Loading...
Ordinance No. 15,465 ORDINANCE NO. 15,465 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS, AUTHORIZING A PROFESSIONAL SERVICES AGREEMENT WITH ARKK ENGINEERS, LLC, FOR ENGINEERING, DESIGN AND CONSTRUCTION PHASE SERVICES FOR THE NEIGHBORHOOD STREET RECONSTRUCTION OF LANTERN PARK, DOLPHIN HARBOR AND CANVASBACK CAY PROJECT; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN IN AN AMOUNT NOT TO EXCEED NINE HUNDRED FORTY-TWO THOUSAND NINE HUNDRED FOURTEEN AND NO.'100 DOLLARS($942,914.00);MAKING OTHER PROVISIONS RELATED THERETO; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS: Section 1: That the City Council of the City of Baytown,Texas,hereby authorizes and directs the City Manager to execute and the City Clerk to attest to a Professional Services Agreement with ARKK Engineers, LLC, for Engineering, Design and Construction Phase Services for the Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor and Canvasback Cay Project. A copy of said agreement is attached hereto as Exhibit "A" and incorporated herein for all intents and purposes. Section 2: That the City Council of the City of Baytown authorizes payment to ARKK Engineers, LLC, in an amount not to exceed NINE HUNDRED FORTY-TWO THOUSAND NINE HUNDRED FOURTEEN AND NO.--100 DOLLARS($942,914.00)for professional services in accordance with the agreement authorized in Section 1 hereinabove. Section 3: That the City Manager is hereby granted general authority to approve a decrease or an increase in costs by FIFTY THOUSAND AND NO.,100 DOLLARS($50,000.00) or less. Section 4: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affi ;NDON ote of the City Council of the City of Baytown this the 8d day of June,2023. B�,YTOf�q' C ETILLO, M yor EST: pF.aa.a..a.°a: V a � CP 4 ANGELA SON lerif r C-2 APP D "f E D, City Attorney R:XarenAn n••ORDINANCES\2023\2023.06.08\PSA-NeighborhoodRecon-LantemPark.DolphiLiHarbor.CanvasbackCay.docx EXHIBIT "A" AGREEMENT FOR CONSULTING SERVICES STATE OF TEXAS § COUNTY OF HARRIS § This Agreement (this "Agreement") is entered into by and between ARKK Engineers, LLC (hereinafter "Consultant") and the City of Baytown, a home-rule municipality located in Harris and Chambers Counties, Texas(the "City"). 1. Scope of Services/Consultant Fees This Agreement authorizes Consultant to perform Architectural and Engineering services for Neighborhood Street Reconstruction of Lantern Park, Dolphin Harbor and Canvasback Cay (the "Work") for and on behalf of the City. a. This Agreement shall commence on the date of execution by the City Manager and shall terminate the earlier of: (a) completion of the Work in accordance with this Agreement, including Exhibits; (b) four hundred and thirty five (435) days following execution by the City Manager; or (c) Termination of this Agreement under Paragraph 11. b. The scope of the Work is detailed in Exhibit "A." C. Compensation and professional fees are detailed in Exhibit"B." d. The time schedules for the Work are specified in Exhibit "C." e. Each of these Exhibits "A" through "C" is incorporated into this Agreement by reference for all purposes. 2. Compensation and Professional Fees a. The City shall pay Consultant in installments based upon monthly progress reports and detailed invoices submitted by the Consultant based upon the following: 1. Preliminary Design Phase................................................................$371,093.00 2. Final Design Phase...........................................................................$386,582.00 3. Bid Phase .............................................................................................$7,270.00 4. Construction Phase...........................................................................$175,969.00 5. Reproduction........................................................................................$2,000.00 6. Total................................................................................................$942,914.00 b. For an agreed contract amount identified as "Lump Sum," "Not to Exceed" and "Reimbursable," Consultant shall not exceed the fixed contractual amount without Agreement for Consulting Services,Page 1 written authorization in the form of a contract amendment. C. Reimbursable Expenses are itemized by work category. Reimbursable Expenses shall be invoiced AT COST, without subsequent markup by Consultant. All invoices containing a request for Reimbursable Expenses shall include copies of the original expense receipts itemized per allowable category. (1) Allowable Reimbursable Expenses include: (a) Hard copy reproductions, copies, and/or binding costs; (b) Postage; (c) Mileage, for travel from Consultant's local office (within a 25-mile radius)to meetings at the City or jobsite. Mileage shall be charged at the current IRS rates; (d) Travel Expenses, mileage from local office to state or federal regulatory agency office beyond 100 miles; and (e) Lodging expenses for destinations beyond 100 miles from Consultant's local office AND when business hours exceed eight hours within one business day OR when Consultant's services require more than one eight-hour day at the destination; provided such expenses have been approved in writing by the City. (2) Disallowed Expenses include travel expenses for professional expertise traveling into the Greater Houston Area from Consultant's office outside the Greater Houston Area. d. Consultant shall invoice based upon total services actually completed during the applicable month. Invoices and all required or requested backup information shall be tendered no more often than once a month. Consultant shall not invoice the City for services or expenses that were incurred more than sixty (60) days before the date of the invoice. Failure to timely invoice the City for services or expenses shall result in Consultant's invoice being denied. e. In the event of a disputed or contested invoice,the City may withhold from payment that portion so disputed or contested, and the undisputed portion will be paid. 3. Personnel of Consultant a. Consultant's Project Manager Consultant shall designate John Rudloff to serve as Project Manager for the Work performed under this Agreement. Any change of Project Manager shall require thirty(30) days advance written approval from the City's Representative. b. Licensed and Registered Architects/Engineers Consultant shall keep full-time registered architects and/or engineers licensed in the State of Texas on staff and assigned to the Work for the duration of its performance of the Work. Agreement for Professional Services,Page 2 C. Data on Consultant's Employees Prior to commencement of the Work,Consultant shall forward to the City a detailed resume of the personnel that will be assigned to the Work. Such personnel shall include, but not be limited to, architects and/or engineers as applicable. d. Rejection of Consultant's Employees The City reserves the right to approve or reject from the Work any employees of Consultant. 4. Designation and Duties of the City's Representative a. The City's Director of Public Works and Engineering or his designee shall act as the City's Representative. b. The City's Representative shall use his best efforts to provide nonconfidential City records for Consultant's usage on the Work and to provide access to City's property and easements. However, the City does not guarantee the accuracy or correctness of the documents so provided. Notwithstanding the foregoing, Consultant shall be entitled to use and rely upon information provided by the City in performing the services required under this Agreement only to the extent and level specified by the City in writing for each document provided. Nothing contained herein shall be construed to require the City to provide such records in any certain format. The format in which the existing data and documentation will be provided shall be at the sole discretion of the City. 5. Standards of Performance a. Consultant shall perform all services under this Agreement with the care and skill ordinarily used by members of Consultant's profession practicing under the same or similar circumstances,time and locality. Opinion of probable cost shall be based upon the Consultant's experience and represent its best judgment as an experienced and qualified professional. Each submittal of opinion of probable cost shall be commensurate with the project design. Consultant shall be responsible for the technical accuracy of its services and documents resulting therefrom, and the City shall not be responsible for discovering deficiencies therein. Consultant shall correct such deficiencies without additional compensation. b. Codes and Standards (i) All references to codes, standards, environmental regulations and/or material specifications shall be to the latest revision, including all effective supplements or addenda thereto, as of the date that the order for any necessary equipment is made by the City or that the construction specified is bid by the City. Agreement for Professional Services,Page 3 (ii) If any such equipment is specially manufactured, it shall be identified to the City, and the Contractor and the Seller shall present sufficient data to the City to support the design and the suitability of the equipment. (iii) All materials specified on any City project shall be in accordance with City, ASTM, ACI, and AASHTO specifications, and with other recognized standards. Proprietary material or other materials for which no generally recognized standards exist may be used provided there has been at least five (5) years of proven experience in the field, and such satisfactory documentation has been approved by the City's Representative. (iv) The Work shall be designed and furnished in accordance with the most current codes and/or standards adopted by city, state, or federal government or in general custom and usage by the profession and shall comply with Texas Department of Licensing and Regulation's rules and regulations, including the Texas Accessibility Standards. (v) The codes and standards used in the profession set forth minimum requirements. These may be exceeded by the Contractor or Consultant if superior methods are available for successful operation of equipment and/or for the construction project on which the Work is performed. Any alternative codes or regulations used shall have requirements that are equivalent or better than those in the above-listed codes and regulations. Consultant shall state the alternative codes and regulations used. (vi) Consultant agrees the services it provides as an experienced and qualified architect/engineer will reflect the professional standards, procedures and performances common in the industry for this project. Consultant further agrees that any analysis, reports,preparation of drawings,the designation or selection of materials and equipment, the selection and supervision of personnel and the performance of other services under this Agreement will be pursuant to the standard of performance common in the profession. (vii) Consultant shall promptly correct any defective analysis caused by Consultant at no cost to City. The City's approval, acceptance, use of or payment for all or any part of Consultant's services hereunder or of the Work itself shall in no way alter Consultant's obligations or the City's rights under this Agreement. As applicable,Consultant shall provide the City with record "as-built" drawings relating to the Work in an electronic format that is acceptable to the City. City shall be in receipt of record drawings, if applicable, prior to final payment. (viii) Consultant has no control over the cost of labor, materials, equipment or services furnished by others, other than its subconsultants. Data projections and estimates are based upon Consultant's opinion based on experience and judgment. Consultant cannot and does not guarantee that actual costs and/or quantities realized will vary from the data projections and estimates prepared by Consultant. Agreement for Professional Services,Page 4 (ix) Consultant shall submit all final construction documents in both hard copy and electronic format. Plans shall be AutoCAD compatible and all other documents shall be Microsoft Office compatible. The software versions used shall be compatible to current City standards. Other support documents, for example, structural calculations, drainage reports and geotechnical reports, shall be submitted in hard copy only. All Record Drawings electronic files shall be submitted to the City in PDF/TIF format. 6. Schedule Consultant shall not proceed with the Work or any stage thereof until written notice to proceed is provided by the City's Representative. Consultant's obligation to render services specified in Exhibit "B" will be for the entire period necessary for the final completion of the construction of the Work. If the Consultant contributes to any delay in the schedule, Consultant will have no right to seek and shall not be entitled to any additional compensation. 7. Instruments of Service Upon execution of this Agreement, Consultant grants to the City an ownership interest in the Instruments of Service. Consultant shall obtain similar interests from the City and Consultant's consultants consistent with this Agreement. As noted in Articles 5 and 11, Consultant shall be required to tender to City all Instruments of Service. With such ownership interest, it is expressly understood by the parties hereto that the City may use the Instruments of Service for any purposes which the City sees fit, including, but not limited to, subsequent construction, reconstruction, alteration,and/or repairs of the Project. As a condition to the City's use of the Instruments of Service, the City hereby expressly agrees to remove Consultant's name and all references to Consultant and its consultants from the Documents. Provided that this Agreement is not terminated for cause by the City, the City shall release any and all claims which the City could make arising out of or in connection with any reuse of the documents by the City. 8. Insurance Consultant shall procure and maintain at its sole cost and expense for the duration of the Agreement, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work hereunder by Consultant, its agents, representatives, volunteers, employees or subconsultants. a. Consultant's insurance coverage shall be primary insurance with respect to the City, its officials, employees and agents. Any insurance or self-insurance maintained by the City, its officials, employees or agents shall be considered in excess of Consultant's insurance and shall not contribute to it. Further, Consultant shall include all subconsultants,agents and assigns as additional insureds under its policy or shall furnish separate certificates and endorsements for each such person or entity. All coverages for subconsultants and assigns shall be subject to all of the requirements stated herein. The following is a list of standard insurance policies along with their respective minimum coverage amounts required in this Agreement: I. Commercial General Liability ■ General Aggregate: $2,000,000 Agreement for Professional Services,Page 5 ■ Products & Completed Operations Aggregate: $2,000,000 ■ Personal & Advertising Injury: $1,000,000 ■ Per Occurrence: $1,000,000 ■ Fire Damage $500,000 ■ Waiver of Subrogation required ■ Coverage shall be broad form ■ No coverage shall be deleted from standard policy without notification of individual exclusions being attached for review and acceptance. 2. Business Automobile Policy ■ Combined Single Limits: $1,000,000 ■ Coverage for "Any Auto" ■ Waiver of Subrogation required 3. Errors and Omissions ■ Limit: $1,000,000 for this project ■ For all architects, engineers, and/or design companies ■ Claims-made form is acceptable ■ Coverage will be in force for one (1) year after completion of the Project ■ Waiver of Subrogation required 4. Workers'Compensation ■ Statutory Limits ■ Employer's Liability$500,000 ■ Waiver of Subrogation required b. The following shall be applicable to all policies of insurance required herein: 1. Insurance carrier for all liability policies must have an A.M. Best Rating of A:VIII or better. 2. Only insurance carriers licensed and admitted to do business in the State of Texas will be accepted. 3. Liability policies must be on occurrence form. Errors and Omissions can be on claims-made form. 4. Each insurance policy shall be endorsed to state that coverage shall not be suspended,voided, canceled or reduced in coverage or in limits except after thirty (30) days prior written notice by mail, return receipt requested, has been given to the City. 5. The City, its officers, agents and employees are to be added as Additional Insureds to all liability policies, with the exception of the Workers' Compensation and Errors and Omissions Policies required herein. Agreement for Professional Services.Page 6 6. Upon request and without cost to the City, certified copies of all insurance policies an&or certificates of insurance shall be furnished to the City. 7. Upon request and without cost to the City, loss runs (claims listing) of any and'or all insurance coverages shall be furnished to the City. 8. All insurance required herein shall be secured and maintained in a company or companies satisfactory to the City, and shall be carried in the name of Consultant. Consultant shall provide copies of insurance policies and endorsements required hereunder to the City on or before the effective date of this Agreement. 9. Indemnification and Release CONSULTANT AGREES TO AND SHALL INDEMNIFY AND HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS, AND EMPLOYEES (HEREINAFTER REFERRED TO AS THE "CITY") FROM AND AGAINST ANY AND ALL CLAIMS, LOSSES, DAMAGES, CAUSES OF ACTION, SUITS AND LIABILITY OF EVERY KIND, INCLUDING ALL EXPENSES OF LITIGATION, COURT COSTS, AND ATTORNEY'S FEES, FOR INJURY TO OR DEATH OF ANY PERSON, FOR DAMAGE TO ANY PROPERTY OR FOR ANY BREACH OF CONTRACT TO THE EXTENT ARISING OUT OF OR IN CONNECTION WITH AN ACT OF NEGLIGENCE, INTENTIONAL TORT, INTELLECTUAL PROPERTY INFRINGEMENT,OR FAILURE TO PAY A SUBCONTRACTOR OR SUPPLIER COMMITTED BY THE CONSULTANT OR THE CONSULTANT'S AGENT, CONSULTANT UNDER CONTRACT,OR ANOTHER ENTITY OVER WHICH THE CONSULTANT EXERCISES CONTROL (COLLECTIVELY, CONSULTANT'S PARTIES). IT IS THE EXPRESS INTENTION OF THE PARTIES HERETO, BOTH CONSULTANT AND THE CITY, THAT THE INDEMNITY PROVIDED FOR IN THIS PARAGRAPH IS INDEMNITY BY CONSULTANT TO INDEMNIFY AND PROTECT THE CITY FROM THE CONSEQUENCES OF CONSULTANT'S PARTIES' OWN WILLFUL MISCONDUCT, JOINT OR SOLE NEGLIGENCE AS WELL AS THE CONSULTANT'S PARTIES' INTENTIONAL TORTS, INTELLECTUAL PROPERTY INFRINGEMENTS, AND FAILURES TO MAKE PAYMENTS ARISING OUT OF OR IN CONNECTION WITH THIS AGREEMENT. SUCH INDEMNITY SHALL NOT APPLY, HOWEVER, TO LIABILITY ARISING FROM THE PERSONAL INJURY, DEATH, OR PROPERTY DAMAGE OF PERSONS THAT Agreement for Professional Services,Page 7 IS CAUSED BY OR RESULTS FROM THE NEGLIGENCE OF ANY PERSON OTHER THAN THE CONSULTANT'S PARTIES. IN THE ' EVENT THAT ANY ACTION OR PROCEEDING IS BROUGHT AGAINST THE CITY FROM WHICH THE CITY IS INDEMNIFIED, CONSULTANT FURTHER AGREES AND COVENANTS TO DEFEND THE ACTION OR PROCEEDING BY LEGAL COUNSEL ACCEPTABLE TO THE CITY. THE INDEMNITY PROVIDED HEREINABOVE SHALL SURVIVE THE TERMINATION AND/OR EXPIRATION OF THIS AGREEMENT, SUBJECT TO THE LIMITATIONS IN TEXAS LOCAL GOVERNMENT CODE SECTION 271.904 AND TEXAS CIVIL PRACTICE AND REMEDIES CODE SECTION 130.002. By this Agreement,the City does not consent to litigation or suit,and the City hereby expressly revokes any consent to litigation that it may have granted by the terms of this Agreement or any other contract or agreement, any charter, or applicable state law. Nothing herein shall be construed so as to limit or waive the City's sovereign immunity. Consultant assumes full responsibility for its services performed hereunder and hereby releases, relinquishes and discharges the City, its officers, agents, and employees from all claims, demands, and causes of action of every kind and character,including the cost of defense thereof, for any injury to or death of any person (whether they be either of the parties hereto, their employees, or other third parties)and any loss of or damage to property(whether the property be that of either of the parties hereto, their employees, or other third parties) that is caused by or alleged to be caused by, arising out of, or in connection with Consultant's services to be performed hereunder. This release shall apply with respect to Consultant's services regardless of whether said claims,demands,and causes of action are covered in whole or in part by insurance. 10. Subcontractors and Subconsultants Consultant shall receive written approval of the City's Representative prior to the use of any subcontractors or subconsultants. A copy of all proposed contracts with subconsultants and/or subcontractors shall be given to the City before execution of such contracts. 11. Termination of Consultant The City, besides all other rights or remedies it may have, shall have the right to terminate this Agreement without cause upon written notice from the City Manager to Consultant of the City's election to do so. Furthermore, the City may immediately and without notice terminate this Agreement if Consultant breaches this Agreement. A breach of this Agreement shall include, but not be limited to, the following: (a) failing to pay insurance premiums, liens, claims or other charges; (b) failing to pay any payments due the city, state, or federal government from Consultant or its principals, including, but not limited to, any taxes, fees, assessments, liens, or any payments identified in this Agreement; Agreement for Professional Services,Page 8 (c) the institution of voluntary or involuntary bankruptcy proceeding against Consultant; (d) the dissolution of Consultant; (e) refusing or failing to prosecute the Work or any separable part with the diligence that will ensure its completion within the time specified in this Agreement; (f) failing to complete Work within the time period specified in this Agreement;and/or (g) the violation of any provision of this Agreement. Upon delivery of any notice of termination required herein, Consultant shall discontinue all services in connection with the performance of the Agreement. Within ten(10)days after receipt of the notice of termination,Consultant shall submit a final statement showing in detail the services satisfactorily performed and accepted and all other appropriate documentation required herein for payment of services. At the same time that the final statement is tendered to the City, Consultant shall also tender to the City's Representative all of Consultant's instruments of service, including all drawings, special provisions, field survey notes, reports, estimates, and any and all other documents or work product generated by Consultant under this Agreement, whether complete or not, in an acceptable form and format together with all unused materials supplied by the City. No final payment will be made until all such instruments of service and materials supplied are so tendered. If this Agreement is terminated for cause, Consultant shall be liable for any damage to the City resulting therefrom. This liability includes any increased costs incurred by the City in completing Consultant's services. The rights and remedies of the City in this section are in addition to any other rights and remedies provided by law or under this Agreement. 12. Records Within ten (10) days of the City's request and at no cost to the City, the City will be entitled to review and receive a copy of all documents that indicate work on the Project that is subject to this Agreement. 13. Supervision of Consultant Consultant is an independent contractor, and the City neither reserves nor possesses any right to control the details of the Work performed by Consultant under the terms of this Agreement. 14. Billing The City shall have thirty (30) days to pay Consultant's invoices from the date of receipt of such invoices and necessary backup information. All invoices must identify with specificity the work or services performed and the date(s) of such work or services. In the event of a disputed or contested invoice, the parties understand and agree that the City may withhold the portion so contested, but the undisputed portion will be paid. Consultant shall invoice the City for work performed no more than once a month and may not invoice the City for work not performed. Invoices shall be received by the City no later than sixty(60)calendar days from the date Consultant and/or its subconsultants perform the services or incur the expense. Failure by Consultant to comply with this requirement shall result in Consultant's invoice being denied and the City being relieved from any liability for payment of the late invoice. 15. Indebtedness If Consultant, at any time during the term of this Agreement, incurs a debt, as the word is defined in section 2-662 of the Code of Ordinances of the City of Baytown, it shall immediately notify the Agreement for Professional Services,Page 9 City's Director of Finance in writing. If the City's Director of Finance becomes aware that Consultant has incurred a debt,the City's Director of Finance shall immediately notify Consultant in writing. If Consultant does not pay the debt within thirty (30) days of either such notification, the City's Director of Finance may deduct funds in an amount equal to the debt from any payments owed to Consultant under this Agreement, and Consultant waives any recourse therefor. 16. Verifications If Consultant has ten (10) or more full-time employees and Consultant's total compensation under this Agreement has a value of One Hundred Thousand Dollars ($100,000.00)or more,Consultant makes the following verifications in accordance with Chapters 2271 and 2274 of the Texas Government Code: a. Consultant does not boycott Israel and will not boycott Israel during the term of the contract to be entered into with the City of Baytown; b. Consultant does not boycott energy companies and will not boycott energy companies during the term of the contract to be entered into with the City of Baytown;and c. Consultant does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association and will not discriminate during the term of the contract against a firearm entity or firearm trade association. 17. Reputation in the Community Consultant shall retain a high reputation in the community for providing professional architectural/engineering services. Consultant shall forward a copy of any current petition or complaint in any court of law which(a)asserts a claim for$50,000 or more for errors or omissions in providing architecturallengineering services and/or (b) seeks to deny Consultant the right to practice architecture`engineering or to perform any other services in the state of Texas. 18. Payroll and Basic Records a. Consultant shall maintain payrolls and basic payroll records during the course of the work performed under this Agreement and shall preserve them for a period of three(3)years from the completion of the work called for under this Agreement for all personnel working on such work. Such records shall contain the name and address of each such employee, social security number, correct classification, hourly rates of wages paid, daily and weekly number of hours worked, deductions made and actual wages paid. b. Consultant shall make the records required to be maintained under the preceding subsection(a)of this section available at no cost to the City for inspection, copying or transcription or its authorized representatives within fifteen (15) days of the City's request therefor. Should the City request copies of the records, Consultant may redact employee social security numbers and/or addresses. Consultant shall permit such representatives to interview Consultant's employees during working hours on the job. 19. Governing Law This Agreement has been made under and shall be governed by the laws of the State of Texas. The parties further agree that performance and all matters related thereto shall be in Harris County, Texas. Agreement for Professional Services,Page 10 20. Notices Unless otherwise provided in this Agreement, any notice provided for or permitted to be given must be in writing and delivered in person or by depositing same in the United States mail,postpaid and registered or certified, and addressed to the party to be notified,with return receipt requested, or by delivering the same to an officer of such party. Notice deposited in the mail as described above shall be conclusively deemed to be effective, unless otherwise stated in this Agreement, from and after the expiration of three(3) days after it is so deposited. For the purpose of notice, the addresses of the parties shall be as follows unless properly changed as provided for herein below: For the City: CITY OF BAYTOWN Attn: City Manager P. O. Box 424 Baytown, Texas 77522-0424 For Consultant: ARKK Engineers, LLC Attn: Madhu Kilambi 7322 Southwest Fwy Suite 1040 Houston,TX 77074 Each party shall have the right from time to time at any time to change its respective address and each shall have the right to specify a new address, provided that at least fifteen (15) days written notice is given of such new address to the other party. 21. No Third-Party Beneficiary This Agreement shall not bestow any rights upon any third party, but rather, shall bind and benefit Consultant and the City only. No person or entity not a signatory to this Agreement shall be entitled to rely on Consultant's performance of its services hereunder,and no right to assert a claim against Consultant by assignment of indemnity rights or otherwise shall accrue to a third party as a result of this Agreement or the performance of Consultant's services hereunder. 22. No Right to Arbitration Notwithstanding anything to the contrary contained in this Agreement, the City and Consultant hereby agree that no claim or dispute between the City and Consultant arising out of or relating to this Agreement shall be decided by any arbitration proceeding, including, without limitation, any proceeding under the Federal Arbitration Act (9 U.S.C. Sections 1-14), or any applicable State arbitration statute, including, but not limited to, the Texas General Arbitration Act, provided that in the event that the City is subjected to an arbitration proceeding notwithstanding this provision, Consultant consents to be joined in the arbitration proceeding if Consultant's presence is required or requested by the City of complete relief to be recorded in the arbitration proceeding. Agreement for Professional Services.Page t l 23. Waiver No waiver by either party to this Agreement of any term or condition of this Agreement shall be deemed or construed to be a waiver of any other term or condition or subsequent waiver of the same term or condition. 24. Complete Agreement This Agreement represents the entire and integrated Agreement between the City and Consultant in regard to the subject matter hereof and supersedes all prior negotiations, representations or agreements, whether written or oral, on the subject matter hereof. This Agreement may only be amended by written instrument approved and executed by both of the parties. The City and Consultant accept and agree to these terms. 25. No Assignment Consultant may not sell or assign all or part interest in this Agreement to another party or parties without the prior express written approval of the City Manager of such sale or assignment. The City may require any records or financial statements necessary in its opinion to ensure such sale or assignment will be in the best interest of the City. 26. Headings The headings used in this Agreement are for general reference only and do not have special significance. 27. Severability All parties agree that should any provision of this Agreement be determined to be invalid or unenforceable, such determination shall not affect any other term of this Agreement, which shall continue in full force and effect. 28. Ambiguities In the event of any ambiguity in any of the terms of this Agreement, it shall not be construed for or against any party hereto on the basis that such party did or did not author the same. 29. Authority The officers executing this Agreement on behalf of the parties hereby represent that such officers have full authority to execute this Agreement and to bind the party heishe represents. IN WITNESS WHEREOF, the parties hereto have executed this Agreement in multiple copies, each of which shall be deemed to be an original, but all of which shall constitute but one and the same Agreement on the day of ,20______, the date of execution by the City Manager of the City of Baytown. CITY OF BAYTOWN JASON E. REYNOLDS, City Manager ATTEST: Agreement for Professionai Services,Page 12 ANGELA JACKSON,City Cleric APPROVED AS TO FORM: SCOTT LEMOND, City Attorney CONSULTANT: ARKK Engineers, LLC (, ignature) ` 4ki Ot LA/. lCdS eR., (Printed Name) n1711Gjd/ LLC (Title) Apn:ement for Professional Services.Page 13 STATE OF TEXAS § COUNTY OF HARRIS § Before me on this day personally appeared Oip 1;pl AG,S� Pe"" , in his/her capacityas nrih41;jb4l of AX, N Foaihee-s LLC. .__ _ on behalf of such L G G. known to me; ❑ proved to me on the oath of ;or ❑ proved to me through his/her current (description of identification card or other document issued by the federal government or any state government that contains the photograph and signature of the acknowledging person) (check one) to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. SUBSCRIBED AND SWORN before me this /9 day of 1774 20 o?3 DAVIDNotary JAN55E1 FAMG 33869 Notary Public in and for the Sta f Texas + �'F Nataryli)#�13i2338b9 � My Commission Expires August 27.2025 R-\Karcn Anderson%CONTRACTSV02MCON'1RAC TEMPLATMArcAuectural or Engineering Services Agreement Template-Section 2 Flexible(sL Final-Fillable).docx Agreement far Professional Services„Page 14 ARKKENGINEERS April 14, 2023 Mr. Michael Leech Assistant Director of Public Works City of Baytown, Texas 2123 Market Street Baytown, Texas 77520 Re: Proposal for Engineering Design and Construction Phase Services for "RW2204 Neighborhood Street Reconstruction of Lantern Park,Dolphin Harbor and Canvasback Cay" Dear Mr. Leech: As requested, ARKK Engineers, LLC (ARKK) is pleased to submit this proposal for performing engineering design and construction phase services for the above referenced project. The streets include the following: Lantern Park Subdivision • Coachman Drive from West Baker Road to Dead End (Approximately 3,000 LF) • Carriage Lane from Coachman Drive to End (Approximately 545 LF) • Cobblestone Lane from Coachman Drive to End (Approximately 545 LF) • Lantern Lane from Coachman Drive to End (Approximately 530 LF) • Coachlight Lane from Coachman Drive to End (Approximately 475 LF) • Survey Lane from Coachman Drive to End (Approximately 435 LF) Bay Oaks Harbor Subdivision • Dolphin Harbor North and South (Approximately 725 LF) • Canvasback Cay North and South (Approximately 675 LF) South Circle Drive (approximately 780 LF) The total estimated construction cost for performing the improvements for all the streets is $8.8 Million (includes a budget of$100,000 for easement acquisition and a 15% construction contingency). This proposal is based on our understanding of the project as discussed in our previous meetings and conversations with City staff and information gathered from our site visits. For your convenience, this proposal consists of General Overview, Scope of Services, and Fee. See 7322 Southwest Fwy suite 1040 • Houston,TX 77074 •1713-400-ARKK•www.arkkengineers.com• TX PE Firm No.13872 Exhibit W for a description the services. See Exhibit'B' for Fee breakdown and Exhibit 'C'for a schedule for the services outlined in this proposal. The total fee for performing the services is the amount of$942,914.00. This proposal is based on designing and bidding the improvements for the streets mentioned above as one construction bid package. ARKK Engineers, LLC sincerely appreciates this opportunity to submit this proposal and we look forward to continuing our work with the City of Baytown. Sincerely, ARKK ENGINEERS, LLC Madhu Kilambi, P.E. Senior Project Manager/ Principal 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 •(713-400-ARKK•www.arkkengineers.com• TX PE Firm No.13872 EXHIBIT'A' This project involves providing engineering design and construction phase services for the reconstruction of the residential neighborhood streets in the Lantern Park Subdivision, Bay Oaks Harbor Subdivision as well as South Circle Drive in the City of Baytown, Texas. The reconstruction will improve the local drainage, roadway driving surface, and accessibility and pedestrian mobility. Lantern Park Subdivision The Lantern Park Subdivision reconstruction includes the following streets: • Coachman Drive from West Baker Toad to Dead End (Approximately 3,000 LF) • Carriage Lane from Coachman Drive to End (Approximately 545 LF) • Cobblestone Lane from Coachman Drive to End (Approximately 545 LF) • Lantern Lane from Coachman Drive to End (Approximately 530 LF) • Coachlight Lane from Coachman Drive to End (Approximately 475 LF) • Survey Lane from Coachman Drive to End (Approximately 435 LF) This project will involve reconstructing these streets with new concrete curb & gutter pavement, and also includes the reconstruction of existing storm sewer, junction boxes and inlets to meet City's drainage standards. Driveways will be replaced up to the right-of-way line or as needed to accomplish the street reconstruction. Sidewalks will be installed wherever feasible. Based on City GIS and maps provided by the City,there appears to be a single 54-inch and four (4) 18-inch outfalls from the Lantern Park subdivision in to the Goose Creek Drainage Ditch. These outfalls do not provide adequate conveyance to meet current City's drainage design standards. At this time, it is anticipated that an additional outfall to Goose Creek will be required to provide an adequate conveyance drainage system for the Lantern Park Subdivision. The existing outfalls have been televised by the City. The TV tapes will be utilized to determine if the existing outfall pipes can be left in place to supplement the drainage provide by the proposed new outfall pipe. The new outfall pipe will require the purchase/condemnation of an easement from a property owner that backs up to the Goose Creek drainage ditch. It is understood that the easement negotiation and acquisition will be conducted by the City's Right-of-Way Department. Installing an additional outfall in to the Goose Creek drainage ditch, which is owned and maintained by Harris County Flood Control District(HCFCD), may require hydraulic modeling to determine impacts caused by the installation of an additional outfall pipe for the subdivision. The magnitude and extent of modeling is not known at this time and will be known at the completion of the 30%design. Therefore,a not to exceed budget for coordination with HCFCD and to perform any modeling services required by HCFCD as part of their approval process is included in this proposal. Lantern Park improvements will also include the replacement of approximately 6,050 linear feet of water line and associated appurtenances within the project area. Based on information Page 1 of 10 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 •{713-400-ARKK 9 www.arkkengineers.com• TX PE Firm No.13872 provided by the City, approximately 1,000 linear feet of new water line along the western side of the subdivision has been installed previously.The proposal does not include the replacement of this 1,000 linear feet of new water line. It is also not anticipated to replace/rehabilitate the sanitary sewer within Lantern Park Subdivision. However,provisions will be made to adjust the existing sewer when in conflict with the proposed improvements. Lantern Park improvements will also include the beautification and re-design of the subdivision entryway. This entry re-design portion of the work will be developed in partnership with the resident association for the Lantern Park Subdivision.It is anticipated that a public input process will be conducted to aid in developing the design of the subdivision entryway. Bay Oaks Harbor Subdivision The Bay Oaks Harbor Subdivision reconstruction includes the following streets: • Dolphin Harbor North and South (Approximately 725 LF) • Canvasback Cay North and South (Approximately 675 LF) The scope of work includes roadway reconstruction with a concrete curb and gutter pavement section with underground drainage improvements. Based on input from City staff,the existing water lines and sanitary sewer lines along these two streets will be replaced as part of this project. Driveways will be replaced up to the right-of-way line or as needed to accomplish the street reconstruction. Drainage improvements include filling in the roadside ditches with a lowered curb and gutter pavement section, and the addition of storm sewers and inlets as needed to meet City-minimum design criteria. South Circle Drive This project also includes the reconstruction of approximately 780 LF of South Circle Drive.The improvements will include roadway reconstruction with concrete pavement curb and gutter section with underground drainage improvements. Driveways will be replaced up to the right- of-way line or as needed to accomplish the street reconstruction. Based on input by the City, it is not anticipated to replace/rehabilitate the water and/or wastewater lines in this project area. This proposal addresses the engineering services ARKK Engineers will provide the City during the design and construction phases, including services such as topographic surveying, geotechnical engineering, plan reproduction, and other services required for the project. During the construction phase,the City of Baytown will provide a project site representative to observe the progress of construction. Therefore, construction management and inspection services by ARKK Engineers' personnel are not part of the scope of this project. Pale 2 of 10 7322 Southwest Fwy Suite 1040 9 Houston,TX 77074 •(713-400-ARKK 0 www.arkkengineers.com• TX PE Firm No.13872 SCOPE OF SERVICES I. DESIGN PHASE A. Preliminary Design Phase (30%Submittal) • Conduct a kickoff meeting with the City of Baytown. • Employ and coordinate with project sub-consultants, to include architectural, geotechnical, surveying, and arborist. • Compile a list of design criteria/assumptions/exceptions for the Project for the Owner's review and approval, including, but not limited to: Handling of structures/fences/landscaping/trees encroaching in the right-of- way; * Replacement of existing utilities within the right-of-way and those within three feet of the hack of curb. * Developing paving options that include adjustments due to change in elevation, profile adjustments, driveways, intersections, manholes, or curb ramps, if applicable. o Upgrading City utilities that are not currently in compliance with City design criteria, or are within 3-feet of the back of curb; o Handling of mailboxes, sidewalks, landings, and retaining wall replacement; o Handing of through-the-curb drains,driveway culverts,and private irrigation systems within the right-of-way; • Obtain from the City available water, sanitary sewer, and storm sewer block maps, designated as-built/record drawings, LIDAR data, 0& M records as part of the data collection efforts. • Request from private utility companies their available utility/maintenance schedules and locations as part of the data collection efforts. • Perform a site reconnaissance visit to the streets identified as part of the Project. • Assess potential right-of-way conflicts as well as compliance with design criteria developed above. The right-of-way conflict assessment is based on data gathered from the site visits and information provided by the City. A detailed right-of-way research study is not part of the scope of work for this project. • Coordinate with other governmental entities which maybe impacted by the project. _ Page3 of 10 7322 Southwest Fwy Suite 1040 9 Houston,TX 77074 •(713-400-ARKK•www.arkkengineers.com• TX PE Firm No.13872 • Coordinate with the City and apprise the City of ARKK's findings and analysis, and obtain input from the City. • Provide 30% submittal drawings, with cost estimates, to the City for review and comments. The 30% drawings will show the plan and profile of the existing topographic survey data, and will contain proposed street and drainage improvements in the plan view only. • Furnish an electronic copy of the 30% submittal to Owner within one hundred and eighty(180) calendar days of authorization to begin services. • Revise the 30% submittal in response to Owner's comments, as appropriate, and furnish one electronic copy of the final submittal within ten(10)calendar days upon receipt of review comments from the Owner. • The Engineer's services under the Preliminary Design Phase will be considered complete on the date when the final revised 30% submittal, with all the City comments addressed, is delivered to and accepted by the Owner. B. Final Design Phase • Prepare final design drawings for the proposed paving and drainage improvements for the reconstruction of the streets which constitute the Project, indicating the scope, extent, and character of the Work to be performed and furnished by the Contractor. Specifications will be prepared in conformance with the 16-Division format of the Construction Specifications Institute or other format desired by the Owner. • Provide technical criteria, written descriptions, and design data for Owner's use in filing applications for permits from or approvals of governmental authorities having jurisdiction to review or approve the final design of the Project and assist Owner in consultations with appropriate authorities. • Advise Owner of any material adjustments to the opinion of probable construction cost and any material adjustments to the total project costs known to Engineer. • Perform and provide the following tasks or deliverables: o Prepare a Storm Water Pollution Prevention Plan for the project. Prepare a Traffic Control Plan for the proposed improvements in accordance with the Texas Manual on Uniform Traffic Control Devices. o Prepare quantity takeoffs and an opinion of probable construction cost for the proposed improvements at the 60%, 90%, and 100% milestones. The Paee 4 of 10 7322 Southwest Fwy Suite 104.0 • Houston,TX 77074 •(713;4007ARKK•www.arkkengineers.com• TX PE Firm No.13872 deliverables for the 60% milestone shall include submittal of the plan and profile drawing sheets and 60%cost estimate. c: The Contract Documents shall be submitted with the plans for both the 90% and 100%submittals. Deliverables shall include construction documents submitted to the Owner at the 60%, 90%and 100%milestones for review,comments,and approvals. o Prepare project-specific construction notes, details, and technical specifications. c� The standard detail sheets provided by the Owner for water, sewer, storm, paving,and typical cross sections shall be utilized and included in the project plans as appropriate. o Cause to be performed the following services: • Surveying: A topographic survey will be performed for each street segment. Approximate location of the rights-of-way will be shown on the plans based on found iron rods other topographical features. The topographic survey shall include a limit of 100 feet within the existing right-of-way in each direction for the intersection immediately adjacent to the roads included in this proposal. The intersection surveying efforts will assist to ascertain the existing drainage patterns. Further,the surveying fee is based on the premise that the Engineer will have survey control placed on the construction plans and the selected contractor will be responsible for construction staking. Right-of-way research is not part of the scope of services. In the event it is determined that the exact location of the right-of-way is needed for certain streets, ARKK Engineers will submit a separate proposal for providing such right-of-way research services for approval by the City. • Geotechnical Investigation: Geotechnical borings will be taken at approximately 500 feet spacing along the proposed improvements. This proposal is based on taking 19 bores at a depth ranging from 5 to 15 feet deep for a total vertical footage of 205 feet. ■ Urban Forestry: Urban forestry services, including a tree protection plan, for the Project shall be provided in accordance with the attached proposal from C.N Koehl Urban Forestry Inc. ■ Environmental Investigation: As discussed with the City, a Phase I Environmental Site Assessment will not be performed for this project. ARKK Engineers can submit a separate proposal for providing such services if requested by the City. P�Le5of10 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 •{713-400-ARKK•www.ackkengineers.com• TX PE Firm No.13872 ■ TDLR Review: An ADA review shall be provided and plans shall be submitted to the TDLR.The Project will require plans to be reviewed in accordance with Texas Architectural Barriers Project Registration (TABPR)guidelines.ARKK will submit the drawings to a State licensed reviewer for review and approval. ARKK will prepare the TABPR application and estimate the review fee. ARKK will submit the completed application and a set of construction drawings to the reviewer for review and approval. ARKK will coordinate with the reviewer to address comments. Once all comments have been cleared, the Project will be registered with the Texas Department of Licensing and Regulations(TDLR).The application fee along with any review fees required by TDLR will be a subcontractor reimbursable fee and therefore, will be billed as such. ■ HCFCD Coordination & Approvals: This project includes the installation of an additional outfall the Lantern Park Subdivision into the Goose Creek drainage ditch, owned and operated by Harris County Flood Control District(HCFCD).This will require coordination with HCFCD and may include hydraulic modeling to determine impacts caused by the installation of an additional outfall pipe for the subdivision. The modeling will have to be presented to HCFCD to demonstrate no adverse impacts from the Lantern Park Improvements. ARKK Engineers will utilize the services of a sub- consultant (Costello, Inc.) for these services. The magnitude and extent of modeling is not known at this time and will be known at the completion of the 30%design. Therefore, a not to exceed budget is included for this line item. ■ A re-design of the Lantern Park subdivision entryway will be included in this contract.ARKK will team with an Architect that has experience in this type of work. It is anticipated that three(3) public meeting will be required to receive input from the Lantern Park Subdivision to aid in developing the design of the subdivision entryway. A budget for architectural services is included in this proposal. ■ Reproduction: Reproduction of plans, reports, and specifications for review sets submittals to governmental agencies, and utility companies will be included in the cost for reproduction. o All geometric design shall be in conformance with the applicable Owner standards,except where variances are permitted,and applicable TxDOT and Harris County standards. o Consult with the Owner and affected utility companies to define and clarify the project requirements and available related data. PaLe6of10 T _ 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 •(713-400-ARKK•www.arkkengineers.com+ TX PE Firm No.13872 o Meet and coordinate with the Owner, area stakeholders, utility owners, as needed to facilitate coordination and approval of the Construction Documents. o Prepare for and attend project progress meetings with the Owner. o Prepare for and attend three (3) public meeting with local residents and businesses for each project area/neighborhood. o The final Contract Documents will be supplied by the Owner. • Furnish one electronic copy of the 60% submittal to OWNER within ninety (90) calendar days of authorization to begin final design services and review the report with the Owner. • Furnish one electronic copy of the 90% submittal, including Bidding Documents, along with a revised opinion of probable Construction Cost to OWNER within sixty (60) calendar days of receipt of 60%submittal comments from Owner. • Revise the 90% submittal in response to Owner's and other parties' comments, as appropriate, and incorporate such revisions in the 100% Bidding Documents. • Furnish one electronic copy of the 100%Bidding Documents for review and approval by Owner, its legal counsel, and other advisors, as appropriate, review it with Owner, and assist Owner in the preparation of other related documents. • Revise the 100% Bidding Documents in response to Owner's and other parties' comments,as appropriate,and submit an electronic copy of the Bidding Documents and an updated opinion of probable Construction Cost to OWNER within thirty(30) calendar days of receipt of 90%submittal comments from Owner. • Submit final plans to subcontractor for TDRA plan review in accordance with State regulations. II. BID PHASE SERVICES • During the bidding phase, provide information to and answer questions from prospective bidders regarding the Project's construction documents. • Prepare project addendums as necessary. • Prepare pre-bid meeting agenda and conduct a pre-bid conference for prospective bidders. • Prepare summary of pre-bid meeting minutes for the project and distribute to all prospective bidders. Page 7 of 10 7322 Southwest Fwy Suite 1040 * Houston,TX 77074 *(713-400-ARKK 9 www.arkkengmeers.com• TX PE Firm No.13872 • Review and respond to questions submitted by Contractors regarding the project plans and specifications. • Evaluate the bids and the qualifications of the apparent low bidder and advise the City as to the acceptability of the apparent low bidder. • Prepare a letter of recommendation to the City. III. CONSTRUCTION PHASE SERVICES 1. Construction Administration Services • Prepare a pre-construction agenda. • Conduct a pre-construction conference for the project. • Prepare summary of pre-construction meeting minutes for the project and distribute to all parties. • Review and respond accordingly to all submittals as required by the contract specifications. • Prepare change orders necessitated by field conditions. • Review the contractor's pay estimates and make payment recommendations to the City. • Visit the site at intervals appropriate to the various stages of construction to observe the progress and quality of executed work and to determine in general if such work is proceeding in accordance with the Contract Documents. • ARKK will not be responsible for the means, methods, techniques, sequences or procedures of construction selected by the Contractor(s) or the safety precautions and programs incident to the work of the Contractor(s). ARKK's effort will be directed toward providing a greater degree of confidence for the City that the completed work of Contractor(s)will conform to the Contract Documents,but ARKK will not be responsible for the failure of Contractor(s) to perform the work in accordance with the Contract Documents. During site visits and on the basis of on- site observations ARKK shall keep the City informed of the progress of the work, shall endeavor to guard the City against defects and deficiencies in such work and may disapprove or reject work failing to conform to the Contract Documents. • Attend progress meetings for the project if requested by the City. • Conduct a final inspection of the Project and assist in making a recommendation for Final Payment on the project. Pae.8 of 10 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 •(713-400-ARKK•www.arkkengineers.com 9 TX PE Firm No.13872 • Engineer shall provide one set of reproducible record plans based on the Contractor's provided red line marked up as-built drawings, and provide one electronic copy of the drawings on a CD. FEE PRELIMINARY DESIGN PHASE (30%Submittal): Preliminary Design Phase Services- lump sum amount of: $218,728.00 Hydraulic Evaluation for HCFCD—Not to Exceed: $77,000.00 Topographic Surveying- Not to Exceed: $46,404.00 Geotechnical Investigation - Not to Exceed: $23,604.00 PER Phase Urban Forestry- Not to Exceed: $5,357.00 SUBTOTAL PRELIMINARY DESIGN PHASE: $371,093.00 FINAL DESIGN PHASE: Final Design Phase Services- lump sum amount of: $350,054.00 Architectural Services—Not to Exceed: $22,000.00 Tree Protection Plan - Not to Exceed: $13,778.00 TDLR Review& Filing Fees - Not to Exceed: $750.00 SUBTOTAL FINAL DESIGN PHASE: $386,S82.00 BID PHASE: Bid Phase Services - lump sum amount of: $7,270.00 SUBTOTAL BID PHASE: $7,270.00 CONSTRUCTION PHASE: Construction Phase Services- lump sum amount of: $169,569.00 TDLR Inspection Fees- Not to Exceed: $2,000.00 Tree Protection Field Layout- Not to Exceed: $4,400.00 SUBTOTAL CONSTRUCTION PHASE: $175,969.00 FEES APPLICABLE TO ALL PHASES: Reproduction - Not to Exceed: $2,000.00 SUBTOTAL: $2,000.00 TOTAL ALL SERVICES: $942,914.00 _ Page 9 of 10 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 9(713-400-ARKK 9 www.arkkengineers.com• TX PE Firm No.13872 RATE SCHEDULE Employee Classification Billine Rate per hour Project Principal (P.E.) $184.00 Senior Project Manager (P.E.) $184.00 Project Manager(P.E.) $140.00-$180.00 Senior Designer $130.00—$150.00 Project Engineer $100.00—$135.00 Senior CADD Operator $125.00-$140.00 CADD Operator $95.00-$105.00 Senior Construction Manager(P.E.) $184.00 Construction Manager $148.00 Construction Inspector $90-$110.00 Reimbursable expenses will be charged at cost plus 10%. Mileage will be charged at the current IRS prevailing rate. _ N _ Page 10 of 10 _ _ 7322 Southwest Fwy Suite 1040 a Houston,TX 77074 •1713-400-ARKK•www.arkkengineers.com• TX PE F1rm No.13872 Exhibit "B" Fee Estimate RW 2204 Reconstruction of Lantern Park Neighborhood, South Circle Drive, Dolphin Harbor and Canvasback Cay SUMMARY PAGE PRELIMINARY DESIGN PHASE $3713,093.00 FINAL DESIGN PHASE $386,582.00 BID PHASE $7,270.00 CONSTRUCTION PHASE $175,969.00 REPRODUCTION $2,000.00 TOTAL ALL SERVICES $942 914.00 Fee Estimate RW 2204 Reconstruction of Lantern Park Neighborhood,South Circle Drive,Dolphin Harbor and Canvasback Cay PER Phase Sr.Project Project Senior Graduate Sr.CADD CADD Manager Manager Designer Engineer EIT Operator Summary HOURLY RATE: $ 184.00 $ 165.00 $ 145.00 $ 115.00 $ 137.00 $ 100.00 1. Coordination l frepare For and Atte 3 Public Meeting 23096--— --__ 4 _ S 16 — le frolac Pannirr9 Rd nd_n Schedulii -- --- 4 — —_ Total Coordination Hours 8 8 16 16 0 0 48 Total Coordination Engineering Fee $ 1,472 $ 1.320 $ 2.320 $ 1,840 $ $ $ 6,952 2. Data Collection Obtain and Review As-Built Drawings and GIS —_----_ _ _ 4 _ _ $ ----- —_•— __ -- Fleld Ver g#$ti Conditions — — _ —_4_—_ — 8 —8 - — Collect PublicfPrivate Utilitv Information - � _ —8 8 — -- --- Total Data Collection Hours 8 8 14 16 0 0 46 Total Data Collection Engineering Fee $ 1,472 S 1.32D $ 2.030 $ 1.840 $ $ S 6,662 3. Develop Design Criteria Create Existing Conditions Base Map a 16 32 40 ent' T a rnm Pro�i.ems"ai�."_.........- — -_ _— -----—-- -— -------� — - Develop Design Criteria 4 8 Total Design Criteria Hours 12 0 24 32 0 40 108 Total Design Criteria Engineering Fee $ 2,208 $ $ 3.480 $ 3,680 $ $ 4,ODO S 13,3e8 4. Drainag Areas Establish Proposed Drainage Areas 4 16 _ 24 repare r age Calculations-- ---- '�---— 4 ---- 16 24-- — — Total Hydraulic 1 Site Plan Hours 8 0 32 48 0 0 88 Total Hydraulic I Site Plan Engineering Fee $ 1.472 $ $ 4.040 $ 5.520 S $ $ 11,632 5. Engineering Evaluation and Recommendations Com a�ralive Analysis of Alternatives --_ —_ — —_ — Develop and Recommend Draie.UtilitRoadwa_ Improve.- — — 2 -- 4 —8 — — 8— -- ---Develop and Recommend Required UtIq Relocation —---— —_—_ 4 — 8 Determine and Recommend Required ROW[EasemerK Acquisition 2 4 Total Evaluation!Recomm Hours 6 12 18 18 0 0 50 Total Evaluation f Recomm Engine rin Fee $ 1.104 $ 1,980 $ 2.320 S 1,840 $ - $ $ 7,244 Fee Estimate RW 2204 Reconstruction of Lantern Park Neighborhood,South Circle Drive,Dolphin Harbor and Canvasback Cay PER Phase Sr.Project Project Senior Graduate Sr.CADD CADD Manager Manager Designer Engineer EIT Operator Summary HOURLY RATE: $ 184.00 $ 165.00 $ 145.00 $ 115 W $ 137.00 $ Va-a S. 30%Submittal Prepare Pratiminar�Plan Sheets i35 P&P s�--_-_-__-- BO 98-_ - 184-- ---176 _- 58.) ...------ - — On-site Meelin8s with- Cil staff ------------_ 9 8 - 9 -----8 --- ___ Progress Meeh'ngs wilh C Virtual meetinqJs----- ___ _ _-_ 8 -_-__ _8 __8__ _ Internal OA!DC Review of Project-_—----_-_-_- - 24 _ _ _24- - - 24-- i6 µ- ------------- 30%Submittal to City Inc orporate Comments from CitK_- �-_ - _2_.._ -16- 16 ......... r-_ -W, '6- - --�- Finalize 30%Submittal - - 2-_ 8 - -a 2 - --3— - Total PER Hours 142 168 224 230 18 579 1,359 Total PER Fee $ 26.128 $ 27.720 $ 32.480 $ 26.450 $ 2.192 $ 57,900 $ 172,870 SUB-TOTAL FOR PER PHASE BASIC SERVICES- S 218,728.00 Hydraulic Modeling/Coordination $ 77,000.00 Topographic Surveying $ 46,404.00 Geotechnical Investigation $ 23,604.00 Urban Forestry Services $ 5,357.00 SUB-TOTAL PRELIMINARY DESIGN PHASE $ 371,093.00 Fee Ex[I'mam IRW 2204 ftcoristrucUon of Larkle rn Pprk N al g h ha rhood,South Cl rcle DFIvm,Dcaphin VarOOF and Cww8*bac1%Cay Final Design and Bid Phase GF.Project F3FDj&rL Setilar Graduate Sr.CADO MZMBI;MF MaMHOMF Oeslgrm Engineer E IT Op4r,*w Summary HOU IDLY uATE. $ 1"40 165.00 $ 145 00 116.00 $ 137.00 1. cowdimmm aid DMA C09MOM I I C4orMnft w0t SLk uw-%i0rft 2 L 2 2 r QKAM IV—am m x I r 16 ............. ....................... ............. ------------X.- ........ ......- ..................... HNry tlelld Public WkLefAVs ....... .. ... ....... IP"Innlng..9 nd SchEc ulhr�. ................................................�r6Ns and OaCa Collect an .... . ............ SUDUAml HaLft 31 44 82 10 2015 Subtotal Fee 5,704 T—&M —6-3M 8,430 IS 2.192 �k_Deslan-Comttrmkm Mans cowr&Nwd wAh VWAINY WR�1) I I 1 4 St"IndWAbbreykillarm I 1 1 4 .... 2— i ......................... Rewew am InmrL SLIM Camol L3)(pe"U§2nmgjr 22 .. ..................... ........................ 2 1 1 1 0. Ina cAmaWWpQQ 2 20 12 15 16 T pwammm Section L2) 2 8 4 4 Is RM a 141) 20D 240 625 ..............................SWPPPL"M 2——— 4 8 4 16SWFVP 2 i 4 1 4 :Q�ZjMftn SheM.(j) 2 32 16 6 32 Traft Cwwd Plan omg(2 2 4 4 4 115 Cw4Wx4on Phasl!V 16 W TMO Wote�ara+r Oans 1 21 2 3 1$ 4 ................................................ ..................... Pwom and v6jdo 0"SuMmid W&MF OCOS, 2 2 2 2 .HN........ ... ...... ......................2-,. .......... ...........— ....... .......... .. ............ ........ R&VI&W sea koxio Ows$WWWO WaSIMAWN DaLaft(1) 2 2 2 2 21 ft and kKkide C!VV SUmvdwd FIL"MON OMl�,Qj 2 2 2 2 §gtjr-Pavenmt DaU&(Cum=Shoot)(2) 2 4 le 4 12 ... ....... ............ ..... REview and InOLKle Cthf*u SlPFtd6�d OFairooe D09di6(1) 2 2 2 2 2 Pre Lw",p,"*MS ec*c DrvkwW Stm.*t 1) 2 2 4 12 ... . ....p ....... .... ..... ... ...... ............... OMM Mbuftrmms Dotag Sheaf(1) 2 2 2 $] " r Tir -...I L Rem 2 4 115 12 ...................................... Cross S&c5ws lor CuLFFIN t4} 2 Is 41 16 44 HUCID PAv-ww St"(1) 2 2 4 2W 4 Fee Estimate RW 2204 Reconstruction of Lantern Park Neighborhood,saw ciecie Drlvp,DurphIn Harbor and Canwas bark Cay Final Design and Bid Phase Sr.Project Project Sanlvr Graduate ST.CADD Mansgor Manager Designer EnglneerEIT ❑peralor SurontaCy hOURLYRiATE: 5 184.00 5 1E5.0 6 145.00 5 11:v $ 137.0(} SuhlOtal#lours 58 294 413 34C) 803 Subfialnllas 1(1,A72 $ 4m.61p S 59,865 S 34,730 $ 110.011 x MAW 4, 0 oslgn-lwmjor:t Manuatl Consirud-on Cost Estima.es inl wish all miklpro9 st+brnig8x a 11} 1$ 16 1$ Conrad D PanLs (Praparad BCit exce�+t61A Form,SVYPPP LtioC,_TOC.Ca�lr 8 12 42 24 ........................ ..............� ..... ......................... ....... ................_.._...... R$ol�caYorr3 81r NnW Hours 4 52 115 i2 15 10 SUMMIFes S 4,418 S S,i60 $ 3.32D S 5,1J6C 5 2.122 $ R Rw ww and Approval Itffl ,W�a.N "np—i"o^ A '^RV 12 _. 12 m„ 72 12 s subrwlr9l Re+aew iAe 4 4 4 .,,,,. ............................. ....._...... W%su m"R.,rlrw k+lart m_ ..._ 4 TRC Sutirrtlllal Rs nw MWl ......... ........ .............. .......W„ ,W.., ....... .........�.......... QA r 0C 24 24 2 Flap!Submiul(wkd plans and Pf0*I Manual} s 1$ 4 SubLotel Hours 66 4a 40 36 4 184 Sulk lA Fee $ 10.304 S T, 4 W0 $ 4.140 $ 5p, $ 23,712 SUBTOTAL FIN ALBESIGN BASIC$ERVI0fS FOR 1 PACKAGE: $ 350,454 S. SWdlnp Read„fr±aa.I,.. .........., ,W................. W. .,..W 1 .� 4 ........................................ ...............I ..........,,.,,,,, ,....W,,,,,,..,....,,, ,,.......,,..,4 ............... Ad.ddrrd3k 1 QFA Wllh Bidder# �2 2 4 Fee Estimate RW 2204 Reconstruction of Lantern Park Neighborhood,South Circle Drive,Dolphin Harbor and Canvasback Cay Final Design and Bid Phase Sr.Project Project Senior Graduate Sr.CARD Manager Manager Designer Engineer EIT Operator Summary HOURLY RATE: $ 184.00 $ 165,00 $ 145.00 $ 115.00 $ 137.00 Bid Tabulation and Low Bidder Recommendation 4 12 12 Subtotal Hours 8 17 0 26 0 51 Subtotal Fee $ 1,472 $ 21805 $ - $ 2,990 $ - $ 7,267 SUBTOTAL BID PHASE $ 7,267 SUMMARY Sub-Total Final Design Phase Basic Services: $ 350,054.00 Architectural Services: $ 22,000.00 Tree Protection Plan $ 13,778.00 TDLR Review and Filing $ 750.00 SUB-TOTAL FINAL DESIGN PHASE $386,582 SUB-TOTAL BID PHASE $ 7,270 Fee Estimate RW 2204 Reconstruction of Lantern Park Neighborhood,South Circle Drive,Dolphin Harbor and Canvasback Cay Construction Phase Sr.Project Project Graduate CADD Manager Manager Engineer Summary HOURLY RATE: $ 184.00 $ 155.0c $ 115.00 $ 11 e i 0D 1. Construction Phase(With Inspection By City) Prepare Contracts For Execution by Awarded Contractor 2 2 Review Contracts(bonds,insurance,etc) 4 2 Submit Contracts for Execution to-City .-._............._.........._...._..._............_....._.._............_._._... ....._-._.-------- --•--•2 --- -•---2----- --........._........ .............._.._._.._.-..... Attend Preconstruclion Conference ��-•-------•----------- ---- •k �-...- -- 8--- --8 -- �--- -----•-- Attend•Canstruction ------- 540 a s 0 2 mt slmth X 2hrlmt 36 40 48 d -----•(---y—/3-=18 mths X-----•--�-------------9�__._._._.-.-._._......_......__. ._.._....__._._.-.....-. -_.._..._------•-- Coordination with City staff 8 8 --- 8---- ---- —-- --- Routine Construction Site Visits ------ -—---- -----6 -- 540 days/30-18 mths X 1 vlmth X 4 hrly 36 72 36 ....._.........�.-...........�...._.._ti._.__--------------•-•---�--•-----------•----• •------�----- �-._.........--_.-...._._...... ......-..__.....................__-•--•--•--'We�_Wl Construction Construction Site Meetings 36 36 36 -- -(540 da•+sue!30=18 mths/2=9 X 4 hr� _- _ Review and Respond to Submittals 36 64 80 Review and Respond to RFIs(assume 24) -_--..-.-.....--.--._.------------------24-- --•-- 48 ---- - ---72----. -..--- ------•--•-•--- Review Pay Applications(18) 18 54 --96 ---- ---- --------- Track Project Budget to Project Completeion ----.--.--------.-.. -.- 9--- --- 16 --- ---24 �- -..--- _--.-..-- PreparelReview Change Orders if requested by City------------ •-- 4-��- ----8_-- w.. 4_--- r---- ------- Assist City with HCFCD Coordination .-..--8 -... �.�24 -`-- ----8--- --TT-� ----.....--...-- Substantial Completion Walk-Thru 8 8 8 Final Construction Walk-Thrv-------- ------ --- - _ __.. - 12 ys------- ---------- --- -- Review Contract Close Out Documents -----.--------.-.----- ---- 1 ----- ---- 1 -- ---2----- .--.-. -- ,_ As-Built l Record Drawings---.--------------•------------- -•---$..-.. —._.. 24 ..-.._,.. - 80 --------- -- -- ---------- ^-- ----Subtotal Hours 231 415 476 80 1.202 Subtotal Fee $ 42,504 $ 64,325 S 54.740 $ 8,000 It 169,569 SUBTOTAL CONSTRUCTION PHASE BASIC SERVICES 1 1 $ 169.569 Sub-Total Construction Phase $ 169,569 TDLR Inspection Fees $ 2,000 Tree Protection Field Layout $ 4,400 SUB-TOTAL CONSTRUCTION PHASE $175,969 Fee Estimate RW 2204 Reconstruction of Lantern Park Neighborhood,South Circle Drive,Dolphin Harbor and Canvasback Cay Construction Phase Sr.Project Project Graduate CADD Manager Manager Engineer Summary HOURLY RATE: $ 184.00 $ 155.00 $ 115.00 $ 100.00 11 SUB-TOTAL REPRODUCTION $2,000 Exhibit'C' PROJECT SCHEDULE OW N(A kecanstruction of Lantern Park 1fe hboThood,Soulh Circle Drive,Dolphin Harbor and Canvasback ;La 1 11 � � aa � gs � 8'ceaa$a 2cg a�SaSa 75a SS c - wn urt .or n oma ra.0 o..m x,-n rwra .•xa. .Ara .ra u ►IIEUMIMAIIY DESIGN PHASE 30K SVOM111 :150 DAYS all- f000r•+onx wnrto•m slr.na Fnamfnl A[pv�rrtEn{yY GSYI fraM I Tna rfm.snw NYd•0n1s and E4*,,rt{NAlll:HUM F•Han Onyn w M wdmrt!0%m[h aM Lt.ITTrarl.— Stan bY'�w f inaln 3"Sb 11N --*Wfi 1117HI r•alf[[Oak(.a+d SreGtrtpa•a la 6aK I N xertocdr,r•xd�.+a a.�n•t n.•er•. e Yarkpr 6aNK�nFN AaPa•t wan,l r0%W Gry,.0co,and Wk., O Stall ae.+aw rraian Dnyn aM SH¢'1<Nonr to 90% � N6 CO repel nnro and PM a.,%(lan[am Park On 5.M S WkrnGIY.KIW,aid UM— SUM e rnnr a or.n,l.ooEn le eaox Satrna 1r0%b Gly.Nri W.aM VIALat SGN 14Yrrt uWa Adnroxfo•yat lnla.wtlrrnmm.waov� fWnd APpwN M tealrvwen Gne•an •rna r.nrdde a mwm tmrdyad�Ima.,wnexh+MweeofNee•WrM rM[arrr•.Pa•a xtaiM+wt dwY�yawyaa •my ulrrdWFmlbgenf rpm NanhC IYFfdpr[b.Nrd an k[f P16r0J epp•dwl TOTI40E�IW OOMStaN•lfOrFlrra"OATS 11l MOM T.O[Ltll AHOlIOONO OIIMl10N•d!S fA1FFOM OATS{SS MONTHS{