Loading...
Ordinance No. 15,834 ORDINANCE NO. 15,834 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 2 TO THE GARTH ROAD RECONSTRUCTION-WATER/WASTEWATER PHASE A & B UTILITY RELOCATION PROJECT WITH SEQUEIRA CIVIL CONSTRUCTION LLC, PROVIDING SEQUEIRA CIVIL CONSTRUCTION, L.L.C. WITH APPROXIMATELY TWO HUNDRED FIFTEEN (215) EXTRA DAYS TO COMPLETE THE PROJECT AND APPROVING A CREDIT TO THE PROJECT IN AN AMOUNT OF SEVEN HUNDRED SEVENTEEN AND 21/100 DOLLARS ($717.21); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 2 to the Garth Road Reconstruction-Water Wastewater Phase A & B Utility Relocation Project with Sequeira Civil Construction LLC, providing Sequeira Civil Construction, L.L.C. with approximately two hundred fifteen (215) extra days to complete the project and approving a credit to the project in an amount of SEVEN HUNDRED SEVENTEEN AND 21.100 DOLLARS ($717.21). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 131h day of June, 2024. r1� NDON CAPETILL , Mayor TEST: �G�6p,YTfD("i�d�� o ANGEL JACKSON, -i Clezfc'�` o�,co APPROVED AS FO ORM: SCOTT LEM N , City Attorney R Kristin Holmes Ordinances 2024 06.13.2024 CC Agenda Change Order 2.Garlh Road Reconstruc"on.Sequetra Construcnon.kh.docc EXHIBIT "At, CITY OF BAYTOWN PUBLIC WORKS & ENGINEERING ' 2123 Market St. Baytown,Texas 77520 BAYTOWN CHANGE ORDER Garth Road Reconstruction-Water/Wastewater Phase A & B Utility Relocation Project Date of Issuance: 5/3/2024 Change Order No.: 2 Contractor: Sequeira Civil Construction CoB Project No.: RW1901 Designer: Kimley-Horn P.O. No.: 2314369 Explanation: This change order encompasses the following: Request for Information(RFI) 16-01 Identified utility conflict with AT&T line that required 269 LF of 18" PVC wastewater pipe, by pipe bursting in lieu of open cut instatllation. RFI 17-01 Identified a conflict with AT&T that required 15 LF of 8" PVC wastewater pipe, by other than open cut installation. RFI 20 Identified utility conflicts with CenterPoint gas line that required 662 LF of 21" HDPE wastewater pipe, by pipe bursting in lieu of open cut installation. Additional days requried(215 days) Description of Work Cost Time 269 LF of 18" PVC wastewater pipe by pipe bursting. 1 15 LF of 8" PVC wastewater pipe by other than open cut. 662 LF of 21" HDPE wastewater pipe by pipe bursting. $ (717.21) 215 Days $ - Days Please attach back-up documentation Cost& Time Change Summary Cost Time Original Contract: $ 7,881,593.00 240 Days Previous Change Order(s): $ 166,776.48 132 Days Contract prior to this change order: $ 8,048,369.48 372 Days Net increase (decrease) from this change order $ (717.21) 215 Days Revised Contract: $ 8,047,652.27 587 Days Percent increase(decrease)this Change Order 0.009% Percent increase(decrease)all Change Orders 2.1% RECOMMENDED: RECOMMENDED: By: Date: Date: 05/24/2024 Design Engineer Frank Simoncaux,Jr, Director of Public Works&Engineering ACCEPTED*: FINANCE APPROVAL: By: Zade 5; awwc Date: 05/10/24 By Date: Contractor Teresa McKenzie,Chief Financial Officer REC MMEN ED: APPROVED: By: Date: 05/16/2024 By Date: Project Manager Jason E.Reynolds,City Manager VERIFIED: By: &A&MM Date: 5/17/24 Business A set Team Member Construction I of 2 D 16 Revised 9 2023 *Contractor agrees to perform change(s)included in this Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed.No payment to the Contractor(or Consultant)shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent,this Change Order governs.Upon execution by all panics,the following changes identified for clue contract value and/or contract time shown,are made part of the contract. Construction 2 of 2 D 16 Revised 9/2023 - G G p of O O d O O p O O O �n O O O O O O O O p O O O O O dC p �mQMp OOlNMO �fONlO ryMOl NlQN0l Nm01 NONl NM uNl O NN QO �m nOl rym 0m 0N m0� NO Ol0 n m Ol 01 N O O Vl OO OO O N ad0 O m O ONO O 8 � N m m N O N M 6 wp m O ry . m m ry Nn 0 U 00 MnOlm QM Nn rl C M m m N N n m m f+1 N m n Ol Vf N .-i f+f N f0 �0 rl n ri ti .-I N N f0 O� M M .ti N Om0 N u N O w 0 0 0 0 0 0 0 O ut O O ul O u1 O C. O O 0 0 0 Q ~ 0 0 0 0+ 'It o o, o vl p o o n In p � 0 l0 N m O n Q Q V1 n a N Q N O p 0 0 lA O <0 Q p 0 0 0 N N W d M N l0 M �M Q Q n O n M O N m N N N n m 0 0 °0 0 O N m Vl N 0 0 0 0 0 0 0 0 0 0 0 coo9 N M O1 M M n O N O 01 m U1 n M N 1p l0 m Ul Q N ti N M N m N u1 n n m O p 0 fA Q U1 m n 1p Ot M 01 tO 0 0 tD N to Q Q m a 0 0 0 0 n m O O 1p „my � Q M foil M n N N N N vt N of N � N m m H V1 N N N N N N N V) Vl V1 N O N N N N�� v1 N Vl�N N N N N Vf N O N C N L u d C 01 n N ry N 0 Q Q N Jt N N N O ti 'y n en+f m .1 M m m Ut Ut tD f0 fD t0 lD l0 C ~ A L u t0f1 n 0 01 ti ff fry+l OMl Om1 M M ti N O O 0 0 0 0 Ul N M N 0 0 a a 0 3 N M N 1p 01 01 111 Q M ry Q f+l N Vl N 0 01 W w b M N eel eel Z 0 0 0 0 0 0 O O �° O O O 0 0 O O 0 0 0 0 m O In l0 Q O O 0 p Vl l/1 m o o a0 Vl O Vl 0 0 0 0 0 N O Q O 0 0 0 0 0 0 0 0 v1 Q - O N N O n 0 0 m 0 N O O O ut G O Ol of O O m "N N W C N Q N O any Q Q N v1 Ol O O O O iO M f1O/1 n b M N m ti 0 V) N 0D M M M Ut M M N .Qa .NI N N t�0 O n n Q N O O n 0 Q O Np M Vl O O m m Ol Ot O O O � m O O O O O O O O O O O p V1 m O O O Vl O Vl O O O O ut O O O O O O N O Vt Vl O O O O O 0 0 0 0 0 0 0 O V1 •- Op 01 n t0 01 N l0 M V1 n ^ N M 01 1p Q O O N 01 l0 V1 n O O O1 N t0 m O O O�j d M 01 M ' VI ry � n � � O O lD 10 n n ryf N n � m U1 b � M � fq 00 m m l0 l0 lR N N f0 n N N N N M Q U1 Vl N to N Ol N O N N N 01 rf N N N N � N ut Vf V) N N N N N N N V1 V1 N N N T C O C O L A y � m 6 C C O u V ? V y `O m N N C C N C C a E N C Q C V O fD N w yl ? C O S ar3i o = uuumas u a`i a = aci u u y y eo m0 10 m O a ww u a i aci L •• c a m E p O a n « 3 c E a a a n a n n c 3 3 4 E fo T > Z Z fo a w ro `o « V T T T T T T .N-1 N N d - V ~ n y O. w « d m y m m m m w m m m « a « y W C f0 y C �+ a a a a d a a E r t - d d F % E d w a w a 3 m m o d a a a V a a w = = d E u u T y ? E E a y w m ° 5 ° n j u c �° ° y c c a 3 m o o ul O �l a s u W m o c > 3 y L s u « « « « c c c c c y c o w c x is w > > d V > .N W -« 'N m u C C W W 1 u - `u - > T - X .fo. fo > > a > a m E u u u w c w w a w ow* o N a m l7 w w > w w f0 c0 E L u O q > > > > O_ > > a N 0 0 « V V O V O O N O O w O w > p C C N N p p J O mv a o .ryi .mi d .. i u aEi 10 ? `� a d w w .. w v aEi i0 a aEi .. w w f V in W >� �l-f .lp. l9 1- K 10 N N N m a ww wo H K K K < < K = K N K M K K =10:1ccloo .-1 r-1 w = N rf N '1 E N ti N n m 0 N M m N M l0 lO m 01 O .-f N m Q Vl l0 n m m . l0 M1 � l y Vl l0 n 01 O N fV ry N M M n n n n m OD m m m Ol 01 01 O1 O O O N N N N N N N N M M l0 N N t0 lO l0 000 V V U SC2 SEOUEIRA CIVIL CONSTRUCTION Garth Road - R1FP#4 DATE 05/01/2024 PROJECT NUMBER: PROJECT: 1 15 LF of 8" PVC wastewater pipe to be installed via boring underneath the sample well as required to make the connection to the sanitary main as noted in RFI #017-01. 2 269 LF of 18" HDPE wastewater pipe to be installed by pipe bursting as result of the response to RFI #016-01. General Contractor Cost 1 Labor $1,437.50 for 15 LF bore of 8"PVC 2 Equipment $730.00 for 15 LF bore of 8"PVC 3 Fuel $150.00 for 15 LF bore of 8"PVC 4 Subcontractor $120,229.00 R&A Road Boring for 15 LF of 8"PVC $1,600.00 minimum charge Aranda Industries for 269 LF of 18"pipe bursting $441.00/LF=$118,629.00 5 Subtotal (sum of lines 1,2,3,4) $122,546.50 6 Subtotal General Contractor Cost $122,546.50 7 General Contractor Overhead (5%of line 6) $6,127.33 g Profit(10%of lines 6& 7) $12,867.38 9 Total Cost for General Contractor(sum lines 6,7&8) Bond & Insurance(GC Only) 10 Cost of Insurance(%of line 9) 0% $0.00 11 Cost of Payment& Performance Bonds(%of line 9) 2% $2,830.82 12 Total cost of proposed C/O (sum lines 9,10&11) Calendar Days Requested: Requested days are located in the document "Garth Rd-Additional Contract Time". .ti f .i REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL 1. PROJECT No.: RW-1901 2. RFP No.: 4 3. PROJECT NAME: Garth Road Reconstruction Water/Wastewater Phase A & B Utility Relocation Project 4. CONTRACTOR: Sequeira Civil Construction 5. CONTRACT No. RW-1901 6. REFERENCE RFls:1016-01 and#017-01 7. Contractor is requested to furnish a price proposal for the work described below. Please complete, sign, and return the proposal at your earliest convenience. Contractor is NOT authorized to perform this work until receipt of a duly authorized Change Order or Work Change Directive. ITEM NO. DESCRIPTION 1 Contractor is requested to provide a price proposal for 15 LF of 8" PVC wastewater pipe to be installed via boring underneath the sample well as required to make the connection to the sanitary main as noted in RFI#017-01, see attached plans. 2 Contractor is requested to provide a price proposal for 269 LF of 18" PVC wastewater pipe to be installed by pipe bursting as result of the response to RFI #016-01 as shown on attached plans. 8. REQUESTED BY: 4/9/2024 Claude Marshall(Signature) DATE END OF DOCUMENT 00932-1 02-01-2004 I CITY OF BAYTOWN PUBLIC WORKS& ENGINEERING (!!% 2123 Market Street BMTOWN Baytown, Texas 77520 Request for Information City of Baytown Project No: RW-1901 RFI Number: 16-01 Project Name: Garth Road Advanced Water:�Wastewater Package (Phase A/B) Contractor: Sequeira Civil Construction LLC Specification Number: N/A Drawing Number: 2.16-2.19 Response Code: Critical = Routine Date Response Required: N/A (within 10 working days of receipt) Information Required: There are (6) 4" AT&T conduit running in conflict with the proposed sanitary from STA 181+30 to 189+60. Contractor/CM Signature Title Date Response:_ _ See attached plan sheet modifications. City Project Manager Signature Date Response to RFI does not authorize change in contract time and price. If the Contractor believes the response given requires an adjustment in contract time or contract price,the contractor shall submit a timely proposal so as not to delay contractor's work m accordance with the General Conditions. Article 7 Changes in the work. (`-t--ti- I ..r I TIIA 0-;-A MIA 'I CITY OF BAYTOWN PUBLIC WORKS& ENGINEERING B' 2123 Market Street BMTOWN Baytown, Texas 77520 Request for Information City of Baytown Project No: RW-1901 RFI Number: 17-01 Project Name: Garth Road Advanced Water/Wastewater Package (Phase A/B) Contractor: Sequeira Civil Construction LLC Specification Number: N/A Drawing Number: _ 2.16-2.17 Response Code: Critical :1 Routine Date Response Required: N/A (within 10 working days of receipt) Information Required: Moving the manhole 15' to the South alleviates the main issue, however, the sample well will still be in conflict with the 8" service which needs to be connected on the West side of the manhole. Contractor/CM Signature Title Date Response: _ Contractor to bore underneath the sample well as required to connect the existing lateral. City Project Manager Signature Date Response to RFI does not authorize change in contract time and price. If the Contractor believes the response given requires an adjustment in contract time or contract price,the contractor shall submit a timely proposal so as not to delay contractor's work in accordance with the General Conditions. Article 7 Changes in the work. ('-trn-firm 1 .F 1 MA D o.;—A 1A I A � W (jam z of + + + �+ � SZ z < LuLu � � L + +" + Ixw � IN IN owo2 1 ZJ _ ++ + I + + QNZW Z � W m Q Q W Q W `L = + + + a � X _ � C' � + + w 00U I v � ~ ')) z ~ 2 + +I+ + �+ d0W QG� + + cn = 2 flow + + + LU OD OF + + 0 2 W _ Q � J + + + Z m O O D + W Q X Z zLU U + + + � W Y � � = i � + +I 0 + 0 w a � = L + +L } + U) + + + + + + + U) i + + + + * T + _ + + O + + +. O + + + + t + + + r r a Q Cl? W W N QQ 0 _ Q � Z N w Z W W Q ww � 0pw02 X z � = cf) 00of - w OOWLL QQZW >. } moo U dH m Qw U) u) UH w W Qo Q � � cn oNOW ~ cr) O W "' QLLCl) /Ja3: U) w d > 0 W — Z WLL J U) J pQ Qc1ro CY) co Z W Q W v W Q Q W w F- L) W LU LU z > U2 I >Q -i a o J O J > 2 w co bo W W U 04 � IX H— `- Q Z W C) w U) o WU Z Z > Z = V) m2OCO Uw < Q � a Q O + --- O z"+ + .16 E VO 133HS `00+08� dl( LLJ p ¢ I I paa= LLJ � � r+ + I w f- t + + + Z >j + + + w I a + + a' --- --- - --- -II + ++ +I p U ,. + + + i -- U + + + -- --- _ + + ++ + + + + + + D U U- + + + + Z Q J + + + QCOO } 2 1 + + + W + U) U + + � W + + 00z M2 ++ ++ ++ + + Q � � _J + + 0w } ++ + + + Q = + + + M + + + + + H-.rol 19 t- ---401 -// —-//— + ++ + + Z J + + ++ + + x w J � + + + W Z of O + + J W n + t + + Jw H— I Q + + + + y W O + 0 � U W Z + ++ +V+ + + + Z Z W �` W 0 p = 3` p w 0 wZ Q z aw Uw m O} N ww Q c T xQ Q +wa w + + + + + U c + U- QC Z N z W 0 + + ++ + + 0C� 0 � z I + + Q ? I + + + + } U] �' ^ cl O ] ++ + ++ ++ cf J Z 0 + + + 4 W Q LW + + + + wJ (DC) z + + + + + J Z U + + + + + + + + + + + + O + + + ++ + O + + + VVO 133HS `00+991 ` iS 3NI-1 HO1dW 1 EO q MM * � . t mm , - 'lot _ --- --- + : � --- -- . | .---- c- --- \ \ k \\ � zU-/ =� � » m W _j w 777 $ / of « w � m � l" 0 � ALL - m O \ ? F- ƒ I ILqw � kzzw k IEO \ � � \ } * / LL / amaLLZwcc < e £ % 2G & c % � 0 \ Lu § � b �� « ° c ~ j � \ EQ L O O� I I i i a3NOONV13V IS Ol HIN ll ,8'Ob- 'L9'S +091 :ViS 1/0 GVOb HD VO - = 9£'Ob+Ob Vl MM 8d I - O i o � O z I = o � z O U�- inO N3dO a 1 NHHl 2OHiO 8 3dld a 1 ONISVO 1331 ..9£ NI038 U- Q ll .8b'S5- '66' 6+6L 6 VIS 1/0 (IMt] Hl VD = 00'08+6£V_L MM 8V 98'66 = (MN) 1 „06 'l'3 b0'6L = (N) I b0'66 = (S)in ,,86 'l'3 +6'Z£ = dOl H 31OHNVIN 'b'I S-6 — :llViSNI — ll ,9Z'99- 'L9' 8+6L 6 :ViS 1/0 GVOH Hl VE) _ £9'69+6£`dl 30 MM 9V I U I o ` aW L d wF O3NO(INVSV 8 Ol HW 'X3 ll L'Zb- '08'b +6L1 t11S o I -i < ca 1/0 GVOH Hl HJ z I Q f = M69+6£dl MM 8d 0 I U c I z � D _ w I � F wL z D x w CO CV M M + '�"� �0 1g ��� / �� �� Z ' U w I Q UZF-p Ua o U Z Q I— s > w 1Z + p �t � 2U W 0 O U W Z I N tu m o aQz Q � � � wa U XO N -gym U) < � w ° WF- z UQ 1 Q � ° H- Q 44 6 t V � mO � Zom w w O a XO m 0000i° W H 9 a WI- Q � Za D cn O U w m Lw It CL a K p co p a- U F- 1 ° `�` LL a JO N Iv co } X • m w _+ i X 3NI13dId 2133SNV2Ji AJa=N3 I JNIS` O 1331S.,Z L H11M.,9'X3 I w i of z I w I w77 n z w J Z ° X Z I w � Q m 0w _ � I m i co O T ! T L% 09+£t ViS 3 N I 1 H OiVN 90'9£+Z9 � ` iS a2J Hi JVO Z_ 0 J Z J N U Ej W - - - K \:J v1 = .- ma. W z + p wW U) ly + U) z _ '" w > 0 > Q JU) ce) a Q Q $ Q O aQ NW � (n QU' fnwm Z (PU pc�iU m Z W �Z _ m XO cn JS aWC iI` W H � 00 � 00 w � aa an. i � ff -, 0 i I a H C; �♦ J S ,v ti r � N w �f z o O w — 1 / Zzi w Q Jw Z - � - rYw UQ m QQ a -j 0 HN aQ O- UQ °owU Q - 2 - W N Z ? m wO W m o O n W oo � Z � -jMoa w 11 Q OW 0 N � Ir w W + W O w a � °p -jco W vi co 'ITU � ? a 00 = o M W (n LL Oa Q0 (nmm � _jO INDEPENDENCE o in BLVD o x a b O w = wL,Z f a w i c W w LL w -- < J I M dj W J � OU F- OIL 00+8t d1S 3 N I I H OiVN 0 *98+98 � d1S dl Hi2JVO REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL 1. PROJECT No.: RW-1901 2. RFP No.: 3 3. PROJECT NAME: Garth Road Reconstruction Water/Wastewater Phase A & B Utility Relocation Project 4. CONTRACTOR: Sequeira Civil Construction 5. CONTRACT No. RW-1901 6. REFERENCE RFls: 1011-01 7. Contractor is requested to furnish a price proposal for the work described below. Please complete, sign, and return the proposal at your earliest convenience. Contractor is NOT authorized to perform this work until receipt of a duly authorized Change Order or Work Change Directive. ITEM NO. DESCRIPTION 1 Contractor is requested to provide a price proposal for the installation of 662 LF of 21" HDPE Wastewater Pipe via Pipe Bursting in lieu of Open Cut installation as noted in RFI #020, see attached. 8. REQUESTED BY: Q, Q 3/14/2024 Claude Marshall(Signature) DATE END OF DOCUMENT 00932-1 02-01-2004 I{ I CITY OF BAYTOWN PUBLIC WORKS& ENGINEERING 2123 Market Street BAYTOWN Baytown, Texas 77520 Request for Information City of Baytown Project No: RW-1901 RFI Number: 20 Project Name: Garth Road Advanced Water/Wastewater Package (Phase A/B) Contractor: Sequeira Civil Construction LLC Specification Number: N/A Drawing Number: 2.05-2.07 Response Code: ❑ Critical Routine Date Response Required: N/A (within 10 working days of receipt) Information Required: See attached transmittal letter. Contractor/CM Signature Title Date Response: The proposed sanitary will be pipe burst from AB WW STA 2 94.85 to AB WW STA 9 56.43. The 42" steel casing will no longer be installed. See the attached plan sheet updates. �2-;I-_ City Project Manager Signature Date 3/11/2024 Response to RFI does not authorize change in contract time and price. If the Contractor believes the response given requires an adjustment in contract time or contract price,the contractor shall submit a timely proposal so as not to delay contractor's work in accordance with the General Conditions. Article 7 Changes in the work. f nnct--t.nn I ..t 1 rI I A D..;—A IMI RFI Transmittal HUITT HZ , ZOLLARS Huitt-Zollars, Inc. 1 10350 Richmond Avenue Suite 300 Houston TX 77042-4248 United States PROJECT: City of Baytown Garth Rd DATE SENT: 3/11/2024 Reconstruction R316476.01 RETURN BY: 3/18/2024 SUBJECT: 020 - Sanitary Pipe Bursting RFI ID: 020 TYPE: RFI TRANSMITTAL ID: 00108 PURPOSE: To Answer VIA: Info Exchange QUESTION: Per the meeting on 3/7, the design engineer is to provide a recommendation on which sections of sanitary can be installed via pipe bursting. Please utilize this RFI for the official response. SUGGESTION: FROM NAME COMPANY EMAIL PHONE Claude Marshall Huitt-Zollars, Inc. cmarshall@huitt- 281.496.0066 zollars.com COMPANY Tyler Barrows Tyler.Barrows@kimley- 281-836-4372 horn.com Stephen Kelly stephen.kelly@kimley- 346-888-3891 horn.com COPIES Danielle Cain Martin Hernandez Rafael Errisuriz Page 1 of 1 WORK CHANGE DIRECTIVE (WCD) BAYTOWN City of Baytown Date: 3/27/2024 Work Change Directive Number: 1 Garth Rd. Reconstruction Project Name: Water/Wastewater-Phase A&B Project Number: RW-1901 Contractor: Sequeira Civil Construction P.O. Number: 2314369 Engineer: Kimley Horn Contractor is hereby directed to immediately perform the following change(s)in the Work. Accomplishment of the Work shall not be predicated upon prior agreement on Contract Sum and/or Contract Time changes,if any. Work Change Directive signed by the Contractor indicates the Contractor's agreement therewith,including adjustment in Contract Sum and /or Contract Time and such agreement shall be effective immediately and shall be recorded as a Change Order. Reference is also made to the General Conditions and Supplementary Conditions of the Contract. 1. Scope of Proposed Work: Per RFI #20 Response: The proposed sanitary will be pipe burst from AB WW STA 2+94.85 to AB WW STA 9+56.43.The 42" steel casinq will no Ion er be installed. See the attached. 2. Purpose of Work .- O Non-agreement on pricing of proposed changes. Z Necessity to proceed for schedule or other reasons. 3. Affected Specification Sections /Contract Drawings: Drawing Sheet(s)/ Detail(s): 2.05, 2.06, and 2.07 Specification Section(s): 02617 j 4. Estimated Change in Contract Price and Contract Times (non-binding, preliminary): Contract Price Contract Time Contract Price: $ 7,000.00 Increase ® Contract Time: 20 days Increase Decrease ❑ Decrease ❑ 5. Basis of Estimated Change in Contract Price: ❑ Lump Sum ® Unit Price ❑ Cost of the Work (Time and Materials) ❑ Other Directive Approvals: Engineer: Date: Print Name/Title Signature Construction Manager: CLAUDE MARSHALS W.-x-& I Date: 3/27/2024 Print Name/Title Signature City Representative: Date: Print Name/Title Signature Contractor: Date: Print Name/Title Signature WORK CHANGE DIRECTIVE PAGE 1 OF 1 REV. 10/06/2023 w �/ ' X w W r lV r m �LLj N R w X 0 06 m F- w N J Z � N O a w w J LLI IL 0 Q = W-i ~ O ~ I Jw z 0 Z w O o p cn � o >- z X w > m NOR CQ Of Q - - 2 w RO/ U U X O Z ] i — � Q JaCD w ,' .. r - O cJ J Z) LL CD I (S133HS 2131dM 3: w 1331S .b 1u u \ _ w N Z w A.4 QO ,` wZO U) M„Z 'dO W Co UU a „gL0U) Zr- 0 > O �QW2zQLov aH I XO O NQ � CO M (N CO wZ N J Q N p . W X * r { C, "t W Z w f+ + 0 r 1 w O r O 7 } � Wc� G •, Q p w _ LU r F- (n Z a. w J z f l Q. � .J 00 �} Q J J N UZ ` w > z T J 00 W a_ Q w lz wX - - wO w j 0 U 4 U) w I I� LW LJ w JJ � Z III w U) I z il�lv'I _ � � I C� U � � II Z ❑ J F- O �.' J Z J LL fn Q Q Z W > m ❑ > �� a Q - W in w ,- a Z v m W U) 04 JW WO = a aZ Ow 0 aI C X a U Q O uJ w w � O aw z ma � m bow o `� x ao ~ w N 2 a w 0 � ' C? > O Q '. ❑ I a_ d rJ W - _I LL O o :; 0 �a ,. w w { w I O O ? ❑ U m U Z W O } QZ 2 W j Z Q W X j W w � O L- if � Z �rw > m WW w > Q D 1 CO � O N = I� w ~ 04 G i 06 W I LO _ { N - it W ❑ � N Y � Z W qF- J J w W w ~ _ LO Z _ w N , z: 09+t d1S 3NI-1 HOiVIN 99'6L+VK d1S (RI Hi2]V!D �D a=J - -- � ¢ c� U) 0 i qr w I} � ti , ItL — Cl) i m0Z A W 4 Jw 0 OO an--- Z cn w Q❑ 0 c9 c� p O d J X Z W } � .,«lam ►� - c)� _ �' w f) O W 0 j0� oz � � s. 0 ��� ply W W CN — z _ �.._, 0 W Z_ > u U � � �, NV:� W --00 V � W W —J O O U- W Hin._ -- — Q z m w � = cq ' cow U � 0 > w = a � � _ C) w � c� w m z X dW 0 vin W w 80 w H I CL w0 2 04 w W 0 � w - - w _ a W J N 0 w z i � Zm w0 U _ I zw w I J z o Q W ARCHER Z ~ ' ROAD �y m z O n w N in In Mir w � � rX0 x w aw I w N U XO W ❑ W co WZ I z_ W Q co - -_= 4 w J 0 Ht- w w z ❑ - p ' � w wz w 1 w w a Q -- S 0 a U m Q U) cif o I om 00 -- QO z . 0 J J �- aw OFn 0 EL ° w ~ oo in o 0 XU) N w o O >� _ � � a I w0 inM z o `rw > � U W U a+0 r-- W ~ W � � Z X'I -4X + Nam a- � � 0 I � � U N� w = 00 'It W � v z 0g _ � � zza- NZ � w _ mm —� o m Q H W Q } pa O � 0 QW II < (D (nmUm O O W X H z J ❑ J >- w -- vp00 X � m ou- � n w 00+9 d1S 3 N I-1 H OiV 0 �'0E+8V I ` JS a2I HllidJ I CITY OF BAYTOWN PUBLIC WORKS& ENGINEERING �F T T� 2123 Market Street BAYTOWN Baytown, Texas 77520 Request for Information City of Baytown Project No: RW-1901 RFI Number: 21 Project Name: Garth Road Advanced Water/Wastewater Package (Phase A/B) Contractor: Sequeira Civil Construction LLC Specification Number: N/A Drawing Number: 2.05 Response Code: Critical ; Routine Date Response Required: N/A (within 10 working days of receipt) Information Required: There is an existing power pole and fiber optic line that is preventing the installation of the manhole located at STA 2+94.85. The power pole is 48" from the CL_of the sanitary while the fiber optic is about 24". There is not enough room to set a trench box to safely install the manhole with its close proximi to the power pole. Contractor/CM Signature Title Date Response: The proposed sanitary manhole at STA 2+94.85 can be moved along the alignment South to Sta 2+74.85. Contractor to connect exist 8" lateral to the manhole. See attached plan sheet. 52-;L City Project Manager Signature Date 3112/2024 Response to RFI does not authorize change in contract time and price. If the Contractor believes the response given requires an adjustment in contract time or contract price,the contractor shall submit a timely proposal so as not to delay contractor's work in accordance with the General Conditions. Article 7 Changes in the work. (q w °b �� x , m M CNI m rn X W off QZ m H wF- N Z cV Q ` = a ww 1. a -i = w cn zw , 0 I w =, z 0 0 uwiz N ? W U > M NOR UU 00m RO/ XO z I w i— I s Q vOorY < [ClJ = 1_ J F = Q L = c D (D 1 w t z w �, i (S133HS b31`dM T 11 11 J J w v N Z '= W JNIS`dO 1331S b � L) _ o 0 P.o Oi U 0- co ~ 3NI-I l:DI dM��Z 'd0 rn U) Z ti o > O a w W2LzQL'oo 't CL ~ O 0 0- MN XO 4 < o f CO wz 0 04 Qo + J0 " Wz w r H Q Q ao cn o Q 0 w �1 w I O N O W ci Z w � 3 a j z 4 E a0 N X UZ w > Q z Y a a 4 �I < w X — — X O z �_ W W H U cn cr, I O X u w I W C LJ U L 41 � i 1 v cL a- Lu Q J r w J f = ~ O Li I