Ordinance No. 15,908 ORDINANCE NO. 15,908 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 TO THE ROBERT E. LEE HIGH SCHOOL DRAINAGE RE-ROUTE PROJECT WITH MBN ENTERPRISES, LLC, APPROVING A DECREASE IN THE CONTRACT AMOUNT FOR THE PROJECT IN THE AMOUNT OF FIFTY-ONE THOUSAND NINE HUNDRED TWELVE AND 25"100 DOLLARS ($51,912.25); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 to the Robert E. Lee High School Drainage Re-route Project with MBN Enterprises, LLC, approving a decrease in the contract amount for the project in the amount of FIFTY-ONE THOUSAND NINE HUNDRED TWELVE AND 25;100 DOLLARS ($51,912.25). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 12`h day of September, 2024. BRANDON CAPETILL , Mayor EST: egp Y �a.Oe''�._ 0 ANGE" KSON, i y Clerk i o APPROVED AS T FO M: ­ SCOTT LEN D, City Attorney R.'Ordtnances and Resolutions-Ordinance Drafts 9 12 2024 Ordinance for Change Order No I for the Robert E Lee High School Drainage Rc-route Project with MEIN Enterprises,LLC docx EXHIBIT "A" CITY OF BAYTOWN PUBLIC WORKS& ENGINEERING 2123 Market St. I Baytown,Texas 77520 �cr WTOWN CHANGE ORDER Robert E. Lee High School Drainage Re-route Date of Issuance: 7/22/2024 Change Order No.: 1 Contractor: MBN Enterprises,LLC. CoB Project No.: DR2104/WWSF8000 Designer: Kunky-Hom and Associates Inc P.O. No.: 2317241 Explanation: This change order encompasses the following: Requests For Information(RFI): RFI 18 pertains to the Rip Rap placed and not quaintified properly in the bid item. RFI 19 pertains to 3 manholes called in the plans,but did not have a bid item. RFI 21 pertains to the extra sod needed due to quainties did not include .85 acres on the project. RFI 25 pertains to the 60"storm water drainage pipe to be abandoned which was shortened from 625'to 502; which was field change due to field condition. RFI 26 pertains to a measurement change of actual fence replaced. RFI 27 pertains to the overage of 6"sub-grade and 3" asphalt due to unknown condition of Gentry Road and the concrete that was under the asphalt. This will be the final change order for the Robert E. Lee High School Drainage Re-route Project. This change order is needed so final payment and closeout can be requested for the project via City Council. Description of Work Cost Time 1• Line 3-(RFI 21)Top Soil added due to.85 extra acres on project $ 11,700.00 Days 2. Line 6- Construction Access- Item not used $ (3,000.00) Days 3. Line 7-(RFI 26)Remove Chain Link Fence-Item not used $ (6,708.00) Days 4. Line 8-(RFI 26)Temporary Chain Link Fence- Item not used $ (13,640.00) Days 5. Line 9-(RFI 26) Install Chain Link Fence-Item not used $ (30,186.00) Days 6. Line10-(RFI 26) Install Single Trk Gate-Item not used $ (3,000.00) Days 7. Line I I-(RFI 26)Install Fence Gate-Item not used $ (2,000.00) Days 8. Line 12-(RFI 21)Sodding-Remaining quanity not used $ (2,100.00) Days 9. Line 14-Tree and Plant Protection $ (7,740.00) Days 10 Line 15-Pipe Removal $ 28.00 Days 11. Line 16-(RFI 25)Controlled Low Strength Material -Item reduced $ (74,550.00) Days 12 Line 35-(RFI 18)Rip Rap-added quanity $ 13,530.00 Days 13 Line 4 1-Remove and replace gravel on shot-put pit $ (1,800.00) Days 14 Line 42-Remove and replace 6"concrete mow strip around shot-put- Item not used $ (2,925.00) Days 15 Line 43-(RFI 27)Remove and dispose of existing asphalt pavement-extra removal due to unforeseen field conditions $ 366.25 Days 16 Line 44-(RFI 27) Install 6" sub-grade- extra quanity due to unforeseen field conditions $ 6,930.00 Days Construction 1 of 2 D16 Re%iced 9 2023 17 Line 45-(RFI 27)Install 6"3" thick asphalt- extra quanity due to unforeseen field conditions $ 4,055.00 Days 18 Line 50-Reinforced Silt Fence $ (5,064.00) Days 19 Al-Temporary Demoblization- Item not used $ (5,000.00) Days 20 (RFI 19)Three(3)Manholes-added bid item to plans $ 66,327.00 Days 21"(RFI 21) Bermuda Seeding-added to plans as sod was removed $ 2,864.50 Days Please attach back-up documentation Cost& Time Chanee Summary Cost Time Original Contract: $ 1,717,017.00 362 Days Previous Change Order(s): $ - Days Contract prior to this change order: $ 1,717,017.00 Days Net increase(decrease) from this change order $ (51,912.25) 0 Days Revised Contract: $ 1,665,104.75 362 Days Percent increase(decrease)this Change Order -3.02% Percent increase(decrease)all Change Orders -3.02% RECOMMENDED: RECOMMEN ED: By: J--pw Date: July 30, 2024 y: !__r Date: 08/14/2024 Design Engineer 4f Frank Simoneaux,Jr,,Otrector of Public Works&Engineering ACCEPTED*- FINANCE APPROVAL: By: C�Date: August 8, 2024 By Date: Contractor Bind Jasim Teresa Mchen .Chic Financial Officer 08-08-24 APPROVED: By Date: Project Manager Jason E Reynolds City Manager VERIFIED: By: De: 8-13-24 at B smess sset Tram Member *Contractor agrees to perform change(s)included in this Change Order for the price and time indicated The prices for changes included all costs associated with this Change Order No work is to be done until this change order is executed No payment to the Contractor(or Consultant)shall be made for work included in the change order until the Contractot*s pay estimate is updated Rem ise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent this Change Order governs Upon execution by all parties the following changes identified for the contract value and or contract time shown are made pan of the contract Construction 2 of 2 D 16 Re\ised 9 2023 Kimley>Morn July 19, 2024 Mr. Michael Leech City of Baytown Assistant Engineering Director—Capital Projects 2123 Market Street Baytown, Texas 77522 RE: Robert E. Lee High School Drainage Re-Route Bid Form Quantities Dear Mr. Leech: Kimley-Horn and Associates, Inc. created the construction documents for Robert E. Lee High School Drainage Re-Route as dated on December 1, 2022 and has been serving the City through Construction Phase Services. The selected contractor, MBN Enterprises, LLC, has submitted requests for information which necessitate a change order as explained below. RFI 18: Rip Rap Bid items for structures along the channel included the phrase'Yip rap" in their description. This phrase was not included on bid item 36. The additional quantity of riprap was not accounted for in bid item 35-rip rap. RFI 19/23: Manholes This item was included in the plans but was not included on the bid form. This item was included in our 95% bid form to the City but was not included on the final bid form. RFI 21: Sodding and Topsoil An early draft set of the construction plans called for hydro mulch seeding to be installed along the channel and for existing conditions to be restored with hydro mulch seeding within construction limits for the below grade storm sewers. The City of Baytown Parks Department commented that the channel needed to be restored with sod.Therefore, the change was made to the plans calling out sod for restoration. This change was intended to take place on the channel only however, the restoration of site over the buried sewers is not clear between the plans and the contract specifications. The quantity reflected on the bid form reflects the channel section to be sodded but not the restoration of site with seeding on the practice fields. MBN had a surplus of 0.07 acres of sod. The engineer recommends that the change order call for Bermuda seeding for the remaining 0.85 acres and top soil for the remaining 0.78 acres to restore the site. The unit price of$3,370 per acre is the accepted cost of Bermuda Seeding. RFI 25: Reduction of Storm Sewer Abandonment Length The construction plans call out 625 LF of 60"storm sewer to be abandoned with Controlled Low Strength Material.The contractor field verified the storm sewer and measured the length to be abandoned is 502 LF. This results in a decrease of the controlled low strength material quantity from 1820 CY to 1462 CY. RFI 26: Change in Fencing Length The contractor completed construction inside of the existing fence eliminating the need to remove and replace the fencing. The bid form was updated to only include replacement of 113 LF of fencing and related items were removed from the contract cost. RFI 27: Gentry Road Overages Upon removal of the existing asphalt, an existing 8-inch concrete slab of 34-square yards was discovered beneath the asphalt.This was an unforeseen circumstance. The engineer recommends removing the section of concrete and replacing with 6-inch subgrade and 3-inch asphalt per the plans. 00 Katy Freeway, Suite :00 Houston, Texas 77079 �� Ki m ey>>>H o r n Page 2 Summary We have reviewed the requested quantity increases and unused quantities on the project which results in the detailed description in Table 1.This table is a summary of the additional costs related to a change order which includes the additional rip rap, manholes, topsoil, seeding, and Gentry overages. There are a surplus of unused quantities, resulting in remaining contract funds and no need for additional funding. Table 1. Change Order Summary 3 21 Topsoil $15,000 AC +0.78 $11,700.00 6 Construction Access $1,500 EA -2 $3,000.00 7 26 Remove Chain Link Fence $6 LF -1118 $6,708.00 8 26 Temporary Chain Link Fence $10 LF -1364 $13,640.00 9 26 Install Chain Link Fence $27 LF -1118 $30,186.00 10 26 Install Single Track Gate $1,500 EA -2 $3,000.00 11 26 Install Fence Gate $2,000 EA -1 $2,000.00 12 21 Sodding $33,000 AC -0.07 $2,100.00 14 Tree and Plant Protection $15 LF -516 $7,740.00 15 Pipe Removal $35 LF 0.8 $28.00 16 25 Controlled Low Strength $150 CY -497 $74,550.00 Material 35 18 Rip Rap $550 CY +24.6 $13,530.00 41 Remove and replace gravel $120 CY -15 $1,800.00 in shot put pit 42 Remove and replace 6" $25 LF -117 $2,925.00 concrete mow strip around shot-put pit 43 27 Remove and dispose of $5 SY +73.25 $366.25 existing asphalt pavement 44 27 Install 6-inch thick sub-grade $500 TONS +13.86 $6,930.00 45 27 Install 3-inch thick asphalt $500 TONS +8.11 $4,055.00 pavement 50 Reinforced Silt Fence $4 LF -1266 $5,064.00 Al Temporary Demobilization $5,000 LS -1 $5,000.00 19/23 Manholes $22,109 EA +3 $66,327.00 21 Bermuda Seeding $3,370 AC +0.85 $2,864.50 Remaining Contract Funds: $51,912.25 'unused quantity Please contact me at 346-348-0965 or sarah.torresAkimley-horn.com if I can offer further clarification. Sincerely, Vk Sa h Torres, PE Kimley-Horn and Associates, Inc. Texas Registered Engineering Firm F-928 00 Katy Freeway, Suite :00 Houst on, Texas 77 07 9 �� rid - u 'oo i0 c iO o- c a c o u u n u o � $o��g$g o N00 voi � o « "idiom-- 'M s V V =N N N N N N N m N N N N N N N H N N N N N N N N N N N N N N N N N N N N Q 0mon08� 8� �MB � ^vaima e e So e e e. .a orv � envoi $ �6 25 � o GiEQt to N N N VI N—N of N N N -N N m N N m N N N N N N N N N N m N m N m N N N 0 0 0 0 0 0 0 0 0 0 O O �O _ O tDD O O O V C J d O 88888bT8n 8�n OS8m NOO 8 O n 1pp a00 rOn 0 0 ti n m O O O� O m fl!N O S S frl O N O N T O O� yy��YI O OD O N E �G�+1 N O N m CO N n p'T U1 O d 0 0o N N O O pppp QQ n N n ui N O m V a d N N N N N N VI N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N - 0 0 8 m N 8 m o n 8 8 8 0 0 0 0 o 0 0 8 0 0 o 0 0 0 o ui 8 o N o 0 8 0 0 0 $ a 0 o o 0 0 0 0 0 o m O o 0 � 000 � oo �`� o0 0000m.no�' � m o 0 0 0 F. L'O n 0 e c o o a` Gp F d N N N N -N m -N N N N N E .+8�o ..�omo -.o 1Om °p rmimo� om �" o �o�D O N O�O O N O n Ci m NI O M 10 lO N an dW N n O N N O O t0 N YI O O m V�f 1� YI N m 1eY7 N O n E W M N N N N N N N N N N N N VI N N N N N N N N N N N N N N N N N N N N N N N C O O m O n O 0 0 0 0 0 0 O O O O O O O N O O c] O O Z 8 rv $ goo8m � n ^a8' �888888So8N � omn $ 8 $ m vioocoN mo f rig<N � g j N N N N N N Vf N N N N N -�N Y�N N VI N m N N N N N N N N N V�N N V� N N Jf Yf N N TITIm N Oni N O O l O T C 000 J d O ol J !nn14r, I nt t;'.1 ,awn J6 LL W Wwaawawav� a > � a a w a c o 4 s c c ^ E c c ; A c c 4 c f mn mt T6-0 c o q « n o .°.LL ° u o .c y E o u g E u o a3i= q m° o t o f q J ° o 0 0 c ° w t E a N- u E m n c c c u q- m i0 _ _ _ _ « E E c L u.3 ° E ° c c °1 ° ° $ ° °3 ° E c y Z m a 'o a u u m m m E E o o c'o m�^ o c m 2 c c c o « 4 A cLL �a E wLLuuv � > ; § �uu r w u _ c u o o_« ,�, o $'" o= xo m' N E Ex . : x . f � o x wwl12 =voi �� enein i� �c+a ao i.�na$co� 2�vc � :.a° �'. 3 no voi�m ti ?,.°u�im eo aom men mums �o n Mm mn In v�N ;Hroi N r V 3~ rvoo� � oR� N N8� 8888mm .. �rvNc 8 8 Z �� pNin NeeaveOO s m Ten W men mw� �� � d a d 0 E a N w a z z z u U �Uy U N W N S $ s m °mo ' $o e10 wN C�0 N m N V N N a b N a N A a pN N N V I N N N N u N N N N N N 8 N N S S S S S�! O O m Ln O N b +O O O O b 0 0 0 •+ m N N b .r b 07 m CO O O n O N e~i N .6144 N N a b ry N b 10 rl N N N N N N N 8 N N N N 8 N N N N Gry NS8 SCOOBN < �O mO �1O .OiM G T �m N N N I- 10 A 0 2 Z a L N o o a w >> LL a a N a Q t E u d � a' g n -i° n u u v m `o � ` o u v°1i - ° t o .° E E E 9 :°c E „ w q E f y me na o < < =uj90 z ° c � �tnm S N n N vbi vbf� �wcY O N oEOWN o O Qa m W �-NO- : I CITY OF BAYTOWN PUBLIC WORKS & ENGINEERING 8 E T 2123 Market Street BAYTOWN Baytown,Texas 77520 Request for Information City of Baytown Project No: DR2104 RFI Number: 18 Project Name: Robert E. Lee High School Drainage Re-Route Contractor: MBN Enterprises, LLC Specification Number: Drawing Number: Response Code: Critical Routine Date Response Required: (within 10 working days of receipt) Information Required: See attached. Contractor/CM Signature Title Date Response: No separate payment will be made for the rip rap. Rip rap is considered incidental per plan sheets 11 and 12, and detail sheets 52 and 54. 3/27/2024 City Project Manager Signature Date Response to RFI does not authorize change in contract time and price. If the Contractor believes the response given requires an adjustment in contract time or contract price,the contractor shall submit a timely proposal so as not to delay contractor's work in accordance with the General Conditions. Article 7 Changes in the work. Construction I of I D14 Revised 2016 Subject: Overrun RipRap Quantities IMBN RFI#18 4 Project: Robert E.Lee High School Drainage Re-route Number: DR2104 On sheet#12 the plans show to put RipRap just in one location at SAT(18+56 to 18+76-Yellow shade)so the QTY in the bid form shows just 8 CY because it's just for this location,but we put RipRap in 6 more different locations as shown in the plan below(Green shade-sheets#12 and#11).Please let your inspector verify these QTYs. .0 Nr• 11 . FNDw.0 NSTALL: 1xE SMCi I] -iCC•:]'" 7'v4'RCB M 0 1lBSSBE�59 pGN CENUK�C 1]B}6pB] AWC-M AND HEADWALL _ CP S1V.EIURE �yE/"SS i TJ: /ExTENCED WRO JBJeO146 '30K 6 LuOPiu ]1!u naq YXi KB Sw 0 ' 17XXfL2.e y .y.-!J'•o ` S1ALL E. SHEET 21 SID[wXLM Owael ANp HEA]RAIL rry, 1pyl+ ..l 1 iRA11SITiCN MCV 7'za' Or t0 OL • EXIp•DED O.RB r �].• �•`!,-'1 r BOX OK WLWRT TO O-EY p51." x�y1[[1 2] NANN2lB,lB)!aJ PROP ifrl PRDP J.S• 2/2e V 1l:53 BAN. MOO StRLCRmE PROF f HCP PROP.EDGE R 7'Xa'<S):5% K PROP 272 3• R2 SH[Es 1. pRAx. 39 R O[CMAYYEL 1!BlSaBJ.BO gONC 90n[PANYO _ 9.13 E: J2aa]a2 Ca U E S.—Sa 152 uE _ _ •07 9.IB 20.12 uE 192 uE .91B PROP lE� _ nROP G -_id106 _ 700 19,9 uE i1:E _ L —- 1? 8 P. FOf � 9 u[- Lt JB'V. / R[�P y HCl4 Sa PROP 272 Sy PRR I L COI.0 SLOPE PAVNG 1 RE SN EET SA 16.02 VE i� PROP R1GNT BANK $TA: •JsSS I CITY OF BAYTOWN PUBLIC WORKS & ENGINEERING 3 2123 Market Street BAYTOWN Baytown,Texas 77520 Request for Information City of Baytown Project No: DR2104 RFI Number: 19 Project Name: Robert E. Lee High School Drainage Re-Route Contractor: MBN Enterprises, LLC Specification Number: Drawing Number: Response Code: Critical Routine Date Response Required: (within 10 working days of receipt) Information Required: See attached. Contractor/CM Signature Title Date Response: Please prepare a change proposal for the installation of three (3) manhole boxes based on the attached information. Price shall include all labor,materials, equipment, bedding, backfill, pipe connections, to furnish and fully install the manholes. The change proposal will be reviewed by the City prior to approval or a fully executed change order. 3 27 2024 City Project Manager Signature Date Response to RFI does not authorize change in contract time and price. If the Contractor believes the response given requires an adjustment in contract time or contract price,the contractor shall submit a timely proposal so as not to delay contractor's work in accordance with the General Conditions. Article 7 Changes in the work. Construction I ❑l'I D14 Revised 2016 A5'DIA.Manhole at 6+89.57 MBN RFI#19Subject: 4 Project: Robert E.Lee High School Drainage Re-route Number: DR2104 Per Manufacturer the 48"dia RCP does not fit into 5'dia Manhole very well.We may need a bigger size of Manhole.Also we don't have pay line item. A: 6+61.57 (�w H 1 - 5' DIA. MANHOLE ^T SEE g�EE eh W/ 45'MORIZ. BEND RIM: 23.00 EX. FIELD GOAL FL 48* (SW): 12.44 000 20.0'� �i TO BE PROTECTED FL 48" (N): 12 44 REMAIN IN PLACE N: 13834974.59 STA: 6+89.57 3244509.69 INSTALL: 1 - 5' DIA. MANHOLE W/ 15'HORIZ. BEND -5+ - - - ++ RIM: 22.88 FL 48" (S): 12.29 FL 48" (N): 12 29 ��/—f ,� f t—�—s ,� /—s v—/ s• r—f ;� .• i—� N: 13835002.54 Q,� E- 3244507.97 ,< STREET S'.GN—, I p•r C. STA: 6+33.57 E+ STRFti Si rl1 -�11 �4" -- INSTALL: \ 1 - 5' DIA. MANHOLE - -- -- \ - -- W/ 45-MORIZ BEND Ex DRAIN' RIM: 23.00 Di r�cr - FL 48* (W): 1260 FL 48" (NE): 12 60 N: 13834953.61 3244491.15 CITY OF BAYTOWN PUBLIC WORKS& ENGINEERING MT � 2123 Market Street HT Baytown, Texas 77520 Request for Information City of Baytown Project No: DR2104 RFI Number: 21 Project Name: Robert E. Lee High School Drainage Re-Route Contractor: MBN Enterprises, LLC Specification Number: Drawing Number: Response Code: : Critical Routine Date Response Required: (within 10 working days of receipt) Information Required: See attached. Contractor/CM Signature Title Date Response: The City will field verify the limits of construction and check the quantity of topsoil and sod placed for the project. No additional payment will be given for sod or topsoil installed outside the limits of construction. Areas disturbed by the Contractor outside of the limits of construction shall be repaired by the Contractor at no separate pay. 3/26/2024 City Project Manager Signature Date Response to RFI does not authorize change in contract time and price. If the Contractor believes the response given requires an adjustment in contract time or contract price,the contractor shall submit a timely proposal so as not to delay contractor's work in accordance with the General Conditions. Article 7 Changes in the work. Construction 1 of 1 D14 Revised 2016 Subject: Pay line item 4�MBN RFI#21 2017 ` ' Project: Robert E.Lee High School Drainage Re-route Number: DR2104 As of Feb approved pay estimate,we have completed the topsoil 0.73 acres and sodding work over of 0.96,from sta 19+09 to sta 12+00.Currently,we are progressing the work from sta 11+00 to 0+00,which covers nearly 1200linear feet length by 50 wide and requires an additional 1.23 acres of top soil and sod.We will have an overrun in the topsoil and sodding as per plan compare to bid form.Please advice. 1 1 1 1 1 1 PLUO a W sn 11 1 1 11 1 1 1 SHEET, 10 -tc ro•rn DL STY SYSTEM TO REMMN - 1 1 E.WX MAGNC 1 1 1 d..T,m SNOT WR OF QMSIMKIIOM —PUT AREA►/ 1 Ole 1 PLUG Ex N•m —«ac----i.Tn�---�_ MW Siam Sr" TOP SOIL AND SODDING DONE I CITY OF BAYTOWN PUBLIC WORKS & ENGINEERING ' 2123 Market Street BHTOWN Baytown,Texas 77520 Request for Information City of Baytown Project No: DR2104 RFI Number: 25 Project Name: Robert E. Lee High School Drainage Re-Route Contractor: MBN Enterprises, LLC Specification Number: Drawing Number: Response Code: Critical E Routine Date Response Required: 6/20/2024 (within 10 working days of receipt) Information Required: Field verification of the location and direction of 60"and 48"pipes does not in accordance with the plan inside baseball field, below are the findings. please let us know how COB wants to do the grouting and send its the revised plan as soon as possible. Contractor CM Signature Title Date Response: The 502 linear feet of 60"pipe is to be abandoned and grouted with controlled low strength material from the junction box to the plug on the existing 60" sewer near station 8+50. The 370 linear feet of 60"pipe, 'unction box and 201 feet of 48"pipe, both from the existing storms stem, are to remain in place. Q Vk_pw 6/10/2024 City Project Manager Signature Date Response to RFI does not authorize change in contract time and price. If the Contractor believes the response given requires an adjustment in contract time or contract price,the contractor shall submit a timely proposal so as not to delay contractor's work in accordance with the General Conditions. Article 7 Changes in the work. Construction I of] D14 Revised 2016 MBN Subject: 60"Abandoned storm pipe is not per plan inside baseball field RFI#25 2017 . Date 6/6/202424 Project: Robert E.Lee High School Drainage Re-route Number: DR2104 Field verification of the location and direction of 60"and 48"pipes does not in accordance with the plan inside baseball field,below are the findings. please let us know how COB wants to do the grouting and send us the revised plan as soon as possible. 1' 1 1 ' 1r 1 } K 1 1 1 8 t1 so- I TRANSITION FROM PROP STORM I ` SEWER TO PROP OPEN CHANNEL I o PLuO EX 60,STLr—\ ISEE DETAIL I/C-09 N •.� ON SHEET 09) \4 Ex.625 LF 60"STM TO OE l - ABANDONED AND GROUTED W/CONTROLLED LOW \\\ S \ \ STRENGTH MATERIAL \ 1 (SPEC 02253) \ 1 \ \ } \ PLUS Ex 80"SIY 1 Pipe \\ �1 \ 6\ I 1 \ SHEET 10 \ qqq. E% 60"STM Ex.STM SYSTEM TO REMAIN Ex.METAL BUILDWG \ �r 1 It 1 M Ex GRHI SNOT LIMITS OF CONSTRUCTION �y5 PUT AREA W/ 1 i PLUG Ex. 48•Stu--. CONCRE — ---- TE CURB ------6.00— I ----- -- —;.ao a.00. x:- sue. ------------ .. �• ;, • i80 TOWARD N E="FIELD ham. • `fir. . ra pwa f F_ k 1 1 P pe TRANSITION FROM PROP. STORM uj SEWER TO PROP. OPEN CHANNEL I 0 1 PLUG Ex 60' STU� (SEE DETAIL 1/C-09 ON SHEET 09) EX 625 LF 60"STM TO BE I ABANDONED AND GROUTED W//CONTROLLED LOW SSRENGTH MATERIAL rA (SPEC 02253) \\\\ rr Juneuon Box �\ r- 1 .1• \ \ 48' \ Pipe \ 8 SHEET 10 / EX STM SYSTEM TO REMAIN EX METAL BUILDING 1 1 1 1 LIMITS OF CONSTRUCTION EX VEL SHOT r PUT 2WTA W/ 1 PLUG EX 48'STM �CONCRETE CURB ____�� T———"' GENTRY DRIVE STORM SEWER 1-�J ") CITY OF BAYTOWN PUBLIC WORKS & ENGINEERING ' 2123 Market Street BMTOWN Baytown,Texas 77520 Request for Information City of Baytown Project No: DR2104 RFl Number: 26 Project Name: Robert E. Lee High School Drainage Re-Route Contractor: MBN Enterprises, LLC Specification Number: Drawing Number: Response Code: ❑ Critical L Routine Date Response Required: 6/20/2024 (within 10 working days of receipt) Information Required: Hi, According to the contract the entire fence need to be removed and replaced. Since we dont utilize it the COB decided to keep it the same and due to the construction phasing we need the - 113 If is been removed it has to be replaced. Please advise. The specific sections that require replacement are: • Main Gate Lee Dr : 50 linear feet • Gentry Drive: 63 linear fee Contractor/CM Signature Title Date Response: We will increase the quantity of the fencing from 0 to 113 If. Proceed with replacement only for these sections. TT *4MW 6/10/2024 City Project Manager Signature Date Response to RFI does not authorize change in contract time and price If the Contractor believes the response given requires an adjustment in contract time or contract price,the contractor shall submit a timely proposal so as not to delay contractor's work in accordance with the General Conditions. Article 7 Changes in the work. Construction l of I D14 Revised 2016 Subject: Remove and replace of 113 Lf of Fence �MBN RFI M26 2017 Date 6/6/202424 Project: Robert E.Lee High School Drainage Re-route Number: DR2104 Hi, According to the Contract the entire fence need to be removed and replaced.Since we dont utilize it the COB decided to keep it the same and due to the construction phasing we need the 113 If is been removed it has to be replaced.Please advise. The specific sections that require replacement are: *Main Gate Lee Dr:50linear feet *Gentry Drive:63 linear fee Main gate Lee Dr On Gentry dr ! CITY OF BAYTOWN PUBLIC WORKS & ENGINEERING E T 2123 Market Street k!T Baytown,Texas 77520 Request for Information City of Baytown Project No: DR2104 RFI Number: 27 Project Name: Robert E. Lee High School Drainage Re-Route Contractor: MBN Enterprises, LLC Specification Number: 02220, 02335, 02741 Drawing Number: Sheet 10 Response Code: Critical Routine Date Response Required: 7/8/2024 (within 10 working days of receipt) Information Required: Regarding the STM that crosses Gentry Road, this road is a concrete road with an asphalt overlay. Attached are pictures of the previously failed "based failure repair. So, The COB has requested to do the saw-cutting an extra 15' in width at this area, So here are the measurements taken when the victor is on field and measurements are sent to keri. The COB has approved the extra width to be saw-cut and excavated. Please advice. Contractor.-CM Signature Title Date Response: The bid fortn has been updated to reflect the additional quantities of items 43, 44,and 45 based on the City approved measurements as follows: Item Description Unit Unit Cost Updated Qty Updated Item Cost 43 Remove and dispose of existing asphalt SY $5 118.5 5593 pavement 44 Install 6"thick sub-grade TONS $500 37.54 $18,770 45 Install 3"thick asphalt pavement TONS $500 19.74 $9,870 )#k1111W 7/3/2024 City Project Manager Signature Date Response to RFI does not authorize change in contract time and price. If the Contractor believes the response given requires an adjustment in contract time or contract price,the contractor shall submit a timely proposal so as not to delay contractor's work in accordance with the General Conditions. Article 7 Changes in the work. Construction 1 of I D14 Revised 2016 Subject: Additional unal e for Sub Grade and Asphalt �1.1� RFI#27 2017 Project: Robert E.Lee High School Drainage Re-route Number: DR2104 Date.- 6/21/2024 Regarding the STM that crosses Gentry Road,this road is a concrete road with an asphalt overlay.Attached are pictures of the previously failed"base failure repair.So,The COB has requested to do the saw-cutting an extra 15'in width at this area,So here are the measurements taken when the victor is on field and measurements are sent to keri.The COB has approved the extra width to be saw-cut and excavated. Please advice. A, � _TM ' 4_1 i - - e++.+f, "it^ a.a!:_- _ ■- -�_ �— f`