Loading...
1999 02 17 BAWA MinutesMINUTES OF THE REGULAR MEETING OF THE BOARD OF DIRECTORS OF THE BAYTOWN AREA WATER AUTHORITY February 17, 1999 The Board of Directors of the Baytown Area Water Authority, Harris County, Texas, met in regular session on Wednesday, February 17, 1999, at 7425 Thompson Road, in the BAWA Conference Room with the following in attendance: Robert L. Gillette, President Peter R. Buenz, Secretary Knox Beavers, Board Member Roy L. Fuller, Board Member Absent: Dan Mundinger, Vice President The meeting opened with a quorum present, and the following business was conducted. Consider Approval of the Minutes for the Regular meeting Held January 19, 1999 Board Member Buenz moved to approve the minutes for January 19, 1999; Board Member Fuller seconded the motion. The vote follows: Ayes: Nays: Board Members Beavers, Buenz, Fuller, and Gillette None Consider Approval of Resolution Expressing Intent to Finance the Expenditures to be Incurred The proposed resolution authorizes the Baytown Area Water Authority to reimburse itself for expenditures not to exceed $1,000,000 through issuance of tax- exempt obligations to be issued subsequent to February 1999. Items to be funded include pilot studies, engineering and permitting costs, for expansion of surface water treatment plant. This allows the authority to proceed with these necessary elements of the expansion project prior to the actual issuance of debt which in the long term saves the authority several thousand dollars. • 990217-2 Minutes of the BAWA Meeting — February 17, 1999 Board Member Beavers moved to approve the resolution; Board Member Fuller seconded the motion. The vote follows: Ayes: Nays: Board Members Beavers, Buenz, Fuller, and Gillette None RESOLUTION EXPRESSING INTENT TO FINANCE EXPENDITURES TO BE INCURRED For Resolution see, Attachment "A." Consider Approval of the Engineering Contract with Camp Dresser & McKee Inc. for the Baytown Area Water Authority Plant Expansion Herb Thomas, Plant Manager, explained that approval of the negotiated contract with Camp Dresser & McKee Inc. will allow the staff to proceed in 1999 with the evaluation and pre -design work for scheduled completion in June 1999. Also, the pilot testing should be completed by September 1999. This will put BAWA in position to develop the construction documents for bid in January 2000. The plan is to have additional capacity to the plant in the first quarter of 2001. Herb Thomas, reported that the percentage of construction fee on the CDM contract is 8.5% which is in line with the fee structure on City of Baytown contracts. In negotiating the contract, significant costs were identified with the pilot testing which could be borne by BAWA such as utilizing BAWA personnel and the laboratory at BAWA. These cost savings totaled approximately $90,000. • 7-3 Minutes of the BAWA Meeting — February 17, 1999 Rodney Chapin, Project Manager, said that the project is based on $19,000,000 for two phases. Total construction Cost Total Construction Cost Evaluation/Predesign Fee Final Design Fee Design Services During Construction Resident Engineering Services Ozone Pilot Testing Additional Services Less Construction Cost TOTAL PROJECT COST Phase I Phase I $10,490,000 6,750,000 293,011 534,864 178,288 358,025 199,526 473,241 $2,036,954 276,000 $19,000,954 Board Member Buenz moved to authorize the contract with Camp Dresser & McKee Inc. for Phases I and II of the BAWA Plant Expansion. Board Member Fuller seconded the motion. The vote follows: Ayes: Nays: Board Members Beavers, Buenz, Fuller, and Gillette None General Manager Mercer noted that BAWA would be prepared to sell bonds in the fall of 1999. Fred Pack reported that current average water sales is 10.7 mgd. This average keeps slowly edging upward which is directly attributable to development. In response to Board inquiry, Mr. Pack said that probably BAWA would be looking at a 4 to 5 mgd expansion, but that can only be determined after the pilot study is complete. The peak will probably end up at 25 mdg. Plant Manager, Herb Thomas, indicated that he would be scheduling a meeting with Gary Dobbs, Publisher and Editor of The Baytown Sun to provide information concerning BAWA's plans for expansion. 990217-4 Minutes of the BAWA Meeting — February 17, 1999 • • Adjourn There being no further business to be transacted, the meeting was adjourned. /?k,,,, Peter R. Buenz Ys Secretary