Loading...
BAWA Resolution No. 2024-29 RESOLUTION NO. 2024-29 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY APPROVING THE BACKWASH LAGOON SLUDGE REMOVAL CONTRACT BETWEEN THE BAYTOWN AREA WATER AUTHORITY AND BRANCH CONSTRUCTION GROUP, LLC, AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY: Section 1: That the Board of Directors of the Baytown Area Water Authority hereby approves the Backwash Lagoon Sludge Removal Contract between the Baytown Area Water Authority and Branch Construction Group, LLC, in an amount not to exceed ONE HUNDRED SIXTY-TWO THOUSAND THREE HUNDRED THIRTY-EIGHT AND NO 100 DOLLARS ($162,338.00) through the Interlocal Purchasing System (TIPS). Section 2: This resolution shall take effect immediately from and after its passage by the Board of Directors of the Baytown Area Water Authority. INTRODUCED, READ and PASSED by the affirmative vote of the Board of Directors of the Baytown Area Water Authority this the 18t1'day of September, 2024. ATTEST: `0\t t 111 l i l,,�� RENDA BRADLEY SMITH, President \ WATFR/� �(i + G ' 0 =0 0 =Z - A GEI, JA K O , Assistant e � y S 'c VED A TO F RM: SCOTT LE ND, General Counsel R:'.Ordinances and Resolutions%Resolution Drafts`BAWA%9.18.202CResolution Approving Backwash Lagoon Sludge Removal Contract between BAWA and Branch Construction.docx