - AMMO STORAGE
$ 9,300.00
231034.00
CPR-B39 - TEMP CONTROL ROOMS 3301 & 3326
$ 2,051.00
260110.00
CPR-A02 - ELECTRICAL MODIFICATIONS - BLDGS U,V,X
$ 18,875.11
260115.00
CPR-A06 - ADD'TL POWER FOR VEHICLE LIFTS -BLDG T
$ 9,937.92
260120.00
CPR-A07 - DISCONNECTS FOR BLDGS U, V, X
$ 10,598.80
260121.00
CPR-A09 - BUILDING T - ADDED POWER
$ 3,555.00
260125.00
ICENTERPOINT GAS LINE RELOCATION
$ 18,365.00
260126.00
CPR-A13 -BUILDING T- ROUGH IN DATA
$ 2,712.00
260127.00
ASI-A013 -BUILDING T- REVISED POWER
$ 8,436.00
260128.00
ELECTRICAL PREMIUM TIME PH 1 - CREDIT
$ 78,140.00
261069.00
ELEC- PREMIUM TIME PH 2 & 3
$ 100,161.00
261070.00
ELEC - MATERIAL ESCALATION - PHASE 2 & 3
$ (254,000.00)
261071.00
1ADDITIONAL TEMP. LIGHTING - PHASE 2 & 3
$ (15,000.00)
261075.00
CPR-B01 - CHILD CARE AREA
$ 1,708.00
261076.00
CPR-B04 - BLDG M - ELECTRICAL CHANGES
$ 19,117.00
261077.00
ASI-13001 - BLDG M - REVISED LIGHT FIXTURES
$ 61,703.00
261078.00
CPR-B08 - BLDG M - ADDED GFCI
$ 1,931.00
261079.00
CPR-B12 - BLDG M - REVISED TV & ELEC. OUTLETS
$ 16,983.00
261080.00
CPR-B14 - BLDG M - ADDED TV LOCATIONS
$ 24,794.00
261081.00
CPR-B15 -BLDG M -ENTRY VESTIBULE LIGHTING
$ 12,100.00
261082.00
CPR-B23 - BLDG M - FARADAY ROOM
$ 6,582.00
261083.00
CPR-B24 - BLDG M - LOBBY STAIR OUTLETS
$ 13,051.00
261084.00
CPR-B25 - BLDG M - REVISED TECHNOLOGY DWGS
$ 3,145.00
261085.00
CPR-B44 - CONDUITS TO COURT PARKING LOT CAMERAS
$ 11,327.86
261086.00
CPR-B47 - BUILDING M - LIGHTING CONTROL SWITCHES
$ 3,951.49
261087.00
CPR-B48 - BUILDING M - CHANGE WIRE SIZE
$ 1,390.32
261088.00
CPR-B56 - DOG KENNEL ADD LIGHTS & OUTLET
$ 1,811.26
270006.00
CPR -Al 3 - BUILDING T - ADDED PHONES
$ 4,990.00
271000.03
CPR-B68 - CABLING FOR HOLDING CAMERAS
$ 2,652.85
271010.00
CPR-BO6 - BLDG M - REVISED DATA LOCATIONS
$ 37,005.00
271011.00
CPR-B14 - BLDG M - ADDED TV LOCATIONS
$ 96,971.00
271012.00
CPR-B21R - BLDG M - EQUIPMENT
$ 9,355.50
271013.00
CPR-B25 - BLDG M - ADDED DATA & WIRE MANAGERS
$ 37,529.00
271014.00
CPR-B27 - BLDG M - FARADAY ROOM MODIFICATIONS
$ 7,631.00
271015.00
CPR-B27 - BLDG M - FARADAY ROOM MODIFICATIONS
$ 16,356.59
271016.00
CPR-B31 - BLDG M - NETWORK SWITCHES
$ 153,432.09
280015.00
PROVIDE POLES FOR CCTV - PHASE 1 B
$ 2,733.00
281036.00
CPR-B26 - BUILDING M - ACCESS CONTROL CHANGES
$ 22,584.00
281037.00
CPR-B36 - BLDG B - ADDING ACCESS CONTROL TO MARSHALL OFFICE
$ 4,653.00
281038.00
CPR-B46 -BUILDING M - ADD AC TO SALLY PORT DOOR
$ 4,865.00
281055.00
PROVIDE POLES FOR CCTV - PHASE 2
$ 2,733.00
281090.00
CPR-B01 - CHILD CARE AREA FIRE ALARM
$ 3,505.00
281300.03
CPR-B68 - HOLDING CELL CAMERAS
$ 4,780.00
310710.00
CPR-A01 - EARTHLWORK & UTILITIES - COURT PARKING
$ 181,765.00
310715.00
CPR-A05 - GRADING REVISIONS
$ 7,113.00
310716.00
CPR-A10 -BUILDING T -ADDED PARKING
$ 7,827.00
311030.00
CPR-B18 - GENERATOR YARD FOUNDATION
$ 22,890.00
311031.00
CPR-B64 - FENCE PANELS IN LIEU OF MASONRY SCREEN
$ 20,866.00
311032.00
CPR-B64 - OPTEX SENSORS ON GATES
$ 3,200.00
321011.00
CPR-B59 - ADDED BOLLARD COVERS
$ 6,230.00
321012.00
CPR-B59 - ADDED CONCRETE WHEEL STOPS
$ 12,350.00
321013.00
CPR-B65 - ADDITIONAL WHEEL STOPS
$ 950.00
320027.00
CPR -Al 1 - BUILDING T - CHAIN LINK DIVIDERS
$ 10,568.00
320028.00
CPR -Al 1 - BUILDING T - TIRE STORAGE
$ 10,537.00
320029.00
CPR-Al2 - BUILDING T - GATE AT MEZZANINE
$ 1,990.00
321025.00
CPR-B01 - CHILD CARE AREA FENCING
$ 3,914.10
320032.00
CONCRETE FENCE CREDIT- PH 1B
$ 113,775.00)
320033.00
CONCRETE FENCE - ENGINEERING & RESTOCKING
$ 35,500.00
320130.00
AFTEC CONCRETE FENCE - PHASE 1 B
$ 45,011.00
321032.00
CONCRETE FENCE CREDIT - PHASE 2
$ 167,167.00
321033.00
AFTEC CONCRETE FENCE - PHASE 2
$ 129,433.00
320090.00
CPR-A14 -REDUCED LANDSCAPING
$ 12,098.00
320091.00
BENDA BOARD AT GRAVEL TRACK
$ 34,972.00
320095.00
CPR-A15 - MEXICAN BEACH PEBBLES
$ 18,053.00
331132.00
CPR-B33 - BLDG M - CHILD CARE DRAINAGE
$ 17,711.00
350015.00
CONSTRUCTION CONTINGENCY PHASE 1A
$ 100,000,00
530020.00
CONSTRUCTION CONTINGENCY PHASE 16
$ 300,000.00)
350025.00
CONSTRUCTION CONTINGENCY PHASE 2&3
$ (931,898.78)
360002.00
SITE ELEC. CONDUIT ALLOWANCE PHASE 1A
$ 75,000.00
360100.00
COURTS DRAINAGE ALLOWANCE PHASE 1A
$ 200,000.00
360600.00
ISIGNAGE ALLOWANCE PHASE 1B
$
360650.00
SIGNAGE ALLOWANCE PHASE 2&3
$ 60,000.00)
360700.00
FARADAY ROOM ALLOWANCE PHASE 2 & 3
$ 110,000.00)
360705.00
POLICE AND FIRE DEP SHIELD SIGN ALLOWANCE PHASE 2&3
$ 40,000.00
360710.00
BUILDING D RENOVATIONS ALLOWANCE PHASE 2&3
$ (20,000.00)
360715.00
EXISTING SOIL CONDITIONS ALLOWANCE PHASE 2&3
$ 100,000.00
000000
UNALLOCATED FUNDS
$ 590,668.00)
Sub Total (616.974.93)
0.00
ELECTRICAL INVOICES MAY 30, 2024
$ 30,573.10
0.00
_ _
ELECTRICAL INVOICES JUNE 30, 2024
$ 22,171.04
0.00
_
ELECTRICAL INVOICES JULY 30, 2024
$ 27,545.74
0.00
ELECTRICAL INVOICES AUGUST 31, 2024
$ 29,302.17
$ 31,242.70
0.00
ELECTRICAL INVOICES SEPTEMBER 30, 2024
0.00
ELECTRICAL INVOICES OCTOBER 30, 2024
$ 31,858.49
Sub Total $ 172,693.24
Grand Total S (444,281.69)