Loading...
Ordinance No. 15,753ORDINANCE NO. 15,753 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 TO THE ANNUAL SANITARY SEWER REHABILITATION PROJECT WITH TEXAS PRIDE UTILITIES, LLC IN AN AMOUNT NOT TO EXCEED TWO -HUNDRED THOUSAND DOLLARS ($200,000.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council does hereby authorize Change Order No. I to the Annual Sanitary Sewer Rehabilitation Project with Texas Pride Utilities, LLC in an amount not to exceed TWO - HUNDRED THOUSAND DOLLARS ($200,000.00). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 141h day of March, 2024. ����,�;�✓ NDON CAPE LLO Mayor ATTEST: � O n O ANGELA CKSOI�; ;ity, Clrk \:_� c'a , City Attorney R:1ScoW0rdinanccs 24-03-14 Texas Pride.docx doc EXHIBIT !' r S •�c l�i'. i, 3t:` CITY OF BAYTOWN PUBLIC WORKS & ENGINEERING 2123 Market St. Baytown, Texas 77520 i PION CHANGE ORDER 1 Annual Sanitary Sewer Rehab Date of !Issuance: CQ 'q ' aoY Change Order No.: 1 Contractor: Texas Pride Utilities LLC COB Project No.: SS2103 3 Designer: NIA P.O. No.: 2316653 �ntan>sNan: This change order encompasses the following: Work item fl l : City staff discovered a sanitary sewer cave-in in the rear easement of Blackstone St. in the Eastpoint Subdivision. Due to the depth of the sanitary sewer mainline staff anticipates the need for assistance of a contractor experienced with these types of repairs. Continued failure of the sanitary sewer mainline would cause further back-up in the mainline affecting 52 properties. The repairs Include replacing the section of the sanitary sewer mainline that is compromised, replacing and limiting service interruptions to affected residents. Restoration work will follow and also be included in the cost. Work Item #2 and #3 In preparation for a system be in at Goose Creek liftslation City staff was made aware of a leak on the goose creek lift station. In addition a large segment of the forcemain failed causing a replacement of 40 additional feet of forcemain Contractor will repair leaking segments and replace the larger failed segment with new pipe and fittings Descri QL0I Work C00 img 1 Replace 8" sanitary sewer main line S 22,188.00 Days 2 Repair leak on Goose Creek lift station forcemain E 82,787.00 Days 3 Replace 40'section of (loose Creek lift station forccmam S 95,025.00 Days iw 4 $ - Days S $ _ Days Please attach back-uo documentation Cost & Time Change Summary Original Contract. Previous Change Order(s): Contract pnor to this change order: Net increase (decrease) from this change order Revised Contract: Percent increase (decrease) this Change Order Percent uwrease�decrease) all Change Orders RECOMMENDED - By: N A Date: Deign Eava r ACCEPTED", Texas Pride Utilities LLC By. Date. oZ/t(#�2� r 7""""" RECOMMENDED Colmruaaon C. Time $ 11000;000.00 365 Days S - Days S 1,000,000.00 365 Days $ 200,000.00 0 Days $ 1,200,000.00 365 Days 20.0% 20.0% ,�/ COMMMEENDED. y - Date. Q2J2JJZM Ermk siamauL k„ Dimaor of Public Works & Englneaing FINANCE APPROVAL. By Date Teresa McKenzie, Cbkf Financial Officer APPROVED. I of 2 D 16 Revised 9/2023 e— By: Date: Project Manager VE By:IED- Date. usin Auer Team Member 7-414-nz-y 2/26/24 By Date: Jaum a Reynolds, Ctty manager TOnItactor agrees to perform changeia) included in this Change Order for the puce and time,ndtcated. The ptkes for changes included an cow arsreciated aith this Change Order. No work as to be done ►mtil this change order is executed, No payment to the Cootracmr (or C(aalitant) stall be made for fAWk inchrdid in tha c1tan8e order until theY`onrraetot'a pay estimate isupdaled. RMIt the project plans and apcafications as nfercnced and lnmfbr as the original project drawings and specifications are inconstpent, this Change Order goeenis Upwt nmutkn by all parties, the following changes identified for the conitect }aloe andkr egatmct time shoma, art made part of the contract �'Y ' { 1 _ + [ roTn ;4 r"-NJ� 1s�.1 ±�� -.. `�t� �..= W.N� .^ p W'' , c �4w.[� �'Y i + IZ� v � �i:��; ::f.i�G.+a„ � .+- y I 'r ++ _^C r y ,a a f�+ ,i`a s •y. 1• � �o e'K � � i� �' �e �' � i 3 � � ... 'y���tt }rc Fly ;i�.�,, ;,,.� „�,+��+1. ;,e. � ��et�rl:fi S�ei, •� � ,.�+ t �;iii�%'��+t`i.3rf��*��!-,., .v:. .ti}t1,r+J�C �.c���._, y i I f [ l'. Construction z of t DI Revised 9n023