BAWA Resolution No. 2024-29 RESOLUTION NO. 2024-29
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN
AREA WATER AUTHORITY APPROVING THE BACKWASH LAGOON
SLUDGE REMOVAL CONTRACT BETWEEN THE BAYTOWN AREA
WATER AUTHORITY AND BRANCH CONSTRUCTION GROUP, LLC, AND
PROVIDING FOR THE EFFECTIVE DATE THEREOF.
******************************************************************************
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN AREA
WATER AUTHORITY:
Section 1: That the Board of Directors of the Baytown Area Water Authority hereby
approves the Backwash Lagoon Sludge Removal Contract between the Baytown Area Water
Authority and Branch Construction Group, LLC, in an amount not to exceed ONE HUNDRED
SIXTY-TWO THOUSAND THREE HUNDRED THIRTY-EIGHT AND NO 100 DOLLARS
($162,338.00) through the Interlocal Purchasing System (TIPS).
Section 2: This resolution shall take effect immediately from and after its passage by the
Board of Directors of the Baytown Area Water Authority.
INTRODUCED, READ and PASSED by the affirmative vote of the Board of Directors of
the Baytown Area Water Authority this the 18t1'day of September, 2024.
ATTEST: `0\t t 111 l i l,,�� RENDA BRADLEY SMITH, President
\ WATFR/�
�(i +
G '
0 =0 0 =Z -
A GEI, JA K O , Assistant e � y
S 'c
VED A TO F RM:
SCOTT LE ND, General Counsel
R:'.Ordinances and Resolutions%Resolution Drafts`BAWA%9.18.202CResolution Approving Backwash Lagoon Sludge Removal Contract between
BAWA and Branch Construction.docx