Ordinance No. 16,201ORDINANCE NO. 16,201 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING DEDUCTIVE CHANGE ORDER NO. 1 FOR THE BAYTOWN SIDEWALK PHASE II PROJECT WITH MBN ENTERPRISES, LLC; APPROVING A DECREASE IN THE CONTRACT AMOUNT BY FOUR HUNDRED SIXTY-SEVEN THOUSAND, TWO HUNDRED SEVENTY- SEVEN DOLLARS AND 09/100. ($467,277.09); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section l: That the City Council does hereby authorize Change Order No. 1 for the Sidewalk Phase II Project with MBN Enterprises, LLC, decreasing the contract amount by FOUR HUNDRED SIXTY-SEVEN THOUSAND, TWO HUNDRED SEVENTY-SEVEN DOLLARS AND NINE CENTS. ($467,277.09). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 24`h day of July, 2025. ST ANG SCOTT G< A,`;" e.�,n� - 3ON; City Clerk TO FORM: OND, City Attorney RAOrdinances and Resolutions\Ordinance Drafts\2025-06-12\Change Order No 1 Sidewalk Phase II Project with MBN Enterprises, LLC BE_ . BAYTOWN Date of Issuance Contractor: Designer: EXHIBIT „A" CITY OF BAYTOWN PUBLIC WORKS & ENGINEERING 2123 Market St. Baytown, Texas 77520 CHANGE ORDER Baytown Sidewalk Phase 11 Project 6/ 12/2025 MBN Enterprises, LLC City of Baytown Change Order No.: CoB Project No.: P.O. No.: TRFC2105 2315998 Explanation - This change order encompasses the following: The purpose of this change order is to facilitate the closeout of the Baytown Sidewalk Phase II Project. Quantities were adjusted due to changes that were made within the Right -of -Way (ROW) by adjacent property owners, utility/telecom providers, and based on field condtions discovered as construction was in progress. The largest change is a reduction in the scope of work. MBN Enterprises, LLC, and the City of Baytown mutally agreed that it was in the best interest of both parties to rebid the Decker Drive segment of the sidewalk due to delays in obtaining the permit process with TxDOT and ExxonMobil's pipeline easement. Ric] Tah Ttems- (Line Item 6) Site demolition (Removal and disposal of any concrete or asphalt) (Line Item 7) Reinforced concrete sidewalk (complete in place) (Line Item 9) Remove and replace traffic signs (Line Item 11) Allowance for tree removal (diameter 12 inches and larger) as directed by the engineer (Line Item 12) Allowance for tree removal (diameter 6 to 12 inches) as directed by the engineer (Line Item 13) Concrete driveway (complete in place includes curb and transition) (Line Item 14) Harris County concrete pad (complete and in place) (Line Item 15) SOD (complete in place) (Line Item 16) Place ADA ramps (complete in place) (Line Item 17) Place 6-inch curb and transition (complete in place) (Line Item 18) Remove existing pavement markings (Line Item 19) 24" Solid W/Y thermoplastic/paint PV markings type II (complete in place) (Line Item 20) Chain link fences (complete in place) (Line Item 21) Hand rail (compete in place)(Type E) (Line Item 22) Remove pavers (this includes capping electrical and irrigation lines, this also includes removal of landscaping around sign) at 4219 West Baker Road by STA-6+60. Protect apartment sign (Line Item 23) Miscellaneous allowance for use by City for general construction items as directed by the engineer (Fixed amount of $40,000.00) (Line Item 24) Allowaace for pedestrian signal work at Main Street and Lee Drive as directed by the engineer (Fixed amount of $40,000.00) (Line Item 25) Retaining wall (complete in place) (Line Item 26) Allowance for topsoil fill as directed by the engineer (Line Item 27) Install extra cement stabilized sand backfill (complete in place) (Line Item 28) High density polyethylene 4" pipe (Line Item 29) High early concrete as directed by the engineer Description of Work Cost 1 . Line Item 6 - Site demolition (Removal and disposal of any concrete or asphalt) $ (2,211.24) 2. Line Item 7 -Reinforced concrete sidewalk (complete in place) $ (206,484.10) Time _ Days 365 Days Construction l of 3 D 16 Revised 9/2023 3 . Line Item 9 - Remove and Replace Traffic Signs $ (39750.00), Days 4. Line Item 11 - Allowance for tree removal (diameter 12 inches and larger) as directed by the engineer $ (21000.00) Days 5. Line Item 12 -Allowance for tree removal (diameter 6 to 12 inches) as directed by the engineer $ (1,000.00) Days 6. Line Item 13 - Concrete driveway (complete in place includes curb and transition) $ (63,473.75) Days 7. Line Item 14 - Harris County concrete pad ( complete and in place) $ (I 8,000.00) Days 8 Line Item 15 -SOD (complete in place) $ (109171.00) Days 9. Line Item 16 - Place ADA ramps (complete in place) $ (659000.00) Days 10. Line Item 17 - Place 6-inch curb and transition (complete in place) $ 2,373.00 Days 11. Line Item 18 - Remove existing pavement markings $ (200.00) Days 12. Line Item 19 - 24" Solid W/Y thermoplastic/paint PV marking type II (complete in place) $ (11800.00) Days 13. Line Item 20 - Chain link fences (complete in place) $ (119700.00) Days 14. Line Item 21 - Hand rail (complete in place) (Type E) $ (12,000.00) Days 15. Line Item 22 - Remove pavers (this includes capping electrical and irrigation lines,'this also includes removal of landscaping around sign) at 4219 West Baker by STA 6+60. Protect apartment sign $ (81000.00) Days 16. Line Item 23 -Miscellaneous allowance for use by City for general construction items as directed by the engineer (Fixed amount of $40,000.00) $ 44,960.00 Days 17. Line Item 24 -Allowance for pedestrian signal work at Main Street and Lee Drive as directed by the engineer (Fixed amount of $401000.00) $ (40,000.00) Days 18. Line Item 25 - Retaining wall (complete in place) $ (91000.00) Days 19. Line Item 26 -Allowance for topsoil fill as directed by the engineer $ (11250.00) Days 20. Line Item 27 - Install extra cement stabilized sand backtill (complete in place) $ (2,250.00) Days 21. Line Item 28 - High density polyethylene 4" pipe $ 39680.00 Days 22. Line Item 29 - High early concrete as directed by the engineer $ (605000.00) Days Please attach back-up documentation Cost & Time Change Summary Cost Time Original Contract: $ 115889840.00 365 Days Previous Change Order(s): $ - Days Contract prior to this change order: $ 19588,840.00 Days Net increase (decrease) from this change order $ (467,277.09) 365 Days Construction 2 of 3 D l 6 Revised 9/2023 Revised Contract: "S 1,12 11562.91 730 Dxvs Percent incre.ase (decrease) this Changle Order - 2 Q.4,,, Percent increasc (decrease-) Call Change Orders _29.4(1).0 4 R F, C 0 livi N/1 F, N f ) I Ri'CON - 1 M 1: N 1) t: D: By:Juan Macias Jua, ("'A 4"1 1.) ate: 07/08/2025 V: 07/09/2025 Deslon I Illcel, Frank slillollcaux,.IC . Directol cat 'Pul-flic Wol-k.'s- & Lnuilleel-11W ACCEPTF FINANCE APPROVAL: L3v: Bind Jase', Date: 7/2/2025 fix," v Date: 07/09/25 Contractor I cl-c-'a MC KCI I/ I k', CI I It: 1' F I I I ill I C I a 101 fi Cel, R F C 1 0 M N/1 E'N D E D: APPROVIA): By: Thang Lam D, 7/7/2025 Date: }reject NL1111-11,cl Mlina,--cr VERIFIED. - fly: )site: 7/8/25 �Collti.aclol. aglret:s W pCI-1,01-111 dlaw'C(`) IIl,:1IIiL.(1 Ill ill], I 11,111�,e ()rder 1,01. 11w priccalld 1111le indl,:a1ed. 111C priccS 1*01- 111cl1 ded all &N.,106 latcd thl,, Chaill-'e Oqh:1- No �%ork I-, it) 11C donc unill this order 1� cv'!Cuted. \o pa\ Illelit to the CoilluakAor wr (,oll�lljtkailu -hall lie madc t'Or \\ork iiiciti(tc(i In (he c1miloc ordk�r untli the Contractor%; pa,,v I'S upddtt:d. RC%l-'e (lie proJect plans and spCCO-Wilti011s ill vd'cicllck<d and illmd'..11-aN ill,.- tit 1 i111,1I proiccl draIwill-o" and inconsi-,loit. till., ( hange Order execution b\ all pt-Irtle';. the 1*011o'.1 Im-, Chall'-'C', idC11111-1cil 1,01, 111c, C('1111act %alue and OF C0111FACt (1111C I). 3h: 111,1de part of coiltrilk:t. I I I - Ll C I I I 1 i. t 1) 10 RC\ 1;Cd 9 2) o Baytown Sidewalk Project Phase It COB Project No: TR2105 Bid No: IFB 23-1220 Original Quantities Final Quantities Change in Contract Item Description • • "Base Unit Prices General -- Item Description ®� • / .. of maximum bid) ®a 111 11 ,11 ,1 111 11 111 1! , 111 11 Traffic Control (In addition to other requirements within TCP contractor should inlcucle an Arrow Board Sign to be used at all times that the rCP is implemented) 1 111 11 1 111 11 1 111 „ 1 111 1, , , 111 11 01550,01565 .• Prevention (Daily Sweeping, Fabric . . Storm Pollution ®� 111 11 11, 11 111 11 ,// II 1 111 11 .1 Project of Baytown) 11 11 130001 11, mil 11 ,1 ,1, II , 11 11 :1 . �© 11 II 11, 11 11 11 111 11 , 11 11 Subtotal Ge—ne—ral . 111 11 Subtotal General:Item Base Unit Prices Site Work Description 1Site Demolition (Rem.and Disposal of any concreteor asphalt). . „ .•1 11 11 :• 11 Reinforced concrete Sidewalk (Complete in Plac. • 11 11 I11 11 •• 1. II •! •11 , 11 ,. •:• 1 /1Cast in Place culvert (compleLe and(comp in . �© ,11 11 /11 11 111 11 f11 11 111 1, 1Remove and Replace Traffic Signs 1Tree removal/ . �© 111 11 111 „ 111 11 IIAllowance for.val (Diameter 12 inches and directed . �© 111 11 111 11 1 1111110111 111 11 101 11 directed �© 11 11 11/ 11 little 11 1 Concrete 1 (Complete Place includes. and transition) ': /1Harris County. '.. (Complete . �� • 111 11 . 111 11 • 111 11 ,us11 11 • 1,1 11 111 „ •1 • . 11 ,EMMUTIM11 1• 11 ©� 11 1 I Place ADA Ramps (Complete in Place) mat Place 6-inch . and transition (Complete in Place) , of MINIENZITI If Remove existing Paveme nt Marking mia , 1, 11 11 11 11 •Solid•, :1 11f 1 11 1 11 I • . • 11 1/ (Complete —Hand Rail ®� 11 11 1 111 11 .•1 1, 11 111 ,1 .1 11 ,1 111 11 1 •. • • • around sign) at 4219 West Baker by STA 6*60. Protect Apartment Sign ®� 111 11 111 11 1 111 11 111 11 (8,000.00) Miscellaneous Allowance forby • Amount • •1,1„1 •1111 11 40,000.00 84,960.00 96111 '.1 11 •.1 11 � 1• for Pedestrian Signal Work at Main and Lee as directed by the Engineer (Fixed Amount of •1 0 11 •1 1/1 11 •1 1/1 11Allowance 41 111 !1 41 111 11 (CompleteRetaining Wall 1 11 111 11 • for . • directed by . • 11 1 11 1 11 1 11 1 11 -install Extra Cement Stabilized Sand :. • • PolyethyleneHigh Density Pipe 'High Early Concrete as directed by . . 11 © .11 11 .1 ,11 1! 1 .11 11 11 .11 11 .1 111 ,1 • . • 1 11 Subtotal 1• . • • �• 1 Grand . Order:1•