Loading...
Ordinance No. 15,570 ORDINANCE NO. 15,570 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 1 TO THE GARTH ROAD RECONSTRUCTION-WATER/WASTEWATER PHASE A & B UTILITY RELOCATION PROJECT WITH SEQUEIRA CIVIL CONSTRUCTION LLC, IN AN AMOUNT NOT TO EXCEED ONE HUNDRED SIXTY-SIX THOUSAND SEVEN HUNDRED SEVENTY-SIX AND 48/100 DOLLARS ($166,776.48); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 1 to the Garth Road Reconstruction-Water/Wastewater Phase A & B Utility Relocation Project with Sequeira Civil Construction LLC, in an amount not to exceed ONE HUNDRED SIXTY-SIX THOUSAND SEVEN HUNDRED SEVENTY-SIX AND 48/100 DOLLARS ($166,776.48). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 28`h day of September, 202 �pYTC+lyy DON CAPETILLO, Mayor ATTEST: OF 4.Qa......p ly ANGEL JACK ,, ity Clerk" q rV APPROVED T FORM: SCOTT MOND, City Attorney R:UCaren Anderson ORDINANCES\2023\2023.09.28•ChangeOrderNo l-GarthRoadReconWater•WastewaterPhaseA&BUtilityRelocationProject.docx EXHIBIT "A" CITY OF BAYTOWN PUBLIC WORKS&ENGINEERING lift 2123 Market St. dU Baytown,Texas 77520 B F AT BAYTOWN CHANGE ORDER Garth Road Reconstruction-Water/wastewater Phase A& B utility Relocation Project Date of Issuance: 9/5/2023 Change Order No.: 1 Contractor: Sequeira Civil Constuction CoB Project No.: RW1901 Designer: Kimley-Horn P.O.No.: 2314369 Explanation: This change order encompasses the following: The contract documents did not include replacing any non-working gate valves that were installed on the old water line. The contractor provided their water bypass plan and after a thorough field investigation it was discovered in order to complete the installation of the water bypass line,we would need six(6)gate valves installed. Description of Work Cost Time 1 Installation of six(6) 16" Gate Valves $166,776.48 132 Days 2 $ - Days Please attach back-up documentation Cost&Time Change Summary Cost Time Original Contract: $7,881,593.00 240 Days Previous Change Order(s): Days Contract prior to this change order: $ 7,881,593.00 Days Net increase(decrease)from this change order $166,776.48 132 Days Revised Contract: $ 8,048,369.48 372 Days Percent increase(decrease)this Change Order 2.1% Percent increase(decrease)all Change Orders 2.1% RECOMMENDED: RECOMMENDED: By: 'L Date: 9/14/23 By: -'� Date: 09/15/2023 Design Engineer Frank Stmoneaux,Jr„ Director of Public Works&Engineering ACCEPTED*: FINANCE APPROVAL: By: Date: IN123 By Date: Contractor Teresa McKenzie,Chief Financial Officer REC9IMME ED: APPROVED: By: Date: 9/14/23 By Date: Project Manager Jason E Reynolds,City Manager VERIFIED: 9/15/23 By: Date: Business Asset Team Member *Contractor agrees to perform change(s)included in this Change Order for the price and time indicated The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed.No payment to the Contractor(or Consultant)shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the onginal project drawings and specifications are inconsistent,this Change Order governs.Upon execution by all parties,the following changes identified for the contract value and/or contract time shown,are made part of the contract Construction 1 of 1 D16 Revised 9/2023 Cut-in Valve Change Order Cut-In Valve Installation: Material Quantity Unit Price Total 8"Material Total Final Total 16"GV 1 EA $8,928.00 $ 9,929.00 $ $ 8,928.00 16"AC to C900 Coupling 2 EA $1,575.00 $ 3,150.00 $ - $ 3,150.00 16"x12"TEE 1 EA $ 950,00 $ 9SO.00 $ 450.00 $ 500.00 16"C900 1 JT $1,794.00 $ 1,794.00 $ - $ 1,794.00 16"Megalug 4 EA $ 389.00 $ 1,5S6.00 $ - $ 1,556.00 12"GV 1 EA $2,880.00 $ 2,880.00 $ 1,035.00 $ 1,845.00 12"45 Bend 2 EA $ 410.00 $ 820.00 $ 265.00 $ 555.00 12"SS Stiffener 1£A $ 195.00 $ 195.00 $ 95.00 $ 100.00 12"C900 1 JT $ 990.00 $ 990.00 $ 419.00 S 571.00 12"Megalug 7 EA $ 178S7 $ 1,249.99 $ 615.00 $ 634.99 Material Total $ 19,633.99 Labor $ 2,150.00 Equipment $ 1,460.00 Fuel $ 350.00 Total Cost $ 23,593.99 Overhead,S% $ 1,179.70 Profit,10% $ 2,477.37 Bond,2% $ 545.02 Total for each $ 27,796.09 cut-in valve Total Change Order Estimate: Cut-In Valve(estimated 6 locations) 5 27,796.08 -Estimet Total Change Order- $ 166,776.49 Requested Calendar Days- 132days