Ordinance No. 15,418
ORDINANCE NO. 15,418 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, APPROVING CHANGE ORDER NO. 3 TO THE BAYTOWN AREA WATER AUTHORITY FRITZ LANHAM WATER TREATMENT PLANT FILTER AIR SCOUR IMPROVEMENTS PROJECT BETWEEN THE BAYTOWN AREA WATER AUTHORITY AND LEM CONSTRUCTION COMPANY, INC.; AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ******************************************************************************************** WHEREAS, the Baytown Area Water Authority's enabling legislation requires that the City Council approve certain agreements before Baytown Area Water Authority ("BAWA") enters into the same; and WHEREAS, on April 5, 2023, the Board of Directors of BAWA approved Change Order No. 3 to the Baytown Area Water Authority Fritz Lanham Water Treatment Plant Filter Air Scour Improvements Project between the Baytown Area Water Authority and LEM Construction Company, Inc.; and WHEREAS, the City of Baytown desires to approve such change order; NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the recitals set forth hereinabove are hereby found to be true and correct and are hereby adopted. Section 2: That the City Council of the City of Baytown, Texas, hereby approves Change Order No. 3 for the Baytown Area Water Authority Fritz Lanham Water Treatment Plant Filter Air Scour Improvements Project between the Baytown Area Water Authority and LEM Construction Company, Inc., which change order is attached hereto as Exhibit "A" and incorporated herein for all intents and purposes. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 13"' day of April, 2023. ANDON CAPETILL , Mayor EST: aNYTOW ! �. n:.�° ANGELA J APPROVED AS SCOTT Q)6rk\ e u° f7 'C Attorney R:UCaren Anderson ORDINANCES ?023\2023.04.13\ApprovingBAWAChangeOrderNo3.docx EXHIBIT "All a BAYTOWN AREA WATER ALMiORTTY Change Order No. 3 t►� t!, Filter Scour Improvements r�otitin I'O: 2203123 Date: 14-Mar-23 Brief Description of Chances: LEM Construction is in the process of rehabilitating the filter system at BAWA Fritz Lanham Water Treatment Plant and has encountered several issues due to field condition change. The valves originally designated to isolate the filters are failing to retain water from each filter while the work is being performed. The inability to retain water from the filters has created an issue with the removal of the old media and the installation of the new media and the new air grid air scour system. Both processes require the media to remain dry in order for proper disposal and installation. The addition of 2" drains to Filters 1, 2, 3, 4, 5, and 6 will help keep the water off the media for proper removal and installation. LEM Construction Is also replacing the inlet and outlet valves on the Ground Storage Tanks damaged during the February 2021 Freeze events (Storm Viola and Uri). The valve F from the High Service Pump Station is experiencing valve closure failure. A 48" Line stop will help isolate the outlet valve of Tank B for removal and replacement. Add or Delete Items: film 1211miglim ILOfi gAilaft Unit Pift! Taal Add one (1) 12" x 2` Hot Tap on existing 12- Backwash line, two (2) 12- x 2" Backwash line taps with two (2) Schedule CO3.1 80 PVC 1'ipe from fiiiers 2, 3, and 6 routed to the existing sump pump pits via a header with 2" ball valves for redundancy. 1 LS $ 27,571.76 $ 27,571.76 Add One of of Vaccuum boxes required to decant e old filter media of all moisture before proper disposal The valve closure failure to Filter al did not retain the water CO3.2 therefore complicating the old media removal. Environmental specifications indicate this media must be dry when dos sin 1 LS E 19,935.94 S 19,935.94 Aca one the stop to the outlet line of Loround StorageTank B Valve F from the High Service Pump Station experiencing valve closure failure, therefore did not CO 3.3 isolation of Valve 4 on Ground Storage Tank B. The line stop will allow for Valve 4 to be removed and replaced accordingly I LS $ 16l,000.00 $ 161,0tlU.(X) Add thzee (3) 12" x 2' sad le taps to backwash ine from filter 1, 4, and 5. Connect the two laps with 2-Schedule 80 CO 3.4 PVC Pipe with a centrifugal pump to manually remove excess water in filters 1A, and S. 1 LS $ 35,560.52 E 35,560.52 1 Olal ('nnlr�N C...n.nfw• 244,068.22 Adotnal pwi..A 1 Original Contract Price S 4,903,000.00 S 4,903,000.00 2 Owner Contingency (within contract) Previous Change Orders E E559,281.58 Remaining Contingency E $ - 3 Change Orders Change Orders S E 559,281.58 FPrevious —4 This change order Is $ 244,068.22 Revised Contract Price 1 E 4,903,000.00 $ 5,706,M9.80 atLEMProposal 6 2 Tapping Valves on Backwashes. Proposal 8 Vaccuum Box Overages, OF",fot- Slop for V e F Failure, P 110 1 Filt1, 4, 5 Water Control, Filter No 8 & Filter No 6 Schedule ers � -0- a —, -/ 03/22/2023 M Pns ction Co., Inc. Date Director of Public Works & Engineering Date icAJ011son, Project Manager Frank O. Simoneaux, Jr. P.E. 3/22/2023 Consultant — Ardurra Group Yue Sun, P.E. Date City Manager Date Jason Reynolds 'Contractor agrees to perform change(s) included in this Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order No payment to the Contractor (or Consultant) sha I I be made for work included in the change order until the Contractors pay estimate is updated Revised project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent, this Change Order governs. Upon execution by all parties, the changes identified in this change order are considered final for the items listed, for the contract value and/or contract time shown, and are made a part of the contract. LEM Construction Company, Inc. 10849 Kinghurst, Suite 150 Houston, TX 77099 LE Ph : 281-495-9550 Fax: 281-495-9995 CONSTRUCTION CO. Letter of Transmittal To: Yue Sun (Ardurra Group, Inc.) Transmittal #: 6.2 Date: 3/9/2023 Job: 2022-01 BAWA-WTP Filter Air Scour Imp Subject: Change Request - 6_Rev2: 12" x 2" Backwash Tap & Drain Piping WE ARE SENDING YOU r Attached I Shop drawings f Prints I Copy of letter I Change order Under separate cover via the following items: Plans I Samples Specifications r Change Request Document Type Copies Date I No. Description Change Request 1 3/9/23 1 6 Rev2 12" x 2" Backwash Tap & Drain Piping THESE ARE TRANSMITTED as checked below: r For approval r Approved as submitted r For your use r Approved as noted r As requested r Returned for corrections r For review and comment r Other r FOR BIDS DUE r PRINTS RETURNED AFTER LOAN TO US Remarks: Copy To: From: Kurt Roedel (LEM Construction Co) Signature: Resubmit_ copies for approval Submit _ copies for distribution Return _ corrected prints If enclosures are not as noted, kindly notify us at once. Page 1 of 1 A LE CONSTRUCTION CO. Change Request To: Yue Sun (Ardurra Group, Inc.) Description: 12" x 2" Backwash Tap & Drain Piping Number: 6_Rev2 Date: 3/9/23 Job: 2022-01 Phone: LEM Construction Company, Inc. 10849 Kinghurst, Suite 150 Houston, TX 77099 Ph: 281495-9550 BAWA -WTP Filter Air Scour Imp We are pleased to offer the below pricing for the following changes: Add one (3) 12" x 2" Hot Tap on existing 12" Backwash Line in Filter Pipe Gallery, to facilitate draining water leaking past the butterfly valve. This is for Filters 2, 3, & 6. Filters 4 & 5 shall be submitted seperatley. Add 2" Sch80 PVC Pipe from three filters 2,3 and 6. (3) 12"X 2" Back wash Line taps routed to the Existing Sump Pump Pits. Mount 2" Drain piping on unistrut supports, and install 2-in ball valves on headers connecting more than one tap for redundancy. Per drawing from Ardurra dated 1/27/23. Note: We assume existing sump pumps are working, so LEM has not included supplemental/ replacement pumps. The total amount to provide this work is.................................................................................................. $27,571.76 (Please refer to attached sheet for details.) Please note that LEM Construction Company, Inc. will require an extra 14 days be added to our completion schedule. If you have any questions, please contact me at 281-495-9550. Submitted by: Kurt Roedel LEM Construction Co, Inc. Approved by: Date: Page 1 of 2 A LE CONSTRUCTION CO. Change Request 6_Rev2 Price Breakdown Continuation Sheet Description: 12" x 2" Backwash Tap & Drain Piping Description Takeoff Qty UOM Labor Material Equipment Subcontract Other Price Final Cleanup by HR 36.00 hr $910.04 $90.00 $1,000 0 Buy Piping & Fittings 1.00 Is $3.830.00 $3,830.0 Apply Coating per SF- "Small Quantities < 200 sr' 1.00 Is $202.23 $42.50 $5.00 $249 7 by -BRUSH & ROLL SUB by EA - 12" Tapping Sleeve & Valve (with material) 3.00 ea $1,061.72 $8.69 $8 250 00 $30. C0 $9,350.4 (Mackie) 1-1/2" to 2-1/2" (PVC) Pipe per LF - Coupled SW Joint 120.00 It $2.105.24 $10.78 $2 116.0 (SW) 1-1/2" to 2-1/2" (PVC) AG Fitting / Spool per EA - Solvent 3000 ea $885.02 $885.0 Weld Joint (SW) 1-1/2" to 2-1/2" Flange Adaptor per EA 6.00 ea $328.68 $328.6 1-1/2" to 2-1/2" 304SS/HDG Single Unistrut Support / 25.00 ea $935.53 $935.5 Clamp per EA Drill and Install 316 SS Wedge Anchor per EA 1/2" 50.00 ea $505.58 $50.00 $555.5 Disinfect Water Line. Spray Method, per SF 4.00 as $303.35 $12.50 $315.8 Subtotal: 1 $7,237.39 $3,904.47 1 1 $8,260.00 $176.00 $19,666.8 Labor Burden - Standard (55%) $3.980.56 Sales Tax (8.25%) $14.44 Insurance & Bond (1.5%) $413.58 Profit & Overhead (15%) $3.596.32 Total: $27,671.76 Page 2 of 2 JSERVICE COMPANY Andrew Latiolais Mickie Service Company, Inc PO Box 55544 Houston, TX, 77255 www.mickieservice.com PHONE (713) 682-7454 FOR LEM Construction ro Kurt Roedel COPY TO Tom Johnson Jessica Anttila QUOTE NUMBER 8991 DATE January 9, 2023 VALID UNTI1 April 9, 2023 at 8:00 AM LEM: BAWA (6)12x2 Tap, Change Order (1 /16/23) (Revised to have 6 mobilizations (1) per tap) Assumptions & Exemptions Customer responsible for all - Excavation, Shoring, Trench Protection, Backfill, Site Restoration, Excavated Material Removal Customer to provide Permits, fees & applications - Accessible, OSHA compliant work area - Equipment/Operator to assist with installation - Concrete for thrust blocking 12 X 2 Full Service TS&V (Steel Pipe to be verified) (Per each) Provide labor, material to perform the TS&V - using the following: - Service saddle • 2" Ball Valve, threaded - AC, PVC, Cl, DI Pipe • Pipe is 12" Pipe 2,500.00 x6 15,000.00 Mobilization per each Per notes, will be (1 ) per trip. Delivery & Duration 200.00 x6 1,200.00 Mickie Service's price is based upon standard delivery times. In the event, expedited service is required to complete the scope of work, Mickie Service reserves the right to assess reasonable charges to cover incurred expenses for expedited sleeve cost etc. to arrive at the job site early. - If pipe is over-sized/undersized, please allow for a few days for Mickie Service to order the appropriate tapping sleeve. �l 3/4" Corp Typically for City of Houston (Optional) O Sales Tax (if Tax Exempt/Resale Certificate not provided) Service & Price Guarantee Subtotal 16,200.00 50.00 x1 50.00 Not selected Not selected Options selected 0 of 2 Total including tax $16,200.00 Service Guarantee: Mickie Service will be present to install with appropriate materials within 24 - 48 hrs of request or will provide 10% price credit. Guarantee Available for - C900/905, DI, Cl, AC type water main - 6% 8",12",16" main. standard OD - 4", 6% 8",12" tap - Greater Houston Area Pricing Guarantee: Mickie Service will match any legitimate written competitive proposal. Proposal Assumptions (A) Mickie Service may terminate the contract/obligation at anytime, in particular if crew does not believe that the tap can be made without risking damage to water main/material/equipment etc., or if conditions are unsafe to perform work (no charges apply in this case). (B) Mickie Service will use appropriately trained crews and well maintained equipment; however, we cannot guarantee coupon retrieval or that damage to the existing water main will not occur during standard tapping procedures (C) Customer is responsible for providing Mickie Service with type of material and size of pipe to be tapped, along with location/position of tap. (D) Customer to provide all equipment/labor necessary to get materials/equipment in/out/positioned in excavation (E) Mickie Service is not responsible if water line is not active, or wrong line is tapped, or tap position does not meet specifications, etc. (F) Customer is responsible for providing Mickie Service with accurate specification information regarding sleeve and valve. (e.g.) sleeve: MJ, SS, Epoxy/Steel and valve: open right/open left. (G) Work to be performed at mutually agreeable times. (H) Cost and responsibilities do not include: a. Engineering b. Excavation/Shoring/Traffic Control c. Thrust blocking, Valve Stack/A box, line tie-in d. De -watering e. Backfill, surface restoration f. Any permits or fees g. Scheduling Inspection h. Waiting time and/or training, safety, or other mandatory crew requirements Indemnification i) TO THE FULLEST EXTENT PERMITTED BY LAW MICKIE SERVICE'S TOTAL LIABILITY TO CLIENT AND ANYONE CLAIMING BY, THROUGH, OR UNDER CLIENT FOR ANY COST, LOSS, OR DAMAGES CAUSED IN PART BY THE NEGLIGENCE OF MICKIE SERVICE AND IN PART BY THE NEGLIGENCE OF CLIENT OR ANY OTHER NEGLIGENT ENTITY OR INDIVIDUAL, SHALL NOT EXCEED THE PERCENTAGE SHARE THAT MICKIE SERVICE NEGLIGENCE BEARS TO THE TOTAL NEGLIGENCE OF CLIENT, MICKIE SERVICE, AND ALL OTHER NEGLIGENT ENTITIES AND INDIVIDUALS. ill MICKIE SERVICE SHALL NOT BE LIABLE FOR ANY INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES, WHETHER GROUNDED IN TORT (INCLUDING NEGLIGENCE), STRICT LIABILITY, OR CONTRACT, AND UNDER NO CIRCUMSTANCES WILL ITS LIABILITY EXCEED THE AGREEMENT PRICE FOR THE GOODS OR SERVICES UPON WHICH LIABILITY IS CLAIMED. ANY ACTION FOR BREACH OF CONTRACT MUST BE COMMENCED WITHIN ONE (1) YEAR AFTER THE CAUSE OF ACTION HAS ACCRUED. .. r � »ti .�j'- • '..mow t:: . • yn ni:l-' J Fisk, ��'�.� .�� �.�.�.���1���� rt r. ,. h.P •] 1.11. 11 .. rtR ,. p � O — -- ��R IPn -- -- mr-c W. Tip, ft7fo4,1-6 ' .vL• e. l � •allin �wU RR PPE G PLAN s >.WIO EOGM .ayv) Ire1 r0.1[a PIPE cuLu. PLAN 0...., .. a. �.. Qa• . �.�.M) a.aP�P.o�IP• s 9 ARDURRA o A.n.o i..wa.P.a..•O.a..u•()9 1 P//?d2 7'8 Wdry 63av g£�s b a SvwPf_►�nP/1yGbM, 1�O�Sw6svxE�__LfIPI/SLR/� �C= /ui7y.9uTo p/ooT SH//TC// 89GPM, 1/7 .6w. oev/ufc„� F.%lea .7�aTa a�ToL�sEau�zE./v:/one o�,�v.ol'6.nc+Aq t_, C/esE/P s7T 6'tn) PM. ,�,9ivf7 oPE,eQrioiu /SO/s7TE,C�Kw�i'H�6e 6a�!//1J• '^^ F Fr --PVL /V aj laePlio fbs4h AtauR v19 -(i ST PIPES To yl—, A Pvc1f Al A LE CONSTRUCTION CO. To: Yue Sun Ardurra Group Description: Filter #1 Vacuum Boxes Overages LEM Construction Company, Inc. 10849 Kinghurst, Suite 150 Houston, TX 77099 Ph: 281-495-9550 Change Request Number: 8 Date: 2/15/23 Job: 2022-01 BAWA -WTP Filter Air Scour Imp Phone: We are pleased to offer the below pricing for the following changes: On Filter Number one, we experienced a valve closure failure on the the filter that was supposed to be without water on the filter while we worked. This Change in conditions made us have to bring in the use of Vacuum boxes to decant the filter media.This was not part of the project, removing water whilst we worked replacing the media. Through our efforts and additonal pumps that LEM Construction provided. We were able to successfully install and repair Filter #1. These Overages that are a real cost to LEM Construction represents the cost to our subcontractor Speciialized Maintenance.We are asking for this change in condtions to be appropirated for. We have found the solution to valve failure on the remaining filters and will request the proposal going forward. The total amount to provide this work is.................................................................................................. $19,935.94 (Please refer to attached sheet for details.) Please note that LEM Construction Company, Inc. will require an extra 4 days be added to our completion schedule. If you have any questions, please contact me at 281-495-9550. Submitted by: Kurt Roedel LEM Construction Co, Inc. Approved by: Date: Page 1 of 2 A LE CONSTRUCTION CO. Change Request 8 Price Breakdown Continuation Sheet Description: Filter #1 Vacuum Boxes Overages Description MAJOR SUBCONTRACTS Labor Material Equipment Subcontract $17.079.41 Other Price $17.079.41 Subtotal: $17,079.41 $17,079.41 Labor Burden $0.00 Equipment S&R $0.00 Sales Tax $0.00 Bonds & Insurance $17,079.41 1.50% $256.19 Overhead & Profit $17,335.60 15.00% $2,600.34 Total: $19,936.94 Page 2 of 2 SPECIALIZED MAINTENANCE SERVICES, INC. 4533 PASADENA BLVD PASADENA, TX 77503 Bill To: LEM CONSTRUCTION CO., INC 10849 KINGHURST SUITE 150 HOUSTON, TX 77099 Item/Description INVOICE: 47207 Internal Copy Invoice Number 47207 Date 1 /25/2023 Our Job No. LEMCON-16 Your Reference BAYTOWN WTP Requisition No. Release No. 2022-01-S028 Authority Terms Net 30 days For Transactions To 1/13/2023 Filter #1 Overages PROJECT: BAYTOWN AREA WATER AUTHORITY WTP FILTER AIR SCOUR IMPROVEMENTS Page: 1 Quantity Unit Unit Price Total Price STAND BY TIME & PUMPING WATER OUT 36.25 HOURS 125.00 4,531.25 PROFILE FEE FOR TCLIP too LS 500.00 500.00 DISPOSAL this price is $300 in 67.45 TON 350.00 23,607.50 VACUUM BOX RENTAL & WASHOUTS contract. Wet Disposal too LS 8,675.66 8,675.66 Was $50 more. Total Overages: $17, 079.41 Subtotal: 37,314.41 Amount Paid: 0.00 Total: 37,314.41 CON TRUCTION CO. Change Request To: Enrique Villa City of Baytown 2104 Market St. Baytown, TX 77520 Ph:281-422-0424 Fax:281-420-6586 Description: 48" Linestop if Valve F Does Not Function LEM Construction Company, Inc. 10849 Kinghurst, Suite 150 Houston, TX 77099 Ph : 281-495-9550 Number: 9 Date: 2/22/23 Job: 2022-01 BAWA-WTP Filter Air Scour Imp Phone: We are pleased to offer the below pricing for the following changes: This is a proposal based on the line item #12 for Change Order #2 that was not utilized. This is in the case that Valve F does not function. Through the operations at BAWA we have found that this in fact the case. We are honoring our bid price of $210,000.00, we are also willing to give a credit to the city of baytown in the sum of-$56,500.00 credit for the change order #2 dewatering scope that was not needed due to the water table being below our excavations. We simply ask for the invoice of our Geotech inquiry to be paid for in the sum of $3,500.00. This will be against the Line item for dewatering.There are two additonal mobilizations from mickie services to come back out and set and take down the linestop at $3.500.00 each. Thank you. The total amount to provide this work is.................................................................................................. $161.000.00 (Please refer to attached sheet for details.) If you have any questions. please contact me at 281-495-9550. Submitted by: Kurt Roedel LEM Construction Co, Inc. Approved by: Date: Page 1 of 2 A LE CONSTRUCTION CO. Change Request 9 Price Breakdown Continuation Sheet Description: 48" Linestop if Valve F Does Not Function Description Labor Material Equipment Subcontract Other Price Additonal Linestop For Valve F failure $210,000.00 $210,000.0 Dewatering Removal $-56,500.00 $-56,500.0 Additional Mobilizations $7,500.00 $7,500.0 Subtotal: $161,000.00 $161,000.0 Labor Burden Equipment S&R Sales Tax Bonds & Insurance $161,000.00 Overhead & Profit $161,000.00 Page 2 of 2 $0.00 $0.00 $0.00 $0.00 $0.00 Total: $161,000.00 LEM Construction Company, Inc. CON TRUCTION CO. Letter of Transmittal 10849 Kinghurst, Suite 150 Houston, TX 77099 Ph : 281-495-9550 Fax: 281-495-9995 To: Enrique Villa Transmittal #: 10.1A City of Baytown Date: 3/9/2023 2104 Market St, Job: 2022-01 BAWA -WTP Filter Air Scour Imp Baytown, TX 77520 Ph:281-422-0424 Fax:281-420-6586 Subject: Change Request - 10 REV 1: Filters 4 & 5, 1 Water Control WE ARE SENDING YOU r Attached Shop drawings I— Prints i Copy of letter I Change order Under separate cover via the following items: Plans I Samples Specifications v Change Request Document Type Copies Date No. Description Change Request 1 3/9/23 10 REV 1 Filters 4 & 5 Water Control THESE ARE TRANSMITTED as checked below: For approval I— Approved as submitted Resubmit _ copies for approval For your use I— Approved as noted Submit _ copies for distribution As requested r Returned for corrections Return _ corrected prints For review and comment r Other FOR BIDS DUE r PRINTS RETURNED AFTER LOAN TO US Remarks: Copy To: From: Signature: If enclosures are not as noted, kindly notify us at once. Page 1 of 1 A LE CONSTRUCTION CO. To: Enrique Villa City of Baytown 2104 Market St. Baytown, TX 77520 Ph:281-422-0424 Fax:281-420-6586 Description: Filters 4 & 5 Water Control LEM Construction Company, Inc. 10849 Kinghurst, Suite 150 Houston, TX 77099 Ph: 281-495-9550 Change Request Number: 10 REV 1 Date: 3/9/23 Job: 2022-01 BAWA-WTP Filter Air Scour Imp Phone: We are pleased to offer the below pricing for the following changes: The Filters 4 & 5 have substantial water leakage. During our investiagtion wih BAWA operations it was witnessed to have leakage rates over 155 gallons per minute respectfully. This change of condition will not allow for just sump pump suction; but these two filters need to be pulled down via a centrifugal pump. Our plan is to utilize the 2 inch saddle tap and connect the pump to hard pipe and draw down the filters manually. This pump will remain for future maintenance of the filter. Please see attached quotes and pricing. This pricing covers Filter 4, 5, & 1. The total amount to provide this work is.................................................................................................. $35,560.52 (Please refer to attached sheet for details.) If you have any questions, please contact me at 281-495-9550. Submitted by: Kurt Roedel LEM Construction Co, Inc. Approved by: Date: Page 1 of 2 Change Request 10 REV 1 Price Breakdown Continuation Sheet Description: Filters 4 & 5 Water Control Description Takeoff Qty UOM Labor Material Equipment Subcontract Other Price Final Cleanup by HR 16.00 hr $404.46 $40.00 $444.4 Electrical 1.00 Is $6.220-00 $6,220.0 Buy Piping & Fittings 1.00 Is $2,385.00 $2,385.0 Buy Pump 1.00 Is $3,035.00 $3,035.0 Drill & Epoxy Dowel Reber per EA- # 4 10.00 as $101.12 $15.40 $10.00 $126.5 Support / Housekeeping Pad Form per LF 4-5" 10.00 If $75.84 $7.00 $82.8 Place Concrete Pad by CF 3.00 cf $151.67 $82.50 $0,30 $234.4 Pt & Patch Concrete per SF - No Ties or Embedded Ties 4.00 sf $2.02 $0.29 $0.04 $2.3 Finish Rub Concrete per SF - At Grade 4.00 sf $9.10 $1.73 $0.06 $10.8 Apply Coating per SF- "Small Quantities < 200 sf' 1.00 Is $202.23 $42.50 $5.00 $249.7 by -BRUSH & ROLL SUB by EA - 12" Tapping Sleeve & Valve (with material) 3.00 ea $1.061.72 $8.69 $8.250.00 $30.00 $9,350.4 (Mackie) 1-112" to 2-1/2" (PVC) Pipe per LF - Coupled SW Joint 120.00 If $2,105.24 $10.78 $2.116.0 (SW) 1-1/2" to 2-1/2" (PVC) AG Fitting I Spool per EA - Solvent 10.00 ea $295,01 $295.0 Weld Joint (SW) 1-1/2" to 2-1/2" Flange Adaptor per EA 2.00 as $109,56 $109.5 1-1/2" to 2-1/2" 304SSIHDG Single Unistrut Support / 25.00 as $935,53 $935.5 Clamp per EA Drill and Install 316 SS Wedge Anchor per EA 1/2" 50-00 as $505-58 $50-00 $555-5 Disinfect Water Line. Spray Method, per SF 4-00 as $303.35 $12.50 $315-8 Centrifugal Pump. Horizontal - per EA- <=2' Discharge 1.00 as $252.79 $50.00 $20.00 $322.7 Subtotal: $6,616.22 $6,644.39 1 1 $14,470.00 $162.40 $26,792.0 Labor Burden - Standard (55%) $3,583.37 Sales Tax (8.25%) $13.40 Insurance & Bond (1.5%) $533.41 Profit & Overhead (15%) $4.638.33 Total: $36,660.62 Page 2 of 2 RON .. .. �. E Dea vy Duty Centrifugal P - _ - Available in: 300 Series Investment Cast Stainless High Head Pump Steel, Cast Bronze and Cast Iron Construction with -�, Stainless Steel Impeller 'a = Bona-N Mechanical Seal and O-Ring on Cast Iron Models Viton® Mechanical Seal and O-Ring on Stainless Steel and High Flow Bronze Models F Pump Optional Silicon Carbide Seals Available Performance of Heavy Duty Front Drain Plugs Located 900 Straight Centrifugal Pumps )m1 [K9 Apart 6o 200 — - High Head Mode8: F-{2N8vW --,%-2HFJ IF.F.t,rt a 160 o- MO e. na+ V7% P.a Wq x-4mi sm . r-r,s HP III." awt Mazimum Head 194 Feet ISO j ,40 i j Y _ —F-- (84 PSI) 40 G �`. 120 - • Maximum Flow 500 GPM F _ 60 2 HP to 15 HP NEMA Motors,, s _ _ _ 20 - ( Single and Three Phase + 1} 10 40 -- .-- . 1 - NPSItr [30 [ml Optional Mount/ng Base 20 NPSItr (6. H) -� 20 'o ' Available x o o 0 0 40 60 120 160 200 240 260 320 360 400 440o111- :W) 0 10 20 30 40 6o so TO so 90 1-%) Solids Handling and Dirty _ Capacity @ 3450 RPM (60 H2) (-)Co mart to psi dxxa. by 2.31 L14M -WSW specific gravity to Water Design AMT Heavy Duty Solids Handling Centrifugal High FhmModels: 40 E pumps are suited for liquid and chemical transfer, ♦-11f.M1r VaHPII WW) 14 °-"�F-'-"^%''"FR'4""'36 Ito -,t_— .-.-.. - C.au:ew.rnw arwpnae0 recirculation, booster service, dirty water and other a.n..aMo-,ewpu industrial applications. Stainless steel units are 32 t00 especially effective in applications where rust and/ 28 : or corrosion can develop in systems. Pumps are -_.. €24 f designed to handle liquids with solids content or 20 sa _ _ _�_-. •-••-�-- dissolved solids and debris. Semi -open impeller ~18 g I I features self-cleaning ability that makes the unit 12 49 "„jm) [IIPSJHr useful in applications involving up to 1/4" diameter a 29 I NPSHr,(A.g,C _ -NPSHr(O. solids and muddy or dirty liquids. Discharge position � � E) ,o can be adjusted in 900 increments with vent and - ° drain plugs for all positions. Type 21 mechanical 0 Go ,2a teo zoo soo 390 420 480 "0 ry.s. ppm) P P 9 YP 0- 10 20 30 40 So °o To ao 90 100 110 120 (m4h) seal and 0-ring casing seal. Pumps are not Capacity o 3450 RPM (60 H2) self -priming and require flooded suction. 6" g Q =nComrerttopsl,dlNdetry231 t.Iquld-Watersp.cfik gnwgy,.0 e 400 Spring Street •Royersford. PA 19468 USA T www.amtpump.Com ■ 888-amt-pump (268-7867) n Gorman -Rupp Company For use with nonflammable liquids corripabble with pump component mafirrh Viton- and Teflon' are registered trademarks of E I. Dupont . =-'Heavy Duty Centrifugal Pumps Pump Dimensional & Specification Data Voilage Fail Load 4 Stilt WI. Model Curve HP PH From ENC f860Hi Amps SUC• DIS' A" a•' C.. D•• E F" G J.. K L" W H Pa.) i 3136 1 56J 115230 22111 5.411314 59 [12.71 &51219J &5189J 25 [&4] 4.0 [10A 43I11.OJ 241621 13 [35] 17.4 [44A 10.6 (26.91 9b (24.41 78 3W- A 2 3 145JM IEFC 23N460 60 2 1 S4 6.1 (155I 3518.91 107 (2711 15 [&9] 25 [6.41 4.0 [1021 4A [114 2.7 (7.0] 13 (35) 19.2148.71 11A P-91 9.6124.41 84 3151 3 SW 2301460 63 5.4 j13AI 3.6 [9.11 &5 [21.81 35 M 25 [6.4) 4.0110.4 43 [11AJ 2A 1621 13 [351 16.9 [429] 10612691 99 [24.4] 71 ' 1 S&I 730 12 SA 1139) 50 [12.71 &6121.81 3-51&91 2.5 [&41 4.011021 43111DI 2.4164 13 P-9 179 KM 10.6 [26.91 9.6124.41 87 9 3 3 1821M /EFC 2307460 814 2 1 Vi 7.1 1180) 660681 10.9127.61 4 5 [11.41 25 [&4) 4.0 [7a2) 1.4111.31 3.71931 03 f0-9 20.01509] 12.8 [32-51 9.6124.41 137 Sibs 3 56J 2307460 814 5.4(139] 3519.11 8.5121.81 1 3.51&91 25[6.41 4.0[10.2) 4.301.0] 2,41621 1.313A 17.4144.21 10-a R6.9) 9.6124.41 75 315E 1 184JM 230 16 7.8 [199] 6.611621 10.8 (27.61 4.5 [11.4; 2.5 1&41 4.0 (10.2J 4A [1t3] 3.7195J 03 [0.9] 24.2161.41 139135.3) 16124.41 143 3152 C 5 3 184JM 76C 2307460 17/9 2 05 7.1118.0) 6.6(1691 10.8(276) 45111.41 25[6.41 4.0110A 4A[113J 3.719.9 03 IDS) 21.7[55.1] 128 r3" 16124.41 145 4M 1 213JM 230 32 9.0122-9 73118.71 12.3 PIAI 5211&31 2.7[?.&1 45111.41 4.7[121] 42[109] 0.21G71 27.01� 162[41.11 12.0IX4) 205 4M0 3 1849A 7ffC 23N460 22/11 3 3 7.0118.0] 6.6116.8) 11.6 (29.5] 4.5 [11.41 27 (7.4 45111.41 4.7 [121] 3.71951 1.0 P-61 225 [57.11 14.3 P6.31 12.0 [3(14) 172 42f6 1 215JM 230 40 9.01229) 6.211673 123PI.4] 5.2[I33) 27 f7cl 4.5(114) 4.7I121) 4.21108] 0.21G7J 27.0[68N 16.2(41.1) 120[30.4J 213 10 Tf 3 3 4ME 3 215AA 2301460 26/13 &1120.71 7.3[18.71 12.3[31.4) 520331 27[7.OJ 45111.4) 4JI1711 42110A 02 A71 26A I66AI 15.0 P6.11 12-0[30.4I 204 4M 1 230 32 9.0 [22.9] 73118.71 11.3 [28.91 52 (13.31 24 [6.21 3.819.71 4A I113J 421109J WA 26.0I66.o4 14.6 P7.11 11.1 128.11 196 F 1213JM iEFC 2 1 ls 4240 3 imm 2301460 22111 7.1118.01 65[1691 10.6177.01 4.5111.41 1 241&21 45[11A] 45[11.41 3.71951 0.1 [03J 21.5(54.61 126(320J 10.5P0.61 163 4M 1 215JM 230 40 9.0 (22.9) 551142) 11.5 [29.31 5.21134 27 VAl 4.711211 59 [12.9J 42110.81 0.3 [09] 26.1166.31 159 [40.4) IO9 [269] 217 4250 G t0 3 2151M 7FfC 230/460 26/13 3 2 8.1(20.71 7311&7) 11.5[29A 511133J 2717.11 /.7 (121] 5.01129J 42[10.8] 03 PA 252(64.01 14.7[37.3) 10.612&91 208 r251 H 15 3 215JM WC 2301460 4724 3 2 8.1 120.71 7.3118.7) 11.5 [29.31 5.2:1331 2717.1J 4.7 (121I 5.0 [12-9 4.21109J 03 P91 1ZS2 (649J 14.7 f373) 10.6 RUJ 218 q Standard NPT (Female) pipe thread. NOTF: Check Price Gook for Spectfic Pump Constr uctionMiaterial Availability. ') This dimension may vary due to motor manufacturer's specifications. KEidnwm Solids Handling Capacity, 1/4" DiaTrnetzr +) 3-Phase motors can also operate on 50 Hz. (This will change full load amps, service factor and RPIVI) NOTE: Dimensions are In Inches (centimeters) and have a tolerance of x 1/4". NOTE. Electric suoply for ALL motors must be within :10% of nameplate voltage rating (e.g. 230V ±10%= 207 to 253). f When Ordering, Add the Correct 1-9A1 Suffix to Model Number Indicating Material Selection 0: } XCI (-95) Cast Iron Construction with Buna-N Seals XB (-94) Cast Bronze Construction with Viton° Seals XSS (-98) Cast Stainless Steel Construction with Vrton• Seals (All Models Come Standard with Stainless Steel Impeller) w" -Wr Standard Features • Stainless Steel, Bronze and Cast Iron Construction • Buna-N or Viton Mechanical Seal and 0-ring, Depending on [Model • Optional Silicon Carbide Mechanical Seals Available • Stainless Steel Motor Shaft and Hardware • NEMA TEFC Single and Three Phase Motors. Depending on Model • Maximum Working Pressure 150 PSI • Maximum Temperature • Viton 200° F • Buna-N 180° F • Optional Seal Wash Port and Hose Available on All Models • Pedestal Version Models Available for Frame Models 145/182/184JM • Optional Mounting Base Available for 182/184/215 JM Frames . QSP - Quick Ship Pump for Many Models • Self-cleaning Stainless Steel Impeller • Solids Handling Design Hazardoi ? >: goof nr4stors available from stock ranging from 1 to 10 HP; CALL FOR QUOTA77ON & LEAD 71ME1 o Manufacturer of AMT & IPT Pumps . 400 Spring Street • Royersford, PA 19468 USA WWW.aMtpump.COM • 888-amt-pump (268-7867) The Gomwn-Rupp Campmy reserves the nght to dis-6-e my model of change epearratons at ary h m vithan a¢uning any A Gorman -Rupp Company 02012 Amerk=%MadOw and rod Company A8 rights reserved. kbRN1AH-RBPP 022C STE-16 ( — p`" - s1N3w3AOHdwl an... aro a31vj ! 8 Afg�w�itl � _m 1NVld MV41V3fll H31VM WMHNVI Zll!!d - s� �gpP g b R ``�:::.. •�' ` W Y' g Aimominv s�r+3liVi+mv3u NMOlAVB �6- t8f f fi Roue mntiux0� 0 IS. — -- Qp IQ �� h nt ' 0 16 -n W Iz: R 5� Wgg D p� '114 o L3Gai rWtl! e7.vnL•q] p t O U U-SqERVIC COMPANY Andrew Latiolais Mickie Service Company, Inc PO Box 55544 Houston, TX, 77255 www.i-nickieservice.com PHONE (713) 682-7454 FOR LEM Construction TO Kurt Roedel i COPYTO Tom Johnson Jessica Anttila 8991 January 9, 2023 VALID UNTIL April 9, 2023 at 8:00 AM LEM: BAWA (6)12x2 Tap, Change Order (1 A 6/23) (Revised to have 6 mobilizations (1) per tap) Assumptions & Exemptions Customer responsible for all - Excavation, Shoring, Trench Protection, Backfill, Site Restoration, Excavated Material Removal Customer to provide Permits, fees & applications - Accessible, OSHA compliant work area - Equipment/Operator to assist with installation - Concrete for thrust blocking 12 X 2 Full Service TS&V (Steel Pipe to be verified) (Per each) Provide labor, material to perform the TS&V - using the following: - Service saddle • 2" Ball Valve, threaded - AC, PVC, Cl, DI Pipe • Pipe is 12" Pipe 2,500.00 x6 15,000.00 Mobilization per each Per notes, will be (1) per trip. Delivery & Duration 200.00 x6 1,200.00 Mickie Service's price is based upon standard delivery times. In the event, expedited service is required to complete the scope of work, Mickie Service reserves the right to assess reasonable charges to cover incurred expenses for expedited sleeve cost etc. to arrive at the job site early. - If pipe is over-sized/undersized, please allow for a few days for Mickie Service to order the appropriate tapping sleeve. ❑ 3/4" Corp Typically for City of Houston (Optional) L) Sales Tax (if Tax Exempt/Resale Certificate not provided) Service & Price Guarantee Subtotal 16,200.00 50.00 x1 50.00 Not selected Not selected Options selected 0 of 2 Total including tax $16,200.00 Service Guarantee: Mickie Service will be present to install with appropriate materials within 24 - 48 hrs of request or will provide 10% price credit. Guarantee Available for - C900/905, DI, Cl, AC type water main - 6", 8",12",16" main. standard OD - 4", 6", 8", 12" tap - Greater Houston Area Pricing Guarantee: Mickie Service will match any legitimate written competitive proposal. Proposal Assumptions (A) Mickie Service may terminate the contract/obligation at anytime, in particular if crew does not believe that the tap can be made without risking damage to water main/material/equipment etc., or if conditions are unsafe to perform work (no charges apply in this case). (B) Mickie Service will use appropriately trained crews and well maintained equipment; however, we cannot guarantee coupon retrieval or that damage to the existing water main will not occur during standard tapping procedures (C) Customer is responsible for providing Mickie Service with type of material and size of pipe to be tapped, along with location/position of tap. (D) Customer to provide all equipment/labor necessary to get materials/equipment in/out/positioned in excavation (E) Mickie Service is not responsible if water line is not active, or wrong line is tapped, or tap position does not meet specifications, etc. (F) Customer is responsible for providing Mickie Service with accurate specification information regarding sleeve and valve. (e.g.) sleeve: MJ, SS, Epoxy/Steel and valve: open right/open left. (G) Work to be performed at mutually agreeable times. (H) Cost and responsibilities do not include: a. Engineering b. Excavation/Shoring/Traffic Control c. Thrust blocking, Valve Stack/A box, line tie-in d. De -watering e. Backfill, surface restoration f. Any permits or fees g. Scheduling Inspection h. Waiting time and/or training, safety, or other mandatory crew requirements Indemnification i) TO THE FULLEST EXTENT PERMITTED BY LAW MICKIE SERVICE'S TOTAL LIABILITY TO CLIENT AND ANYONE CLAIMING BY, THROUGH, OR UNDER CLIENT FOR ANY COST, LOSS, OR DAMAGES CAUSED IN PART BY THE NEGLIGENCE OF MICKIE SERVICE AND IN PART BY THE NEGLIGENCE OF CLIENT OR ANY OTHER NEGLIGENT ENTITY OR INDIVIDUAL, SHALL NOT EXCEED THE PERCENTAGE SHARE THAT MICKIE SERVICE NEGLIGENCE BEARS TO THE TOTAL NEGLIGENCE OF CLIENT, MICKIE SERVICE, AND ALL OTHER NEGLIGENT ENTITIES AND INDIVIDUALS. ii) MICKIE SERVICE SHALL NOT BE LIABLE FOR ANY INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES, WHETHER GROUNDED IN TORT (INCLUDING NEGLIGENCE), STRICT LIABILITY, OR CONTRACT, AND UNDER NO CIRCUMSTANCES WILL ITS LIABILITY EXCEED THE AGREEMENT PRICE FOR THE GOODS OR SERVICES UPON WHICH LIABILITY IS CLAIMED. ANY ACTION FOR BREACH OF CONTRACT MUST BE COMMENCED WITHIN ONE (1) YEAR AFTER THE CAUSE OF ACTION HAS ACCRUED. Sales Quote CORCOHEN Page: 1 INDUSTRIAL SUPPLY Sales Quote Number: 1083 CO. Phone:713-467-3300 Fax:0666.666-6660 Sales Quote Date: 11/3/2022 Sell To: LEM — BAWA Ship To: Houston Plant Quotes Ship Via Customer ID PQ Terms NET 30 SalesPerson JOB: LEM BAWA Lead Time: Engineer Name : Tag No. Quantity Unit Description Unit Price Total Price 0001 120 Feet 2" SCH 80 PVC PIPE PE 6.182 741.82 10 Each 2" PVC SCH80 90 ELL SOCxSOC 74.18 82.07 15 Each 2" RIGID IPS STRUT CLAMP 304SS 5A7 102.30 20 Feet 1-5/8" X 1-5/8" SOLID BACK-TO-BACK STRUT 12 5.12 1,458.00 GAUGE 304SS Total: 2,384.19 Please refer to the quotation number above to insure proper pricing. All sales are in U.S. Dollars. The estimated time to ship is based on information available to Cohen at the time of this quotation. (Cohen is not responsible for delays due to the availability of material.) FOB: Our yard in Houston or point of shipment. Prices are quoted firm for 30 days. Sales tax will be added unless the proper exempt certificates are submitted with the order. kroedel@lemconstruction.com From: Ronnie Scott <rscott@lemconstruction.com> Sent: Friday, February 17, 2023 10:37 AM To: Kurt Roedel Subject: Fwd: Single Phase Straight Centrifugal Pump Pump 4242-95. 18-20 business days Sent from my Wad Begin forwarded message: From: Michael Stricker <mstricker@zoneindustries.com> Date: February 17, 2023 at 9:25:28 AM CST To: rscott@lemconstruction.com Subject: RE: Single Phase Straight Centrifugal Pump Ron, Lead time below for the second pump option. Current estimated lead time on this item is 18-20 business days. Thanks, Michael Stricker ZONE INDUSTRIES 3303 Cypresswood Spring, TX 77388 0:713-783-8530 M: 713-882-9455 F: 713-783-1221 www.zone-ind.com mstricker@zoneindustries.com ZONE INDUSTRIES From: Michael Stricker Sent: Thursday, February 16, 2023 2:17 PM To: rscott@lemconstruction.com Subject: Single Phase Straight Centrifugal Pump Importance: High Ron, See pricing below for a couple of options. I'll confirm lead time for option 2 asap. Item #: 315A-95 List: $1,296.00 Net: $972.00 Current estimated lead time on this item is 28-30 business days. Item #: 4242-95 List: $3,035.00 Net: $2,276.00 Lead time to be advised Thanks, Michael Stricker ZONE INDUSTRIES 3303 Cypresswood Spring, TX 77388 O: 713-783-8530 M: 713-882-9455 F: 713-783-1221 www.zone-ind.com mstricker@zoneindustries.com ZONE INDUSTRIES PFEIFFER&SON, LTD. Electrical & Telecommunication Contractors CHANGE ORDER REQUEST BID DATE: March 1, 2023 TO: LEM Construction ATTN: Mr. Kurt Roedel PROJECT: Fritz Lanham Air Scour Booster Pump Addition We are pleased to offer for your consideration the below lump sum quotation for the electrical and controls construction of the Extra Work described below on the above referenced project. ELECTRIC POWER AND CONTROLS TO CONTRACTOR SUPPLIED BOOSTER PUMP According to our interpretation of the drawing and pump information provided to us we propose to furnish all material, labor, equipment, and supervision in a safe and skillful manner for the neat and workmanlike completion of that Extra Work for the below total price. Please carefully review the pricing, clarifications and exclusions provided below. ELECTRICAL...............................$6,220.00 To avoid confusion, we offer the following clarifications and exclusions: 1. The motor is NOT included. 2. We will provide one 2P 50A breaker in existing Panel LP-4A. Price is contingent upon this panel having available load capacity to handle the additional load. 3. We will provide one Size 2, 240V, NEMA I Combination Starter with on.- off selector switch. 4. We will provide 50' of flexible power cord with required pin and sleeve connectors for connection to motor provided by others. 5. Bonds are NOT included. 6. Sales taxes are NOT included. 7. Builder's Risk insurance covering our scope of work is not included, as this should be the General Contractor's responsibility, and therefore we assume no responsibility for theft or vandalism of installed material. Additional coverage specifically required by the contractor may necessitate additional premium charges 8. The above pricing is valid for 30 days. Thereafter the above pricing is subject to escalation. We appreciate this opportunity to quote on this project. If you have any questions or need additional clarifications, please call me at (281) 471-4222. Sincerely, PFEIFFER & SON, LTD. Mark Andey Office: (281) 471-4222 Fax: (281) 471-6856 www. V feifferandson.com If this Extra Work is accepted please complete the below and return the completed and signed change order request via email. Accepted by: _ __ ___ _ Date: Printed Name: Date: CONTRACTOR'S LICENSE # 18259 REGULATED BY THE TEXAS DEPARTMENT OF LICENSING AND REGULATION P.O. BOX 12157' AUSTIN, TX 78711 (800) 803-9202 • (512) 463-6599' w-,Ay.liccnsc.statc.tx.us.'compiaints TEXAS DEPARTMENT OF PUBLIC SAFETY SECURITY LICENSE B 17037 kroedel@lemconstruction.com From: Sent: To: Subject: 120 If 10 ea. 20 If. 15. ea. 6. ea. 1 ea. Ronnie Scott <rscott@lemconstruction.com> Wednesday, March 1, 2023 11:27 AM kroedel@lemconstruction.com Re: Change order for Pumps 4 & 5 2 " pipe pvc s/80 2"90 ell. PVC S/80 15/8. Un strut. SS 2" un strut clips. SS 2" x 20' flex hose. With connections. 4". Wall core by LEM Sent from my iPad $130.00 ea. price from white cap On Mar 1, 2023, at 11:10 AM, kroedel@lemconstruction.com wrote: Ron, How much 2 inch pipe will be needed for filters 4&5 and just 2 holes needed to be drilled? Trying to finish this today so I can get it turned in. Kurt Roedel LEM Construction Company, Inc. 10849 Kinghurst, Suite 150 Houston, TX 77099 Cell: 281-770-3614 Office: 281-495-9550 x115 Fax: 281-495-9995 LEMConstruction.com 1 D, 3 SAWA FILTERAIR SCOUR IMPROVEMENTS FILTERS 1 THRU 6 4 ■C3 FILTER >e 8 7 ® SAWA OPERATION DRAIN FILTER C 8 8 'Q LOCK/TAG OUT BACKWASH VALVE BAWA/LEM 8 ® LOCK/TAG OUT SETTLED WATER VALVE BAWA/LEM 10 5.1 LOCK/TAG OUT WASTE BACKWASH VALVE SAWA/LEM i tt E0 LOCK/TAG OUT SURFACE WASH VALVE SAWAILEM 12 oQ REMOVE EXISTING SURFACE WASH SYSTEM LEM 13 .© FILTER MEDIA REMOVAL/DISPOSAL LEWSMS 14 ■ CLEAN FILTER & UNDER DRAIN LEM 15 ® INSPECTION OF EXISTING UNDERDRAIN ARDURRA/BAWA/ROBERTS 18 ® PRELIMINARY DISTRIBUTION TEST UNDERDRAIN ARDURRA/BAWAIROBERTS 17 © INSTALLATION OF 3" THICK OF SAND 18 .© INSTALLATION OF AIR SCOURIGRID SYSTEM LEM/ROBERTS 19 TESTING OF AIR SCOUR/GRID SYSTEM ARDURRA/BAWA/ROBERTS/LEM 20 ® INSTALLATION OF SAND SYSTEM 9"THICK LEM/ROSERTS 21 BACKWASH OF SAND SAWAILEM/ROBERTS 22 0 REMOVE THE TOP 1" OF SAND CHECK FINAL DEPTH ARDURRA/BAWA/LEM/ROBERTS -Y3— INSTALLATION OF ANTHRACITE SYSTEM 18" THICK LEM/ROBERTS 24 BACKWASH OF ANTHRACITE,SAND GRAVEL SAWA/LEM/ROSERTS 25 REMOVE THE TOP 1" OF ANTHRACITE CHECK FINAL DEPTH ARDURRA/BAWA/LEM/ROSERTS 26 13 BACKWASH WITH NEW BACKWASH PROGRAM PRIMEfRAWA 27 E3 DISINFECTION OF FILTER 3 PLACE INTO SERVICE SAWA - — Task Split ........ Project: SAWA FILTER REPLACEMENT FILTER 0 8 3.9.23 Progress +ra■w�w+raw Date: Mon 3/1323 Milestone Summaryv3 i Page 1 -- 140 days Toe 1/323 Wed 16 days Fri 3/17/23 Thu 1 day? Fri 3/17/23 Fri 3/1723I 1 day? Fri 3117123 Fri 3/17231 1 day? Fn 311723 Fri 3/1723 1 day? Fri 311723 Fri 311723 1 day? Fri 311723 Fri 3117123 1 day Sat 311823 Sat 3/1823 3 days Mon 3/2023 Wed 3122123 1 day? Wed 32223 Wed 3/=3 1 day? Thu 3123123 Thu 32323 1 day? Thu 32323 Thu 32323 1 day? Thu 3/2323 Thu 32323 3 days Fri 312423 Tue 32823 1 day? Wed 32923 Wed 3/2923 1 day? Wed 32923 Wed 312923 1 day? Wed 32923 Wed 3/29/23 1 day? Wed 32923 Wed 3/2923 1 day? Thu 3/30/23 Thu 3/3023 1 day? Thu 3/30123 Thu 33023 1 day? Thu 3/3023 Thu 313023 1 day? Fri 3/3123 Fn 33123 4 days Mon 4323 Thu 4/8/23' Project Summary External Tasks External Milestone 0 Deadline t3 10 — Task Name - - - 2 3 0 BAWA FILTERAIR SCOUR IMPROVEMENTS FILTERS 1 THRU 8 4 5 0 FILTER # 6 6 7 0 BAWA OPERATION DRAIN FILTER # 6 8 © LOCK/rAG OUT BACKWASH VALVE BAWA/LEM 9 nQ LOCK/TAG OUT SETTLED WATER VALVE SAWA/LEM 10 © LOCKrrAG OUT WASTE BACKWASH VALVE SAWAILEM 11 E3 LOCK/TAG OUT SURFACE WASH VALVE BAWA/LEM 12 71 REMOVE EXISTING SURFACE WASH SYSTEM LEM 13 [3 FILTER MEDIA REMOVAUDISPOSAL LEWSMS 14 © CLEAN FILTER 8 UNDER DRAIN LEM 15 ,L-33 INSPECTION OF EXISTING UNDERDRAIN AROURWLBAWAIROSERTS 16 I1-04 PRELIMINARY DISTRIBUTION TEST UNDERDRAIN ARDURRA/BAWA/ROBERTS 17 - INSTALLATION OF 3" THICK OF SAND LEM T8 ice. INSTALLATION OF AIR SCOUR/GRID SYSTEM LEM/ROBERTS 19 TESTING OF AIR SCOURIGRID SYSTEM ARDURRA/BAWA/ROSERTS/LEM 20 E3 INSTALLATION OF SAND SYSTEM 9-THICK LEWROBERTS 21 IE3 BACKWASH OF SAND BAWA/LEM/ROBERTS 22 Ej REMOVE THE TOP V OF SAND CHECK FINAL DEPTH ARDURRA/BAWA/LEM/ROBERTS 23 INSTALLATION OF ANTHRACITE SYSTEM 18 THICK LEWROBERTS 24 BACKWASH OF ANTHRACITE,SAND GRAVEL BAWA/LEM/ROBERTS 25 REMOVE THE TOP 1' OF ANTHRACITE CHECK FINAL DEPTH ARDURRABAWA/LEM/ROBERTS 25 r4 BACKWASH WITH NEW BACKWASH PROGRAM PRIME/BAWA DISINFECTION OF FILTER & PLACE INTO SERVICE BAWA Protect BAWA FILTER REPLACEMENT FILTER # 6 3.13.23 Date: Mon 311323 Task Split Progress Milestone Summary Page 1 Duration Start Finish Apr 2 '23 S S M 140 days Tue 1/3/23 Tue 16 days Fn 41723 Thu 42723 1 day? Fn 41723 Fri 4f7/23 1 day? Fn 4/723 Fn 4/723 1 day? Fri 41723 Fri 417/23 1 day? Fn 4f723 Fri 41723 1 day? Fn 4/723 Fri 4!7/23 1 day Sat 4/823 Sat 4/823 3 days Mon 4/1023 Wed 4/1223 1 day? Wed 4112/23 Wed 4/1223 1 day? Thu 4/1323 Thu 4/1323 1 day? Thu 4/1323 Thu 4/1323 1 day7 Thu 411323 Thu 411323 3 days Fri 411423 Tue 4/1823 1 day Wed 411923 Wed 4/1923 1 day? Wed 4/1923 Wed 411923 1 day? Wed 4/1923 Wed 4/1923 1 day? Wed 4119123 Wed 4119/23 1 day? Thu 4120 23 Thu 420/23 1 day? Thu 42023 Thu 42023 1 day? Thu 42023 Thu 420/23 1day? Fri42123 Fri42123 4 days Mon 412423 Thu 427123 Pro/eGSummary External Tasks ® External Milestone 0 O Deadline L