Loading...
Ordinance No. 15,566 ORDINANCE NO. 15,566 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 4 TO THE ROSELAND PARK PAVILION PROJECT WITH COX CONSTRUCTION, LLC, FOR A REDUCTION OF SIX THOUSAND TWO HUNDRED THIRTY-FIVE AND NO.1 100 DOLLARS ($6,235.00) ON THE PROJECT; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS: Section 1: That the City Council does hereby authorize Change Order No. 4 to the Roseland Park Pavilion Project with Cox Construction,LLC,for a reduction of SIX THOUSAND TWO HUNDRED THIRTY-FIVE AND NO. 100 DOLLARS ($6,235.00) on the project. A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 28`h day of September, 2023. DON CAPETILLO,Mayor ATTEST: �oF QAYTOtyt,T = N a` 0 ANGELA aCK �XitOF y' lc APPROVED AS O S ZUTT OND, City Attorney R:�Karen Anderson'.ORDINANCES\2023\2023.09.28,ChangeOrderNo4-RoselandParkPavilionProject.docx EXHIBIT "A CITY OF BAYTOWN PUBLIC WORKS& ENGINEERING I 2123 Market St. Baytown,Texas 77520 E BAYTOWN CHANGE ORDER # 4 Roseland Park Pavilion Date of Issuance: 8/16/2023 Change Order No.: 4 Contractor: Cox Commercial Construction,LLC CoB Project No.: PK2001 Designer: Quorum Architects, Inc. P.O. No.: 2202039 Explanation: This change order encompasses the following: This is the deductive change order deducting the amount from the contract line item ALT-3, Sealed Concrete Floors, in the lieu of LVT flooring. The contractor completed the sealed concrete floor. However,the City expressed concern about the flooring issus at the Roseland Park Pavilion. There are stains on the concrete floor inside the pavilion caused by poor workmanship, which the City of Baytown finds unacceptable. The City and the contractor then agreed that the cost of$6,235.00 would be deducted from the contract. Description of Work Cost Time I Line Item ALT-3, Sealed Concrete Floors $ (11,425.00) 0 Days 2 Work performed as part of the line item ALT-3, Sealed Concrete Floors $ 5,190.00 0 Days Total amount credited to the City $ (6,235.00) 0 Days Please attach back-up documentation Cost& Time Change Summary Cost Time Original Contract: $ 1,844,874.00 365 Days Previous Change Order(s): $ 50,451.00 100 Days Contract prior to this change order: $ 1,895,325.00 Days Net increase(decrease)from this change order $ (6,235.00) 0 Days Revised Contract: $ 1,889,090.00 465 Days Finance Approval: Date: RECOMMENDED: MEN�D,ED: RECOMMENDED: By:--- t ..yt1I Vl Date: 9/1/23 By Date:_ og1001Z423 Design Engineer Director of Public Works&Engineering ACCEPTED*: APPROVED: B �- Date:09.01.2023 By Date: Contractor City Manager *Contractor agrees to perform change(s)included in this Change Order for the price and time indicated The prices for changes included all costs associated with this Change Order No work is to be done until this change order is executed No payment to the Contractor(or Consultant)shall be made for work included in the change order until the Contractor's pay estimate is updated Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent,this Change Order governs Upon execution by all parties.the following changes identified for the contract value and.'or contract time shown,are made part of the contract Construction 1 of 1 D16 Re-*ised 2021 CITY OF BAYTOWN PUBLIC WORKS&ENGINEERING DEPARTMENT 2123 Market Street BA YTOWN Baytown,Texas 77520 (281)420-5300 July 11, 2023 Mr. Douglas Cox Cox Commercial Construction, LLC PO Box 819 Deer Park,Texas 77536 RE: COB Project No. DR2001 Roseland Park Pavilion Dear Mr. Cox, The purpose of this letter is to provide direction on the flooring issues at the Roseland Park Pavilion. There are stains on the concrete floor inside of the pavilion caused by poor workmanship and the appearance of which, the City of Baytown finds to be unacceptable. The project specifications address such matters in the following section: 03-30-00 cast-in-place concrete, subsection 3.02,paragraph B. B Repair of Formed Surfaces, 1. Repair exposed-to-view formed concrete surfaces.where possible,that contain defects which adversely affect the appearance of the finish Remove and replace the concrete having defective surfaces if the defects cannot be repa red to the satisfaction of the Architect. Surface defects,as such,include color and texture irregularities,cracks,spalls,air bubbles, honeycomb rock pockets,and holes left by the roar and bolts-fins and other projections on the surface;and stains and other discolorations tha5 cannot be removed by cleaning It is our opinion that repairs such as those referenced above to address the stains are no longer practical because the flooring has been sealed. The repairs to address the workmanship issues should have been made prior to sealing the concrete. To address this, and because it is impractical to remedy the stains in accordance with the specifications,the City of Baytown is formally requesting that Cox Construction remove the flooring sealant from all areas to which it is applied. Further, the cost of the sealant, as cited in the schedule of values for the project as $6,235.00 will be with held from the project retainage and not paid to Cox Construction. Please contact me as soon as possible to discuss this matter so that the project closeout process can be completed and final payments made. Sincerely, Michael Leech Assistant Director /t4�� Copy: Frank O. Simoneaux Jr. P.E., City of Baytown Roshan Chaudhary, City of Baytown Gregerz Joseph, City of Baytown wwti.ba yto%mo rg A B C D 1 E F G H 1 WORK COMPLETED MATERIALS TOTAL ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY COMPLETED AND so BALANCE TO RETAINAGE PREVIOUS FINISH (IF VARIABLE APPLICATION NO. WORK VALUE THIS PERIOD STORED STORED TO DATE (G=C) (C-G) RATE) D E (NOT IN D OR E) (D-E+F) Overhead Sectional 08.03 Doors 13 300.00 13 300.00 0.00 0.00 13 300.00 100.0000 0.00 665.00 Storefront Shops& 08.04 Calcs 5,945.00 5,945.00 0.00 0.00 5,945.00 100.00% 0.00 297.25 08.05 IStorefront Materials 19 590.00 19 590.00 0.00 0.00 19 590.00 100.0000 0.00 979.50 08.06 Storefront Fabrications 4,735.00 4,735.00 0.00 0.00 4,735.00 100.0000 0.00 236.75 08.07 Storefront Installation 6,085.00 6,085.00 0.00 0.00 6,085.00 I00.00-o 0.00 304.25 08.08 Glazing Material 9,585.00 8,626.50 958.50 0.00 9,585.00 100.000u 0.00 479.25 08.09 Glazing Installation 4,060.00 3,654.00 406.001 0.00 4,060.00 100.0000 0.00 203.00 Finish Hardware- 08.10 Material 3,200.00 3,200.00 0.00 0.00 3,200.00 100.000u 0.00 160.00 Finish Hardware- 08.11 lInstallation 500.00 0.00 500.00 0.00 500.00 100.00% 0.00 25.00 Interior Metal Frame/Gyp Board 09.01 Assemblies 46 123.00 46 123.00 0.00 0.00 46 123.00 100.0000 0.00 2,306.15 Ceramic Tiling/Rubber 09.02 Base 23 915.00 17 936.25 5978.75 0.00 23 915.00 100.000u 0.00 1,195.75 Interior Concrete Floor 09.03 Sealer 6,235.00 2,182.25 4052.75 0.00 6,235.00 100.00% 0.00 311.75 09.04 Interior Paint 5,950.00 5,057.50 892.50 0.00 5,950.00 100.0000 0.00 297.50 09.05 Exterior Paint 9,000.00 4,500.00 4,500.00 0.00 9,000.00 100.0000 0.00 450.00 10.01 Toilet Partitions 10 088.00 0.00 10 088.00 0.00 10 088.00 100.000. 0.00 504.40 10.02 Toilet Accessories 8,990.00 0.00 8,990.00 0.00 8,990.00 100.000. 0.00 449.50 Fire Protection 10.03 Specialties 960.00 0.00 960.00 0.00 960.00 100.000o 0.00 48.00 Wall Protection/Comer 10.04 jGuards 804.00 0.00 804.00 0.00 804.00 100.0010 0.00 40.20 10.05 Aluminum anopy 81300.00 7,885.00 415.00 0.00 8 300.00 100.000ol 0.00 415.00 22.01 Plumb Fixtures-Material 19 888.00 19 888.00 0.00 0.00 19 888.00 100.000. 0.00 994.40 22.02 Plumb Fixtures-Labor 6,662.00 6,662.00 0.00 0.00 6,662.00 100.0000 0.00 333.10 Plumb Drains/Calriers- 22.03 Material 3 605.00 3 605.00 0.00 0.00 31605.00 100.00% 0.00 180.25 AIA Document G703-1992 Copyright L,1963 1965.1966.1967,1970.1978.1983 and 1992.All rights reamed.-The American Institute of Architects;'American Institute of Architects AIA.'the AIA logo.and 'AIA Contract Documents'are trademarks of The American Institute of Architects.This document was produced at 13:00:47 CT on 02/0612023 under Order No.4104239482 which expires on 01129/2024.is not for 3 resale,Is licensed for one-time use only.and may only be used In accordance with the AIA Contract Dowmentse Terms of Service.To report copyright violations,e-mail docinfo@aiawntracts corn User Notes: (3B9ADAAC)